agile CO1
Analyze the software development cycle in detail CO1
Explain Capability Maturity Model (CMM) CO1
Illustrate agile Process ?What are the Advantages of the agile model? CO1
Compare Waterfall model and Spiral model of Software development. CO1
What is an Agile Process? Explain any one Agile Process model with its
CO1
advantages and disadvantages?
Distinguish between any 3 Software development models ? CO1
Describe Scenario Based model with example. CO2
Analyze Class Based Model and sketch class diagram for Banking System. CO2
Analyse the different functions of Food Ordering System and sketch DFD(upto
CO2
2 level) for same.
Sketch State Transition Diagram for ATM System and Explain Behavioural
CO2
based modelin detail.
Justify How to write Software Requirment Specification Document of any real
CO2
time example
Describe Feasibility Analysis in detail and what is the need of Feasibility
CO2
Analysis
Explain Different factors of Cost and what is Cost and Benefit Analysis and
CO2
the steps for determination of cost and benefit
Consider a project having 50,00 lines of code in an embedded software with
critical area hence reliability is high. Calculate the following
(1) Estimation CO3
(2) Development
(3) Average Staffing
Diffrenciate between COCOMO and COCOMO II model. CO3
Calculate the Critical path for the following data :-
Activity → Time
1-2 → 4
1-3 → 1
1-4 → 1
3-4 → 1
3-5 → 6
CO3
4-9 → 5
5-6 → 4
5-7 → 8
6-8 → 1
7-8 → 2
8-10 → 5
9-10 → 7
Explain the Fish-bone diagram with an example and steps. CO3
Consider a software project using semi-detached mode with 30,000 lines of
code. Calculate the following for this project:
(1) Effort estimation
(2) Duration estimation CO3
(3) Person Estimation
(4) Average Staff Size
(5) Productivity
Analyse the various types of Timeline Charts CO3
Analyze the need for Software project scheduling & explain the various
CO3
principles of Software Project Scheduling in detail.