The document outlines a 6-week proof of concept program for migrating data centers to Azure using a 'Lift and Shift' approach. It details the phases of discovery, assessment, planning, and migration, including specific tasks and deliverables for each week. The engagement plan emphasizes the importance of security, compliance, and user acceptance testing throughout the migration process.

Uploaded by

GC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views2 pages

6-Week Proof of Concept

The document outlines a 6-week proof of concept program for migrating data centers to Azure using a 'Lift and Shift' approach. It details the phases of discovery, assessment, planning, and migration, including specific tasks and deliverables for each week. The engagement plan emphasizes the importance of security, compliance, and user acceptance testing throughout the migration process.

Uploaded by

GC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Data Center Migration (Lift and Shift) to Azure:

6-Week Proof of Concept

Nous Data Center Migration (Lift and Shift) to Azure program will
demonstrate the benefits of migrating selected workloads to
Azure Virtual Machines (VM). It will enable your organization’s
modernization to Azure cloud via assessment, plan, and blueprint
helping ensure a successful migration to the cloud.

Solution Overview

VMware, Hyper-V, Physical Machines, and Other Public Clouds

Prep Phase Build Phase

Discovery Assessment Build and Validation Migration

1 2 4 5

Planning Post Migration


Azure Migrate
Database Migration Assistant
SQL Server Migration Assistant
Microsoft Assessment Planning

3 Transition 6
Continuous Continuous

Cost Optimization and Right Sizing


Engagement Plan

Week 1 Week 2 Week 3-4

Migration Scope and Success Criteria Migration Planning and Azure Environment Setup
Infrastructure Discovery Implementation Roadmap Setup/Build Connectivity
Application Discovery Backup and DisasterRecovery Setup Firewall and Security Infra
Architecture
Security and Compliances Prepare Automation Templates
Requirments Failover and Failback Process
Review: Build Infrastructure,
On-premise Connectivity: Cloud Automation Template Design Components, Compliance, Best
VPN/Expressroute Data Sync and Replication Process Practices Implementation
Infrastructure Assessment Review Migration Plan Infrastructure Testing: Components,
Connectivity, Security and DR
Application Assessment
Define/Plan Strategy for Workload
Discovery - Assessment Reports
Migration to Azure
Requirements Review Meeting - Client
Prepare Runbooks

Week 5 Week 6

Piloting Prepare Transition Plan

Full Migration of Workload Review Standard Operating


Procedures with Customer
Data Synchronization and Replication
Knowledge Transfer to
Setup Backup Process
Customer Team
Failover and Failback Testing with
Post Implementation Training
Production and Azure DR
and Support
Environment

User Acceptance Testing

Deliverables
Assessment Report, Roadmap, and Cut-over planning, Azure workloads, DR
TCO analysis subsystem, and Validation Reports

Solution Architecture, Design, and Standard Operating Procedure Runbooks,


Execution Plan Training, and Transition

POC Implementation and Automation Validation and Verification

USA USA CANADA GERMANY UK INDIA


California New Jersey Toronto Mainz Brentford Bangalore
Tel: +1 925 425 7325 Tel: +1 732 985 9533 Tel: +1 905 402 9943 Tel: +49 6131 28910 31 Tel: +44 208 587 1411 Tel: +91 80 41939400

nousinfo.com
testree.com [email protected] @nousinfosystems company/nous-infosystems
vserve247.com

All product names, logos, brands, trademarks, and registered trademarks are properties of their respective owners and are for identification purposes only and do not imply endorsement.

SOFTWARE SOLUTIONS | INDEPENDENT TESTING | REMOTE INFRASTRUCTURE MANAGEMENT © 2020 All Rights Reserved.

You might also like