POUR-08 RAFT POURING

( Resource Details - Concrete Pouring Plan )

DATE:
Work Force Strength REMARKS
Staffs Near Static Pump/bucket loading area
QC Staff (At Concrete Check Point) 2 No
QC Technician 2 No
Staff at Raft
Area Incharge 1 No
Site Execution Engineer 2 No
QC Staff 2 Nos
Surveyor 1 No
Supervisors 3 No
Electrician 1 Nos
Safety Officer 1 Nos
Machineries:
Tower Crane No
Power float 5 Nos
Vibrator 6 Nos
BOBCAT/DUMPER Nos
Mobile Pump Nos
Static Pump Nos
Transit mixers No
Labour:
Mason 12 Nos
Mason Helper 12 Nos
Steel Fitter 2 Nos
Unskilled workers Nos
Supervisors (Sub vendor) Nos
Carpentor 2 Nos
Total Workers 54 Nos