Assembly Scrap
Assembly Scrap
com/
1. Assembly Scrap.
2. Component Scrap
3. Operation Scrap.
Assembly Scrap
During Production there will be some loss always due to various reasons and due to this we will get less
output than the planned one…for example if planned to produce a qty of 100 KG we may get around
99.5 KG as the final output or yield. Now to get the actual output as the planned one we need to increase
the planned qty by some percentage so that we will get the output as per the expectation. For this we
use Assembly Scrap…
Assembly scrap increases the order quantity of the header material and subsequently increases the
order quantity for corresponding components. The dependent requirements of the material
components are therefore increased correspondingly.
Settings : You have to maintain the assembly scrap in the material master (MRP view) as a percentage
in the Assembly scrap field for the assembly header material.
Flow :
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
1
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
2
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
3
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
4
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
5
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
6
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
7
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
8
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
9
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
10
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
11
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
12
Mickael QUESNOT © https://s4hclub.com/
Maintain 5% as the assembly scrap in the MRP1 view in material master for the header material…
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
13
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
14
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
15
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
16
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
17
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
18
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
19
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
20
Mickael QUESNOT © https://s4hclub.com/
Now go to components overview… you can observe components qty’s are also increased by 5%
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
21
Mickael QUESNOT © https://s4hclub.com/
Component Scrap
Sometimes a particular component always consumed more during a production process than the
planned one. component scrap only applies to one component. Component scrap increases the
dependent requirements quantity of the component.
Settings:
– You can enter values for calculating component scrap in the material master or the BOM in the BOM
on the Item Detail Screen General Data (data block for quantity data). This component scrap is only
relevant for the individual BOM.
– In the material master (view MRP 4) in the Component scrap field. This component scrap is relevant
for all BOMs.
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
22
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
23
Mickael QUESNOT © https://s4hclub.com/
-The component scrap quantity maintained for a material component in the BOM has the higher
priority.
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
24
Mickael QUESNOT © https://s4hclub.com/
Flow :
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
25
Mickael QUESNOT © https://s4hclub.com/
Maintain 7% as component scrap in in the BOM item details for the component 79 as shown below…..
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
26
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
27
Mickael QUESNOT © https://s4hclub.com/
Now go to component overview in the process order and you can observe that only qty of component
79 is increased by 7%
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
28
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
29
Mickael QUESNOT © https://s4hclub.com/
You can maintain the component scrap in material master MRP4 view of the component 79 as shown
below….
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
30
Mickael QUESNOT © https://s4hclub.com/
Operation Scrap
During Production process after a particular operation, you may get some loss. Now you need to adjust
the qty, standard values and other values of the subsequent operations. For this Operation scrap is used
in production.
Settings :
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
31
Mickael QUESNOT © https://s4hclub.com/
You can enter operation scrap (in %) in the routing and in the BOM.
The operation scrap entered in the routing refers to the activity quantity consumed, while the operation
scrap entered in the BOM refers to the material quantity used. In this case, the net indicator must be
turned on.
Flow :
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
32
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
33
Mickael QUESNOT © https://s4hclub.com/
Maintain 20% as operation scrap in the operation details of the operation 1 as shown below….
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
34
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
35
Mickael QUESNOT © https://s4hclub.com/
Now create Production order for header material with order qty 100 KG
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
36
Mickael QUESNOT © https://s4hclub.com/
MICKAEL QUESNOT🎯🇪🇺 ©
Directeur BU SAP SCM & CONCUR
37
Mickael QUESNOT © https://s4hclub.com/
Scroll to right…..you will be able to see operation qty of second operation and third operations are
reduced by 20%…