0% found this document useful (0 votes)
2 views9 pages

Laporan Statistik Sosial

The document presents statistical analyses including validity and reliability tests, normality, multicollinearity, heteroscedasticity, linearity, and autocorrelation tests. It shows that the correlation between work performance and compensation level is weak, with a Pearson correlation of 0.092 and a significance level of 0.698. The regression analysis indicates that work performance does not significantly predict compensation level, as evidenced by an R-squared value of 0.009.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views9 pages

Laporan Statistik Sosial

The document presents statistical analyses including validity and reliability tests, normality, multicollinearity, heteroscedasticity, linearity, and autocorrelation tests. It shows that the correlation between work performance and compensation level is weak, with a Pearson correlation of 0.092 and a significance level of 0.698. The regression analysis indicates that work performance does not significantly predict compensation level, as evidenced by an R-squared value of 0.009.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

STATISTIK SOSIAL

A. UJI VALIDITAS DAN RELIABILITAS


1. UJI VALIDITAS

Correlations

Correlations

PRESTASI TINGKAT
KERJA KOMPENSASI

PRESTASI KERJA Pearson Correlation 1 ,092

Sig. (2-tailed) ,698

N 20 20
TINGKAT KOMPENSASI Pearson Correlation ,092 1

Sig. (2-tailed) ,698

N 20 20

2. UJI RELIABILITAS
Reliability

Scale: ALL VARIABLES


Case Processing Summary

N %

Cases Valid 20 100,0

Excludeda 0 ,0

Total 20 100,0

Reliability Statistics

Cronbach's
Alpha N of Items

,169 2

B. UJI ASUMSI KLASIK


1. UJI NORMAL
Regression
Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 PRESTASI
. Enter
KERJAb

Model Summaryb

Adjusted R Std. Error of the


Model R R Square Square Estimate

1 ,092a ,009 -,047 2,008

ANOVAa

Model Sum of Squares df Mean Square F Sig.

1 Regression ,625 1 ,625 ,155 ,698b

Residual 72,575 18 4,032

Total 73,200 19

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients

Model B Std. Error Beta t Sig.

1 (Constant) 20,121 5,299 3,797 ,001

PRESTASI KERJA ,087 ,220 ,092 ,394 ,698

Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value 21,77 22,46 22,20 ,181 20

Residual -3,378 3,796 ,000 1,954 20

Std. Predicted Value -2,369 1,460 ,000 1,000 20

Std. Residual -1,682 1,890 ,000 ,973 20

Descriptives
Descriptive Statistics

Minimu Maximu Std.


N m m Mean Deviation Skewness Kurtosis

Std. Std.
Statistic Statistic Statistic Statistic Statistic Statistic Error Statistic Error

Unstandardized - ,000000
20 3,79566 1,95441531 -,296 ,512 -,499 ,992
Residual 3,37794 0
Valid N (listwise) 20

2. UJI MULTIKOLINEARITAS
Regression
Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 PRESTASI
. Enter
KERJAb

Model Summaryb

Adjusted R Std. Error of


Model R R Square Square the Estimate

1 ,092a ,009 -,047 2,008

ANOVAa

Sum of
Model Squares df Mean Square F Sig.

1 Regression ,625 1 ,625 ,155 ,698b

Residual 72,575 18 4,032

Total 73,200 19

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

1 (Constant) 20,121 5,299 3,797 ,001

PRESTASI
,087 ,220 ,092 ,394 ,698 1,000 1,000
KERJA
Collinearity Diagnosticsa

Variance Proportions

PRESTASI
Model Dimension Eigenvalue Condition Index (Constant) KERJA

1 1 1,996 1,000 ,00 ,00

2 ,004 23,563 1,00 1,00

Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value 21,77 22,46 22,20 ,181 20


Residual -3,378 3,796 ,000 1,954 20
Std. Predicted Value -2,369 1,460 ,000 1,000 20
Std. Residual -1,682 1,890 ,000 ,973 20

3. UJI HETEROKEDASTISITAS
COMPUTE Abresid=ABS(RES_1). EXECUTE.

Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 TINGKAT
KOMPENSASI,
. Enter
PRESTASI
KERJAb

Model Summarya

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients

Model B Std. Error Beta t Sig.

1 (Constant) ,823 3,799 ,217 ,831

PRESTASI KERJA ,147 ,118 ,284 1,241 ,231

TINGKAT KOMPENSASI -,124 ,126 -,225 -,984 ,339

Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value ,7613 2,2845 1,5870 ,37343 20


Residual -1,47475 2,67229 ,00000 1,01451 20

Std. Predicted Value -2,211 1,868 ,000 1,000 20

Std. Residual -1,375 2,492 ,000 ,946 20

4. UJI LINEARITAS
Means
Case Processing Summary

Cases

Included Excluded Total

N Percent N Percent N Percent

PRESTASI KERJA *
20 100,0% 0 0,0% 20 100,0%
TINGKAT KOMPENSASI

Report
PRESTASI KERJA

TINGKAT KOMPENSASI Mean N Std. Deviation

19 24,33 3 2,082
20 25,00 1 .
21 23,33 3 2,082
22 23,33 3 1,528
23 22,00 4 2,449
24 25,80 5 1,304
26 24,00 1 .
Total 23,95 20 2,089

ANOVA Table

Sum of Mean
Squares df Square F Sig.

PRESTASI KERJA * Between (Combined) 36,150 6 6,025 1,674 ,205


TINGKAT Groups Linearity ,708 1 ,708 ,197 ,665
KOMPENSASI Deviation from
35,442 5 7,088 1,969 ,151
Linearity

Within Groups 46,800 13 3,600

Total 82,950 19

Measures of Association
R R Squared Eta Eta Squared

PRESTASI KERJA * TINGKAT


,092 ,009 ,660 ,436
KOMPENSASI

5. UJI AUTOKORELASI (BILA DATANYA TIME SERIES)


Regression
Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 TINGKAT
KOMPENSASI,
. Enter
PRESTASI
KERJAb

Model Summaryb

Model Durbin-Watson

1 1,518a

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients

Model B Std. Error Beta t Sig.

1 (Constant) ,823 3,799 ,217 ,831

PRESTASI KERJA ,147 ,118 ,284 1,241 ,231

TINGKAT KOMPENSASI -,124 ,126 -,225 -,984 ,339

Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value ,7613 2,2845 1,5870 ,37343 20

Residual -1,47475 2,67229 ,00000 1,01451 20

Std. Predicted Value -2,211 1,868 ,000 1,000 20

Std. Residual -1,375 2,492 ,000 ,946 20

C. REGRESI DAN UJI HIPOTESIS


1. REGRESI LINEAR SEDERHANA
Regression
Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 PRESTASI
. Enter
KERJAb

Model Summaryb

Change Statistics

R Square
Model Change F Change df1 df2 Sig. F Change Durbin-Watson

1 ,009a ,155 1 18 ,698 1,261

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients

Model B Std. Error Beta t Sig.

1 (Constant) 20,121 5,299 3,797 ,001

PRESTASI KERJA ,087 ,220 ,092 ,394 ,698

Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value 21,77 22,46 22,20 ,181 20


Residual -3,378 3,796 ,000 1,954 20
Std. Predicted Value -2,369 1,460 ,000 1,000 20
Std. Residual -1,682 1,890 ,000 ,973 20

2. REGRESI LINEAR BERGANDA


Regression
Descriptive Statistics

Mean Std. Deviation N

TINGKAT KOMPENSASI 22,20 1,963 20


PRESTASI KERJA 23,95 2,089 20

Correlations

TINGKAT PRESTASI
KOMPENSASI KERJA

Pearson Correlation TINGKAT KOMPENSASI 1,000 ,092

PRESTASI KERJA ,092 1,000


Sig. (1-tailed) TINGKAT KOMPENSASI . ,349
PRESTASI KERJA ,349 .
N TINGKAT KOMPENSASI 20 20

PRESTASI KERJA 20 20

Variables
Entered/Removeda

Variab Variab
M les les
od Entere Remo Met
el d ved hod

1 PRES
TASI Ent
.
KERJ er
Ab

Model Summaryb

Change Statistics

Std. R
Adjust Error Squar Durbin
M R ed R of the e F Sig. F -
od Squ Squar Estim Chang Cha Chang Watso
el R are e ate e nge df1 df2 e n

1 ,09
,009 -,047 2,008 ,009 ,155 1 18 ,698 1,261
2a

ANOVAa

Sum of Mean
Model Squares df Square F Sig.

1 Regressi
,625 1 ,625 ,155 ,698b
on

Residual 72,575 18 4,032

Total 73,200 19

Coefficientsa

Model Unstandardized Standardiz t Sig. Correlations Collinearity


Coefficients ed Statistics
Coefficient
s
Zero- Toleran
B Std. Error Beta order Partial Part ce VIF

1 (Constant) 20,121 5,299 3,797 ,001

PRESTASI
,087 ,220 ,092 ,394 ,698 ,092 ,092 ,092 1,000 1,000
KERJA

Collinearity Diagnosticsa

Variance Proportions

Model Dimension Eigenvalue Condition Index (Constant) PRESTASI KERJA

1 1 1,996 1,000 ,00 ,00

2 ,004 23,563 1,00 1,00

Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value 21,77 22,46 22,20 ,181 20


Residual -3,378 3,796 ,000 1,954 20
Std. Predicted Value -2,369 1,460 ,000 1,000 20
Std. Residual -1,682 1,890 ,000 ,973 20

3. UJI (PENGUJIAN HIPOTESIS PARSIAL)


4. UJI SECARA SIUMULTAN (UJI F)

You might also like