0% found this document useful (0 votes)
7 views4 pages

enviro_install_pages-V17

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 4

l

a
m

j
j j c
enviro
d
Openable h c
Window
M
Door h P
f k g
d
c h
b c

T Flue Terminal Indicates areas for flue terminals

Minimum clearances required for balanced flue terminals or the flue terminals of outdoor appliances
enviro 17

Quick Step Installation Manual


1
(according to AS5601-2004[AGA gas installation code] or NZS 5261 [New Zealand]
12
Do...
a Bellow eaves, balconies or other projections 300 mm j Horizontally from an openable window, door, or non-mechanical
b From the ground or above a balcony 300 mm air inlet, or any other opening into a building, with the exception of
Quick Step Installation Manual

3 2
c From a return wall or external corner 500 mm sub-floor ventilations 500 mm
4 1
d From a gas meter (M)3 1000 mm k Vertically below an openable widow, door,or non-mechanical
e From an electricaity
4 meter or fuse
2 box (P) 500 mm air inlet, or any other opening into a building, with the exception of
f From a drain or soil pipe 3
150 mm sub-floor ventilation 150 mm
g Horizontal from an building
4 structure 500 mm l Minimum horizontal clearance to any surface
h From any other flue terminal, cowl or combustion air intake 500 mm (such as an exterior wall) for vertical terminations 610 mm
m Minimum height above roof line for vertical termination 600 mm

Using your flexible flue pipe Configure triangle


The Enviro’s revolutionary flue system incorporates one
65mm diameter pipe and one 58mm diameter pipe. Using up to three bends, use this triangle to
4m
work out measurements for your 4.5 mtr
Do...

2
Use 3 bends only
Our flexible flue has the ability to bend
3 times between the heating unit and
✔ Example 1
flue. Remember, the first bend out of the
Heater is counted as one. The Enviro
can be flued through the roof, wall
3 the cowl. This includes the bend or floor. *See your Heatmaster
straight out of the heater if you’re 3m
1 fluing through the ceiling or floor. dealer for full details.

Do... Make the flue pipe go over


the bearers and joists. ✔
You may bend the flue over joists and bearers.
2m

It is recommended that a 20mm clearance be


maintained between the smaller gas exhaust Example 2
flue and combustible materials.

enviro

1m
Never Do... Fluing where the pipe had a spot
lower than the rest.
Never allow a low spot in the flue.
Installing the flue with a dip or “goose Example 3
neck” can result in reduced efficiency or
even prevent the fire from working.
0m

1m

2m

3m

4m

A 20mm clearance is recommended from the extraction (smaller) flue to combustibles.

Key Information – Quick step check list


Plumber Incoming gas connection provided – 1/2 inch BSP male connector Page 2
Gas input – 42MJ high Page 2
32MJ low
Manifold pressure Manifold pressure is factory set.
High (Nat gas) 0.69 Kpa To check pressure and adjust
Low (Nat gas) 0.45 Kpa refer to page 8 of the customer
High (LPG) 2.25 KPA Low operation information & Installation
(LPG) 1.38 KPA instructions.
Electrician Standard flex 2m, 3 pin plug provided. Requires power point with Page 2
double pole isolation switch.
Appliance must be tested for correct operation prior to leaving - minimum 20 minutes.
If appilance cannot be adjusted to preform correctly contact Heatmaster prior to leaving.

Addition literature
www.heatmaster.com.au
Supplements for flue installation and heat transfer can be obtained by contacting your Heatmaster dealer.

4 *All information contained in this mini summary is correct at the time of publication. This is only a summary and should be read in conjunction with the full installation
instructions. Pictures are representative only and are not drawn to scale. Installation should be carried out by a licensed gas fitter and any electrical work carried out by a
licensed electrician.
For inbuilt installation (into a wall)
3
With it’s revolutionary design, the Enviro can be mounted at any height on the wall. You can choose to install the
Enviro at ground level with standard fascia or further up the wall with extended fascia.
enviro

Firebox dimensions Resting on the heath Further up the wall


Extended facsia
If mounting the Enviro

recommended that a
non combustible hearth
be used for a minimum

Standard facsia
Quick Step Installation Manual

Standard

Extended
Attaching the fascia
ø65
ø58

Optional freestanding casing While attaching the facsia is straight forward, it is


180 153
109
important that it remains vertical all the time to make
When using the freestanding
56
sure the top and bottom clip in by way of clips at both
Extended Facsia 331 43 casing, simply centre unit within the top and bottom. (Before fascia can be removed,
453
the casing and attach 440
1080 door must be unscrewed and removed)
fascia (as outlined)

1
200

STEP
Back vi ew in mm 440

Remove all
1 – Electrical power four screws
cable (Requires 733
isolation switch)
Minimum framing dimensions
2 – Incoming gas
Move fascia forward
1 connection (1/2” BSP
Male connector)

Keep vertical
PLAN VIEW

2
2 3 – Extraction fan

Quick Step Installation Manual


4 – Incoming air

STEP
580
3
4

550mm
required depth
Gas imput
High 42 MJ/h Low 32 MJ/h
p
ntrol on bottom left
960mm Note: Clip in manual de of fascia fascia clips slip
required opening width control on bottom left down over heat box lip
Rear View

3
side of fascia fascia clips slip
down over heat box lip

STEP
g
g
A C

Front
D w all

enviro
STEP
150
690mm 180
required set the Enviro
height firebo x to your
B desired heigh t • Casing H 733 x D 580 x W1080mm
A • 200mm dia cut out in top of casing to allow for decorative fascia clips slip
down over heat box lip
rigid flue (to hide flexi exhaust and air intake) on the bottom lip also.
B – Your choice of pebbles, coals or logs placed into the
• Air holes in the back top of casing for air ventilation
ELEVATION VIEW
* C and D are only applicable if installing under bench • Provisional holes for both gas line and power cord in rear of
top and or into Joinery. casing

2
C – Minimum enclosure height from top of box = 300mm
D – 1 Inlet and 1 outlet ventilation with a cross sectional
Access panel advised for servicing if required
area of 5000mm for each.
For inbuilt installation (into a wall)
3
With it’s revolutionary design, the Enviro can be mounted at any height on the wall. You can choose to install the
Enviro at ground level with standard fascia or further up the wall with extended fascia.
enviro

Firebox dimensions Resting on the heath Further up the wall


Extended facsia
If mounting the Enviro

recommended that a
non combustible hearth
be used for a minimum

Standard facsia
Quick Step Installation Manual

Standard

Extended
Attaching the fascia
ø65
ø58

Optional freestanding casing While attaching the facsia is straight forward, it is


180 153
109
important that it remains vertical all the time to make
When using the freestanding
56
sure the top and bottom clip in by way of clips at both
Extended Facsia 331 43 casing, simply centre unit within the top and bottom. (Before fascia can be removed,
453
the casing and attach 440
1080 door must be unscrewed and removed)
fascia (as outlined)

1
200

STEP
Back vi ew in mm 440

Remove all
1 – Electrical power four screws
cable (Requires 733
isolation switch)
Minimum framing dimensions
2 – Incoming gas
Move fascia forward
1 connection (1/2” BSP
Male connector)

Keep vertical
PLAN VIEW

2
2 3 – Extraction fan

Quick Step Installation Manual


4 – Incoming air

STEP
550
3
4

550mm
required depth
Gas imput
High 42 MJ/h Low 32 MJ/h
p
ntrol on bottom left
960mm Note: Clip in manual de of fascia fascia clips slip
required opening width control on bottom left down over heat box lip
Rear View

3
side of fascia fascia clips slip
down over heat box lip

STEP
A C

Front
D w all

enviro
STEP
150
690mm 180
required set the Enviro
height firebo x to your
B desired heigh t • Casing H 733 x D 580 x W1080mm
A • 200mm dia cut out in top of casing to allow for decorative fascia clips slip
down over heat box lip
rigid flue (to hide flexi exhaust and air intake) on the bottom lip also.
B – Your choice of pebbles, coals or logs placed into the
• Air holes in the back top of casing for air ventilation
ELEVATION VIEW
* C and D are only applicable if installing under bench • Provisional holes for both gas line and power cord in rear of
top and or into Joinery. casing

2
C – Minimum enclosure height from top of box = 300mm
D – 1 Inlet and 1 outlet ventilation with a cross sectional
area of 5000mm for each.
l
a
m

j
j j c
enviro
d
Openable h c
Window
M
Door h P
f k g
d
c h
b c

T Flue Terminal Indicates areas for flue terminals

Minimum clearances required for balanced flue terminals or the flue terminals of outdoor appliances
enviro 17

Quick Step Installation Manual


1
(according to AS5601-2004[AGA gas installation code] or NZS 5261 [New Zealand]
12
Do...
a Bellow eaves, balconies or other projections 300 mm j Horizontally from an openable window, door, or non-mechanical
b From the ground or above a balcony 300 mm air inlet, or any other opening into a building, with the exception of
Quick Step Installation Manual

3 2
c From a return wall or external corner 500 mm sub-floor ventilations 500 mm
4 1
d From a gas meter (M)3 1000 mm k Vertically below an openable widow, door,or non-mechanical
e From an electricaity
4 meter or fuse
2 box (P) 500 mm air inlet, or any other opening into a building, with the exception of
f From a drain or soil pipe 3
150 mm sub-floor ventilation 150 mm
g Horizontal from an building
4 structure 500 mm l Minimum horizontal clearance to any surface
h From any other flue terminal, cowl or combustion air intake 500 mm (such as an exterior wall) for vertical terminations 610 mm
m Minimum height above roof line for vertical termination 600 mm

Using your flexible flue pipe Configure triangle


The Enviro’s revolutionary flue system incorporates one
65mm diameter pipe and one 58mm diameter pipe. Using up to three bends, use this triangle to
4m
work out measurements for your 4.5 mtr
Do...

2
Use 3 bends only
Our flexible flue has the ability to bend
3 times between the heating unit and
✔ Example 1
flue. Remember, the first bend out of the
Heater is counted as one. The Enviro
can be flued through the roof, wall
3 the cowl. This includes the bend or floor. *See your Heatmaster
straight out of the heater if you’re 3m
1 fluing through the ceiling or floor. dealer for full details.

Do... Make the flue pipe go over


the bearers and joists. ✔
You may bend the flue over joists and bearers.
2m

It is recommended that a 20mm clearance be


maintained between the smaller gas exhaust Example 2
flue and combustible materials.

enviro

1m
Never Do... Fluing where the pipe had a spot
lower than the rest.
Never allow a low spot in the flue.
Installing the flue with a dip or “goose Example 3
neck” can result in reduced efficiency or
even prevent the fire from working.
0m

1m

2m

3m

4m

A 20mm clearance is recommended from the extraction (smaller) flue to combustibles.

Key Information – Quick step check list


Plumber Incoming gas connection provided – 1/2 inch BSP male connector Page 2
Gas input – 42MJ high Page 2
32MJ low
Manifold pressure Manifold pressure is factory set.
High (Nat gas) 0.69 Kpa To check pressure and adjust
Low (Nat gas) 0.45 Kpa refer to page 8 of the customer
High (LPG) 2.25 KPA Low operation information & Installation
(LPG) 1.38 KPA instructions.
Electrician Standard flex 2m, 3 pin plug provided. Requires power point with Page 2
double pole isolation switch.
Appliance must be tested for correct operation prior to leaving - minimum 20 minutes.
If appilance cannot be adjusted to preform correctly contact Heatmaster prior to leaving.

Addition literature
www.heatmaster.com.au
Supplements for flue installation and heat transfer can be obtained by contacting your Heatmaster dealer.

4 *All information contained in this mini summary is correct at the time of publication. This is only a summary and should be read in conjunction with the full installation
instructions. Pictures are representative only and are not drawn to scale. Installation should be carried out by a licensed gas fitter and any electrical work carried out by a
licensed electrician.

You might also like