How to fill the TARGET / This Week Plan / Todays Plan column?
For JH PILLAR: 1) Cleaning Time Reduction 2) Easy to Lubricate 3) Easy to Inspect 4) Easy to Re-tighten 5) Inaccessible area improvement & Pending White Tag status & Plan for Abnormality removal to be included Example: Target Cleaning time reduction Target for this week Spindle Guard to be provided Todays Plan To study the burr splash / Temporary guard to be provided / Effectiveness to be checked / Material to be organized for permanent guard / Permanent guard to be fabricated / Effectiveness to be verified For KK PILLAR: Target to be linked with PQCDSM 1) Losses Reduction 2) Cycle Time Reduction (or) Productivity Improvement 3) Manufacturing Cost Reduction Example: Target Loss reduction (Prioritize Loss from Loss data of that cell) Target for this week Tool Change loss to be reduced from 40 min to 10 min/shift Todays Plan To observe the Tool change time /To analyze thro ECRS /To raise PR for ready tools / To provide ready tools near the machine / Effectiveness verification For PM PILLAR: Target to be linked with PQCDSM 1) Breakdown Occurrence Reduction 2) Breakdown Time Reduction 3) Prev. Maintenance Time Reduction 4) Spare Cost Reduction 5) Energy saving improvement & Pending Red Tag status & Plan for Abnormality removal to be included Example: Target B/d Occurrence Reduction (Prioritize from B/d data of that cell) Target for this week Coolant entry (is the root cause for the b/d) to be eliminated
Todays Plan Analyzing the coolant entry / Design the guard / Raising PR for material / Fabricating guard / verifying effectiveness
For QM PILLAR: Target to be linked with PQCDSM 1) Customer Complaint Elimination 2) In-process Scrap Reduction 3) Variation Reduction Example: Target In-process scrap reduction (Prioritize from In-process scrap data of that cell) Target for this week Dent Scrap reduction Todays Plan Data collection on dent scrap / Observe the process / Relieving the bung / Effectiveness verification