Building Control
Building Control
Buildings Ordinance
Section 2:
Definition of new building:
1) Newly constructed building;
2) Existing building of which not less than half of volume is rebuilt;
3) Alternation of existing building that not less than one half of superficial area of main wall is
reconstructed.
BD Circular (29-07-2013): horizontal extension and vertical extension outside the dimensions of an
existing building would constitute a new building.
Section 14A: consent to commence of works is not deemed under Section 15 if SSSP is not available
Section 41:
Subsection (1): The following are exempted from provision of the BO:-
1) Buildings belonging to Government
2) Buildings subject to Housing Ordinance, buildings on land that vested in Housing Authority or
under HA’s control and management;
3) Buildings on land that vested in person who represent Hong Kong Garrison;
4) Street or access road vested in and maintained by Government
Subsection (3): Building works (other than drainage works, ground investigation in the scheduled area,
site formation or minor works) in the building are exempted from section 4, 9, 9AA, 14(1) & 21 if the
works do not involve structure of the building.
Subsection (4): BO does not apply to temporary buildings used as a place of public entertainment.
Section 42: Empowering section for BA to grant exemption/modification of this Ordinance, but:-
1) Do not apply to section 14 of the BO;
2) Shall not be granted to the prejudice of the standard of structural stability and public health.
10-2017
Section 28A:
Access facilities for telecommunications and broadcasting services (TBE room):
1) Size: refer to PNAP APP 84; based on calculation of Useable Floor Spaces / No. of room or flats
2) Headroom: 2.8m for domestic / hotel and 3m for commercial / industrial
3) Provided with sufficient lighting and ventilation.
4) No water-borne pipes (drainage, sewage, sprinkler, etc.), high voltage power supply, transformers
should be installed inside TBE room.
Section 30:
Provision of natural ventilation and lighting for habitation, office and kitchen, by means of window(s):-
a) Aggregate superficial area of glass in window = 1/10 of UFA
b) Openable window = 1/16 of UFA; top of opening shall not be less than 2m (1.9 m) from floor
Section 32: Area to be served shall be within 9m from the prescribed window
Section 36:
Provision of natural ventilation and lighting for room containing soil and waste fitments:-
a) Aggregate superficial area of glass in window = 1/10 of UFA
b) Openable window = 1/10 of UFA; top of opening shall not be less than 2m (1.9 m) from floor
Fresh air intake shall not be within 5m from exhaust air/ potential pollution sources/cooling tower
2. Performance Approach under APP 130 (for domestic kitchen and habitable rooms only):-
Lighting: Measuring the Vertical Daylight Factor (VDF) – 4% kitchen & 8% habitable rooms
Ventilation: 1.5 ACH natural + 5 ACH mechanical for kitchen & 1.5ACH natural for habitable rooms
*window is allowed to face “open air” instead of “external air” for provision of natural ventilation
**Area to be served by the window could be extended to 12m instead of 9m under Section 32
when cross ventilation is provided
Section 8:
Protective barrier for level difference > 600mm (1.1m high, lowest 150mm built solid, gap <100mm).
This section NOT apply to area for maintenance only, single family house, stage in assembly hall and
loading bay in factory)
Section 35: Floors next to external ground shall be not less than 150mm above external ground
Section 49: Flat roof shall be at a level of not less than 150mm below adjacent usable floor area
Modification of section 35 & 49 (pursuant to section 42 of the BO), with compensatory measure:-
a) Surface channel with not less than 2 drain outlets;
b) 1:80 fall; and
c) If above are not feasible due to site constraint, 150mm curb is acceptable subject to BA discretion.
Building (Refuse Storage and Material Recovery Chambers and Refuse Chutes) Regulations
Section 3:
Provision of RS&MRC:
1) Area: refer to schedule; based on UFS calculation; Size not less than 1.5m x 1.5m (section 8(1));
2) Headroom: 2m (section 8(2));
3) Provided with close-fitting steel door (situated in external wall with H>1.8m & W>1.25m);
4) One of the walls shall be an external wall (section 7);
5) Provided with a water supply point (section 12);
6) Mechanical ventilation with 3 ACH and equipped with air purifying facilities (section 12A);
7) Internal faces of the walls shall be lined with glazed bricks or glazed tiles (section 9);
8) Ceiling to be smooth finishes (section 9);
9) Floor laid to fall to an outlet which is connected to an Back Inlet Trapped Gully situated immediately
outside the Chamber (section 9 & 11); and
10) Floor with quarry tile as finishes (section 9).
This regulations not apply to building for use of church, school and carpark.
Section 3A:
Provision of “refuse room” to every floor of domestic building (exclude hotel, guesthouse, boarding
house)
Refuse Room:
1) Size: min. 1.5m x 1.5m (section 8(1));
2) Mechanical ventilation with 3 ACH and equipped with air purifying facilities (section 12A);
3) Lighting not less than 120lux at finished floor level (section 12C); and
4) Separated from the rest of building by 2FRP walls and 1FRP door (PNAP APP 35).
Addendum (QC for tempered glass & repair of structural elements & supporting structure for antenna):
Tempered Glass:
1) Quality supervision plan to be submitted upon application to commencement of works.
2) Declaration statement on QAS/QAC, compliance report on heat soak process and quality supervision
report to be submitted upon report completion of works.
3) Prepared & signed by: AP/RSE (class 1), RMWC (class 2&3)
4) Quality control supervisor(100% supervision ): AP/RSE or T3 (class 1), RMWC or T1 (class 2&3)
Structural Repair:
Recasting of structural elements under item 1.17. Design of temporary support and QC of concrete &
rebar are required.
Mandatory Building Inspection Scheme (MBIS) Under Section 30B of BO – Building aged 30 or above
Exemption: Domestic building not exceeding 3 storeys in height
Procedure & Specified forms:
1) Pre-notification letters (non-statutory)
2) Statutory Notice under 30(B) of the BO – not less than 6 months after pre-notice
Owner to appoint RI and submit MBI 1
3) Prescribed inspection by RI – completed within 3 months
RI to submit MBI 3 or MBU 3a with an inspection report
3a) Detailed investigation when RI thinks necessary – EOT application
RI submit notification and detailed investigation proposal in advance
4) Prescribed repair by RGBC/RMWC under RI’s supervision – completed within 6 months
RI to submit MBI 4 with a completion report
Prescribed inspection is confined to all common parts, external walls, projections and signboards.
5 Building Elements:
a) External elements and other physical elements;
b) Structural elements;
c) Fire safety elements;
d) Drainage system; and
e) Unauthorized building works.
Structural Elements
Columns, walls, beams, slab;
Staircase;
Cantilevered projecting structure (100% for pure slab type / 30% for beam-slab type)
Transfer structure (30%)
Protective barrier
Other ancillary building structures such as bridge, swimming pool, etc.
10-2017
Follow legislations, standards and CoPs at the time the building was constructed and the A&A works
had been carried out.
Points to note:
1) Any unauthorized alteration affecting fire safety?
2) Unsuitable change in use?
Drainage System
Drainage system located at the external wall
Drainage system in the common parts
Drainage system laid within common pipe ducts (every 3 floor for PD inside individual units)
Common underground and aboveground drainage system, including manhole
Points to note:
1) Misconnection of foul / storm water system?
2) Discharge of foul water to open areas?
Points to note:
UBW found are for BA’s record only;
Report to BA immediately for UBW with obvious hazard or imminent danger to life or property
(e.g. overloading); lead to serious environmental problem; under construction
10-2017
Mandatory Window Inspection Scheme (MWIS) under 30C of BO – Building aged 10 or above
Exemption: Domestic building not exceeding 3 storeys in height
Procedure & Specified forms:
1) Pre-notification letters (non-statutory)
2) Statutory Notice under 30(C) of the BO – not less than 2 months after pre-notice
QP to submit MWI 1
3) To complete inspection by QP and repair – within 6 months
Minor amendment NOT qualified for deferring submission – modification to B(A)R 33(1):
1. Result in major revision;
2. Have material effect on the fundamental issues;
2a) Involve Form BA 16
3. Concern on stability of slope / retaining wall, adjoining building;
4. Not in compliance with OZP; OR
5. Works outside the lot boundary.
RGE shall be appointed when excavation >= 4.5m. RGE shall prepare geotechnical assessment.
Guidelines for Design and Safety Provision for the ACs Platforms:-
Access
a) From inside of units via windows directly where the worker needs not to climb out to the external;
b) From inside of units via openable window where the worker has to climb out to the external;
c) From common areas on the same floor via maintenance access doors where the worker may or
may not have to climb out to the external (door: 500mm x 900mm)
Configuration
a) Max. 900mm projection (with that outer 150mm of the platform shall be perforated)
b) 400mm maintenance space on either front or back side of the AC unit while 300mm for both sides
c) Min. 100mm gap to be provided between AC unit and outer edge of platform
d) Two layers of AC could be provided for those with access in/from the units
e) Screen shall not higher than 1600mm (2-layer case) or no higher than the AC unit (1-layer case)
Besides the dimensional or positional requirements under Appendix B of APP 126, points to note:-
a) Signboard to be covered by FH/HR system and sprinkler system if the signboard is not wholly made
of non-combustible materials;
b) Fireman’s emergency switch to be provided for signboard connected to electricity supply (i.e. LED
signboard). Position of switch shall be near main entrance or vertically below the signboard;
c) Roof signboard shall not be fully or partially enclosed (i.e. 3sides), otherwise, GFA accountable.
GR/LR License:
Licensing Authority: Food and Environmental Hygiene Department
Time frame (exclude site works): around 2~3 months, with following breakdown:-
3 weeks to AVP meeting & issue LoR -> 2 weeks to issue P/L -> 3 weeks to issue F/L (total 2months)
Points to note:
1) Design load for restaurant = 4kPa
2) Check user clause under Lease; Check OZP
3) At least 50% of designed openable/breakable window to their original condition (FSD)
4) Free of UBW - Certification of UBW by AP shall be submitted (i.e. form UBW-1 / UBW-2)
5) Not situated at premises below basement level 4
6) Not located vertically below school, CCC, RCHE
7) Not located on the upper floor of single staircase building/ domestic building