Conventional AS - process calculation
Conventional AS - process calculation
Px Y ob 5 Q S 0 S
Page 1
Px (wasted sludge) = Px Y ob 5 Q S 0 S 5571 kg/d
Y
Y ob 0.30 g MLSS/g BOD
1 k d
5
c
assume the percent of MLVSS/MLSS = 0.8
then the actual (Px) = 6963 kg/d
Qw (wasted sludge flow rate) = Px/ Xr = 928 m3/d
Page 2
percent of oxygen in air = 0.2318 g O2 / g air
Theoritical Air required under field conditions = 8,535 m3 air/hr
assume that efficiency of air diffuser (Fine bubble) = 0.25
the theoretical air required for one tank= 34,139 m3/hr
Air Blower capacity = 6,000 m3/hr
No of working blowers (2nd stage) = 6 add 3 standby
Chlorination requirements
average chlorine dose = 10.0 g/m3
daily Cl2 required = Q * dose = 500 kg/d
Cl2 requirement (per Two weeks) = 7500 kg/2 weeks
mass of chlorine drum = 800.0 kg
Total No of drums for 2n stage = 9.4
select No of drums 10