Available To Promise

Uploaded by

arpitsap09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views8 pages

Available To Promise

Uploaded by

arpitsap09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Available To Promise (ATP) and the

Scope of Check
54374,936

This post aims to describe the various components that are included, or excluded,
from the ATP check based on the rules defined in the scope of check. A number of
these options are fairly self explanatory, but some of them have caveats, behave
differently based on other configuration choices, or are less than intuitive. Hopefully
this guide helps others in their review of ATP configuration.

Examples of the MRP Elements that are impacted by each option and examples of
transactions that generate or modify the MRP Elements are included. The
screenshot below is an example of a standard SAP Availability Check for sales orders.

The documentation that follows is based on my own experience, testing in an ECC 6


environment, and with some assistance from the SAP Support Portal. Some useful
references are provided at the bottom of this document.

Stocks
All of the options in this area have the ability to impact the general stock quantity
that is used to represent the current stock level at the plan and at the storage
location level. In addition the Incl.quality insp. Stock and W/o subcontracting options
can also impact the MRP elements that are taken into account for availability.

Include safety stock


This option prevents the subtraction of safety stock from available inventory. In the
example above Safety Stock would be checked. With this option checked the Stock
Line in CO09 should match the Stock Line in MD04. With it un-checked the Stock Line
in CO09 should be the result of subtracting Safety Stock from current stock.

MRP Elements Impacted: None

StockIn Transfer
Stock in transfer should not be confused with stock in transit, that is used in the two
step Stock Transfer Order process involving a Stock Transfer PO, Outbound Delivery,
and subsequent goods receipt. StockIn Transfer only applies to stock put into an in
transit status, such as with a manual 313 goods movement to place stock in transit
between two storage locations or a 303 to place stock in transit between two plants.
With this box checked the quantity in transit is added to the stock line of the
destination plant or storage location. Without this checked the stock in transit is
completely unavailable and ignored, both at the sending and receiving locations.

MRP Elements Impacted: None


Related Transactions: MIGO, MB1B

Incl.quality insp. Stock


For QM managed materials this will include Quality Inspection lots, maintained
through transaction QA02, and will show the lot as available inventory on the
Inspection End Date for the lot. Each lot is separately listed with its MRP Element.

For materials that are not QM managed this will include stock that is posted into
Quality Inspection Stock. Quality inspection stock can be posted to manually
through transaction like MB1C using standard movement types 503, 523, or 563.
Quality inspection stock is included as part of the total stock line that is available.

MRP Elements Impacted: QM-Lot

Related Transactions: QA01, QA02, QA03

Include blocked stock


Includes stock that is in a block status, such as stock that is posted into Blocked
Stock using movement type 505. This inventory is represented as part of the total
stock. This does not impact material that is received into Goods Receipt Blocked
Stock, such as material received with movement type 103. Material Received into
Goods Receipt Blocked Stock will continue to display as a POItem.

MRP Elements impacted: None

Related Transactions: MIGO, MB1C

Include restricted Use Stock


Applies to batch inventory when batch status management is active. When this flag
is checked then batches that have a restricted status are included along with the
unrestricted.

MRP Elements impacted: None

W/o subcontracting
With this flag checked stock provided to vendor is removed from the availability
check. This also removes and requirements that the subcontracting process may
place on component plant inventory, meaning that SubReq MRP Elements will not be
reflected in Demand, this would have the greatest impact on a material that was
both a subcontracting component for one process and itself a subcontracted
material.

This will not impact the inclusion of the POitem or PurRqs elements related to a
subcontracting PO being placed with a vendor.

MRP Elements impacted: SubReq

Replenishment Lead Time


Check without RLT
When unchecked then the system will calculate the replenishment lead time for the
material. When replenishment lead time is active only requirements that fall within
the lead time are considered and everything that falls outside of RLT automatically
confirms.

Replenishment lead time is calculated differently for externally procured material


and produced material, which is determined based on the Procurement Type of the
material. Materials with a procurement type of X are treated as produced materials
for RLT purposes.

Externally Procured Material

There are three key fields that are used in determining the RLT for a purchased
material.

1. Purchasing Processing Time


This is a configured value and assigned to the plant MRP settings through
OPPQ. This duration is checked against the factory calendar and applies only
to work days.
2. Planned Delivery Time
This value comes from the Material Master MRP 2 view and is applied without
regard to the factory calendar.
3. GR Processing Time
This value comes from the material master MRP2 view and is checked against
the factory calendar, only being applied to work days.

The example below represents a material at a plant with 1 day of Purchasing


Processing time, 30 days of Planned Delivery Time and 2 days of GR Processing
Time. The factory calendar for the plant is show to the right, with dates in green
being non-working days.

Produced Material

There are two different methods for calculating the RLT for produced materials.
When the Total Replenishment Lead Time in the MRP 2 view is populated then this is
the value that is used. If this value is empty then SAP checks the Production Time,
which is a combination of the In House Production Time and GR Processing Time
from the MRP 2 view of the material master. Both of these methods use the factory
calendar and are applied only to work days.

The following example is for a material with Total Replenishment lead time
maintained and a factory calendar that doesn’t include weekends. The Total
Replenishment lead time is 20 days.

Storage Location Inspection


No storage location inspection
When the storage location is specified in a transaction then it is ignored when
performing the ATP check. This means that if a plant has 100 EA of inventory in
storage location A001, and a delivery is created for 100 EA but specifying storage
location WM01, then the ATP check will still be successful without storage location
inspection.

In/outward movements
Incl.purchase orders
There are three options when including purchase orders, which include all forms of
purchase orders, such as purchases from vendors, stock transfer orders, and inter-
company stock transfers, and returns to vendor. These options only apply to the
receiving quantities for purchase orders. The outbound requirements for stock
transfers are controlled through the Incl.rel.order reqs option.

This option controls the inclusion or exclusion of the POitem MRP Element and the
ShpgNt MRP Element. When purchase orders are included the ShpgNt is always
considered, no matter which option is chosen in the Incl.ship.notificat. option.

Related Transactions: ME21N, ME22N

MRP Element: POitem, ShpgNt, Return

Blank – Do not check

Inbound quantities from Purchase Orders are ignored.

X – Check

Include purchase orders in available inventory.

X works like A if the STO configuration in Purchasing à Purchase Order à Set Up Stock
Transfer Order à Assign Delivery Type and Checking Rule is set up for the PO Type
and Plant to have the ATP Conf. MRP flag checked or if the Fix Date / Quantity flag is
checked in the PO line item.

Availability Date: Delivery Date from PO Line Item + GR Processing Time. GR


processing time is calculated based on the factory calendar.

If an inbound delivery / shipping confirmation has been applied to the PO Item then
Delivery Date is taken from this confirmed date and then the GR processing time is
added. This is reflected by the MRP Element changing from a POitem to a ShpgNt.
Shipping Notifications are always recognized for POs when POs are checked,
regardless of the subsequent Incl.ship.notificat. option.

A – Check Purch.Orders (If Stock Trans.Ord.:Check Confirmed Qty)

Include purchase orders in available inventory.


Availability Date: Delivery Date from PO Line Item + GR Processing Time. GR
processing time is calculated based on the factory calendar.

For STOs each Schedule Line is included on its confirmed date with its confirmed
quantity. The GR processing time is added to each of these dates.

If an inbound delivery / shipping confirmation has been applied to the PO Item then
Delivery Date is taken from this confirmed date and then the GR processing time is
added. This is reflected by the MRP Element changing from a POitem to a ShpgNt.
Shipping Notifications are always recognized for POs when POs are checked,
regardless of the subsequent Incl.ship.notificat. option.

Incl. purch.requistions
Include Purchase Requisitions in availability check.

Availability Date: Delivery Date from PO Line Item + GR Processing Time.

Related Transactions: ME51N, ME52N

MRP Elements: PurRqs

Incl. dependent reqs


Includes the dependent requirements generated by the component demand of
planned orders. These requirements are included for all planned orders, regardless
of being MRP generated, Component Checked, or Capacity Scheduled.

Requirement Date: Start Date of the planned order

MRP Elements: DepReq

Include reservations
This is not to be confused with Production Order Component reservations, which
controlled by the Incl.depen.reservat. option.

This option will include demand from reservations made through transaction MB21.

Availability Date: Base date of the reservation.

MRP Element: MtlRes

Include Sales Reqmnts


Includes demand generated from Sales Orders, Scheduling Agreements and other
types of SD documents that are configured for requirements, depending on
configuration this could include Inquiries and Quotes.

MRP Elements: CusOrd, SchAgr

Related Transactions: VA01, VA02, VA31, VA32


Include Deliveries
This option is specific to SD deliveries and does not impact outbound STO deliveries
or inbound purchasing related deliveries. This option will place a requirement on the
material availability date of the delivery line.

MRP Elements: Delvry

Related Transactions: VL01n, VL02N, VL10G, VL10A

Incl.ship.notificat.
This option is only relevant if the Incl.purchase orders option is blank. This option
will only include Purchase Orders that have a shipping confirmation. If the
Incl.purchase orders option is set to either A or X then Shipment Notifications are
always taken into consideration, regardless of this setting.

MRP Elements: ShpgNt

Related Transactions: ME22N

Incl.depen.reservat.
This option will include component requirements for Production Orders. There are
notes from SAP regarding this option and its applicability to purchase orders. I have
only used this option to manage reservations related to Production Order
components.

MRP Elements: OrdRes

Related Transactions: CO01, CO02

A – Only include withdrawable reservations

This option will only include requirements related to release Production Orders.
Order Reservations for production orders that are not yet released will not be
considered.

X – Include all reservations

This option will include all production order reservations.

Incl.rel.order reqs
This option is to include the demand for the supplying plant of stock transfers, either
related to purchase reqs or purchase orders.

A – Check releases for stock transport orders only

Only include Stock Transfer Purchase Order requirements at the supplying plant.

MRP Elements: Ord.DS


X – Check releases for stock transport orders and requisitions

Include both Purchase Requisitions and Purchase Order stock transfer requirements
at the supplying plant.

MRP Elements: Ord.DS, PRqRel

Transactions: ME51N, ME52N, ME21N, ME22N

Incl. planned orders


This option includes the receipts from Planned Orders. This option should be
carefully considered as planned orders are often created automatically by the MRP
process.

MRP Elements: PldOrd

Transactions: MD11, MD12, MD01

X – Check all planned orders

Includes all planned orders, MRP Generated, manually created, firmed, confirmed, or
capacity planned.

A – Check firmed planned orders only

Only include planned orders with the Plnd order flag checked in the Firming section.

B – Only check planned orders that are completely confirmed

Only include planned orders that have been availability checked in order to confirm
component availability.

Incl. production orders


This option includes planned receipts from production orders.

MRP Elements: PrdOrd

Transactions: CO01, CO02

X – Take all production orders into account

This option will include all open production orders

F – Only take released production orders into account

This option will only include receipts for open production orders that have been
released for production.

Receipts in past
The Receipts in past option impacts all receipt related ( inventory additive ) MRP
Elements.

MRP Elements: PrdOrd, PldOrd, ShpgNt, POitem, PurRqs, QM-lot

Include receipts from past and future


This option takes into account all planned receipts, based on the other options that
are chosen, regardless of the date of the planned receipt.

A – Include receipts from past and future, with messages


This option takes into account all planned receipts, based on the other options that
are chosen, regardless of the date of the planned receipt. A message is presented to
the user when the ATP check includes planned receipts that were supposed to have
already occurred.

B – Include future receipts only


This option excludes all planned receipts with a date that falls in the past and
includes all receipts where there is a current or future date.

C – Include future receipts only, with a message


This option excludes all planned receipts with a date that falls in the past and
includes all receipts where there is a current or future date. A message is presented
to the user when the ATP check includes planned receipts that are planned for the
future.

Useful References
 SAP Support Notes / Articles
o 2219495 – Debugging guide ERP ATP check
o 835219 – FAQ: ATP composite note
o 1893237 – Everything about transaction Co09