STR 12011
STR 12011
25
C1
90
25
A B C D E F G H I J K L M N O P Q R S T Engineering Affairs Sector
59.20
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40 C2 Building Department
110
25
MC C5 MC C2
1 NC
TB=12
TOT=12
C3
TB=25
GF=54
FF=37
C3
TB=20
MF=16
GF=46
TB=19
MF=27
TB=19
MF=32
TB=19
MF=22
TB=12
MF=24
GF=48
C1
TB=5
MC
TB=19
C3
TB=19
MC
TB=18
C1
TB=18
MC
TB=20
C1
TB=21
MF=18
GF=33
C1
TB=22
GF=37
FF=18
C1 TB=18
GF=46
FF=13
C2
TB=8
RF=12
TOT=128
FF=28
RF=12
TOT=46
GF=96
FF=62 TOT=41 FF=31
TOT=115
MF=11
GF=22
FF=14
MF=18
TOT=37
MF=31
GF=52
MF=19
TOT=37
MF=30
GF=28
FF=19
MF=23
TOT=43
FF=14
RF=12
RF=12
TOT=89
TOT=77
C3
GF=54 TOT=209 FF=24 TOT=98
FF=49 TOT=122 TOT=52 TOT=95
100
TOT=126
TOT=111
4.80
TB=12
NCTOT=12
NC TB=3 CW CW
TOT=3 TB=11 TB=11
30
GF=83 GF=62
TB=14 FF=59 TB=13 C4 FF=76
TB=17 TB=19 TB=19 RF=53
TB=23
MF=16 MC
MZ=26
GF=64 C4
RF=53
TOT=206
C4
MF=17
GF=63 MF=34 C9
TB=19
MF=36 C9 TB=21
MF=23
MF=38 C9 TB=16
MF=14
C4 TOT=202 C3
TB=13
MF=20
C5
TB=21
MF=20 NOTES
2 TOT=39
NC
FF=47
RF=12
TOT=163
FF=48
RF=12
TOT=153
MC TB=27
MF=35
TOT=62
MC TB=30
MF=40
TOT=70
MC TB=24
MF=30
TOT=54
GF=161
FF=111
TOT=323
MC MF=22
TOT=41
GF=135
FF=157
TOT=347
GF=133
TOT=177
GF=143
FF=154
TOT=354
GF=55
FF=53
RF=12
TOT=150
GF=30
FF=64
RF=12
TOT=139
GF=62
FF=114
TOT=217
TB=8
2.70
NC TOT=8
TB=26
TOT=26
C3 C3
3 TB=14 NC TB=8
MF=55 C3 C3
TB=8
MF=40
GF=94
TB=20
MF=40
GF=60 C4
1.60
TOT=14 NC
C8 GF=140 TB=22 TB=20 TB=22 TB=6 TB=11
MC TB=24 TOT=142 TOT=120
FF=98 TB=11
TB=9 C6 MF=18
C6 MF=38 MF=33 C7 MF=17 MF=24 MF=16
30
3.60
C4
TB=20 MC TB=11 TB=18
TB=22
GF=66 MC TOT=11 MC MF=14 MC TB=19 MC MF=16
NC TB=13
FF=57
TOT=32 MF=29 MC TB=19 MC TOT=38
TOT=13
TOT=143 TB=17 TB=8 TOT=48 MF=25 TB=19
MF=16 MF=28 NC MF=28
TOT=44 C2
25.50
TOT=47
5 TOT=33 TOT=36
C4
TB=33
MF=48
GF=117
TOT=198
TB=20
MF=36
GF=56
TOT=112
3.95
MC TB=11
TB=12 MC C8 MC C5 MF=24
GF=37
C5
MF=14 TB=25 MC TB=20 C4 C1
TB=20 FF=130
TOT=26 MZ=20
TB=28
MZ=47
MF=42 MF=27 C9 TB=24 TB=28 TB=16 TB=1 TB=16
C8 MF=35
GF=130 TB=27 TB=22 TOT=202
GF=126
120
TB=17 GF=143 TOT=47 MF=25 TB=18 C6 FF=121 C7 TB=27
TOT=37 FF=99
FF=84 MF=43 MF=27 MF=18 C9 MF=40 MF=40
C7 C10 MF=44
6 TOT=317
C7
TOT=277 GF=196
FF=131
TOT=394
TOT=53 GF=84
FF=56
TOT=183
GF=48
FF=33
TOT=100
MF=38
GF=175
FF=105
TOT=336
GF=111
FF=77
TOT=244
TOT=306 GF=135
FF=73
TOT=275
MF=39
GF=122
FF=79
TOT=267
GF=211
FF=194
TOT=471 MC TB=20
MF=45
2.45
30
TOT=65
TB=22
GF=129
C5 FF=65
7 C4
TB=15
MF=18
MC
MC MC MC MC MC MC MC MC MC MC
MC
MC
TOT=216
GF=75
TB=14 MC TB=27 TB=19 TB=23 TB=17 TB=17 TB=17 TB=17 TB=36
FF=64 TB=29 TB=20 TB=18 TB=19
MF=20 MF=27 MF=28 MF=25 MF=24 MF=22 MF=24 TB=17 MF=21 MF=13
TOT=172 MF=40 MF=29 MF=26 MF=24 MF=28
TOT=34 TOT=54 TOT=47 TOT=48 TOT=41 TOT=39 TOT=41 TOT=38 TOT=49
TOT=69 TOT=49 TOT=44 TOT=47
TOT=41
TB=31 C8 NC
6.40
NC MF=46
TB=11
TOT=11
NC
TB=18
GF=124
FF=91 NC
TB=8
TOT=8
TB=14
TOT=14
C6
TOT=18 TOT=292
130
TB=11 C1
GF=33 C3 C1
FF=28 C5 C3 C4
TOT=72
TB=7 NC TB=1 NC
TB=1 TB=1 TB=1 TB=1
NC
C4 TB=1
NC C4 C1
8
30
NC GF=76 GF=128 GF=39 GF=59 GF=89 GF=90 GF=114
FF=41 FF=87 FF=30 FF=38 FF=44 FF=66 FF=74 TB=15 TB=12
TB=14 TB=1 TB=1 TB=1 TB=1 GF=92 GF=43
C1 TOT=14 C1 TB=27 TOT=124 TOT=1 TOT=216 TOT=1 TOT=70 TOT=98 TOT=134 TOT=157 TOT=1 TOT=189 TOT=1 FF=61 FF=33
GF=32
FF=23 TOT=168 TOT=88
TOT=82
C7
HUSSEIN ALI ODHAH AL KHADRI
140
30
PROPOSED COMMERCIAL
CENTER (G+1)
120
DRAWING TITILE :
40
C8
30
120
35
0252 ABDEL RAHMAN
C10
SECTOR STRUC. ENG.
NC
SOUTHERN SECTOR
25
C1
90
A B C D E F G H I J K L M N O P Q R S T
25
59.20 Engineering Affairs Sector
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40
C2 Building Department
110
25
0.05 0.20
25MM EXPANSION JOINT 0.20 0.70
1.10 MC C5 MC C2 0.40
1 NC C3 C3 C1 MC C3 MC C1 MC C1 C1 C1
0.25
0.25
0.25
0.30
0.30
0.30
0.30
0.80
0.80
0.25
1.00
1.80
1.10
1.10
1.05 0.90 0.80 1.10 0.80
2.15
C2 0.45 0.25 0.10
0.90
2.25
3.85 0.20 2.25 0.25
1.60 C3
4.80
NC
100
0.75 CW CW
0.30 0.25
NC 0.25
2.90
2.40
0.20 C4 0.30
ROTAED ON FIRST FLOOR
1.45
1.20
1.20
MC C4 C9 0.30 C9 C9 C4 C3 C5
1.10
1.00
1.00
0.85
C4
30
1.00 1.80 0.80
2 MC
0.30
MC MC MC
0.10
NOTES
0.70
NC
0.20
1.10
1.40 C3
3 C3
0.25
0.25
0.30
NC 1.10
0.30
0.90
0.90
0.90
0.200.90
C6 C7
0.70
0.70
C4
0.60
C6 25MM EXPANSION JOINT
4
0.30
0.40
0.30
110
2.15
3.60
C4 0.20
0.25
1.00 NC 0.25 MC 1.90
MC MC MC 1.25 MC MC MC 1.40
1.00
30
MC 1.00
1.10
0.90
0.90
0.90
0.90
0.90
0.90
0.85
0.45 C2
25.50
0.25
0.20
0.05
0.05
C4 0.90
2.10
2.50
0.30
3.95
1.40
0.30 0.55
1.25
1.25
1.20
C7
1.15
1.15
0.95
1.05
1.10
1.00
1.00
C6 C7
0.80
0.80
0.70
6 C10 MC
0.05
0.10
0.20
0.15
C7
0.35
0.40
25MM EXPANSION JOINT
30
7 C5
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
MC
0.60
C4 MC MC
1.00
2.85
1.10
NC
0.20
2.55
6.40
NC C8 0.90
1.15 0.20
0.30 C6
2.75
3.20
3.20
3.20
0.15
25MM EXPANSION JOINT 0.25 0.05 0.30
C3 C5 C1 C1 1.00
130
0.80 0.30 ROTAED ON FIRST FLOOR C3 0.90 C4
3.00
1.10
1.10
1.10
1.00
1.00
NC NC NC
C4 0.10 C4 C1
8 2.25 0.65
0.30
0.25
0.25
0.25
0.20
0.20
NC NC
C1 C1 ROTAED ON FIRST FLOOR 0.80
0.05 0.15 0.25 0.40
0.50 0.45 0.30
30
C7
HUSSEIN ALI ODHAH AL KHADRI
140
30
PROPOSED COMMERCIAL
CENTER (G+1)
120
DRAWING TITILE :
40
C8
30
120
35
0252 ABDEL RAHMAN
C10
SECTOR STRUC. ENG.
MC
SOUTHERN SECTOR
25
C1
90
A B C D E F G H I J K L M N O P Q R S T
25
59.20
Engineering Affairs Sector
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40
C2 Building Department
110
25
0.05
1.05 1.10 0.20 0.25
25MM EXPANSION JOINT
0.20 0.25 C5 0.60 C1 0.25
1 C3 C3 C3 C2 C1 C1
0.25
0.25
0.25
0.25
C1
0.60
0.60
1.00
C1 0.70
1.10
C2
0.30
0.025 1.00 0.60
0.90
0.25
CW 0.30
C1 PLATNED ROOF COL
CW C3
0.35
0.25 0.30
100
2.40
2.40
0.35
1.20
1.20
1.20
C4 C9 C9 C3
1.10
C4 C9 C4
2 0.05
C5
30
0.60 0.25 0.15 0.60 0.25
0.60
0.50
NOTES
2.70
1.00
1.00
3 C8
0.25
25MM EXPANSION JOINT 0.45
1.60
1.10
1.00
C6
0.90
0.90
0.90
C6 C3 C3
1.30
C7
4
0.10
1.05 C4
0.30
0.30 0.30 0.025
3.60
C4 110
1.10
25.50
30
5
0.30 0.40
3.95
1.75
1.00
1.10
C6 C7
0.80
1.20
0.70
C9
1.15
0.55
1.00
C4 C1
6
0.55
C7 C10
0.05
C5
0.25
0.20
0.20
0.05
0.20
0.20
0.10
0.05
0.25
2.45
0.60
7 0.85
30
1.00
C4
C8
6.40
1.00
1.00
C1 C1 C5 C4 C4 C1
8
0.30
0.25
0.25
0.25
C1 1.00 130
0.20 0.15 0.15 0.15 0.45 0.10 0.40 0.60
30
C7
HUSSEIN ALI ODHAH AL KHADRI
140
30
PROPOSED COMMERCIAL
CENTER (G+1)
120
DRAWING TITILE :
40
C8
FIRST FLOOR COLUMNS LAYOUT
120
35
0252 ABDEL RAHMAN
C10
SECTOR STRUC. ENG.
SOUTHERN SECTOR
20
59.20
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40
Building Department
C1
1 C1 C1 C1 C1
0.80
0.80
0.80
0.80
0.20 2.25 0.20 0.20 0.20
2.25
4.80
0.45
CW 2.90 0.20
0.20 0.20 0.35 0.20
2.40
2.40
C1 CW
C1 C1 C1 C1
1.50
0.80
0.80
0.80
0.80
2 NOTES
1.50
1.50
0.45 0.60 0.60
2.70
C1 1.10
C1
3 0.30
1.60
4
3.60
25.50
5
3.95
6
2.45
7
6.40
PROPOSED COMMERCIAL
CENTER (G+1)
DRAWING TITILE :
A B C D E F G H I J K L M N O P Q R S T
59.20
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40
Engineering Affairs Sector
100
Building Department
as arch
9.75 4.40 14.45
4.30 1.35 1.60 7.90 2.40
1.50 1.60
1.60 F4 1.60
1.00 2.05 CF11
1.55
1.55
2.70
1.35
1.35
1.35
1.35
1.55
MC F1* C5 MC F1* MC F1* 1.35 F8
1 F** NC C3 C3 C2 C1 C2 MC C1 MC C1
5T20 TOP
C1 C1
1.60
2.40
2.85
3.60
1.00
1.60
1.60
0.75 2.00
3.45
3.05
0.25
1.45 TOT=12 TOT=46 TOT=209 TOT=41 TOT=115 TOT=52 TOT=37 TOT=126 TOT=37 TOT=95 5T20BOTTOM TOT=76
2.25
1.55
4.80
C2
4.60
TOT=89
1.90
2.35
TOT=128 TOT=122 TOT=43 TOT=98 MESH BOTH WAYS
1.40
2.60
3.40
TOT=111 L=6.00 m
4.80
1.85
18.40 2.00
TOT=12
L=3.00 m
L=3.00 m
T20@150
T20@150
CW CW
L=6.00 m
T16@100
T20@ 150
T16@100
3.00
3.00
L=6.00 m
0.35
TOT=3
10
TOT=323 TOT=347 TOT=354
9.90
L=3.00 m
L=3.00 m
1.00
T20@100
C4
L=3.00 m
3.50
TOT=206
T20@150
C9
1.55
C9 T20@ 150 T20@ 150
25
2.00
MC C4 0.80
4.00
1.15 C4 C4 NC MC MC NC L=3.00 m L=3.00 m
TOT=202 C3
C9 0.80
1.20
2 3.60
TOT=39
1.15
TOT=163
TOT=153
TOT=62
TOT=70 TOT=54 D90 cm 2mx2m TOT=41
3.00 TOT=177 3.00 TOT=151 T16@100
L=6.00 m
TOT=139 3.50
TOT=217
C5
7.80
15.60
L=3.00 m
TOT=26
TOT=142
C3 0.80 NOTES
3 NC TOT=301 C8
C3
TOT=120
L=3.00 m
T20@200
L=3.00 m
T20@200
1.05
L=3.00 m
T20@200
C3 C3
TOT=124
1.60
TOT=126
TOT=14
L=4.00 m
NC
T20@ 200
1.15 MC
3.00
TOT=11
3.00
C7
4.00
C6
3.00
TOT=40
0.55
C6
4 3.00 3.00
T20@ 200
3.00
T20@ 200
4.00 5T20 TOP
0.80 1.40 2.25 1.20 2.65
2.60
T20@ 200
T20@ 200
L=3.00 m 5T20BOTTOM
2.00
L=3.00 m L=4.00 m
L=3.00 m
MESH BOTH WAYS
3.60
T16@200
L= 6.00 m
C4 1.20 2.65 3.55
MC MC THICK= 80 CM
MC TOT=11 MC MC MC MC
L=3.00 m
T20@100
3.00
TOT=32 TOT=48 TOT=44
24.40
1.60
TOT=143 TOT=33 TOT=36 TOT=47 TOT=38 TOT=13
MC TOT=198 C2
25.50
20.95
5 0.80
6.65
1.40
L=3.00 m T16@200
1.75 1.40 1.30
T16@200 4.00 L= 3.00 m
L= 3.00 m C5
3.95
1.20 2.65
5.55
L=3.00 m
MC
T20@150
L=3.00 m
T20@200
L=3.00 m
L=3.00 m
T20@200
T20@100
MC MC
3.00
D95
L=3.00 m
L=3.00 m
T10@200
3.00
TOT=306
T20@200
4.00
1.05
L=3.00 m
4.00
0.80
T20@200
T16@200
L= 4.00 m
C8
L=3.00 m
3.00
T20@200
2.00
2.55
MC TOT=394 3.0mx3.0m
3.00
2.40
TOT=26
3.00
L=4.00 m
C9
T20@ 200
TOT=277 TOT=275
3.00
C4 C1 TOT=267
1.95
C8
3.00
TOT=317
TOT=183
TOT=37 TOT=53 TOT=244 TOT=202
T20@ 150
TOT=100
C9 T20@ 200 C7
4.00
TOT=47
8.85 T20@ 200 C6 L=3.00 m C7 T20@ 200
TOT=471 T20@ 100 0.90 F*
L=3.00 m 4.00 T20@ 200 T20@ 200
6 L=3.00 m
L=3.00 m C10 L=3.00 m MC
2.00
L=3.00 m
3.75
C7 L=3.00 m
3.00
3.00 3.00 T20@ 200 TOT=336
1.05
4.00
1.15
3.50 L=4.00 m T20@ 100 3.00 3.00 TOT=65
1.15
L=3.00 m
3.00 1.15 1.40
2.45
2.35
2.45
C5
5.00 38.05 3.00 2.00
L=3.00 m
T16@200
1.60 0.85 1.10 1.70 1.15 1.50 1.10 1.10 1.10 0.45 TOT=216
3.00
7
0.25
0.25
0.25
0.25
2.00 0.25
0.25
0.25
0.25
0.25
0.25
1.25 1.10
2.85
C4 T16@ 200 F1* 45cm MC MC MC
5.00 MC F* MC F* MC F* MC F* F* MC F* MC F* MC F* MC F* MC F*
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.60
1.85
L=3.00 m MC F* TOT=49
TOT=34 TOT=69 TOT=48 TOT=41 TOT=41 TOT=44
0.85
TOT=172 TOT=54 TOT=47 TOT=49 TOT=39 TOT=41 TOT=38 TOT=47
L=4.50 m
5.40
T16@200
3.00
4.50
3.95
3.95
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
1.00 1.00 2.00 2.00
TOT=292 NC
F**
NC F**
6.40
1.00
1.00
3.70
4.10
F10 F9 C1
4.50
3.40
1.15
3.40
3.60
2.70
1.00
1.00
1.00
1.00
1.00
2.10
C1 TOT=14 TOT=1 TOT=1 TOT=70 TOT=98 TOT=1 TOT=1
0.85
C1 TOT=88
0.95
TOT=82 TOT=124 TOT=216 TOT=134 TOT=157 TOT=189 TOT=168
1.25
1.25
1.30
1.35
1.40
0.40
1.55
1.65
1.80
F2
2.65
TOP STEEL
BOTTOM STEEL
HUSSEIN ALI ODHAH AL KHADRI
PROPOSED COMMERCIAL
SCHEDULE OF FOOTINGS
LENGTH WIDTH HEIGHT BOTTOM REINFORCEMENT TOP REINFORCEMENT
CENTER (G+1)
FOT. REMARKS
NO (MM) (MM) (MM) DRAWING TITILE :
SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN
F1 3400 2700 550 T16 @ 150c/c T16 @150 c/c ----------- ----------- ISOLITED
F2 2700 1900 450 T16 @ 200c/c T16 @100 c/c ----------- ----------- ISOLITED
FOOTINGS LAYOUT
F3 3400 2750 550 T16 @ 150c/c T16 @100 c/c ----------- ----------- ISOLITED
PLOT NO. ARCH. ENG.
F4 4300 3600 650 T16 @ 100c/c T16 @100 c/c ----------- ----------- ISOLITED 0252 ABDEL RAHMAN
F5 3700 3000 650 T16 @ 150c/c T16 @100 c/c ISOLITED SECTOR STRUC. ENG.
F6 4100 3400 650 T16 @ 100c/c T16 @100 c/c ISOLITED SOUTHERN SECTOR
F7 4500 3800 650 T16 @ 100c/c T16 @100 c/c T16 @200 c/c T16 @200 c/c ISOLITED DISTRICT M.E.P. ENG.
F8 2400 2400 450 T16 @ 200c/c T16 @200 c/c T16 @200 c/c T16 @200 c/c ISOLITED TALLAH 2
F9 2650 2100 450 T16 @ 200c/c T16 @200 c/c T16 @200 c/c T16 @200 c/c ISOLITED JOB. NO. DRAWN BY :
F10 2500 2000 450 T16 @ 200c/c T16 @200 c/c T16 @200 c/c T16 @200 c/c ISOLITED 12011 AMJAD AZIZ
CF11 SEE PLAN 650 T16 @ 100c/c T16 @100 c/c T16 @200 c/c T16 @200 c/c COMBINED SCALE CHECKED BY :
FOUNDATION LAYOUT F* 2000 2000 450 T16 @ 200 c/c T16 @200 c/c ----------- ----------- ISOLITED 1:100
5
ST/100/01 SCALE 1:100 MTS
F** 1000 1000 400 T16 @ 200 c/c T16 @200 c/c ----------- ----------- ISOLITED SHEET NO. DATE :
F1* 1600 1600 450 T16 @ 200 c/c T16 @200 c/c ----------- ----------- ISOLITED 24/04/2024
NOTES :
1) PLEASE REFER ARCHITECTURAL DRAWINGS FOR LEVELS
- HATCH INDICATES WALL FOOTINGS
Building Department
12mm SEALANT
100
COMPACTED
FILL MATERIAL
SECTION (A - A)
A B C D E F G H I J K L M N O P Q R S T
59.20
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40 NOTES
12mm SEALANT 12mm SEALANT
100
1 TB1
TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
SECTION (B - B)
TB1
4.80
TB2 TB3
4.45
TB1 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB4 TB2
TB3
TB1 400
TB2
2
200 100
TB4 TB3 TB3 WF TB4 WF TB4 WF TB4 TB3 WF TB3 TB3 TB4 TB3 TB3 TB3
45°
2.70
3 TB4 WF WF TB3
WF
1.60
WF TB3 WF
WF WF WF WF WF TB1 T8@200
25.50
TB3
TB3
3.95
3.50 TB5
TB1 TB3 TB1 TB1 TB3 TB1 TB3 TB3
TB1 TB3
TB3 TB1 TB1 CTB1 TB1 TB1 TB1 CTB1 TB1 CTB1 TB1 CTB1 TB1
6 TB1 TB3
TB4 TB4
TB1 TB4 TB4 TB4 TB4 TB3 TB4
TB3 TB5
2.45
TB3 TB4
TB3 TB4 TB3 TB4
TB3 TB3 TB3 STAIR SECTION
TB3 TB4
7 TB3
TB1 TB3 TB4 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB3
TB1 TB2
TB1
TB1 TB4 TB3 TB3
6.40
TB3 TB3
TB1 TB3 TB3
TB1
TB3
TB3
HUSSEIN ALI ODHAH AL KHADRI
TB1 TB1
8 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
PROPOSED COMMERCIAL
CENTER (G+1)
DRAWING TITILE :
100
100
100
100
100 100
100
100
MC C5 MC
1 C3
B1 B1
B1 B1 C2 C1
B1
MC
B1
C3 B1 MC B1 C1 B1 MC B1 C1
O.T.S
7T12 TOP AS PER DRG.
7T12BOTTOM
B1 MESH BOTH WAYS B1 B1 B1 7T12 TOP
4.80
B1 B1
100
100
B1 B1 B1 B1 7T12BOTTOM B1
THICK= 20 CM
MESH BOTH WAYS
CW THICK= 20 CM CW
C4 CTB1
MC C4 C9 C9 C9 C4 B1 100
C4 C3
C5 100 NOTES
2 B1 B1 MC B1 MC B1 MC B1 B1
MC
B1 B1 B1 B1 100
100
100
100
7T12 TOP
B2
2.70
7T12BOTTOM B1
MESH BOTH WAYS
B1 THICK= 20 CM
C3
3 B3
C8
B3
C3 C3
C3
B1
1.60
B1 B1 MC
C6 B1 C6 B1 C7 B1 B1
4 7T12 TOP
7T12BOTTOM
B1
7T12 TOP
7T12BOTTOM
7T12 TOP
7T12BOTTOM
MESH BOTH WAYS
B1 MESH BOTH WAYS B1 MESH BOTH WAYS
THICK= 20 CM
B1 B1
B1 THICK= 20 CM
B2 DETAIL OF STEEL AT O.T.S.
3.60
THICK= 20 CM
B1 MC B1 MC B1 B1 B1 MC SCALE 1:50
MC MC MC MC
B1 C2
25.50
5 B1
C4
B2
B2
3.95
MC B2 C8 B1 CTB1 B1 MC B1 CTB1 B1 MC B1 B1 B1 B1 B1 B1 B1 B1 C5
CTB1 CTB1 CTB1
C8
CTB1 C7 CTB1 CTB1 BEAMS AND SLAB REMARKS
C7 C9 C9 C7 B1 C10 CTB1
C4 C1 C6
6 7T12 TOP
7T12BOTTOM
MESH BOTH WAYS
7T12 TOP
7T12BOTTOM
MC
B1
* CONCRETE MIXES :-
B2 B1
2.45
FUTURE MEZZANINE
openings with bend length at least the effective beam/slab depth.
* All extra top reinforcements over columns shall be L/3 as shown or 3.0m
long whichever is larger. Reinforcements shall be placed centrally over
column unless otherwise specified.
WHICHEVER IS LARGER
HUSSEIN ALI ODHAH AL KHADRI
L/3 L/3
PROPOSED COMMERCIAL
WHICHEVER IS LARGER
L/3
CENTER (G+1)
DRAWING TITILE :
L/3
MEZZANINE FLOOR PLAN
WHERE: L - IS THE GREATER SPAN LENGTH BETWEEN
ADJACENT SPANS
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
A B C D E F G H I J K L M N O P Q R S T BEAMS
GRADE(FCU)
40
59.20 SLABS 40
UPSTAND, PARAPET 40
DOWNSTAND
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40 GRADE FOR STEEL FY = 460 N/mm2
CB1@
Building Department
CB1@ B(20X80)/B4 INV GOING WITH STAIR CB1@ 25MM EXPANSION JOINT CB1@ B(20X80)/B4 INV GOING WITH/STAIR LEVEL LANDING
B(20X80) B(20X80) B(20X80) B(20X80) B(20X80)
1 LEVEL LANDING LEVEL LANDING B(20X80) LEVEL LANDING
B(20X90)
100
100
B(20X80) 100
100
PTB(150X80)
B(20X80)
3.00 3.00 100
PTB(150X80)
4.80
B(20X80)
B(20X80)
100
ROTAED ON FIRST FLOOR
100
4.00
4.00
B(20X80)
2 SP SP O.T.S
B(20X90)
4.00
B(20X80)
AS PER DRG.
2.70
DP* (450)
100
100
3
3.00
1.60
100
4 100 NOTES
PTB(150X80)
B(20X80)
100
PTB(150X80)
100
100
100
PT SLAB 30cm
3.60
PT SLAB 26cm
B(20X80)
B(20X80)
25.50
B(20X80)
3.00
3.00
3.00
DP(450)
3.95
DP* (450)
DP* (450)
25MM EXPANSION JOINT
SCALE 1:50
4.00
B(20X80)
4.00
4.00
6 B(20X80) B(20X80)
2.45
7
BEAMS AND SLAB REMARKS
PTB(150X80)
* CONCRETE MIXES :-
B(20X80)
B(20X90)
B(20X80)
B(20X80)
6.40
WHICHEVER IS LARGER
HUSSEIN ALI ODHAH AL KHADRI
L/3 L/3
PROPOSED COMMERCIAL
WHICHEVER IS LARGER
L/3
CENTER (G+1)
DRAWING TITILE :
L/3
GROUND FLOOR PLAN
WHERE: L - IS THE GREATER SPAN LENGTH BETWEEN
ADJACENT SPANS
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
100
100
Building Department
100
100
100 100
A B C D E F G H I J K L M N O P Q R S T
59.20
100
100
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40 O.T.S
AS PER DRG.
100
100
100
100
CB1@
B(20X80)/B4 INV GOING WITH STAIR 25MM EXPANSION JOINT CB1@ B(20X80)/B4 INV GOING WITH STAIR LEVEL LANDING
B(20X80) B(20X80) B(20X80) B(20X80) B(20X80) B(20X80)
1 C1 LEVEL LANDING
B(20X90)
100
100
100
100
B(20X80)
NOTES
3.00
3.00 3.00
0.45
3.00
4.80
B(20X80)
B(20X80)
4.00
4.00
4.00
4.00
2 SP
DP* (450) DP* (450) DP* (450) SP DETAIL OF STEEL AT O.T.S.
B(20X90)
DP* (450)
3.0m x 4.0m 3.0m x 4.0m 3.0m x 4.0m ROOF(stairs)
COL COL 3.0m x 4.0m SCALE 1:50
2.70
C1 PLATNED ROOF
ROOF(stairs)
C1 PLATNED ROOF COL COL
B(20X80)
B(20X80)
25.50
aggregate size of 20 mm) to be used for mass and reinforced concrete for
B(20X90)
4.00
3.0m x 4.0m
25MM EXPANSION JOINT 3.0m x 4.0m DP* (450) all reinforced concrete superstructure with min. 400 O.P.C and max. slump
with plasticiser 70 mm .
4.00
3.0m x 4.0m
4.00
4.00
4.00
6 B(20X80)
DP* (450) 3.00
* Steel used is high tensile steel (60/40) with proof stress not less than
460 N/sq.m (UAE).
2.45
3.0m x 4.0m
B(20X80)
B(20X80)
6.40
* All reinforcements shall be provided with 90 degree bends on slab edges and
openings with bend length at least the effective beam/slab depth.
8 B(20X80) B(20X80) B(20X80) B(20X80) B(20X80) B(20X80) B(20X80) B(20X80) B(20X80)
* All extra top reinforcements over columns shall be L/3 as shown or 3.0m
long whichever is larger. Reinforcements shall be placed centrally over
column unless otherwise specified.
WHICHEVER IS LARGER
HUSSEIN ALI ODHAH AL KHADRI
L/3 L/3
PROPOSED COMMERCIAL
WHICHEVER IS LARGER
L/3
CENTER (G+1)
SLAB DESCRIPTION: P.T SLAB SLAB DESCRIPTION: P.T SLAB DRAWING TITILE :
L/3
FIRST FLOOR PLAN
WHERE: L - IS THE GREATER SPAN LENGTH BETWEEN
ADJACENT SPANS
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
A B C D E F G H I J K L M N O P Q R S T BEAMS
GRADE(FCU)
40
40
59.20 SLABS
UPSTAND, PARAPET 40
DOWNSTAND
4.10 3.60 1.40 2.24 1.20 5.66 1.50 3.10 4.58 3.38 3.35 4.10 3.70 3.70 3.36 1.40 2.24 1.20 5.40 GRADE FOR STEEL FY = 460 N/mm2
100
100
Building Department
100
100
B1 B1 100
1 CB1
C1
5T12 TOP & BOTTOM
CB1
C1
CB1
C1 5T12 TOP & BOTTOM
CB1
C1
100
100
100
4.80
B1 B1 0.35 B1 B1
C1 B1
O.T.S
C1 C1 B1 C1 C1
AS PER DRG.
2
100
100
CB1 CB1 B1 CB1
1.70
2.70
C1 B1
B1 C1 B1 100
100
3
1.60
100
100
100
100
4 NOTES
3.60
25.50
6
2.45
7
BEAMS AND SLAB REMARKS
* CONCRETE MIXES :-
6.40
20
construction joints unless otherwise approved by the structural designer
* All reinforcements shall be provided with 90 degree bends on slab edges and
TOP openings with bend length at least the effective beam/slab depth.
REINF. * All extra top reinforcements over columns shall be L/3 as shown or 3.0m
C1 long whichever is larger. Reinforcements shall be placed centrally over
BOTT column unless otherwise specified.
REINF. HUSSEIN ALI ODHAH AL KHADRI
WHICHEVER IS LARGER
WHICHEVER IS LARGER
L/3
CENTER (G+1)
DRAWING TITILE :
L/3
ROOF FLOOR PLAN
WHERE: L - IS THE GREATER SPAN LENGTH BETWEEN
ADJACENT SPANS
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
Building Department
SLAB
Ø8 /STEPS C D E F
AS/ARC.
B4 Ø12@15 c/c
BEAM AS/SCH.
GOING WITH STAIRS
AS/ARC.
NOTES
Ø8@20 /STEPS 1.40 2.25 1.20
Ø12@15 c/c B(20X80)/B4 INV GOING WITH STAIR
26C
Ø12@15 c/c Ø16@15 c/c
1
M
Ø12@15 c/c STAIRS THIRD FLIGHT 2
Ø16@15 c/c SECTION DETAILS
4.80
B4
BEAM AS/SCH.
GOING WITH STAIR
Ø8 /STEPS
Ø12@15 c/c
Ø12@15 c/c Ø8@20 /STEPS
SLAB
AS/ARC.
B4 Ø12@15 c/c
AS/ARC.
BEAM AS/SCH.
Ø16@15 c/c
2
26C
Ø12@15 c/c
M
Ø16@15 c/c
B4
BEAM AS/SCH.
B4
BEAM AS/SCH. HUSSEIN ALI ODHAH AL KHADRI
GOING WITH STAIR
Ø8 /STEPS
PROPOSED COMMERCIAL
0.2 2.25
0.2
1.85
0.2
CENTER (G+1)
H-h
Ø12@15 c/c
DRAWING TITILE :
0.2
AS/ARC.
Ø8@20 /STEPS
STAIR DETAILS
AS/ARC.
CM
Ø16@15 c/c
H (As/plan)
26
SP
2.0
2.4
PLOT NO. ARCH. ENG.
( OPENING )
Ø12@15 c/c
0252 ABDEL RAHMAN
h
TB AS/SCH.
SECTOR STRUC. ENG.
SOUTHERN SECTOR
0.2
STAIR FIRST FLIGHT 1 FLOOR LEVEL DISTRICT M.E.P. ENG.
SECTION DETAILS DET. OF LINTEL BEAM IN LEFT WALL SECTIONAL PLAN OF CW TALLAH 2
2.55
3.00
35.15
5.00
2.60
4.20
NOTES
2.95 27.15
8.00
3.25
2.50
2.10
30.45
25
25 45
(-0.25)
T12/15cm C/C
20
T12/15cm C/C
T12/15cmC/C
HUSSEIN ALI ODHAH AL KHADRI
T16@15cmC/C
T12/15 C/C
T16@15cmC/C
T12/15cmC/C
1.20
1.00
T12/15 C/C
PROPOSED COMMERCIAL
T12/15C/C T12/15C/C
CENTER (G+1)
(-1.45m LEVEL) 20 DRAWING TITILE :
W TANK DETAIL
80
80
T16@15cm C/C
(-2.60 m LEVEL)
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
SCALE
12 WATER TANK DETAILS 1:100
CHECKED BY :
Building Department
NOTES
I
I
HUSSEIN ALI ODHAH AL KHADRI
I
I
PROPOSED COMMERCIAL
CENTER (G+1)
DRAWING TITILE :
GENERAL NOTES
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
SCALE CHECKED BY :
1:100
SITTING LAYOUT PLAN SHEET NO. DATE :
SCALE : 1:100 24/04/2024
LIVE LOAD: 2.0KN/M2
DEAD LOAD: 2.0KN/M2
WALL LOAD: 13.0KN/M
FOR ROOFS
LIVE LOAD: 2.0KN/M2
DEAD LOAD: 3.0KN/M2
GENERAL NOTES
Engineering Affairs Sector
NOTES
9.0 ABBREVIATIONS:
9.1 GENERAL:
m
b
PROPOSED COMMERCIAL
CENTER (G+1)
DRAWING TITILE :
GENERAL NOTES
PLOT NO. ARCH. ENG.
0252 ABDEL RAHMAN
SCALE CHECKED BY :
1:100
SITTING LAYOUT PLAN
SCALE : 1:100 SHEET NO. DATE :
24/04/2024
LIVE LOAD: 2.0KN/M2
DEAD LOAD: 2.0KN/M2
WALL LOAD: 13.0KN/M
FOR ROOFS
LIVE LOAD: 2.0KN/M2
DEAD LOAD: 3.0KN/M2
GENERAL NOTES
Engineering Affairs Sector
1.0 GENERAL:
Building Department
NOTES
SCALE CHECKED BY :
SITTING LAYOUT PLAN 1:100