0% found this document useful (0 votes)
14 views3 pages

Project Phase Instruction

Uploaded by

Anbuchelvan VK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views3 pages

Project Phase Instruction

Uploaded by

Anbuchelvan VK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Phase 1: Planning and Research

Phase 2: Implementation and Development


Phase 3: Evaluation and Conclusion

Project Report: Three-Phase Breakdown

Introduction: The project is divided into three phases to ensure a systematic and
effective completion. Each phase has its specific objectives and deliverables aimed at
achieving the overall project goals. Below is a detailed breakdown of each phase along
with the guidance for submissions in the Eduvate Portal.

Phase 1: Planning and Research


Objectives:

Define project scope, objectives, and deliverables.


Conduct preliminary research to gather necessary information and
resources.
Develop a comprehensive project plan including timelines and milestones.

Tasks to be Completed:

1. Define the project scope document outlining the goals and objectives.
2. Conduct thorough research on the topic including literature review and data
collection.
3. Develop a project plan specifying tasks, timelines, and responsibilities.

Submission Headers - Eduvate Portal:

Provide the detailed project plan with timelines and milestones.


Provide list of Tools and other components that will be used in Executing the
Project

Headings in the Submission Document:

Abstract of the Project ( in Under 600 words : plagiarism Free)


System Requirements (Miniumum System Requirement to run this project)
Tools and Versions (Versions of various tools and languages that will be
used)
Phase 2: Implementation and
Development
Objectives:

Execute the project plan as per the defined timeline.


Develop the project components based on the research findings.
Regularly monitor progress and make necessary adjustments.

Tasks to be Completed:

1. Start implementing the project components such as software development,


data analysis, etc.
2. Regularly update project progress and communicate with team members.
3. Test and validate developed components to ensure functionality and quality.

Submission Guidance for Eduvate Portal:

Upload evidence of project implementation such as code snippets,


prototypes, or analysis reports.
Provide updates on project progress including any challenges faced and
solutions implemented.
Document the testing process and outcomes.

Headings in the Submission Document:

Abstract of the Project ( in Under 600 words : plagiarism Free)

System Requirements (Miniumum System Requirement to run this project)

Tools and Versions (Versions of various tools and languages that will be
used)

Flow Chart

Code Implementation: (Source Code)

Project Hurdles: (Difficulties Faced During the project)

Output: (Screenshots of errors or outputs received)


(By the End of Phase 2, Atleast 50 % of the project must be completed)
(Students Will Make individual Submission)

Phase 3: Evaluation and Conclusion


Objectives:

Evaluate the project outcomes against the initial objectives.


Gather feedback and make necessary improvements.
Summarize the project findings and conclude the work.

Tasks to be Completed:

1. Evaluate the project outcomes based on predefined criteria.


2. Gather feedback from stakeholders or users for improvement.
3. Summarize the project journey, key findings, and lessons learned.

Submission Guidance for Eduvate Portal:

Upload the evaluation report comparing the achieved outcomes with the
initial objectives.
Provide feedback received from stakeholders or users along with any
proposed improvements.
Conclude the project by summarizing the overall experience, challenges
faced, and future recommendations

Headings in the Submission Document:

Abstract of the Project ( in Under 600 words : plagiarism Free)


System Requirements (Miniumum System Requirement to run this project)
Tools and Versions (Versions of various tools and languages that will be
used)
Flow Chart
Code Implementation: (Source Code)
Output: (Screenshots outputs received)
Future Scope

You might also like