0% found this document useful (0 votes)
14 views13 pages

09 Preventive Maintenance

Uploaded by

vladimer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views13 pages

09 Preventive Maintenance

Uploaded by

vladimer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 1 of 13

Prerequisite Programs
Preventive Maintenance Program

ENGINEERING AND MAINTENANCE GOALS


 TO PROVIDE QUALITY AND CONTINUES REFRIGERATION SYSTEM OPERATION
 TO PROVIDE QUALITY PREVENTIVE MAINTENANCE SCHEDULE FOR EQUIPMENT
 TO MAINTAIN AND REPAIR ALL ELECTRICAL AND ALL MECHANICAL INSTALLATION AND EQUIPMENTS
 TO MAINTAIN AND REPAIR COLD STORAGE FACILITIES
 TO MAINTAIN AND REPAIR ADMIN BUILDING AND OTHER FACILITIES

MACHINE ROOM OPERATORS RESPONSIBILITY


 MACHINE ROOM OPERATORS ARE IN CHARGE OF STARTING AND SHUTDOWN OF REFRIGERATION SYSTEM.
THEY ARE ALSO IN CHARGE FOR MAINTAINING AND MONITORING THE TEMPERATURE OF COLD STORAGE
ROOMS, DEFROSTING AND HOURLY LOG IN OF TEMPERATURE, COMPRESSORS PARAMETERS, CONDENSER
PRESSURE AND AMMONIA PUMP.
 CONDUCT ROVING INSPECTION AT COLD STORAGE AND FACILITIES
 CONDUCT WEEKLY WARM UP OF GENERATOR SET
 IN CHARGE OF PLUG IN AND PLUG OUT OF REEFER VAN
 ASSIST IN THE REPAIR AND PREVENTIVE MANTENANCE OF EQUIPMENTS

ENGINEERING AND MAINTENANCE PROCESS


 STARTING OF REFRIGERATION SYSYTEM
1. SWITCH ON CONDENSER FAN MOTOR AND PUMP

2. START RUNNING HIGH STAGE COMPRESSOR AT 20% CAPACITY

3. SWITCH ON AMMONIA PUMP OF -8 SEPARATOR AND EVAPORATORS FAN OF LOADING BAY

4. START RUNNING LOW STAGE COMPRESSOR AT 20% CAPACITY

5. SWITCH ON AMMONIA PUMP OF -37 SEPARATOR AND EVAPORATORS FAN OF TWO COLD ROOMS

6. SWITCH ON AIR PURGER

7. AFTER THE SUCTION PRESSURE AND DISCHARGE PRESSURE OF HIGH STAGE AND LOW STAGE
COMPRESSOR REACH THE SET POINT VALUE THEN

8. HIGH STAGE AND LOW STAGE COMPRESSOR CAN RUN ON AUTOMATIC OPERATION

9. SWITCH ON NOW ALL COLD STORAGE ROOM EVAPORATORS FAN

10. START MONITORING OF TEMPERATURE AND PARAMETERS OF COMPRESSORS

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 2 of 13

Prerequisite Programs
Preventive Maintenance Program

 SHUTDOWN OF REFRIGERATION SYSTEM


1. SWITCH OFF EVAPORATOR FAN OF ALL COLD ROOMS AND LOADING BAY

2. SWITCH OFF AMMONIA PUMP OF -8 SEPARATOR AND -37 SEPARATOR

3. START UNLOADING LOW STAGE COMPRESSOR

4. AT ZERO LOAD CAPACITY SWITCH OFF THE COMPRESSOR

5. START UNLOADING HIGH STAGE COMPRESSOR

6. AT ZERO LOAD CAPAPCITY SWITCH OFF THE COMPRESSOR

7. SWITCH OFF CONDENSER

8. SWITCH OFF AIR PURGER

 REFRIGERATION CYCLE
STARTING FROM THE HIGH STAGE COMPRESSOR, GAS AMMONIA IS COMPRESS TO A CERTAIN HIGH
TEMPERATURE AND PRESSURE AND THEN CONDENSE AT THE EVAPORATIVE CONDENSER TO BECOME LIQUID
AMMONIA GOING AT THE RECEIVER AND THEN AT THE -37 RE CIRCULATOR, LIQUID AMMONIA AT THE RE CIRCULATOR
IS PUMP UP TO THE EVAPORATOR OF EVERY COLD STORAGE ROOMS, LIQUID AMMONIA AT EVAPORATOR BECOME
SATURATED GAS GOING BACK AT -37 RE CIRCULATOR, BOOSTER OR LOW STAGE COMPRESSOR SUCTION SATURATED
GAS TO BOOST THE TEMPERATURE AND PRESSURE OF AMMONIA GAS TO INTERCOOLER AND HIGH STAGE
COMPRESSOR SUCTION IT AND COMPRESS IT AGAIN TO A CERTAIN HIGH TEMPERATURE AND PRESSURE TO FORM A
REFRIGERATION CYCLE.

 TEMPERATURE MONITORING
1. HOURLY LOG IN OF COLD STORAGE TEMPERATURE

2. HOURLY ROVING MONITORING OF DIAL AND DATA LOGGER AT COLD STORAGE

3. CONTROLING OF COLD STORAGE ROOM TEMPERATURE AT CONTROL ROOM

 COMPRESSOR MONITORING
1. HOURLY LOG IN OF COMPRESSORS PARAMETERS

2. HOURLY LOG IN OF AMMONIA PUMP PRESSURE

3. HOURLY LOG IN OF CONDENSER PRESSURE

 ROVING INSPECTION
1. HOURLY INSPECTION AT COLD STORAGE FOR POSSIBLE AMMONIA LEAK

2. HOURLY INSPECTION AT COLD STORAGE FOR ICE BUILD UP

3. HOURLY INSPECTION AT COLD STOREGE FOR EQUIPMENT BREAKDOWN

4. HOURLY INSPECTION AT FACILITIES FOR ANY DAMAGES

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 3 of 13

Prerequisite Programs
Preventive Maintenance Program

5. HOURLY INSPECTION AT FACILITIES FOR BUSTED BULBS

6. HOURLY INSPECTION AT FACLITIES FOR PLUG IN REEFER VAN

 WEEKLY WARM UP OF GENERATOR SET


1. CHECK UP OF BATTERY

2. CHECK UP OF DIESEL FUEL

3. CHECK UP OF COOLANT

4. CHECK UP OF ENGINE OIL

5. STARTING UP OF GENERATOR FOR 15 MINUTES

 PLUG IN AND PLUG OUT OF REEFER VAN


1. CHECK REEFER VAN IF THERE IS A CABLE WIRE AND MALE SOCKET FOR PLUG IN

2. CHECK IF THE REEFER VAN IS 440V OR 220V POWER SUPPLY

3. IF THERE IS AN AVAILABLE FEMALE SOCKET PLUG IT DIRECTLY

4. IF THERE IS NO AVAILABLE FEMALE SOCKET REMOVE MALE SOCKET AND WIRED IT AT THE
EXTENSION WIRE WE PROVIDE AT PLUG STATION

5. LOG THE TIME, REEFER VAN NUMBER, CUSTOMER NAME AND MRO NAME

6. SIGN IT WITH THE CUSTOMER AND CHECKER

7. LOG THE DATA AT PLUG IN AND OUT LOG BOOK

ENGINEERING AND MAINTENANCE PREVENTIVE MAINTENANCE SCHEDULE


 COMPRESSOR
1. SEMI ANNUAL REPLACEMENT OF REFRIGERATION OIL

2. SEMI ANNUAL COMPRESSOR MOTOR BEARING LUBRICATION

3. CLEANING OF OIL STRAINER

4. CLEANING OF SUCTION STRAINER

5. CHECKING OF COUPLING

6. CHECKING OF ELECTRICAL CONNECTION

7. CHECKING OF SENSOR AND CALIBRATION IF NEEDED

 FORKLIFTS
1. YEARLY REPLACEMENT OF HYDRAULIC OIL

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 4 of 13

Prerequisite Programs
Preventive Maintenance Program

2. LUBRICATION OF LIFT MAST, MAST ROLLER, CHAIN AND CHAIN PULLEYS

3. LUBRICATION OF FORK CARRAGE

4. CHECK DISTILLED WATER OF BATTERY

5. CHECK LOAD WHEEL FOR DAMAGES AND DEFORMATION

6. CHECK BRAKE FLUID

7. CHECK HYDRAULIC HOSE LINE

8. COORDINATE WITH THE THIRD PARTY SERVICE PROVIDER FOR IMMEDIATE REPAIR OR SERVICE

 EVAPORATIVE CONDENSER
1. THIRD PARTY SERVICE PROVIDER

2. DESCALING OF EVAPORATIVE COIL

3. HIGH PRESSURE WASHER CLEANING

4. SERVICE OF DIAMAGNETISM

 EVAPORATOR FAN
1. FAN MOTOR REWINDING

2. INSPECTION OF AMPERES

3. INSPECTION OF VIBRATION

4. REMOVAL OF ICE BUILD UP

 MAIN TRANSFORMER
1. THIRD PARTY SERVICE PROVIDER

2. INSULATION RESISTANCE TEST

3. WINDING RESISTANCE TEST

4. TRANSFORMER RATIO TEST

5. POLARIZATION TEST

6. TRANFORMER OIL TEST

7. OIL LEAK INSPECTION

 VFD (VARIABLE FREQUENCY DRIVE


1. THIRD PARTY SERVICE PROVIDER

2. CLEAN FAN PCV BOARD AND CAPACITOR

3. CALIBRATION OF SENSOR

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 5 of 13

Prerequisite Programs
Preventive Maintenance Program

4. CLEANING OF FILTERS

 HAND PALLETS
1. REPLACEMENT OF HYDRAULIC OIL

2. REPLACEMENT OF DEFECTIVE TIRE WHEEL AND BEARING

3. REPLACEMENT OF OIL SEAL

4. REPLACEMENT OF COMPRESSION SPRING

5. REPLACEMENT OF SHAFTING

 FACILITY MAINTENANCE

1. REPLACEMENT OF BUSTED BULBS

2. REPAINTING WORKS

3. CIVIL WORKS

4. DOOR REPAIR

5. LEAK REPAIR

PREVENTIVE MAINTENANCE SCHEDULE OF COMPRESSOR

 CHANGE OIL EVERY 6 MONTHS

 COMPRESSOR MOTOR BEARING LUBRICATION

 7 DRUMS OF CAPELLA OIL

 1 PAIL OF POLYREX GREASE

PREVENTIVE MAINTENANCE SCHEDULE OF HAND PALLET

 CHANGE OR TOP UP OIL EVERY 6 MONTHS

 WHEEL BEARING LUBRICATION OR REPLACEMENT

 3 PAILS OF HYDRAULIC OIL

 1 PAIL OF GREASE

PREVENTIVE MAINTENANCE SCHEDULE OF FORKLIFT

 CHANGE OR TOP UP OIL EVERY 6 MONTHS

 MAST,CHAIN AND MAST BEARING LUBRICATION

 EVERY WEEK BATTERY SOLUTION TOP UP

 3 PAILS OF HYDRAULIC OIL

 1 PAIL FOOD GRADE GREASE

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 6 of 13

Prerequisite Programs
Preventive Maintenance Program

 10 GALLONS OF DISTILLED WATER

PREVENTIVE MAINTENANCE SCHEDULE OF REFIGERATION SYSTEM

 ONCE A YEAR CHARGING OF AMMONIA

 10 CYLINDRICAL TANK OF AMMONIA

PREVENTIVE MAINTENANCE SCHEDULE OF EVAPORATOR

 REWINDING OF FAN MOTOR

PREVENTIVE MAINTENANCE SCHEDULE OF EVAPORATIVE CONDENSER

 QUARTERLY COIL DESCALING

 THEOVERM YEARLY CONTRACT FOR DESCALING

PREVENTIVE MAINTENANCE SCHEDULE OF GENERATOR SET

 EMISSION TESTING EVERY 6 MONTHS

 CHANGE OIL EVERY 10K RUNNING HOURS

 YEARLY TOP UP OF FUEL

 RENEW PERMIT TO OPERATE AIR

MAINTENANCE WORK AT COLD STORAGE AND ADMIN OFFICE

 REPLACEMENT OF 250 WATTS METAL HALLIDE BUSTED BULB

 REPLACEMENT OF 250 WATTS BALLAST AND CAPACITOR

 REPLACEMENT OF 36 WATTS FLOURESCENT BUSTED BULB

 REPLACEMENT OF ELECTRONIC BALLAST

 REPLACEMENT OF DAMAGE PLASTIC CURTAIN

 REPAINTING WORKS

 REPLACEMENT OF LOAD CELL FOR WEIGHING SCALE

WATER DISCHARGE PERMIT

 WATER DISCHARGE TEST EVERY MONTH

 RENEWAL OF WATER DISCHARGE PERMIT

PREVENTIVE MAINTENANCE SCHEDULE OF VARIABLE FREQUENCY DRIVE ( VFD )

 ONCE A YEAR MAINTENANCE SERVICE BY DANFOSS

PREVENTIVE MAINTENANCE SCHEDULE OF 2MV TRANSFORMER

 ONCE A YEAR MAINTENANCE SERVICE BY MEGA POWER

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 7 of 13

Prerequisite Programs
Preventive Maintenance Program

LIST OF MACHINES AND EQUIPTMENT


1 UNIT GENERATOR SET
BRAND NAME : CATERPILLAR
MODEL : SR4
SERIAL NUMBER: GPA 02632
STAND BY POWER: 1562 KVA, 1250 KW
VOLTAGE : 440 VOLTS
CURRENT : 1878 AMPERES
PRIME MOVER MODEL: 3512
SERIAL NUMBER: 1KZ01587
FUEL CONSUMPTION: 100 LITERS/ HOUR

2 UNITS SCREW COMPRESSOR ( BOOSTER )


BRAND NAME : FRICK
MODEL : RWF 11- 177
CAPACITY : 407 KW
TE / TC : - 37 C/ -8 C
REFRIGERANT : R717
PC : 91.2 KW
MOTOR RATING: 125 KW / 150 HP
RUNNING SPEED: 3600 RPM
CURRENT : 205.267 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

1 UNIT SCREW COMPRESSOR ( HI- STAGE )


BRAND NAME : FRICK
MODEL : RWF 11- 222
CAPACITY : 1552.4 KW
TE / TC : -8 C/ +35 C
REFRIGERANT : R717
PC : 386.1 KW
MOTOR RATING: 429 KW / 517 HP
RUNNING SPEED: 3600 RPM
CURRENT : 704.479 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

1 UNIT SCREW COMPRESSOR ( SWING )


BRAND NAME : FRICK
MODEL : RWF 11-222
CAPACITY : 1552.4 KW cond. 1 / 511.1 KW cond. 2
TE / TC : -8 C/ +35 C cond. 1 / -37 C/ -8 C cond. 2
REFRIGERANT : R717
PC : 386.1 KW cond. 1 / 112 KW cond. 2
MOTOR RATING: 429 KW / 517 HP
RUNNING SPEED: 3600 RPM
CURRENT : 704.479 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 8 of 13

Prerequisite Programs
Preventive Maintenance Program

1 UNIT SCREW COMPRESSOR ( BOOSTER SMALL ) FROM VVS 2 (ON GOING REPLACEMENT)
BRAND NAME : SABROE
MODEL : SAB 151E
CAPACITY : 262 KW
TE / TC : -37 C / -8 C
REFRIGERANT : R717
PC : 64.4KW
MOTOR RATING: 86 KW / 103.75 HP
RUNNING SPEED: 3600 RPM
CURRENT : 141.22 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

1 UNIT SCREW COMPRESSOR ( HIGH STAGE SMALL ) FROM VVS 1


ON GOING REPLACEMENT
BRAND NAME : SABROE
MODEL : SAB 163
CAPACITY : 762 KW
TE / TC : -8 C / +35 C
REFRIGERANT : R717
PC : 222.1 KW
MOTOR RATING: 280 KW / 267.94 HP
RUNNING SPEED: 3600 RPM
CURRENT : 364.72 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

2 UNITS EVAPORATIVE CONDENSER


BRAND NAME : SNOWKEY
MODEL : SEC – 1585
CAPACITY : 1150 KW / 283 TONS per unit
REFRIGERANT : R717
PUMP MOTOR : 5.5 KW
FAN MOTOR : 5 X 4 KW
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ
CIRCULATION RATE : 850 gallons per minute
EVAPORATION : 7.65 gallons per minute
RATE OF MAKE UP WATER : 12.75 gallons per minute

1 UNIT EVAPORATIVE CONDENSER


BRAND NAME : SNOWKEY
MODEL : SEC – 2490
CAPACITY : 1844 KW / 566 TONS
REFIGERANT : R717
PUMP MOTOR : 2 X 5.5 KW
FAN MOTOR : 2 X 11 KW
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ
CIRCULATION RATE : 1,698 gallons per minute
EVAPORATION : 15.28 gallons per minute
RATE OF MAKE UP WATER : 25.47 gallons per minute

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 9 of 13

Prerequisite Programs
Preventive Maintenance Program

2 UNITS AMMONIA PUMP

BRAND NAME : LEDERLE


SERIAL NUMBER: 400002007 / 400002008
PUMP TYPE : CNF 50 – 200
MOTOR TYPE : AGX 8.5
CAPACITY : 7.2 CUBIC METER / HOUR
TEMPERATURE: -37 C AT 60 HZ
PC : 7.81 KW
RUNNING SPEED: 3519 RPM
CURRENT : 20 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

3 UNITS AMMONIA PUMP with 1 SPARE

BRAND NAME : WITT


MODEL : HRP 5050
CAPACITY : 3.5 CUBIC METER / HOUR
PC : 4.8 KW
RUNNING SPEED: 3500 RPM
CURRENT : 12 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

4 UNITS AMMONIA PUMP

BRAND NAME : WITT


MODEL : HRP 8050
CAPACITY : 5.5 CUBIC METER / HOUR
PC : 4.8 KW
RUNNING SPEED: 3500 RPM
CURRENT : 12 AMPERES
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

2 UNITS EVAPORATOR ( BLAST FREEZER )

BRAND NAME : THERMOFIN


MODEL : X-TAFA090.1-H-3-32-16-8-HG
CAPACITY : 167 KW
RT : -30 C
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

19 UNITS EVAPORATOR ( COLD STORAGE ROOMS)

BRAND NAME : THERMOFIN


MODEL : X-TEN.1-065-E-3-7-E
CAPACITY : 40 KW
RT : -27 C
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

4 UNITS EVAPORATOR ( LOADING AREA )

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 10 of 13

Prerequisite Programs
Preventive Maintenance Program

BRAND NAME : THERMOFIN


MODEL : TADNO45.1-E-2-10
CAPACITY : 30 KW
RT : + 10 C
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

4 UNITS EVAPORATOR ( ANTE ROOM )

BRAND NAME : THERMOFIN


MODEL : S-GHT050-2C/310-HL/24P.1
CAPACITY : 30 KW
RT : +7 C
VOLTAGE : 440 VOLTS, 3 PHASE, 60 HZ

3 UNITS PRESSURE VESSEL TANK

-37 RE CIRCULATOR
MODEL : HORIZONTAL RE CIRCULATOR ( 1.83MO X 3.0M SL )
-8 INTERCOOLER
MODEL : HORIZONTAL INTERCOOLER WITH COIL ( 1.83MO X 3.0M SL )
SEPARATOR
MODEL : HORIZONTAL LIQUID RECEIVER ( 1.2MO X 3.85M SL )
1 UNIT VARIABLE FREQUENCY DRIVE

BRAND NAME : DANFOSS


SERIAL NUMBER: 000230H363
P/N : 131G7079
CAPACITY : 450 KW / 600 HP
RATED INPUT : 3 X 380 – 480 VOLT, 50 HZ / 60 HZ, 787 AMPERES / 718 AMPERES
RATED OUTPUT : 3 X 0 – VOLT INPUT, 0 – 590 HZ, 800 AMPERES / 730 AMPERES

1 UNIT AUTOMATIC AIR PURGER

BRAND NAME : HANSEN


MODEL : APO8
SERIAL NUMBER: 7298H
VOLTAGE : 120 VOLTS, 1 PHASE, 60 HZ
CURRENT : 3.0 AMPERES

1 UNIT HIGH VOLTAGE SWITCH GEAR

BRAND NAME : COOPER


SERIAL NUMBER: 12E501
TYPE : VN2-24
CAPACITY : 13.8 KV, 3 PHASE, 3 WATT, 60 HZ

1 UNIT PAD MOUNTED TRANSFORMER

BRAND NAME : DONG A ELECTRIC LTD.


SERIAL NUMBER: 13-3P 3017
RATED CAPACITY: 2000 KVA

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 11 of 13

Prerequisite Programs
Preventive Maintenance Program

PRIMARY VOLTAGE: 13200 VOLTS


SECONDARY VOLTAGE: 480 VOLTS
PRIMARY CURRENT: 87.5 AMPERES
SECONDARY CURRENT: 2405.6 AMPRES
COOLING METHOD : ONAN

2 UNITS DRY TYPE TRANSFORMER

BRAND NAME : DELTA STAR / MOBILECT


SERIAL NUMBER: 2K14MO911-883 / 250 2014-2
CAPACITY : 250 KVA, 3 PHASE, 60 HZ
PRIMARY VOLTAGE: 480 VOLTS
SECONDARY VOLTAGE: 240 VOLTS
PRIMARY CURRENT: 300.7 AMPERES
SECONDARY CURRENT: 601.4 AMPERES

1 UNIT LOW VOLTAGE SWITCH GEAR

BRAND NAME : SCHNEIDER


VOLTAGE : 440 VOLTS, 3 PHASE, 3 WATTS, 60 HZ
CURRENT : 2500 AMPERES
1 UNIT DISTRIBUTION PANEL

CAPACITY : 440 VOLTS, 3 PHASE, 60 HZ


CURRENT : 1250 AMPERES CB, 1600 AMPERES CB, 680 AMPERES CB, 2 X 400 AMPERES CB

2 UNIT CONTROL PANEL FOR CORRIDOR 1 AND 2

CAPACITY : 440 VOLTS, 3 PHASE, 60 HZ


CONTROL TYPE: TEMPERATURE CONTROLER
BRAND NAME : DANFOSS

2 UNIT LIGHTING PANEL

CAPACITY : 220 VOLTS, 1 PHASE, 60 HZ

1 UNIT REEFER VAN PLUG IN AND OUT PANEL

CAPACITY : 440 VOLTS, 3 PHASE, 60 HZ

1 UNIT DEEP WELL PUMP

BRAND NAME : FRANKLIN ELECTRIC


MODEL : 2366028120
CAPACITY : 8.6 KW / 10 HP
SPEED : 3460 RPM
VOLTAGE : 230 VOLTS, 3 PHASE, 60 HZ
CURRENT : 32.2 AMPERES
DEEP : 9 PIPES DEEP

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 12 of 13

Prerequisite Programs
Preventive Maintenance Program

5 UNITS BATTERY CHARGER FOR FORKLIFTS

BRAND NAME : BPI


SERIAL NUMBERS: 14018319,14018320,13002155,13003607,13001161
OUTPUT DC : 48 VOLTS DC
CURRENT : 120 AMPERES
CAPACITY : 750 Ah
INPUT AC : 230 VOLTS, 3 PHASE, 60 HZ
POWER : 7.34 KW

5 UNITS BATTERY FOR FORKLIFTS

BRAND NAME : BAE


MODEL : 8P2S 700, 5P2S 700
SERIAL NUMBERS: 14001,14002,14003,14017,14018
CELL : 24 CELLS
CAPACITY : 700 Ah
VOLTAGE : 48 VOLT DC

3 UNITS BATTERY FOR FORKLIFTS

BRAND NAME : MIDAC


SERIAL NUMBERS: 112545,112544,112543
CELL : 24 CELLS
CAPACITY : 700 Ah
VOLTAGE : 48 VOLT DC

2 UNITS BATTERY FOR FORKLIFTS

BRAND NAME : HAWKERS


SERIAL NUMBERS: 117488 E15 / 117483 E15
CELL : 24 CELLS
CAPACITY : 700 Ah
VOLTAGE : 48 VOLTS DC

1 UNIT BATTERY CHARGER FOR GENERATOR SET

BRAND NAME : UPEI


MODEL : UPEI RBC 24 VDC-20A
INPUT VOLTAGE: 24 VOLTS, 1 PHASE, 60 HZ
OUTPUT VOLTAGE: 24 VOLTS DC
OUTPUT CURRENT: 20 AMPERES

5 UNITS FORKLIFT TRUCKS

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager
Document Code: Effective Date:

VVSCSPPC-DVO-PRP-09 January 09, 2017


Revision: 04 Page 13 of 13

Prerequisite Programs
Preventive Maintenance Program

BRAND NAME : LINDE


MODEL SERIAL NUMBER MAST NUMBER
R20S – 12 H2X115D03036 / 2013 (H2X187D00852) M187-020T02-1045-06 / 115
R20S – 12 H2X115D03042 / 2013 (H2X187D00851) M187-020T02-1045-06 / 115
R20S – 12 H2X115D03029 / 2013 (H2X187D00853) M187-020T02-1045-06 / 115
R20HD – 01 H21120F01851 / 2015 (H21502F00725) M1502-02T00-1065-06 / 112
R20HD – 01 H21120F01804 / 2015 (H21502F00745) M1502-02T00-1065-06 / 112

3 UNITS WEIGHING SCALE

BRAND NAME : ASUKI


MO0DEL : E 120
CAPACITY : 2 TONS

3 UNITS WEIGHING SCALE

BRAND NAME : ASUKI


MODEL : E 120
CAPACITY : 750 KILOGRAMS

12 UNITS PALLET TRUCKS

BRAND NAME : EURO LIFTER / MHEG


CAPACITY : 2500 KILOGRAMS

20 UNITS DATA LOGGER ( FOR COLD ROOM )

BRAND NAME : TESTO


MODEL : 174T

2 UNITS DATA LOGGER ( FOR BLAST FREEZER )

BRAND NAME : TESTO


MODEL : 175T3

Prepared By: Approved By:

Jaya M. Andres Jay Silvano


Documents Controller Engineering Manager