0% found this document useful (0 votes)
34 views7 pages

External Works

Works

Uploaded by

eldersagir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views7 pages

External Works

Works

Uploaded by

eldersagir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

External Works

S/ DESCRIPTION QTY UNIT RATE AMOUNT


N N
K
EXTERNAL WORKS

SITE PREPARATION

Clear site of all shrubs, bushes and the like and grub
A up their roots and dispose of as directed 1100 m2 300.00 330,000.00

Excavate oversite to remove vegetable soil average


150mm deep and wheel, spread and level on site as
B directed. 1100 m2 250.00 275,000.00

Grade and level excavated surface to follow natural


C terrain of site 1100 m2 250.00 275,000.00

SITE PREPARATION
Carried to Summary 880,000.00

External Works
3/1
External Works

DRIVES AND PARKING

Approved rock laterite to 100% BS compaction:


Approved laterite hardcore filling well rammed and
A consolidated, in layers not exceeding 150mm thick 330 m3 3,000.00 990,000.00

Concrete Work

Plain insitu concrete

Plain precast vibrated concrete grade 20 in:

150x300x450mm long half battered kerb finished


fair on all exposed faces and bedded, jointed and
pointed in cement mortar on and
including300x100mm thick bed and haunched up at
front with and including all necessary formwork
B and excavations. 154 m 6,500.00 1,001,000.00

C Ditto curved to various radii 68 m 7,000.00 476,000.00

Interlocking tiles

60mm thick precast paving interlocking slabs laid


in approved pattern on and including 50mm thick
D cement and sand bed 1100 m2 10,000.00 11,000,000.00

DRIVES AND PARKING


Carried to Summary 13,467,000.00

External Works
3/2
External Works

LANDSCAPING

Allow a provisional sum of N1,000,000.00 for soft


landscaping to be expended as directed by the
A Architect. Sum 1,000,000.00

LANDSCAPING
Carried to Summary 1,000,000.00

External Works
3/3
External Works

DRAINAGE

Surface water drainage

Excavate trench for storm water drains starting


A from stripped level and not exceeding 1.50mm deep 162 m3 3,000.00 486,000.00

B Remove surplus excavated material from site 162 m3 400.00 64,800.00

Concrete work

Reinforced insitu concrete

Vibrated concrete grade 20 in:

C 100mm thick bed 196 m2 9,500.00 1,862,000.00

Reinforcement

BRC fabric mesh reinforcement to BS 4483 ref.


A142 weighing 2.22kg/m2 laid and lapped in
accordance with manufacturer's instructions in:

D Bed 196 m2 1,800.00 352,800.00

Blockwork

Hollow sandcrete blockwork filled solid with


vibrated concrete grade 20 and jointed in cement
and sand mortar (1:3)

E 225mm wall 258 m2 11,000.00 2,838,000.00

Rendering

15mm thick cement and sand (1:3) rendering


finished fair and smooth on:

F walls 258 m2 4,200.00 1,083,600.00

DRAINAGE
Carried to Summary 6,687,200.00

External Works
3/4
External Works

EXTERNAL SERVICES

Street Lighting

Supply and lay the following cables in trenches, pvc


pipes or blockwork (All provisional)

B 4Cx6mm2 pvc/swa/pvc copper cable 405 m 3,500.00 1,417,500.00

C 1x25W SON-T city sphere amenity pole mounted


fitting with 400mm diameter globe on 3m street
lighting pole 10 90,000.00 900,000.00

D 30A street lighting kiosk complete with contactor


and out going terminals 1 nr 255,000.00 255,000.00

EXTERNAL SERVICES
Carried to Summary 2,572,500.00

External Works
3/5
External Works

SUMMARY

SITE PREPARATION 3/1 880,000.00

DRIVES AND PARKING 3/2 13,467,000.00

LANDSCAPING 3/4 1,000,000.00

DRAINAGE 3/5 6,687,200.00

EXTERNAL SERVICES 3/9 2,572,500.00

EXTERNAL WORKS AND SERVICES


Carried to General Summary 24,606,700.00

External Works
3/6
Proposed Islamic School

PROPOSED ISLAMIC ACADEMY

GENERAL SUMMARY
S/NO. PAGE AMOUNT

GENERAL SUMMARY

BILL NR. 1: Preliminaries and General Clauses 500,000.00

BILL NR. 2: External Works 24,606,700.00

N 25,106,700.00
CONTINGENCIES

Allow a provisional sum of N2,000,000.00 for


contingencies to be expended as directed by the N 2,000,000.00
Architect
SUB TOTAL 27,106,700.00

Add V.A.T 5%
1,355,335.00

GRAND TOTAL N 28,462,035.00