Estimation Concepts 51608
Estimation Concepts 51608
1. Which among the following is the major reason one should estimate for? Select the correct
option(s) and click submit.
2. Which of the following is not estimated in development projects? Select the correct option(s)
and click submit.
Size
Effort
Schedule
Resource Rate
3. Which of the following parameter is not estimated for support based projects? Select the
correct option(s) and click submit.
Effort
Schedule
FTE
Size
4. It is a method of software estimation that is based on consultation with one or more experts
that have experience with similar projects. What are we talking about?
Wideband Delphi
COCOMO
SLIM Tool
COCOTS
5. A particular estimation "parameter" is getting calculated through this formula: y* sqr root
PY(square root of effort in Pe Years). The value of y is 2.50 -3.00 for projects of effort <= 180
person months and 2.00 -2.50 for projects of effort > 1 Select the correct option(s) and click
submit.
Size in LOC
Schedule in Months
Cost in USD
Continue
6. NESMA, FISMA, COSMIC and IFPUG publish the variants of one counting practice. Which
counting practice are we refer here?
Requirement Points
Fundamental Point
Feature Point
Function Point
Size
Effort
Price
Schedule
estimation.
8. The estimated effort for a project is 500 PH end to end (analysis to pre-implementation).
However, the estimator feels around 50 PH of effort would be needed for development
environment set up. In which category of effort adjustment should it be accounted
Common Factor
Risk Factors
Static Factors
10. Which of the following documentation is useful when conducting any functional size
measurement? Select the correct option(s) and click submit.
Class diagrams
Data/Object models
Requirements
11. Which of the following is not true of a boundary? Select the correct option(s) and click
submit.
12. Baseline or installed functional size is synonymous with which of the following? Select the
correct option(s) and click submit.
Is self-contained and leaves the business of the application being counted in a consistent state
14. When can an elementary process be classified as an EQ? Select the correct option(s) and
click submit.
15. One can classify each elementary process as an external input (El), external output (EO), or
an external inquiry (EQ) based on:
16. Which of the following can be a possible FTR? Select the correct option(s) and click submit.
External inquiries
Application Boundary
18. Identify the formula for Value Adjustment Factor. Select the correct option(s) and click
submit.
Incoming incidents
Number of applications
Number of users
20. Match the following estimation areas with its corresponding unit of measurement. 1. Size a.
Person Days
3. Schedule c. $290
21. An application in production needs to be supported for a period of two years. Which of the
following estimation mode needs to be used for estimation of effort and FTE for the above
project?
CRM-Siebel
22. An automation testing team wants to determine its productivity for this year. Which of the
following do you think is/are suitable determinator(s) for computing productivity in a testing
team?
Automation Tool
23. For estimation in a maintenance project, for a change request ranging around 100 PD, ECOE
recommends the following estimation model.
24. You are estimating a large bespoke development project using ADM detailed development
model. What is the possible output?
500 KLOC
25. What is OBP in context of estimation? Select the correct option(s) and click submit.
Performance Testing
27. Prem is the project manager for a support based project in which he needs at least 10PH for
monitoring the application
Productivity
Common Factors
Static Factor
28. What are the primary driving factors for the determination of size for CRs?
Change Complexity
Program Complexity
Requirement descriptions
Both a and b
29. While performing effort estimation, what is the productivity determinator for Function Point
based Detail Development model?
Technology
Team Size
Number of SME's
Statement 2: Common factors and Project specific characteristics doesn't depend on the size of the
project. Which of the above statement(s) is/are correct?
Statement 1
Statement 2
None