0% found this document useful (0 votes)
3 views

Assignment Prasoon

Uploaded by

Prasoon Khare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Assignment Prasoon

Uploaded by

Prasoon Khare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Hi Prasoon,

As discussed, please find the assignment.

The subject is “Data Center Generator Market” in which you are supposed to identify the maximum
numbers of companies serving the market, to identify major drivers and challenges, to identify
recent advancements, and to conduct competitive analysis.

Primary research is not required for this study. All estimations and analysis must be performed
based on the available secondary information. Other research studies can also be leveraged to find
the relative information.

Project Title: Data Center Generator Market

1. Develop Report Title with the Most Number of Segmentations (Please mention all
segmentation and their sub-segmentations)
2. Identify Market Drivers and Challenges Shaping the Market (based on secondary research)
3. Estimate global market size (2023) and forecast up to 2030 (based on secondary research)
a. Include all assumptions considered during the data analysis
b. Identify the right research methodology (supply- or demand-side analysis)
4. Triangulate the Estimated Market Size from Multiple Ways

Expected Deliverables: Excel Sheet (Covering all market size and assumptions) and Presentation
(Covering graphs and relevant insights)

Deadline: 4-5 Days (13-Jan-2025)

You might also like