1. This is the Technical Appendix to Surrey Design: A strategic guide to quality built environments. It
expands upon Chapter 6 – Movement and elements of Chapter 4 – Resources and Chapter 2
- Quality, of the main guide. This Technical Appendix has been adopted by Surrey County
Council as supplementary planning guidance.
2. Surrey Design advocates a new approach to design which considers neighbourhoods
comprehensively; highways and transportation are just one element. The designer should
be aware that the main principles of Surrey Design will always apply and that the resolution of
any potential conflict should be based on the principles of good design contained in the main
document. Designers should exploit the minimum appropriate technical solution for any
given location. There is no standard formula for designing layouts and much will depend
on local context.
3. Access to development should be considered in the following order:
– Pedestrians and the mobility impaired
– Cyclists
– Public Transport
– Service Vehicles
– Cars
4. Pedestrians and cyclists should have as direct a route as possible to local facilities in order
to encourage local journeys without a car. The road system should be appropriate to each
individual location but should be broadly based on a lattice to maximise permeability,
especially for pedestrians, cyclists and public transport.
5. Roads should be designed so that the speed of traffic is 20 mph or less. Within neighbourhoods,
in larger developments there may be the need to provide for 30mph local distributor roads
which perform a more important movement role.
6. This document avoids reproducing information from elsewhere and refers to the relevant
publications where appropriate. The principles contained within the DTLR advice Design
Bulletin 32, Places, Streets and Movement, and By Design are incorporated within this Appendix,
as are relevant elements of the former volumes 1 to 4 of Roads and Footpaths – a Design Guide
for Surrey. This Appendix reinforces a move away from overly prescriptive standards and takes
the arrangement of buildings and enclosure as the starting point for layout design, rather than
highway engineering requirements. It is important, however, that this is not at the expense of
safety.
7. This Appendix is arranged into a number of Chapters and reflects the Objectives and
Principles contained within Surrey Design. There are also Chapters relating to Highway
Landscaping, Engineering Specification and Highway Adoption and Procedures. There is a
section within the Engineering Specification Chapter relating to sustainable development
which developers should take particular account of.
8. This Appendix replaces Volumes 1 to 4 of Roads and Footpaths – A Design Guide for Surrey as
Supplementary Planning Guidance. It should not be read in isolation but in conjunction
with Surrey Design and other DTLR guidance. Only then can it be seen in the proper context.
January 2002
Introduction
9. Previous guidance has relied on the concept of ‘Design Value’ to determine the highway
requirements of residential developments. In order to simplify matters and to bring Surrey in
line with ‘Places, Streets and Movement’, this has now been replaced with the more
straightforward concept of number of dwellings served. With the inter-connectivity of streets
now emphasised there will often be more than one route to any one dwelling. This will
require a pragmatic approach to calculating future vehicle movements. As such any reference
to the number of dwellings served should be understood to also refer to the equivalent vehicle
movements generated by this number of dwellings. Non-residential and mixed use
developments should continue to be assessed on the basis of the traffic generation of the
proposal under consideration.
General References
Surrey Local Government Association; Surrey Design January 2002
DETR; Design Bulletin 32: Residential Roads and Footpaths – Layout
Considerations; Second Edition; HMSO; London; April 1992
Department of the Environment, Transport and the Regions (DETR); Places,
Streets and Movement – A Companion Guide to Design Guide Bulletin 32:
Residential Roads and Footpaths; HMSO; London; September 1998
DETR; By Design – Urban Design in the Planning System: Towards Better
Practice; DETR; London; 2000
DTLR & CABE; Better Places to Live – A companion guide to PPG3,
Llewelyn-Davies and Alan Baxter & Associates; 2001
January 2002
CHAPTER 1
January 2002
Surrey Design – Movement Objectives and Principles
These elements are reflected in both Surrey Design and this Technical Appendix, as well as in
more recent DTLR guidance in By Design.
1.5 It is considered that the result of residential development which has been focused on the
movement and parking of vehicles has been the creation of places which badly relate to their
locality and are indistinguishable from one another. This is largely due to the planning of
residential layouts being dictated by the road hierarchy and the Highway Authority’s road design
geometry and adoption criteria. A better approach would be to consider the arrangement of the
buildings and enclosure first and then to fit the roads around the buildings, rather than vice
versa. That is not to say that the highway engineering requirements should be ignored, but that
they should be applied flexibly and with more regard to other considerations.
1.6 All layouts must be designed with regard to the Disability Discrimination Act 1995, which
requires that facilities are suitable for the mobility impaired. This is in accordance with the
latest design standards of the DTLR Mobility Unit. Throughout this guidance, where reference
is made to ‘pedestrians’, please note that this includes the mobility impaired.
January 2002
CHAPTER 2
2.1 Introduction
2.1.1 The over-riding objective of this Appendix is to create places that are safe and easy to move
through and are accessible to all. In order to ensure that streets are safe, they should be
designed so that traffic speeds cannot exceed 20 miles per hour. In order to make places that
are easy to move through, the street pattern should generally resemble a lattice which
maximises opportunities for movement through a site, especially for cyclists and pedestrians.
Through-use by cars can be discouraged in order to create places where people can congregate
and children can play. This can be achieved by a range of measures including landscaping
features, physical barriers and the built form. Culs-de sac will not be the predominant layout
feature, although they will still play a role.
2.1.2 Previous guidance was written with the primary aim of accommodating the car. The emphasis
is now on designing neighbourhoods and creating spaces for people. The car will no longer
take priority, although it is important to ensure that road safety is not compromised. Access to
development should be considered in the order of User Access Hierarchy.
2.1.3 This hierarchy can only fully apply to larger scale development. Smaller developments
may not be able to accommodate public transport, but precedence in all cases should be given
to pedestrians and cyclists. Pedestrian and cycle links to existing bus stops, schools, shops,
health centres and other facilities are essential for all sizes of development.
January 2002
Access by Non-Car Modes
2.2.2 With the requirements of the Disability Discrimination Act and the Human Rights Act, it is
imperative that full consideration is given to the mobility impaired not only during the design
of highway schemes but in all matters. Surrey County Council is mindful of its responsibility
in this area and supports the principle of ‘access for all’. Work has commenced on producing a
Mobility Chapter for inclusion in the County’s manual of policies and standards (MaPS) and
reference must be made to this document when it is in place. In the interim, designers must
not only meet the requirements of the latest guidance from the DTLR Mobility Unit but
provide evidence of having taken into consideration the views of the relevant access group(s)
for that area.
Raised tables at junctions can provide suitable places for pedestrians to cross
January 2002
Access by Non-Car Modes
2.2.7 Footways can be separated from the carriageway by verges, bollards or posts. Bollards can
generally be used on roads serving less than 100 dwellings and can be used when the
carriageway and the footway are at the same level. Special attention needs to be paid to the
needs of people with disabilities.
2.2.8 The mobility impaired are restricted in the distances that they can walk or travel without a
rest. In order to maximise the accessibility of a development to all, it is recommended that
resting points, such as benches, are provided at regular intervals. Different mobility
impairments have different requirements with the visually impaired and wheelchair users
able to travel approximately 150m without a rest, those walking without an aid able to travel
approximately 100m and stick users only able to travel about 50m without a rest. This will
need to be taken into account when planning resting points.
Footway Fundamentals
Width
Footways should generally be 2.0m wide although they can be reduced to 1.2m for short
distances to avoid existing obstructions such as trees or buildings. Footways serving non-
residential uses may need to be widened within the immediate vicinity of the
development to accommodate increased pedestrian flow and waiting pedestrians and
prams. This is especially the case at primary schools where parents often wait at the school
to collect their children. The required widths are as follows:
Bollards/posts
These should be situated 500mm clear of the carriageway edge and should be a maximum
of 4.5m apart, although they may be more closely spaced if it is necessary to avoid vehicle
movement between them.
January 2002
Access by Non-Car Modes
2.2.12 Footpaths and cyclepaths that link elements of the road system and link the road system to
public facilities, such as bus stops, shops, schools and health centres, will be adoptable by the
Highway Authority. It is a general requirement that all footpaths and cyclepaths should be
appropriately signed, including surface markings, although this may be relaxed in
conservation area after discussions with the Highway Authority.
January 2002
Access by Non-Car Modes
2.2.13 Footpaths and cycle paths that cross roads serving 100 or more dwellings may need special
arrangements to protect the safety of pedestrians and cyclists, such as the staggering of
footpath ends or the provision of barrier rails. Crossing points on roads serving 300 or more
dwellings may require a central refuge and barrier rails but the safety requirement for this
needs to be balanced against the overall design concept for the development.
January 2002
Access by Non-Car Modes
2.3.4 The physical design of the highway within development must facilitate the unhindered
movement of buses along bus routes. This relates not only to the geometry of the highway
but also the location of bus stops, the control of parking and so forth. In particular, any speed
management measures should be bus friendly and be designed with the co-operation of the
local bus companies to ensure acceptance. In addition, where a school forms part of a
development, there will be a need to design access to the school and provide facilities at the
destination for coaches as well as local bus services.
2.3.5 Where appropriate, developments should provide priority movement for buses. This can be
through the provision of bus only movements, priority at traffic signals, bus only links and
so forth. For example, a dedicated bus only link has been provided at a development in
Brookwood. Electronically rising and falling bollards activated by coded ‘tags’ issued to the
bus company control the link. This initiative facilitates a more direct and thus quicker access
to a residential development and superstore. Engineering measures must always be designed
sympathetically to the overall nature of the development.
2.3.6 The trip to the bus stop and the facilities provided at the bus stop must be considered as part
of the overall journey. It is vital therefore that high quality, overlooked and accessible routes
to and from bus stops are provided within development. This must be considered both during
daylight hours and during darkness as an un-lit or poorly lit route to a bus stop or at the stop
itself will not encourage the use of public transport and may give rise to a perceived or real
security risk.
2.3.7 Certain bus stops within a development will offer access to and from key destinations. This
may include schools, a post office, sports centre, local shops etc. Bus stops should be located
as close to these key destinations as possible, taking into account other factors such as safety
and efficient bus routing. The clustering of local facilities will aid the delivery of this and is
particularly important in the move to create public transport opportunities for school journeys.
Similarly, bus stops should be located adjacent to focal points on the pedestrian network.
2.3.8 A bus stop does not merely consist of a pole with a bus stop flag. The stops must be easily
accessible to passengers, provide shelter and protection from the elements, have seating
within a paved area, afford easy access to the increasing number of low floor buses and
be a source of information for the journey options available. The shelters themselves can
be designed sympathetically to the surrounding environment and may also reflect the
individual or distinctive characteristics of an area. They should also be designed with
personal safety in mind.
2.3.9 Partnership work with bus operators and the local community has created popular and
successful services, which has upgraded the image of bus travel and attracted new custom.
For example, in the Goldsworth Park area of Woking, a partnership between the County
Council, Borough Council and operator has seen both improvements in access, waiting
environment, information and service provision. This initiative has seen the introduction of
raised kerbs at bus stops to facilitate easier access onto and off buses. The road surface has also
been treated with a coloured surface dressing to highlight the existence of the bus stop to car
drivers, with the aim of stopping parking at bus stops and enabling buses to pull up adjacent
to the raised boarding point. This is a particularly important issue for the elderly or disabled
people, or those encumbered by luggage, shopping or children. This sort of initiative should
be advanced as part of new developments or improvements to existing development.
2.3.10 Allowing the bus to stop close to the kerb minimises any obstruction to the flow of other
traffic. Sufficient space should be kept free to accommodate front or rear loading buses as
appropriate. Front loading buses are the norm in Surrey; thus kerbs should be located so as
not to obstruct the swept path of buses with lowered front steps. Where more than one stop
is required, sufficient road space should be kept clear for all the bus services involved.
January 2002
Access by Non-Car Modes
2.3.11 Bus lay-bys can offer protection of road space at bus stops, but this is an inefficient use of
space and can create difficulties for buses seeking to rejoin traffic on the main carriageway.
Where lay-bys are provided they should be designed to discourage parking or loading by
other vehicles with the appropriate legal restrictions, coloured surfacing and road markings.
2.3.12 It is important to recognise that under the Transport Act 1985 bus services in Surrey are
provided on a deregulated basis. The County Council secures the provision of a large number
of bus services each year through contracts with local operators. These services, be they local
bus, education or community transport services, are in addition to the commercial network.
The County Council is therefore in the best position to advise on the level of service provision
appropriate for a development and the facilities to support the services and encourage as wide
a use as possible.
2.3.13 Developers, local authorities and local bus operators must work together to find the optimum
level of bus service provision for a development by making the best use of existing services.
Enhancements may take the form of bus service diversions, increases in service frequency,
increases in the days or hours of operation, the provision of entirely new routes, or even the
establishment of dedicated development bus services. Other complimentary initiatives such as
ticketing or fare offers can also generate patronage.
2.3.14 For public transport to be an attractive option to residents within a new development, services
should be in place soon after the first occupants move in. This will ensure that public transport
is available as an option for travel when journey patterns are first established, rather than the
latter when it is often much more difficult to wean motorists away from their car. However, a
balance has to be struck between providing bus services when the first occupant moves in, set
against the realisation that the economic viability of services will increase as occupancy rises.
2.3.15 The long-term support of bus services and the maintenance of any infrastructure are key
issues. It is important that as part of the design of a development infrastructure is protected.
For example, ensuring that there is informal surveillance in place to reduce the risk of
vandalism. Overall, maintenance and a long-term financial commitment to infrastructure
and services should be in place before a development goes ahead.
2.3.16 The development of a higher density of dwellings will increase the viability of public
transport. At the same time increasing densities where public transport is poor will increase
car dependency. It is important therefore that the potential of public transport is assessed
with respect to the proposed development.
2.3.17 In addition to bus services, all developments should take into account the need to access
the rail network. It is recognised that larger developments may be better placed to facilitate
infrastructure improvements due to the higher capital costs involved. Many developments
can, however, facilitate various initiatives to enhance access to the rail network. Examples
include: CCTV; improved pedestrian links and signing; improved infrastructure; provision
of bus information at rail stations; better lighting and security enhancements; secure cycle
storage; encouragement of the integration of bus and rail services; accessibility improvements
and so on.
2.3.18 Such initiatives have a positive impact upon many thousands of rail passengers. The key
organisations for the creation of improvements are the Strategic Rail Authority, the train
operating companies, Office of the Rail Regulator and Railtrack or its successor.
2.3.19 In conclusion, there is a clear need to consider the requirements for efficient and effective
public transport provision both in terms of services and infrastructure. This should be
undertaken at the initial planning stage of any development proposal. When carried
through properly, this should maximise the modal share of public transport.
January 2002
Access by Non-Car Modes
Activities
2.4.2 Safe routes to schools are achieved through a combination of:
• Infrastructure improvements
• Participation with pupils and parents
• Education and Training
• Publicity and Events
These activities complement each other to obtain maximum effect. Infrastructure
improvements should be designed to meet the criteria outlined elsewhere in this document.
2.4.3 The key to successful safe routes to schools is usually in the process of how measures are
decided. They need to be relevant and useful to parents and pupils. Increasingly, the process
is being set out and agreed through the use of School Travel Plans.
January 2002
Access by Non-Car Modes
New Schools
2.4.7 The aim at all new schools, be they state or private, should be to create a first-class environment
for journeys by foot, cycle, bus and train. It is expected that any proposed new school will
produce a comprehensive school travel plan prior to opening with:
1. Measures in place before the opening to ensure that car dependence is minimised from
the first day;
2. A programme set out to ensure continuing participation by students, staff and parents.
References
Surrey Cycle Design Guide - SCC
Guidance on the Use of Tactile Paving Surfaces – DTLR
Design Bulletin 32 – DTLR
Providing for Journeys by Foot – Institute of Highways and Transportation
Disability Discrimination Act 1995 – HMSO
Manual of Policies and Standards (MaPS) – SCC
Guidelines for Planning for Public Transport in Developments – Institution of
Highways and Transportation
School Travel Plans – Everything You Need to know – SCC
January 2002
CHAPTER 3
3.1 Introduction
3.1.1 Although this guide aims to give priority to movement by non-car modes, it is still necessary to
make provision for the car. However, that provision should not be to the detriment of other
design considerations. Previous developments have been highly hierarchical and, whilst it is
important that the type of road is appropriate to the nature and the scale of the development
concerned, any hierarchy should not dictate the form of development. It is sufficient that roads
are designed to be of adequate width to accommodate the level of development concerned.
The process of fitting the roads in the spaces created by the buildings
January 2002
Design for Movement
3.2.2 The design of schemes needs to take into account the potential redevelopment of adjoining
land so that future development is not prejudiced.
3.2.3 The aim of this Appendix is to ensure a high standard of design in line with the objectives of
Surrey Design. Schemes with road layouts that meet this standard of design will also be
adoptable by the Highway Authority. Even if it is not the intention of the developer to have
the roads adopted, the design requirements will still apply. The following areas will normally
be adoptable:
Roads and on-street parking bays
Footways
Footpaths linking roads or linking roads to local facilities
Road margins
Visibility zones (except at private accesses)
Cycle routes
Bus-only links
3.2.4 Garages and/or parking courts with no highway function will not be adopted. Areas of
landscaping will not be adopted unless performing a structural design function (such as
street trees). Structures overhanging adoptable areas and windows and doors opening over
the adoptable area must be indicated on the road layout drawing. A road will not be adopted
if suitable arrangements for the adoption of the services, foul and the highway drainage are
not in place. This and their location should be considered from the outset. Underground
services should be located in verges (minimum 2m wide) or footways in order to avoid
excavating the carriageway.
3.2.5 Generally, sites serving in excess of 100 dwellings should have more than one point of
access to the existing highway network and this is desirable for all sites serving in excess
of 50 dwellings. This is to ensure that there is a route for the emergency services, even if one
access becomes blocked, and also to distribute traffic through the development. Emergency
access may be provided via an emergency route from a point in the existing road network
where normal access would be unacceptable. Such an emergency route can be treated as a
public footpath or cyclepath. Permeability for non-car modes should be maximised with a
number of access points. Buses may need to be accommodated within the site or good
footpath links to existing bus stops created.
3.3 Carriageways
3.3.1 Carriageway widths are partly determined by traffic flow. The widths referred to for dwelling
numbers in the box below are the minimum necessary for the free movement of traffic but
the greater widths will be required to accommodate on-street parking, buses and other
functions of the street. There is no difference in the width requirements of a shared surface
and a carriageway (excluding the footways) to serve the same number of dwellings. All
carriageway widths allow for reasonable access by service vehicles, although some delay from
two such vehicles meeting is considered acceptable.
3.3.2 Falls on verges should be towards paved highway surfaces and low spots should be avoided.
Mounding of verges is acceptable where there is sufficient width but side slopes on grass
verges should not exceed 20% (1:5). Steeper slopes may be acceptable if they are suitably
planted with densely rooting plants.
3.3.3 A range of materials acceptable for carriageway surfacing and edging can be found in Chapter
9 – Specification. Carriageways and parking bays within adoptable areas must be properly
restrained at their edge.
Shared Surfaces
3.3.4 Streets may be designed without footways (as Shared Surfaces) were serving up to 50 dwellings
or the equivalent. In these situations, where traffic speed is less than 20mph, a segregated
facility for pedestrians is unnecessary.
January 2002
Design for Movement
3.3.5 Shared surfaces should be separated from roads with footways by a rumble strip. This is a strip
of raised contrasting paving which warns pedestrians and drivers that they are entering or
leaving a shared surface area. A contrast of the colour and texture of shared surfaces with the
surface finishing of adjoining roads also indicates that these areas are different. Bituminous
and surface dressing materials are not acceptable in shared surface areas but products showing
the same characteristics as block paving will be considered. Rumble strips can also be used to
warn of a junction or other speed control feature (see Chapter Four). Footways should extend
beyond both ends of a rumble strip and join the shared surface at the same level. This is to
ensure that wheelchair users and those with pushchairs can pass comfortably.
3.3.6 Shared surfaces flanked by planted or grassed areas are usually adoptable to a line 2m from the
edge of the carriageway. There is no need to mark this on the ground except possibly on paved
surfaces. Shared surfaces enclosed by buildings or walls are adoptable between the faces of the
structures. Opening doors and windows should not obstruct pedestrian, cycle and vehicular
movement. Steps, canopies and porches are usually excluded from the adoptable area. Access
roads serving 6 dwellings or less may be treated as a private drive.
January 2002
Design for Movement
30 (50) 6 30
20 (30) 1 20
Widening on bends
Carriageway widening on bends should be provided in accordance with advice in DB32
in order to allow for the wider path of vehicles when turning.
January 2002
Design for Movement
30 (50) 60
20 (30) 33
Utilities
3.3.7 Public utility mains should generally be located under verges or footways and only under
the carriageway when crossing from margin to margin. In such circumstances, they should
be ducted and runs co-ordinated beneath a ‘service crossing strip’.
3.3.8 The Highway Authority will normally adopt a 2m wide service margin, although exceptions
will be considered. A narrower margin may be adopted where adequate provision for
underground services has been agreed with the Statutory Undertakers. Wherever the margin
is not exactly 2m wide, the highway limit shall be marked. The margin may need to exceed
2m where it contains a manhole or surface water sewer, soakaways or other form of sustainable
urban drainage (SUDS).
January 2002
Design for Movement
3.3.9 Where no margin is required for footway or underground services, a minimum margin of 0.5m
is required to ensure maintenance of the carriageway edge and adequate clearance for vehicles.
Where the outer edge of such a margin is marked by a wall, the carriageway surface can extend
to the wall. Private adjoining structures should not be used to form a drainage channel.
3.3.10 Developers should contact the relevant utilities at the earliest opportunity in order to co-
ordinate works. This is extremely important where mains or services cross carriageways of
structural concrete or surfaced with concrete blocks. Details of existing and proposed mains
and services are required by the Engineer before work starts on site.
Drainage
3.3.11 Surface water drainage on shared surfaces can be collected in channels at one edge, both edges
or along the centre line of the carriageway. Centre line drainage is only acceptable on shared
surface roads.
3.3.12 Public sewers and highway drains can be located under any part of the highway but manholes
should be located in footways and verges, not the carriageway or parking areas.
3.3.13 Surface water from private drives, paths, accesses etc must be prevented from reaching the
highway or the highway drainage system.
3.4 Junctions
3.4.1 Junctions are the points at which a road is joined by another vehicular route. Junctions can
be of a ‘T’ form, with the stem of the T being the non-priority road, a staggered crossroad
or a roundabout. Priority ‘T’ junctions will always provide speed control for non-priority
roads. Staggered crossroads also provide speed control if their kerb radii do not overlap.
Further guidance can be found in the appropriate national standards, advice notes and
traffic advisory leaflets. Junctions will often provide turning places and should normally
have branches at least 4.8m wide.
3.4.2 There is a tendency for drivers to stop in a position that obstructs vehicles turning right into
the non-priority road at ‘T’ junctions which are not formed at right angles. At priority
junctions therefore, roads should meet nearly at right angles (within 10° of 90°) unless the
non-priority road serves more than 100 dwellings in which case the roads should meet at 90°.
In such circumstances, the non-priority road should be straight for twice the length of the
junction radius.
3.4.3 Junction spacing is not restricted where traffic speed is less than 20mph and roads serve less
than 100 dwellings subject to adequate visibility to maintain safety. Roads serving between
100 and 300 dwellings should have a junction spacing of at least 30 metres, on either side of
the priority road.
3.4.4 Junctions should be designed on the basis of the number of dwellings being served. Junctions
between residential access roads may be used by heavy goods vehicles for turning. The
junction should always be designed on the basis of the higher number of dwellings being
served (i.e. 1-50, 50-100 or 100-300). In order to prevent high speeds for traffic entering the
non-priority road, mountable shoulders can be constructed. These form part of the
carriageway. Junction layout must clearly establish traffic priority when the junction serves
more than 50 dwellings.
Roundabout Junctions
3.4.5 When a roundabout is included within a layout it should be designed to the current national
standards except in shared surfaces, where special circumstances apply. Roundabouts in
residential access roads should have unmountable centre islands.
3.4.6 A shared surface roundabout may be acceptable provided that:
• Only one of the branches leads to the distributor network
• The main branch should be 5.5m wide and the minor branches 4.8m wide within a 20m
radius from the centre of the island
January 2002
Design for Movement
• There should be no vehicular or pedestrian access (except public footpaths) to any branch
within a 20m radius of the centre of the island
• The main branch does not serve more than 100 dwellings
• One of the minor branches serves more than 50 dwellings
• The centre lines of all the branches intersect at the centre of the island
• The angle between two adjacent branches is at least 80°
• The roundabout is not relied on for turning heavy goods vehicles
• Visibility is available across the island between 0.6 and 2m above the surrounding carriageway
• The island is not mountable by vehicles
January 2002
Design for Movement
Kerb Radii
3.4.7 In general, tighter bellmouth radii have a better traffic calming effect and reduce the impact of
road geometry on the quality of space (see Places, Streets and Movement page 57). However, in
order to accommodate the movement of larger vehicles minimum radii may need to be
associated with wider carriageways or mountable shoulders. Priority junctions within
residential layouts, serving 300 dwellings or less, should generally have kerb radii as follows:
3.4.8 Mountable shoulders at junctions can only be used in shared surfaces. If either carriageway
is less than 5.5m wide as it approaches a junction with a 4.5m kerb radius, then a mountable
shoulder with 7.5m internal radius should be provided.
3.4.9 New road junctions and access to the existing road network will be determined by the
engineer in accordance with current national standards.
Visibility
3.4.10 Visibility zones are required at all junctions. The provision of adequate visibility is essential in
order to provide a safe stopping distance for all traffic. Stopping distances are sufficient to
allow a driver to stop a vehicle at a comfortable rate of deceleration in wet weather conditions.
Visibility zones for traffic turning out of non-priority roads are defined by ‘x’ distance and ‘y’
distance. Please see the following illustration.
January 2002
Design for Movement
It is also necessary to provide visibility zones at junctions of footpaths and cyclepaths with
carriageways. An ‘x’ distance of 1 m should be provided for residential roads serving up to
300 dwellings and an ‘x’ distance of 1.5 m elsewhere.
At footway crossings (whether vehicular or cycle), a 2 m x 2 m visibility zone should be
provided. At the junction of a driveway and a carriageway, visibility to the same standard
as a road junction should be provided. Vertical sightlines are required between a height of
0.6m and 2m in all cases.
3.4.11 Visibility at existing junctions should not be inhibited by new development and potential
improvements to junctions with substandard visibility should not be compromised by new
development. The Highway Authority may require land needed for visibility improvements to
be dedicated or transferred as highway land.
January 2002
Design for Movement
3.4.12 In the interests of safety it is important that adequate forward visibility is provided on all
bends and curves, especially shared surfaces where pedestrians will be in the carriageway.
Please see Chapter Three.
January 2002
Design for Movement
January 2002
Design for Movement
References
Advice Note TD16/93: Geometric Design of Roundabouts - DTLR
Advice Note TD42/95: Geometric Design of Priority Junctions – DTLR
Traffic Advisory Leaflets
Design Bulletin 32 – DTLR
New Roads and Streetworks Act 1991 – HMSO
Provision of Mains and Services by Public Utilities on Residential
Estates – National Joint Utilities Group
Manual of Policies and Standards (MaPS) - SCC
January 2002
CHAPTER 4
Speed Restraint
4.1 Introduction
4.1.1 Speed control should be considered at the earliest stages in the design process, not added as
an afterthought. The method of speed control will be dictated by the form of the development
and should be appropriate to the overall design solution for the development.
4.1.2 Speed is constrained by the use of speed controls which can include the urban form itself,
landscaping, priority junctions, staggered crossroads, speed regulating curves, islands,
carriageway deflections, localised narrowing and the ends of the roads. Wherever possible,
traffic speeds should be managed by the arrangement of buildings and spaces with physical
traffic calming measures used to supplement this. It is unlikely that formal 20 mph zones will
be acceptable or required in new residential developments, the design should ensure that such
a zone is unnecessary.
January 2002
Speed Restraint
4.2.2 Vertical traffic calming, such as humps and tables, as a means of controlling speed is generally
to be avoided. It can lead to increased traffic noise and a reduction in local air quality. Possible
exceptions to this are the re-use of existing roads on brown-field sites and the provision of
raised junctions.
4.2.3 On bus routes and in mixed-use areas with residential and business uses, it should be
possible to drive from a dwelling to the existing road system without negotiating more
than six speed controls.
4.2.4 Ultimately it is the combination of features that generate a low-speed environment, but the
prime influences are the arrangement of the buildings and the design of junctions. The rigid
application of standard solutions should be avoided.
January 2002
Speed Restraint
Speed Control Bends May Only Turn Through An Angle of Between 80° and 100°
January 2002
Speed Restraint
References
Design Bulletin 32 – DTLR
Places, Streets and Movement – DTLR
Traffic Advisory Leaflets – DTLR
Urban Safety Management – Institution of Highways and Transportation
Rural Safety Management – Institution of Highways and Transportation
Manual of Policies and Standards (MaPS) - SCC
January 2002
CHAPTER 5
Parking
5.1.1 The parking of cars is an important issue that can influence whether or not residential
developments are successful. There is a general expectation that drivers are able to park
their cars as close as possible to their destination, preferably within view. This desire has
to be balanced against the need to maintain the overall design concept for an area. Parking
should not dictate urban form.
January 2002
Parking
Parking Fundamentals
Parking spaces should generally conform to the dimensional requirements of this
Appendix. This is important both for the size of the space and the room needed to
manoeuvre into and out of it.
Parking spaces at right angles to the carriageway should have an 800 mm clearance
between the parking space and the footway in order to accommodate any overhang. This
can be surfaced or planted in order to deter pedestrian use, although pedestrian crossing
points should be provided. A 6m paved surface is required to manoeuvre into and out of
these spaces, such as in parking squares and courts. The gradient should not be steeper
than 5% (1:20).
Parking spaces provided in lay-bys parallel to the carriageway should be 6m long with
crossfalls between 2% (1:50) and 3% (1:33).
Delineate parking spaces at right angles or parallel to the carriageway by permanent
changes in texture or materials or the use of granite setts or concrete blocks set
intermittently in the surface.
Covered parking areas (such as carriage arches) should have a clear headroom of 2.5m
throughout. Covered areas that will be accessed by service vehicles should have a clear
headroom of 4m, provided the entry is flat.
January 2002
Parking
5.3 Driveways
5.3.1 For the purposes of this document, driveways are private vehicular accesses, without public
right of way and not adopted by the Highway Authority. A driveway may serve up to 6
dwellings. It may also serve a garage court, provided its ends are intervisible. Driveways can
join residential roads serving up to 300 dwellings and may require provision for vehicles to
turn when located on roads serving in excess of 100 dwellings with traffic speeds in excess
of 20 mph.
Driveway Fundamentals
Width
The minimum width of a domestic driveway is 2.75m but where driveways are likely to
be used by service vehicles or serve parking courts they should be a minimum of 3 m wide.
Where dwellings are more than 45 metres from the highway, the design of the driveway
should provide a 3.7m wide corridor free of obstacles to fire appliance access. Driveways
should be widened to 4.1m where parking may regularly occur or where they regularly
provide pedestrian access. Single driveways should not exceed a width of 3.2m at the
highway boundary.
Access
Driveway access is generally not permitted at speed control features, at junction
bellmouths and within 2m of a rumble strip.
Length
In roads serving more than 50 dwellings, driveways leading to garages should be at least
6m long to allow for parking in front of the garage, clear of the carriageway. Where roads
serve less than 50 dwellings, driveways leading to garages can be between 1m and 3m
in length.
Carry distances
The design of driveways should take account of the following maximum carry distances:
Gradients
Driveway gradients are restricted as follows:
Driveways not used by service vehicles - 10% (1:10) for the first 6m
Driveways used by service vehicles -
Residential roads 10% (1:10) for the first 10m
Other roads 5% (1:20) for the first 10m
January 2002
Parking
5.3.2 Driveways should cross the footway by way of a ramped vehicle crossing as shown below:
5.3.3 Footway crossings shall be of a similar width to the access being served, and they should be
splayed or radiused for a distance of 2m from the carriageway edge. Crossfalls on the footway
should be maintained as far as possible and the crossfall gradient of a footway crossing should
not exceed 5% (1:20) over the width, although lesser gradients are preferred.
5.3.4 Driveway vehicle crossings will require an enhanced base construction in addition to the
standard footway construction to include a roadbase layer. Consideration should be given,
when constructing ramped vehicle crossings to dropped kerb access, to the location and
installation depth of pipes, culverts and cables. Where conflicts of level exist, the services
should be protected by way of a buried concrete slab construction. See Chapter 9 for guidance
on the use of carriageway materials and pavement design.
January 2002
Parking
References
Planning Policy Guidance Note (PPG) 13 : Transportation - DTLR
Planning Policy Guidance Note (PPG) 3: Housing - DTLR
A Parking Strategy for Surrey – SCC
Design Bulletin 32 – DTLR
Places, Streets and Movement – DTLR
Manual of Policies and Standards (MaPS) - SCC
January 2002
CHAPTER 6
1. The following legislation and procedures should also be observed: Highways Act 1959 (Section 134), amended by the Highways Act 1980 (Section 141);
British Standards and guidance prepared by BALI, Landscape Institute, and Horticultural Association (see list at end of chapter).
January 2002
Soft Landscape within the Highway
6.6 Services
6.6.1 Consideration should be given to the layout of services near trees. It is possible for services
to be damaged as trees establish, where services are not properly laid or are installed in close
proximity to the bole of the tree. Badly laid drains with leaking joints encourage root
development and the eventual penetration by roots of certain tree species. Potential problems
can also occur as a result of excavation needed to route services. Rarely is disturbed planting
restored satisfactorily. Consideration should be given to techniques designed to avoid this (i.e.
routing services through common ducting or gravel strips or other easily excavated services).
6.6.2 Underground services will be protected by barriers blocking root growth or by ducting
between adjacent service access points when there are existing or proposed trees closeby.
Services within 2m of small trees, 3.5m of medium trees and 5m of large trees should be
protected in this way. Expert advice should be sought when existing trees may be affected.
January 2002
Soft Landscape within the Highway
6.7 Location and planting distances of trees from pavements and carriageways
6.7.1 Particularly in roadside locations, trees are placed in a restricted area of soil, and in time roots
will want to penetrate beyond the narrow space in which they initially develop. The anticipated
size and rooting habit must therefore influence where trees and shrubs are planted in relation
to pavements and highways, in order to allow sufficient space for canopy development and root
spread away from the immediate road edge. One solution is to plant in a ‘back verge’ (verges
between carriageway and footway), which would provide space to include larger tree species as
part of a structural landscape. Where planting is on an embankment, the choice of species and
distance of planting from the road will be influenced by the gradient (when in excess of 33%,
1:3) available soil cover, maintenance implications and exposure to wind.
January 2002
Soft Landscape within the Highway
January 2002
Soft Landscape within the Highway
Weeding
Granular soil active chemical treatment to shrub borders once annually m2 0.15
Granular soil active chemical treatment to tree bases once annually per tree 0.18
Granular soil active chemical treatment along hedges once annually lin m 0.15
Selective weed control of perennials/noxious weeds per visit m2 0.20
Handweeding ground cover areas - quarterly per visit m2 0.50
Handweeding shrub borders - 2 x annually per visit m2 0.60
Strimming interspaces within planted areas - 2 x annually per visit m2 0.12
Mulching
Replenishment of shrub borders with coarse bark bi-annually m2 3.60
Replenishment of shrub borders with wood chip bi-annually m2 2.50
Litter
Collection and disposal of litter from open grass areas per visit 100m2 3.00
Collection and disposal of litter from shrub borders per visit 100m2 6.00
Leaf collection from grassed and paved areas per visit 100m2 5.00
January 2002
Soft Landscape within the Highway
Grass Cutting
Cutting grass open areas with slopes less than 30 per visit 1000m2 25.00
degrees to 50mm height and removing arisings
Cutting open grass areas with slopes less than 30 per visit 1000m2 15.00
degrees to 75mm height and leaving arisings in-situ
Cutting grass areas obstructed by trees and other per visit 100m2 3.00
planted areas to 50mm height and removing arisings
Cutting grass areas obstructed by trees and other per visit 100m2 2.00
planted areas to 75mm height and leaving arisings in-situ
Renovation of damaged areas with topsoil and seeding as required m2 1.50
(allow for 5% of total grassed area)
Renovation of damaged areas with topsoil and turfing as required m2 3.50
(allow for 5% of total grassed area)
Aeration of grassed areas with spiked aerator to improve annual visit 100m2 1.00
grass cover and drainage (allow for 15% of grassed area)
Strimming rough grass areas on slopes less than 30 degrees per visit m2 0.10
Strimming rough grass areas on slopes in excess of 30 degrees per visit m2 0.12
Cutting wildflower areas and removing arisings annual visit m2 0.20
Trimming Hedges
Trimming formal hedges to 1.8m and removing arisings per visit lin metre 1.00
3 x annually
Trimming informal hedges and removing arisings annual visit lin metre 1.25
Replanting Trees
RB = Root balled
BR = Bare root
Costs indicated include for cost of tree, excavation of tree pit, planting, staking, strimmer guard, and
watering (4 times) in accordance with SCC Standard Specification. Does not include for steel guards.
Replacement of Advanced nursery stock trees (RB) as required per item 100.00
Replacement of damaged selected standard tree (RB) as required per item 45.00
Replacement of damaged standard trees (BR) as required per item 35.00
Fencing
Replacement chestnut pale fencing 1200 height as required lin metre 5.50
Replacement low level timber trip rail 450 height as required lin metre 18.00
Replacement rabbit proof fencing 900 height as required lin metre 3.50
Note: The costs were calculated in March 2000, and will be updated periodically. The sums
will be checked for adequacy when each scheme is submitted.
January 2002
Soft Landscape within the Highway
Existing Trees
Note: Ignore trees classified as 'Ancient trees'
Structural defects Have identified defects been Request works to be carried out
attended to fully as itemised
Are there signs of other defects Secure a new assessment/work schedule
which are not listed (weak forks, and monitor works are carried out to
pruning wounds, die back) requirements specified
Decay and Cavities Have implications been assessed Secure works schedule from
by arboriculturalist Arboriculturalist
Has recommended treatment Monitor works are carried out to
been carried out requirements specified
Root disturbance Are there signs of exposed Request soil cover to appropriate depth
roots / root severance and root pruning
General Health Are there obvious signs of lack Check impact with arboriculturalist /
of vigour / poor health remove or treat tree
Are there signs of fungal Check impact with arboriculturalist /
development or cancers. remove or treat tree
Are there signs of peeling, loose Check impact with arboriculturalist /
bark, or die back remove or treat tree
Has there been good bud Check impact with arboriculturalist /
formation, fruiting or leafing out remove or treat tree
General Appearance Are there signs of windblow Check impact with arboriculturalist /
remove or treat tree
Are there signs of trunk or Check impact with arboriculturalist /
canopy damage remove or treat tree
Has the tree been shaped up Secure appropriate treatment in
according to specification accordance with Spec
January 2002
Soft Landscape within the Highway
Special Works Have old pollards been re-worked Secure appropriate treatment in
satisfactorily accordance with Spec
Have coppiced trees been Secure appropriate treatment in
re-worked satisfactorily accordance with Spec
Miscellaneous Has protective fencing been Request removal and making good
removed
If being retained, is fencing Secure repairs
stable and in good repair
Have all tree work arisings been Request removal
cleared from site
Weed Control Has a weed/grass free zone been Request treatment - 2 m min circle with
maintained around base selected herbicide
Has pre-emergent herbicide been Request treatment if appropriate during
applied prior to handover late winter
Are there signs of soil disturbance Request reconsolidation, chemical
likely to activate weeds treatment and mulch.
Mulch If used, has mulch cover been Request 100 mm depth min of coarse
maintained at 100mm depth bark / wood chip
Growth Are there obvious signs of lack Decide whether tree should be replaced
of vigour / poor health
Has tree attained a size Decide whether tree should be replaced
consistent with species
Damage / Health Are there signs of Request repair work if possible and
strimmer / mower damage protection with guards
If damage cannot be repaired request
replacement tree
Are there signs of physical Request pruning to be carried out
damage to canopy
Are there signs of pests / disease Seek arboricultural advice / Request
corrective work.
Have broken/crossing branches Request removal
been neatly removed
January 2002
Soft Landscape within the Highway
Shelters Are any welded mesh steel tree Request replacement or adjustment
guards intact and upright as appropriate
Are any strimmer / mower Request replacement as appropriate
guards intact or removal
Stakes / Ties of holes. Have stakes / ties been removed. Request removal and disposal, and filling
Are earth anchors and guy cables Request adjustment or replacement of
for semi-mature trees properly defective elements
adjusted and intact
Location Are any trees impacted / deformed Request selective removal or coppicing
by shading
Are any trees causing obstruction Request removal.
or shading
Vandalism Have any trees been badly Request replacement or coppicing if
vandalised appropriate species
Watering Have trees been provided with Request installation if tree being
replaced
integral watering system
Weed Control Has a weed/grass free zone been Request treatment - 1 m min circle with
maintained around base selected herbicide
Has pre-emergent herbicide been Request treatment if appropriate during
applied prior to handover late winter
Are there signs of soil disturbance Request reconsolidation, chemical
likely to activate weeds treatment and mulch.
Mulch If used, has mulch cover been Request 75 mm depth min of coarse
maintained at 100mm depth bark / wood chip
Fertilizer Has a well balanced fertilizer Request application of agreed fertilizer
been applied
January 2002
Soft Landscape within the Highway
Shelters Have shelters / guards been Request removal and disposal, and filling
removed, or of holes.
If retained are they intact, fully Request replacements or adjustments to
adjusted and stable be carried out
Stakes / Ties of holes. Have any stakes / ties been Request removal and disposal, and
filling
removed.
Thinning Have overcrowded trees been Request thinning
thinned to at least 2m apart
Shrubs
Objective: to produce a dense canopy of healthy growth and form appropriate to species, neatly pruned back from any
adjacent roads or footpaths to remove obstruction. Ground cover should form a continuous weed free cover of ground
surface.
Weed Control Has weed control been Request treatment of ground area with
maintained throughout the border selected herbicide
Are there signs of noxious weeds Request treatment with selective
(I.e. docks / thistle) herbicide
Are there signs of couch grass Request specialist treatment and / or
colonisation replanting
Has pre-emergent herbicide been Request treatment if appropriate during
applied prior to handover late winter
Are there signs of soil disturbance Request reconsolidation, chemical
likely to activate weeds treatment and mulch.
Mulch Has mulch cover been provided If not, request 75 mm minimum depth
of coarse bark
If mulch cover has been provided, Request restoration to full depth
is it intact / full coverage and cover
Are any mulch mats intact and Request adjustment, replacement
in place or removal
Litter Have shrub areas been cleared of Request removal and disposal from site
litter and surface debris
Firming Have any shrubs been loosened Request firming or replacement of
shrubs
by wind action / vandalism
Shelters Have shelters / guards Request removal and disposal, and
been removed filling of holes.
Replacements Have dead / missing / badly Request replacement with
damaged plants been replaced appropriate species
Coverage Has ground cover planting Request provision of gap filling planting
achieved full carpet coverage
Has shrub planting got Request provision of gap filling planting
obvious gaps
January 2002
Soft Landscape within the Highway
Pruning Are there outgrowths over edge Request pruning of shrubs back to
of carriageway or footpath agreed line
Have broken / damaged Request pruning
branches / shoots been pruned
Vandalism Have any shrubs been badly Request replacement or coppicing
vandalised if appropriate species
Services Have service installation trenches Request soil restoration and new
been properly restored planting
Hedges
Objective: to produce a dense matrix of healthy growth , neatly trimmed to appropriate shape, preferable 'A' shape,
allowing for removal of obstructive outgrowths adjacent to carriageways and footpaths. Generally, heights of hedges should
not be greater than 2 metres.
Weed Control Has weed control been maintained Request treatment of ground area with
throughout the hedge selected herbicide
Are there signs of noxious weeds Request treatment with selective
(I.e. docks / thistle) herbicide
Are there signs of couch grass Request specialist treatment
colonisation
Has pre-emergent herbicide been Request treatment if appropriate during
applied prior to handover late winter
Mulch Has mulch cover been provided If not, request 75 mm minimum depth
of coarse bark
If mulch cover has been provided, Request restoration to full depth
is it intact / full coverage and cover
Litter Have hedges been cleared of litter Request removal and disposal from site
and surface debris
Replacements Have dead / missing / badly Request replacement with
damaged plants been replaced appropriate species
Grassed Areas
Objective: to produce a dense level mat cover, neatly cut according to grade or use of area.
Weeds Are there signs of noxious weeds Request use of selective herbicide
within sward
Is weed colonisation above 15% Request recultivation and
of sward composition reseeding / turfing
January 2002
Soft Landscape within the Highway
Soil Condition Are there signs of ground Request decompaction / deep cultivation
compaction
Are there signs of erosion Request complete recultivation and
reseeding / returfing
Are there signs of localised Request provision of adequate drainage
waterlogging / ponding
Are there signs of partially Request removal and reseeding
buried debris
Grass Cover Has 85% minimum cover of Request for recultivation and
healthy sward been achieved reseeding / turfing of gaps
Is sward cover patchy and less Request complete recultivation and
than 85% cover reseeding / turfing
Soil Levels Are soil levels more than 50mm Request soil regrading and
above the level of adjacent kerbs reseeding / turfing
or footpaths
Are soil levels less than 25mm Request that soil levels are built up to a
above the level of adjacent kerbs minimum of 25mm above adjacent kerb
or footpaths or footpath level
Are soil levels below the level of As above
adjacent kerbs or footpaths
Are levels across grassed area Request regrading to levels suitable for
uniform without abrupt changes efficient mowing and reseeding / turfing
in level or rises / depressions
Have hollows been formed at the Request installation of gravel
base of banked areas adjacent to strip soakaway
kerbs or footpaths and walls to
intercept water
Stones Has stone picking been carried out Request removal of all surface stones
Awkward Areas Are there grassed areas that could Request suitable planting or
prove difficult to mow hard landscape
Grass Species Have the correct grass mixes Request evidence of grass seed / turf
been used to suit proposed mix used. If appropriate request
cutting regimes reseeding / turfing
Wild Flowers Have wild flowers been used in Request wild flower areas to be
the grass mixes marked clearly
Is there evidence of wild flower If appropriate request replanting
content in grass matrix with plugs
Is there evidence of grass arisings Request raking off and disposal
lying on surface of arisings
Bulbs Has bulb planting been included Request bulb planted areas to be
within grassed areas marked clearly
Will bulb planted areas conflict Request removal of bulbs and
with mowing regimes reseeding of area
Trees Have rings of bare ground been Request herbicide treatment to form
formed around trees mowing margins
Cutting Have grass areas been freshly cut Request that cutting to a height of
and arisings removed 25mm is carried out
January 2002
Soft Landscape within the Highway
References
British Standard BS 5837:- Trees in Relation to Construction 1991
ISBN 0 580 20245 3
Trees on Development Sites, D.R. Helliwell, Arboricultural Association.
ISBN 0 900978 11 2
Guidelines for the Planning, Installation and Maintenance of Utility Services in
Proximity to Trees. National Joint Utilities Group, 30, Millbank, London, SW1P 4RD
NHBC Standards, Chapter 4.2, Building near Trees. ISBN 0 907257 208
DOE Circular 11/95 ISBN 0 11 753130 8
Other Reading
National House-Building Council (192) Standards, Chapter 4.2 (NHBC, Amersham)
January 2002
CHAPTER 7
Lighting
7.1 General Requirements
7.1.1 Lighting should be planned as an integral part of a housing or mixed lay out. Adequate and
an even distribution of light is required to help prevent night-time accidents and personal
attacks, protect property, discourage crime and vandalism.
7.1.2 Lighting columns, brackets and luminaries must be chosen for appearance, efficiency, running
costs and maintenance requirements.
7.1.3 Only lighting which fulfils a highway function will be adopted.
7.1.4 Road lighting should be designed to emphasise the essential distinction between leading to
places and roads as places. Most highway lighting will be designed using light sources mounted
at 5 metres above ground level, and to light the highway uniformly. Where required, such as
Section 278 schemes at entrances to the development site, the new lighting is to match, or
compliment, any existing lighting. This may require columns of a different height because of
design needs. In exceptional circumstances columns with a mounting height of less than 5
metres but meeting BS 5489 requirements, or subsequently revised standard may be considered.
7.1.5 Developers may submit their own proposal for approval of the Highway Authority. The scheme
shall include all illuminated traffic signs and bollards. Alternatively the Authority will prepare
a lighting scheme at fully detailed specification for lighting that is to be adopted, for which
the Authority will make a charge. Where the Authority is approving the Developer’s proposed
scheme and the time spent on this approval is excessive, the Authority will reserve the right
to charge.
7.1.6 Whichever course is chosen the lighting scheme must be presented as an integral part of the
planning application. The column, bracket, luminaries and light source must be in accordance
with the Highway Authority’s approved equipment list and general policy, as well as complying
with BS5489 (or subsequent standard) requirements.
7.1.7 The Developer is to show all lighting, signing, bollards etc., on all construction/layout plans
(including sales and legal/conveyancing literature) in order that the prospective residents are
aware that there may be street furniture placed adjacent to any given plot. The County
Council will not be a party to any disagreement between the developer and a prospective
resident over the siting of street furniture.
7.2 Design
7.2.1 Street furniture, especially lighting columns and the associated brackets (if required) and
luminaries, has a significant impact on the environment. An application for the approval of
details for a residential or mixed development road lighting system shall include all column
positions and a description of the equipment proposed. A copy of the calculations detailing
the performance of the lighting system is to accompany the drawings. Full details of the
calculations required can be obtained from the Engineer. The details are to include the
positioning of new illuminated signs and bollards. Existing lighting on the adjoining roads
shall be shown on the drawings. The new lighting scheme is to integrate with the existing,
leaving no unlit or dark areas. Existing lighting, which is to be removed or re-sited, shall be
included in the details of the proposed works.
January 2002
Lighting
7.2.2 Wall mounted brackets or lighting fittings may be fixed to structures under the developer’s
control, subject to an agreement and a licence being issued, (and a clause inserted in the Section
38 agreement). The licence shall be worded so that it passes to successors in Title and does not
have to be re-issued whenever the structure’s ownership changes. Generally highway lighting
columns and brackets are to be painted in accordance with the Authority’s painting specification.
All highway lighting units are to be vandal resistant.
7.2.3 All roads and footpaths, intended for adoption, should normally be provided with a lighting
system. Exceptionally a new road in a conservation area, or an area of special amenity value,
may be permitted without highway lighting. This situation may only occur if the roads in the
vicinity have no highway lighting. Before a final decision on this is made, consideration is
required of the record of crime or night-time accidents in the area, and following consultation
with the Parish Council. A road is automatically un-restricted if there is not a system of
highway lights, a traffic order is required to vary the speed limit.1
7.2.4 The Highway Authority will design highway lighting for distributor roads. A Developer may
design a road lighting scheme for a residential or mixed-use access road or may request the
Highway Authority to produce it. Two copies of a plan showing the proposed site layout and
the extent of the works are to accompany such a request. The County Council’s Highway
Lighting engineer will respond with an estimate of the cost of design etc., and a confirmation
(CI) of his understanding of the developer’s requirements. Design, etc. of the work will start
on receipt of the developer’s, or their consulting engineer’s official order. The Engineer will
indicate the layout of the scheme required and will issue a specification of the equipment to
be used. Details of any lit traffic signs or bollards required will be included with any private
cable network requirements. One copy of the plan will be returned to the developer together
with the specification. The developer is to incorporate the details into the drawings to be
submitted in the Section 38, and/or Section 278 agreement.
Number of Dwellings served Lantern Type Mounting Height Light Source BS 5489 Part 3
Lighting Categories
Roads serving 0 to 20 dwellings Side Entry 5.0 metre 50 watt SON-T Plus 3/3
Roads serving 20 to 50 dwellings Side Entry 5.0 metre 50 watt SON-T Plus 3/2
Roads serving 50 to 300 dwellings Side Entry 5.0 metre 50 watt SON-T Plus 3/1
Side Entry 6.0 metre 70 watt SON-T Plus 3/1
7.3.2 Side entry lanterns giving an asymmetric distribution are generally preferred to Post Top
lanterns for the lighting of predominantly linear spaces. In certain circumstances, however,
the use of Post Top lanterns will be considered. Generally, more expensive Post Top lanterns
are used where the aesthetics of the area requires additional consideration.
1. A system of street lighting for the purposes of the interpretation of Section 82 of The Road Traffic Regulation Act 1984 shall, within Surrey, be taken to mean a system
comprising a minimum of 3 lamps placed not more than 183 metres (200 yards) apart except in the following circumstances: In computing the number of lamps on a
road no account shall be taken of any lamps placed at or adjacent to any form of junction, including roundabout, of the road with another road or roads unless the
road has, apart from the lamps placed at or adjacent to the junction, a minimum of 3 lamps placed not more than 183 metres (200 yards) apart and the lamps placed
at or adjacent to the junction form a continuous part of the system of street lighting so formed.
January 2002
Lighting
7.4 Location
7.4.1 Lighting units should be located to provide maximum lighting where it is most needed.
Therefore they should normally be provided at junctions, roundabouts, speed controls and
areas where pedestrians and other users meet with moving vehicles. The Surrey County
Council’s Code of Practice (ILE Code of Practice is awaited) for the lighting of traffic calming
schemes is to be adhered to. Shared surfaces must be adequately lit to ensure the safety of the
pedestrians. Care must be taken that any buildings and trees do not produce dangerous
shadows. It is usual to design a staggered layout where able, but where the road is curved
lights should be provided on the outside of the curve. At curves in shared surfaces, lights
should be placed so that vehicles and pedestrians are visible but the column does not form
an obstruction to moving vehicles.
7.4.2 A lighting column set 0.5 metres clear of the channel line would obstruct a footway directly
abutting a carriageway. Accordingly a column should be located at the rear of the footway
which is not separated from the carriageway by a verge or margin.
7.4.3 Columns shall generally be located on the outside of a curve in the carriageway alignment.
Wherever possible, positions should be selected away from established or newly planted trees
and tall shrubs, where the shadows cast would interfere with the aims of the lighting design.
Care should be taken in designing a layout to avoid annoyance being caused by stray light.
(See the Guidance Notes issued by the Institution of Lighting Engineers). Locating a column
in line with a party boundary, combined with use of modern optics, may reduce or prevent
nuisance from stray light. Ease of access for maintenance vehicles should also be taken into
consideration when deciding on column locations.
7.5 Spacing
7.5.1 Highway lights should be generally spaced to achieve the lighting categories indicated in Table
1. All the relevant parts of BS 5489 (or subsequent standard) are to be observed. Where shorter
distances are required to light critical points, see 5.1 above, the design is to be able to
accommodate this requirement.
7.5.2 Columns shall be positioned to minimise the risk of impact by vehicles. The minimum
requirements for horizontal clearances are as indicated in BS 5489, Part 1, table 1, or
subsequently revised standard.
References
BS 5489, Parts 1 to 9, as required.
Institute of Lighting Engineers (ILE) Guidance Notes for Reduction of Light
Pollution. www.ile.org.uk
SCC Code of Practice for the Lighting of Traffic Calming Schemes. (An ILE
Technical Committee is currently considering the production of a Technical
Report on the subject, to produce a Code of Practice. Once this is published
and its content assessed, its adoption by SCC will be considered).
BS 5649 (1978)
BS EN IOS 1461: 1999
BS 4533 (1981)
Ingress Protection Rating (IP).
BS 33767 (IEC 662)
BS 88. HRC Fuses.
BS 7671 16th Edition Regulations for Electrical Installations.
January 2002
Detailed Specification for Lighting
Columns and Brackets
1 A reputable manufacturer shall produce all street furniture and the Developer shall satisfy the Engineer that replacements
are readily available. In general standard items of street furniture will only be accepted, as the cost of replacement may be
otherwise unreasonable.
2 Columns and any necessary brackets shall be chosen to give the required mounting height and position for the lanterns
provided. Generally, the bracket projection for either column or wall mounted unit should be 0.3m, but should not exceed
0.5m. Where the bracket is inclined, this should not exceed 5 degrees unless the circumstances are exceptional.
3 Steel lighting columns shall be manufactured to BS 5649 (1978), or subsequently revised standard, and shall be protected
against corrosion by means of a shot blasted and metal sprayed external finish with galvanised internal finish, applied at
the works, or a hot dipped galvanised finish complete. The columns with external metal-sprayed and galvanised internal
finish shall have a sealant or similar protective coating applied both externally and internally at the works. The root section
of all columns shall be painted with black bituminous paint.
4 Hot dipped galvanised columns shall be galvanised in accordance with BS EN IOS 1461: 1999, or subsequently revised standard.
5 Where non standard or unusual columns, brackets or lanterns may be accepted by the County Council. If so a commuted
sum will be required because of the increased cost of replacement and maintenance.
6 Each column shall have a weatherproof access door to the base compartment, which shall be fitted with a tri-headed, lock
at the top and retaining, lug at the base of the door.
7 The base compartment shall be fitted with a baseboard on which is mounted the REC’s cut out, the double pole switched
fused secondary disconnector and the photo electric cell electronic base unit. The baseboard shall be manufactured from a
material which will not be adversely affected by moisture and will accept normal fixings.
Lanterns
8 Lanterns should be mounted at 5 metres mounting height in residential access roads. This should allow for a 5.1 metres
vertical clearance where the lantern overhangs a vehicle surface
9 Lanterns shall be manufactured to BS 4533 (1981) or subsequent revision of the standard. Lanterns shall have integral
control gear and ‘preferable’ will be fitted with an automatic disconnection arrangement within the lantern, which operates
when the canopy is opened. Generally side entry style lanterns are preferred with suitable optics to provide the control of
the light from the lamp to meet the lighting level requirements set out in Table 1, (BS 5489 Part 3) or subsequent revision
of that standard. The lanterns shall generally employ a deep bowl but shallow curved bowl or flat glass style can be
employed, as required by the project. Where Post Top style lanterns are considered, the optics and distribution are to
produce results meeting the levels set in Table 1.
10 The preferred Ingress Protection rating (IP) is to be IP66 for the lamp and optical section of the lantern and IP45 for the
gear compartment where this is separate from the lamp compartment. IP 65 is acceptable for the lamp and optical section
until IP66 becomes more available and the choice of lanterns is increased.
Wall Mounting
11 Where a wall-mounted unit is specified a suitable bracket shall be provided and fixed to the adjoining structure. Such
brackets should ensure that the lantern is secured in the appropriate position with the necessary clearance given in Section
7.5. An agreement and a signed licence are to be obtained from the owners of the structure where a lighting unit is mounted,
to include an easement for access to any conduit or ducting and for maintenance and the provision for the electrical supply
and all relevant control gear. The method of connection for energy supply must comply with the requirements of the local
Regional Electricity Company (REC).
Control Gear
12 The control gear for lamps shall be designed to operate off of 230 volts AC +10%, -6%, 1995, to change to 230volts + or –
10% January 2003. All terminals are to be shrouded so that live metal parts cannot be touched. The capacitor shall correct
the power factor to not less than 0.85 lagging.
13 The Photoelectric controls shall be two part electronic, on highway lighting units, with the detector mounted on the top of
the lantern, secured by a locking nut. One part electronic negative ratio cell will be considered in special cases. The
photocell is to be secured by means of a locking nut. The manufacturer shall provide a mounting hole in a suitable place in
the lanterns before they arrive on site. The electronic base unit is to be mounted in the base compartment of the column
and shall be of the plug in type capable of switching a discharge load of 3 x 400W HPS. The switching differential is to be
1:0.5 negative. The power consumption is 0.25 watts continuous. The photocell shall be calibrated to switch on at 70 LUX.
Where illuminated signs are installed, the photocell unit shall be similar to the above, but will be a one-piece miniature
unit installed into the sign light. All illuminated bollards are lit continuously.
Wiring
14 Lantern and column wiring cable shall be polyvinyl chloride insulated and sheathed cables of 300/500 grade flat twin and
earth (6242Y). Cables shall be correctly colour coded and have a copper conductor size of 2.5 sq. mm and shall be provided
with the correct coloured double insulated tails for connection into the REC’s cut out from the secondary isolation unit.
Unsupported lengths of cable shall be kept to a minimum and not allowed to come into contact with components by their
freedom of movement. Photoelectric cell wiring shall be 1.5mm sq, type (6192Y) flat twin.
15 All wiring shall comply with BS 7671 : 1992. IEE Wiring Regulations, 16th Edition, Requirements for Electrical Installations,
or subsequently revised standard.
Secondary means of isolation
16 A double pole switched disconnector unit complete with a BS 88 HRC fuse is to be provided in the base of the column,
above the REC’s cutout. The fuse is to be rated so as to protect the lamp circuit. The disconnector unit is to have a 32 amp
rated double pole switch, marked ON/OFF with green/red mechanical indication giving a positive indication of the state of
the unit. It is to have a transparent cover so that the switch position can be clearly seen and fitted with a device to prevent
the fuse being withdrawn without the operation of the switch, thus making it safe to withdraw the fuse. The transparent
cover is also to have a facility so that it can be secured by means of a padlock to prevent operation of the switch.
Earthing
17 All metal work (other than current carrying parts) shall be earthed on to a fixed 4 way terminal block. A final main 6mm sq
earth conductor (colour coded) for the PME termination shall be taken from the block and a minimum of 600mm left to
enable this connection to be made by the Regional Electricity Company.
Identification Numbering
18 Columns and signs are to be identified by means of a number in accordance with a schedule agreed by the Engineer. Either
the numbers shall be the Charles EN plate system or of a stick on plastic type approved by the Engineer. The letters/numbers
shall not be less than 50mm in height and located 1.83 metres above ground level. Where necessary speak to the local
engineer to determine the style and source of supply of numbers.
January 2002
CHAPTER 8
Traffic Signs
8.1 Introduction
8.1.1 The County Council has fully adopted the latest versions of “Specification for Highway
Works” and “BS 873” in its requirements for temporary and permanent signing. It is a
requirement of the above specification that an “Appendix 12/1” (schedule of signs) be
provided to include all details of the signs and associated equipment.
January 2002
Traffic Signs
8.2.9 Warning and Regulatory signs shall be in accordance with the Diagram No. in the Schedule
of Signs, the relevant Diagram No. in the Traffic Signs Regulations and General Directions
and the Working Drawings for Traffic Sign Design and Manufacture.
8.2.10 All signs shall be produced by a manufacturer who has achieved or is in the process of achieving
accreditation under an approved Quality Assurance Scheme.
8.2.11 The Contractor shall repair or replace and where necessary, dismantle and re-erect any sign
which fails to meet the requirements of the Specification. Such repair or replacement shall
be completed within a reasonable time.
Type Description
Material Description
EXT Extension to existing post
PCS Plastic coated steel
GAL Galvanised steel
8.2.17 All plastic coated posts shall be coloured Aircraft Grey to BS 381C No. 693 unless otherwise
instructed by the Engineer.
8.2.18 Extensions to existing posts shall have a spigot that fits internally into the existing post. The
design and fixing shall be agreed with the Engineer
January 2002
Traffic Signs
References
(1) Manual of Contract Documents for Highway Works, Specification for
Highway Works
(2) The Traffic Signs Regulations & General Directions 1994 (as amended)
(3) Traffic Signs Manual (as amended)
(4) The Design and use of Directional Informatory Signs - Local Transport
Note 1/94
(5) Working Drawings for Traffic Sign Design and Manufacture
(6) Surrey County Council – Standard Detail Drawings
(7) Surrey County Council Manual of Policies and Standards (MaPS)
(8) BS 873, BS 381C, BS 3262, BS 6044 and BS 6088
January 2002
Traffic Signs
Class Description
NR Non-reflective sheeting
1 Class 1 retroreflective sheeting
2 Class 2 retroreflective sheeting
WA Wide angle retroreflective sheeting
i) Non-Reflective Sheeting
A permanent road traffic sign made with non-reflective sheeting when illuminated in accordance with the Traffic Sign
Regulations and General Directions will for seven years provide satisfactory performance by day and night for drivers
of motor vehicles under normal driving conditions.
January 2002
Traffic Signs
Entrance Angle
Observation Angle Colour -5° 15° 40°
20° White 300 250 30
Yellow 250 200 25
Red 75 60 7
Blue 15 12 1.7
Green 30 20 2.5
30° White 250 220 35
Yellow 200 175 30
Red 57 50 9
Blue 10 8 2
Green 25 18 3
1° White 80 60 15
Yellow 65 45 13
Red 20 14 5
Blue 4 3.5 0.8
Green 8 6 1.2
11 The sheeting shall have an effective performance life of 7 years and during this period shall provide satisfactory performance
night and day for drivers of motor vehicles under normal conditions. The retroreflective sheeting will adhere to the
substrate and the average coefficient of retroreflection over the 7 year period shall not fall below 50% of the value
specified in the above table.
Illumination of Permanent Road Signs
12 Lighting units for permanent road signs shall be of external type and in accordance with BS 873: Part 5. The type and
number shall be in accordance with the Schedule of Signs. The construction and location of lighting units shall be in
accordance with Standard Detail Drawing No. 1000/453 and the lighting unit manufacturers recommendations. Electrical
installation shall be in accordance with Standard Detail Drawing No. 1000/452.
Permanent Internally Illuminated Bollards
13 All permanent internally illuminated bollards shall be of the base lit type as shown in Standard Detail Drawing No. 1000/452
and in accordance with BS 873: Part 3. The head shall either be blank or show the sign specified in the Schedule of Signs.
Location of Permanent Traffic Signs
14 The approximate position that each permanent traffic sign shall occupy shall be ascertained by reference to the Drawings
and the Schedule of Signs. The exact location shall be set out by the Contractor in the presence of the engineer before
commencement of associated groundwork
January 2002
CHAPTER 9
Highway Specification
9.1 Introduction
9.1.1 The concept of “Pavement Design” set out in this Technical Appendix is based upon the
standard set by the Highways Agency in the Design Manual for Roads and Bridges (DMRB),
Volume 7: Pavement Design and Maintenance, current editions (1), except where stated.
9.1.2 Highway materials, pavement construction and the overall quality of work requirements shall
comply with the edition current, at the time of the development design submission and
contract, of the Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works (SHW) and Volume 2 : Notes for Guidance on the SHW, except where
stated.
9.1.3 Where Local Plan policy requires, or where the development is within an existing conservation
area specific materials, surfacing types, and/or finishes other than those set out may be used
with the agreement of the Local Planning Authority and County Highway Authority.
9.1.4 The DMRB requires knowledge or an estimation of Design Traffic flow in terms of number of
standard axles passing over the pavement in a specified design life. This Technical Appendix
relies on the number of dwellings served and it will be assumed that 1 dwelling unit corresponds
to a cumulative traffic flow of 1000 standard axles in one direction at the time of opening.
Feeder roads and improvements to the existing highway network must recognise both traffic
at opening and within the design life and hence take into account the traffic assessment, growth
rates set out in DMRB and / or the specific requirements of the local highway network for
which Surrey CC is the highway authority.
9.1.5 The design of surfacing for bituminous roads serving less than 1000 dwellings is based on TRL
LR 1132 (2). All other designs for roads serving more than 1000 dwellings equivalent to 1.0
million standard axles (1 msa) should be based on traffic calculations set out currently in HD
24/96 Traffic Assessment (3) and pavement design principles set out currently in HD 26/94
Design Criteria (4), future revisions should be taken in to account and amended Technical
Appendices will be issued where relevant.
9.1.6 All pavement designs related to a length of adoptable carriageway shall be based on a 40 year
design life. The pavement design and construction parts of this Appendix will be periodically
updated as materials and design specifications change.
9.1.7 It is also brought to the notice of the designer at this stage that, in order to maintain
consistency of construction with maintenance processes, the choice of pavement design
materials has been restricted to those used/allowed in the County Council term tenders and
maintenance contracts. Additionally, models of the most commonly used Appendices to the
SHW, App 7/1 and 11/1 (5), have been included for use by the designer in order to standardise
the approval mechanisms.
9.1.8 The Specification for Highway Works and the Highway Authority require that where a material,
group of materials or process is covered by a National Quality Management Sector Scheme
(QMSS) or a Product Certification (Marked or Non-Marked) Scheme or a BBA certification
scheme or Statutory Type Approval or Highways Agency Type Approval then only materials,
processes or installations or contractors holding such certification shall be used in the works.
A full list of such schemes is maintained as a further set of Appendices within the
Specification for Highway Works or can be obtained from the Authority.
January 2002
Highway Specification
9.1.9 Developer’s submissions should include all pavement design assumptions or calculations,
traffic volumes and growths, 2 copies of the soils report for the site, 2 copies of the drainage
report with supporting calculations and permissions together with any other supporting
documentation for the design submission.
9.1.10 The developers attention is also drawn to Surrey County Council, Manual of Policies and
Standards, (MaPS) (11) when preparing design submissions.
References
(1) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 23/99 General Information
(2) Transport Research Laboratory LR 1132 The Structural Design of
Bituminous Roads
(3) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 24/96 Traffic Assessment
(4) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 26/96 Pavement Design
(5) Specification for Highway Works Volume 2 Notes for Guidance - Appendix
7/1 Permitted Pavement Options and Appendix 11/1 Kerbs, Footways and
Paved Areas
(6) National Quality Management Sector Schemes - Sector 14, Production of
Asphalt Mixes
(7) British Standards Institution BS 7533 Guide for Structural Design of Pavements
constructed with Clay or Concrete Block Pavers
(8) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 28/94 Skidding Resistance
(9) British Board of Agrément. Highway Authorities Product Approval Scheme
(10) Construction Industry Research and Information Association (CIRIA)
Report C522 Sustainable Urban Drainage Systems – design manual for
England and Wales
(11) Surrey County Council, Manual of Policies and Standards, (MaPS),
Volume 1: Highway Maintenance
Volume 2: Development Planning
Volume 3: Transportation Planning
Volume 4: Traffic Management
Volume 5: Highway Safety
January 2002
Highway Specification
Principles of Sustainability
9.2.2 In engineering terms sustainability is concerned with designs and approaches that result in
the more efficient use of resources, that make use of recycled materials and allow those materials
to be recycled when they are replaced.
9.2.3 This could be achieved in the following ways:-
• Minimising the use of materials;
use only the minimum materials necessary for the development.
• Reduction of Waste;
the wastage of materials can be reduced effectively by introducing regular audits to monitor
and control site activity more closely, e.g. materials ordering and site practices.
• Recovery of materials for re-use;
where any site clearance or demolition is involved, the developer should initially maximise
the recovery and re-use of any materials within the confines of the site. Only if this is not
practicable should this be carried out off-site.
• Re-use and Recycling of Materials;
there are many materials that can be effectively re-used and recycled. Advice about
individual materials can be obtained from the Building Research Establishment Centre
for Waste & Recycling (www.bre.co.uk/recycle/index.html), telephone 01923-664000).
9.2.4 Surrey County Council’s Waste Wise Business manual (www.surreycc.gov.uk/wwbm) or the
Waste Policy Group, telephone 020-8541-9781, can also provide advice about local facilities.
9.2.5 The DTLR paper “Building a Better Quality of Life: A Strategy for More Sustainable
Construction” also contains a great deal of helpful advice on how to make construction
more sustainable. The paper can be found on the DTLR website at
www.construction.detr.gov.uk/cirm/sustainable/bql/index.htm.
January 2002
Highway Specification
January 2002
Highway Specification
Useful Contacts
Sustainable Construction Building a Better Quality of Life: A Strategy for
More Sustainable Construction, DTLR August 2000.
Available from: DTLR Free Literature
PO Box 236
Wetherby LS23 7NB
Tel: 0870-1226236
Fax: 0870-1226237
e-mail: [email protected]
It can also be downloaded from the DTLR website at www.dtlr.gov.uk.
General Environmental Management and Best Practice Contacts SuPERB,
The Surrey Programme for Environmentally Responsible Businesses is a
local organisation to help Surrey businesses with environmental
management.
Tel: 07071-780263
e-mail: [email protected]
The Building Research Establishment Centre for Waste and Recycling can
provide advice about a wide range of individual materials.
Website: www.bre.co.uk/recycle/index.html
Tel: 01923-664000
January 2002
Highway Specification
January 2002
Highway Specification
The following table is based on TRRL LR1132 (6) and DMRB Volume 7 (HD 25/94) (7).
Type of Soil Plasticity Index CBR %
Clay of very high or extremely high plasticity 45 or greater Just greater than 2%
Clay of high plasticity 30 to 44 3%
Clay of intermediate plasticity 20 to 29 4%
Clay of low plasticity Up to 19 5%
Silt (assumes material may saturate) N/A 1%
January 2002
Highway Specification
References
(1) British Standards Institution BS 5930 – Code of practice for Site Investigations
(2) Soil Assessment Cone Penetrometer (MEXE cone penetrometer) Croney, D. and
Croney, P.:1991 – The design and performance of Road Pavements. 2nd Edition
Manufactures Handbook – SACP Model 244, CNS Farnell & Co, Ltd.
(3) Clegg Hammer Clegg, B. : 1976: an Impact testing device for in-situ base course
evaluation. Proceeding 8th ARRB Conference, Perth Western Australia Suppliers
Handbook – Clegg Impact Soil Tester. Trevor Deakin Consultants Ltd.
(4) TRL dynamic cone penetrometer
a) Kleyn, EG & Van Heerden : 1983: Using DCP soundings to optimise
pavement rehabilation. Report LS/83, Materials Branch, Transvaal Roads
Dept. Pretoria, South Africa
b) Manufactures Handbook – DCP Model A2465. CNS Farnell & Co. Ltd.
(5) Pilcon / Geonor Hand Vane.
a) BS 1377:1990: Methods of test for soils for civil engineering purposes.
Part 9: In-situ tests – “The hand vane is a miniature version to that
described in Section 4.4
b) Serota, A & Jangle, A: 1972: A direct reading pocket shear vane.
Civil Engineering - ASCE
(6) Transport Research Laboratory LR 1132 The Structural Design of
Bituminous Roads
(7) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 25/94 - Foundations
(8) Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works (SHW) and Volume 2 : Notes for Guidance on the SHW
January 2002
Highway Specification
January 2002
Highway Specification
9.4.9 The following restrictions with respect to certain classes of fill shall be observed.
• Class 6 Special Granular Fills - the use of chalk as a constituent of Class 6 fills shall not
be permitted.
• Class 6F1 capping is not permitted unless it provides a demonstrated 15% CBR support as
placed and compacted.
• Recycled materials, e.g. crushed concrete, are in most cases acceptable as special granular fills,
provided that they meet the specification requirements for that class of fill. Contamination by
lesser materials must be avoided at source and by control during processing, crushing and in the
stockpile. Approval of any recycled material should normally be restricted to stockpile approval.
• Bituminous planings are acceptable as capping (Class 6F3), or as sub-base in footway
construction but shall not be used elsewhere in the works. Bituminous (asphalt) planings
may also be recycled as part of the “Foamix”® (4) plant mix process or any in-situ recycling
process to provide a bituminous base material.
• Chalk - unless exceptionally hard and stable, when it may be classified as Class 1A or 1C
granular fill, chalk should always be treated separately from other earthworks materials as
Class 3 material. Chalk or chalk blended material is not acceptable as capping material and
cannot in any event be placed within 450 mm of the finished road level.
• Geotextile – separation between soft subgrade materials and the sub-base shall be achieved
by a geotextile fabric complying with clause 609 of SHW. It is essential that a 300mm lap
is achieved during installation and that the fabric material has a life expectancy of 40 years.
Certificates of compliance with the minimum performance requirements set out in clause
609 must be provided. Additional performance required over and above those set out in
clause 609 by a pavement foundation, earthworks stability design or drainage detail shall
be specified in the contract appendices.
9.4.10 The developer is reminded of Surrey CC policy to promote sustainability wherever possible
and the use of insitu materials and the re-use of construction materials is actively encouraged.
Alternative materials and their use should be submitted for approval.
References
(1) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 25/94 – Foundations
(2) Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works (SHW) and Volume 2 : Notes for Guidance on the SHW
(3) Manual of Contract Documents for Highway Works, Volume 3 Highway
Construction Details
(4) “Foamix”® A proprietary recycled plant-mixed bituminous material produced
and marketed by Foster Yeoman Ltd.
January 2002
Highway Specification
Brownfield Sites
9.5.5 Additionally, in brownfield locations and / or where contamination of natural soils by
industrial waste, chemicals, hydrocarbons, has occurred, a full detailed investigation and
classification of soils and contaminants must be undertaken. A copy of the full report must
be submitted with the design submission.
9.5.6 The contaminants should be identified and a planned removal or treatment regime put in place.
It is essential that movement of such materials within the site should be minimised and
controlled. Deposits of contaminated soils should be isolated from all drainage works and
from any contact with surface or ground water movement through to a water course or aquifer.
9.5.7 The use of geotextile fabrics, separators or impermeable membranes may be considered, however,
their effectiveness in the long term and possible damage by future excavations must be taken
into account.
January 2002
Highway Specification
Design considerations
9.5.9 Earthworks shall be designed, classified and executed in accordance with the SHW Series 600,
the Design Manual for Roads and Bridges Volume 4 (1) and Part 3 of this document. For the
purposes of earthworks on site, materials shall be classified according to 600 series Table 6/1 of
the SHW. It should be made clear in the scheme specification which classes are expected to be
used and, where site-specific acceptability limits are required in Table 6/1, these shall be
included in Appendix 6/1. Any special materials not included in the SHW, for example clay
linings to ponds, shall be fully specified and supported in the submission by calculations and
any other technical documentation.
9.5.10 Compaction of earthworks shall also be in accordance with SHW Series 600 and Tables 6/1
and 6/4. The use of compaction plant other than that described in SHW must be accompanied
by a compaction trial at which time the compactive effort and layer thickness of the
alternative must be demonstrated.
Reinforced Earthworks
9.5.11 Strengthened embankments and / or earthworks for reinforced soil and anchored earth
structures, ground anchors or crib walling may be used but only when full supporting
documentation and calculations have been submitted and approved by the authority.
Where such structures would be classified as ‘highway structures’ the proposal shall be
subject to the authority’s Technical Approval Procedure. The designer must consider the
implications of maintenance, access for maintenance and of any Health and Safety issues
of accessibility during the normal in-service life of the structure.
January 2002
Highway Specification
9.5.13 Reinforced, anchored or nailed slopes may be used to achieve stable slopes within restricted
spaces but the following conditions will apply:
• Design shall be in accordance with BS8006 (2).
• Slopes steeper than 1 in 1 (45°) AND exceeding 1.37m height will constitute a
highway structure.*
• Slopes which are to be vegetated shall not be steeper than 60° to the horizontal
(approximately 1.75 to 1).
• Where a slope steeper than 60° is required, a hard face shall be provided which may be
sloped or stepped to give the required profile.
• Plastic reinforcing elements or fabrics shall not be exposed at a slope face where there is a
significant risk of damage by fire. They shall also have a proven longevity and shall not be
susceptible to damage by light
• Metal wire or mesh reinforcement shall not be exposed at a slope or wall face where it could
be damaged or vandalised presenting a risk to pedestrians or cyclists.
9.5.14 Hard facing elements (including crib walls, gabions and proprietary interlocking walls) shall
be constructed in such a way as to prevent the theft of, or vandalism to such elements, gabion
stone etc. Crib walling shall be constructed in accordance with HA Standard BD 68 (3) and
further detailed by an Appendix 6/10 in the contract. Similarly gabion walling shall be
constructed in accordance with wire manufactured and complying with BS 1052 (4).
Alternatives must be specified in an Appendix 6/10 in the contract.
9.5.15 Reinforced soil and anchored earth structures are “special structures”* and the related
earthworks and reinforcing elements shall comply with HA Standard BD 70 (5). Equally
corrugated steel buried structures and the related earthworks shall comply with the special
requirements of clause 2501 and clause 623
* Where earth retaining structures are incorporated in the design full design submissions shall
be forwarded to the Authority for a full design check approval by both the Geotechnical
Engineer and Structural Engineer of the Authority. (see also Structures requirements and check
list.)
References
(1) Design Manual for Roads and Bridges – Volume 4
(2) British Standards Institution BS 8006 – Code of Practice for Strengthened Soils
and other Fills.
(3) Highways Agency, Bridges Standard BD 68 – Crib Retaining Walls.
(4) British Standards Institution BS 1052 – Specification for Mild Steel Wire for
general engineering purposes.
(5) Highways Agency, Bridges Standard BD 70 – Strengthening / Reinforced Soils
for Retaining Walls
January 2002
Highway Specification
January 2002
Highway Specification
9.6.9 The following tables set out typical design thickness related to traffic. The developer may
interpolate between examples or preferably refer to the design tables in each document.
Flexible Construction
Cumulative traffic Roadbase & Basecourse (100pen) Surfacing (*)
0.1msa 100mm 20mm Minimum
0.5msa 150mm 20mm Minimum
1.0msa 160mm 30mm Minimum
*surfacing may be 6mm Dense Bitumen Wearing Course Macadam (DBWC), 10mm Close Graded Wearing
Course Macadam (CGWC) complying with BS 4987 (3)or a Proprietary thin surfacing system to clause 942
of SHW or Stone Mastic Asphalt (SMA). Adjustment for macadam and binder equivalence must be made.
Designs for greater than 30 msa should be by consultation between developer and the
authority.
*** The current preferred surfacing option is a polymer or fibre modified SMA together with a rolled asphalt base course
for designs of up to 5msa and together with a two layer DBM 100 pen base course/roadbase laid in two layers for
designs of greater than 10msa cumulative traffic.
January 2002
Highway Specification
Bituminous Roadbase
9.6.11 The permitted roadbase materials are based on term contract specifications.
Dense Bitumen Macadam (DBM 100 pen) - BS 4987
Hot Rolled Asphalt (HRA 50 pen) - BS 594
Dense Bitumen Macadam, 50 penetration bitumen (DBM 50)* - BS 4987
9.6.12 The aggregate size for all bituminous roadbase material shall be restricted to 28 mm nominal
size laid in layers compatible with the aggregate in the range 70 to 110 mm. The use of gravel
aggregate is not permitted and aggregate in the roadbase layer shall be restricted to crushed
rock or slag.
The use of 200 pen bitumen (DBM 200) is permitted for use in footway construction and areas
of adopted carriageway serving less than 500 dwellings (0.5 msa). When used in the carriageway
an equivalence value of 0.7 shall be applied
i.e. 200 pen 215 mm 155 mm 85 mm
100 pen 150 mm 110 mm 60 mm
9.6.13 The use of HDM or particularly HMB (heavy duty or high modulus base materials), is not
envisaged for development related works. Should larger high traffic density construction be
required for a specific scheme then design consultation between the developer and the
authority may consider these options.
9.6.17 Additionally for all areas of anticipated channelised heavy traffic, particularly approaches
to traffic lights, and in all instances for designs of greater than 20 msa traffic, the base course
shall be DBM 50.
January 2002
Highway Specification
9.6.20 Only Rolled Asphalt Design Mixes shall be used where asphalt is the selected surface for the
development or scheme. These are designated for current SCC Term Tender contracts as SCC
mix ‘A’, ‘B’, ‘E’, ‘R’, ‘S’ and allow for the whole range of anticipated traffic loadings.
Alternatively design mix asphalt wearing courses complying with BS 594 and clause 943 may be
used. See the following summary of SCC design mixes and model Appendix 7/1 for mix details.
9.6.21 Lay bys and bus bays may be constructed using flexible, flexible composite or proprietary
construction systems provided fuel resistant binders are incorporated in the wearing course
layer. Fuel resistant bitumen is available as a straight substitution. Combined systems of
bituminous aggregate skeleton and cement/resin matrix are also available.
9.6.22 The use of Surface Dressing as a new wearing course surface treatment or finish is not
acceptable for adoptable roads within a development related submission.
9.6.23 Additionally it should be noted that for “Shared Surfaces” the construction and surfacing
material must comply with the greater requirements of vehicular traffic.
9.6.24 Permitted surfacing systems and wearing course materials are as follows:-
BS 594layer thickness
HRA wearing course SCC Mix A - light weight use - 40 mm
HRA wearing course SCC Mix B - general use - 40 mm
HRA wearing course SCC Mix E – high stone content 40 mm
HRA wearing course SCC Mix R - heavy channelised traffic - 40 mm
HRA wearing course SCC Mix S - very heavy channelised traffic - 50 mm
10 mm Close graded and 6 mm macadam have a material equivalence of 0.9 based on 100 pen
bitumen which should be taken into account when relating the additional thickness required
for the total pavement design.
9.6.25 Hence when using the above wearing course material options the following additional
construction is required based on the national 100 mm of surfacing (w/c + bc) thickness.
Material Wearing Course Factor Base Course
HRA WC 50 pen factor 1.0 40 mm layer = 60 mm b/c
HRA WC 50 pen factor 1.0 50 mm layer = 50 mm b/c
6 mm Thin surfacing /SMA factor 1.0 20 mm layer(15-25) = 80 mm (75/85)
10 mm Thin surfacing/SMA factor 1.0 30 mm(25-35) = 70 mm (65/85)
14 mm Thin surfacing/SMA factor 1.0 40 mm layer (35-45) = 60 mm (55/65)
10 mm CGWC 100 pen factor 0.9 30 mm layer = 85 mm
10 mm CGWC 200 pen factor 0.9+0.7 30 mm layer = 90 mm
6 mm DBM 200 pen factor 0.9+0.7 20 mm layer = 95 mm
(where 0.9 and 0.7 are factors for macadam and binder equivalence respectively.)
January 2002
Highway Specification
9.6.26 The following pavement design examples highlight the above philosophy.
Example 1
Design traffic 1000 dwellings served(1 msa)
Design thickness 190 mm flexible
Options:
a) 40 mm (minimum) HRA WC Mix B
60 mm DBM 100, 20 mm base course
90 mm DBM 100, 28 mm roadbase
b) 30 mm (minimum) SMA (-10 mm)
60 mm DBM 50 - (channelised traffic) -
100 mm DBM 100 - 28 mm roadbase (+ 10 mm)
c) 30 mm CGWC 200 pen (-15 mm)
60 mm DBM 200 pen, 20 mm bc (-25 mm)
180 mm DBM 200 pen 28 mm roadbase [(-40 mm)(+ 80 mm)]
Example 2
Design traffic 20,000 dwellings served or 20 msa county network road
Design thickness 320 mm flexible
Options:
a) 50 mm HRA WC Mix S - clause 943
50 mm DBM 50, 20 mm base course – (channelised traffic)
220 mm DBM 100 28 mm roadbase
b) 40 mm SMA
60 mm DBM 50 – (channelised traffic)
180 mm DBM 50 - 28 mm roadbase
Example 3
Design traffic 500 dwellings served (0.5 msa)
Design thickness 170 mm flexible
Options:
a) 40 mm HRA w/c Mix B
60 mm DBM 100 20 mm base course
70 mm DBM 100 28 mm roadbase
b) 20 mm DBM 100 6 mm w/c (-20 mm)
60 mm DBM 100 20 mm base course
90 mm DBM 100 28 mm roadbase (+ 20mm)
c) 20 mm DBM 200 6 mm w/c (-25 mm)
60 mm DBM 200 20 mm bc (-25 mm)
120 mm HRA 50 28m roadbase [(+25) (+25)]
9.6.28 For roads serving more than 1000 dwellings (1 msa) a determinate design based on CBM3G
shall be used to provide a minimum layer thickness of 150 mm laid on clause 803 granular
sub-base or Cement Bound Material category 1 or 2 (CBM1 or CBM2) stabilised sub-base.
9.6.29 For roads with less traffic serving between 100 dwellings (0.1 msa) to 1000 dwellings (1.0 msa)
the design curve in LR 1132 may be used except that a two layer 100 mm bituminous
construction shall be applied.
January 2002
Highway Specification
9.6.30 A minimum 120 mm thick layer of CBM 3G* shall be maintained for all roads serving up uo
1000 dwellings (1.0 msa).
*The use of CBM3G (Roadbase containing gravel aggregate or roadbase that has a coefficient of thermal expansion
more than 10 x 10-6 per ∞C containing crushed rock aggregate) is preferred as a locally sourced aggregate. The nominal
size of the aggregate may be 20 mm for layer thickness less than 150 mm and 20 or 40 mm nominal size for a layer
thickness greater than 150 mm.
9.6.31 Although the use of any bituminous base material and wearing course surfacing described
previously can be used in conjunction with the CBM3 layer the following combinations
are the preferred options.
CBM3 120 mm layer - up to 1000 dwellings served (1.0 msa)
30 mm wearing course - Clause 942 polymer/fibre modified SMA or Thin Surfacing
70 mm Rolled Asphalt 20 mm base course or 20 mm DBM 100 base course
CBM3 150 mm to 250 mm layer / 1 msa to 20 msa
30 mm wearing course - Clause 942 polymer/fibre modified SMA or Thin Surfacing
70 to 120 mm of 20 mm DBM 100 base course in 1 or 2 layers.
9.6.32 The 20 mm or 40 mm nominal aggregate size CBM3 layer shall be fully compacted in
accordance with SHW clauses 1035/8. The layer shall be sprayed with a bitumen emulsion
curing compound and the layer shall not be trafficked until the material has gained strength
equal to the 7 day requirement measured by concrete cubes compacted to site density and
cured alongside the slab.
9.6.33 Alternatively, for small areas, the CBM3 layer may be covered immediately [i.e. within 2 hours
of batching] with the next bituminous layer although this is only envisaged for areas of
restricted width, at tie-ins, and where immediate trafficking is not envisaged.
Aggregate Selection
9.6.34 Aggregates in Wearing Course Mixtures.
The polished stone value (PSV) and aggregate abrasion value (AAV) of any applied Pre-Coated
Chippings, the Aggregate in the mix of any Close Graded Wearing Course (CGWC), Proprietary
Thin Surfacing or Stone Mastic Asphalt shall be in accordance with DMRB HD 36/99 (7) except
that the minimum PSV in any site definition, including all carriageway, footway or vehicular
crossing construction , shall be 55.
The PSV and AAV of the surfacing aggregate shall be in the range set out below.
January 2002
Highway Specification
cv/day/dir
traffic 0 to 250 251 to 1000 1001 to 1750 1751 to 2500
max AAV for pre coated chippings 14 12 12 10
for asphalt
max AAV for aggregate in thin 16 16 14 14
surfacing or macadam
9.6.35 A list of approved aggregates and effective PSV ratings is maintained by Surrey CC, Materials
Laboratory. Aggregates from any other or new source must be approved by Surrey CC,
Materials Laboratory prior to any works commencing. Certificates from ten (10 no.) individual
PSV tests carried out during the previous 12 months undertaken by at least 3 different UKAS
(8) accredited test laboratories must be submitted.
9.6.36 The stock of high quality road stone nationally is restrictive and a balance between acceptable
specifications and ease of supply must be maintained. Designers and specifying engineers
should not over specify the aggregate for simplification and a true skidding resistance
assessment in accordance with DMRB should be carried out whenever possible.
January 2002
Highway Specification
9.6.38 It is anticipated that SCC will update the above schedule on a regular basis. It will be re-issued
to successful term tender contractors, suppliers and developers.
9.6.39 Prior to any works commencing Surrey CC, Materials Laboratory, must approve aggregate from
any other source.
January 2002
Highway Specification
9.6.40 Details of the proposed material, the source, shipping and storage details, together with
a sample, must be supplied to the Surrey CC, Materials Laboratory, at least 28 days before
work commences.
9.6.41 Certificates from ten (10 no) individual PSV tests carried out during the previous year (12
months) undertaken by at least 3 different UKAS accredited test laboratories must be
submitted to Surrey CC, Infrastructure Group, Materials, Merrow.
9.6.42 It is possible that trials of new aggregates sources will be carried out for monitoring purposes,
albeit with the aggregate used and placed in a lower risk category than that required by
design standards.
Surface Texture
9.6.49 Surface texture shall be measured by the sand patch method described in clause 921 of SHW.
A minimum surface texture of 1.5 mm (sand patch) shall be achieved for all materials used in
a high speed location (greater than 40 mph).
For all low speed roads with a speed limit of less than 40 mph (includes all estate roads except
cul-de-sacs) a surface texture of 1.2 mm average (sand patch) shall be achieved.
For any non thoroughfare (i.e. cul de sac), a surface texture is of less importance than adequate
aggregate PSV and an average surface texture of 0.7 mm is acceptable for medium textured or
close graded macadam.
January 2002
Highway Specification
9.6.51 Adequacy of compaction of all dense bitumen macadam base course and roadbase materials
(DBM100, DBM50, HDM, HMB35) laid in the carriageway shall be in accordance with clause
929 of SHW and shall have a void content of less than 8% .
9.6.52 Adequacy of compaction for all materials laid generally within the carriageway, either by hand
or machine, shall be measured by void content (clause 901):
The void content of the mix, when placed and compacted, to be in the following range:
- 2% - 6% for HRA wearing course with no individual result to be greater than 7%,
- less than 6% for rolled asphalt base and roadbase,
- less than 8% for dense or close graded bitumen macadam wearing course and
- within the range recommended by the proprietary system for thin surfacing systems or stone
mastic asphalt.
9.6.53 The contractor will be expected to demonstrate an adequate level of compaction with the use
of a calibrated nuclear density meter (NDM) or other measurement devices during the works
and to supply, when required, certificates of density and void content test results. Where low
density or high void contents are achieved indicating possible poor levels of compaction the
contractor will be required to demonstrate adequate levels of compaction of the layer (s) in
question by core sampling and testing of the bituminous material in the Surrey CC, Materials
Group Laboratory.
January 2002
Highway Specification
References
(1) Transport Research Laboratory LR 1132 The Structural Design of
Bituminous Roads
(2) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 25/94 – Foundations
(3) British Standards Institution BS 4987 – Coated Macadam for Roads and Other
Paved Areas.
(4) British Standards Institution BS 594 – Hot Rolled Asphalt for Roads and Other
Paved Areas.
(5) National Quality Assurance scheme - Sector 14, Production of Asphalt Mixes.
(6) British Board of Agrément. Highway Authorities Product Approval Scheme.
(7) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement
Design and Maintenance HD 36/99 Surfacing Materials for New and
Maintenance Construction .
(8) UKAS – United Kingdom Accreditation Service.
(9) Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works (SHW) and Volume 2 : Notes for Guidance on the SHW.
(10) Foamstab – Industry System (several Contractors) for the In-Situ recycling
of existing pavement construction using “Foamed Bitumen” as the
introduced binder.
(11) “Cementstab” – Industry System (several Contractors) for the In-Situ
recycling of existing pavement construction using “Portland Cement”
as the introduced binder.
(12) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 37/99. Bituminous Surfacing Materials and Techniques
January 2002
Highway Specification
9.7.6 Additionally, “Natural Stone Surfacing” may be used, particularly, in conservation areas where
matching of aggregate and or coloured natural stone may be a requirement. Although, the
selection of the natural stone element will be based on a locally based decision, attention is
drawn to the document “Natural Stone Surfacing – Good Practice Guide” (4). Where footways
or pavements are constructed, in part, with natural stone setts then this shall be carried out in
accordance with BS 7533 Part 7 (5)
9.7.7 The design of pavements surfaced with concrete or clay pavers and concrete flags or natural
stone slabs shall be in accordance with the procedures and recommendations set out in BS
7533, Parts 1(6)and 2(7) amended as follows for pavements taking vehicular traffic of any kind:
• The minimum number of dwellings served from 0 to 500 ( 0 to 0.5 msa recommended in BS
7533) shall be amended to include a bituminous bound roadbase, hence all areas of adopted
highway paving shall be laid with a bituminous or cementitious roadbase.
• A minimum bituminous roadbase layer of 70 mm, comprising 28 mm nominal size DBM
100pen roadbase in conjunction with a 30 mm laying course of sand shall be used in the
design category 0 to 0.5 msa where no special case conditions prevail (see paragraph 3.2 of
BS 7533). In all other instances the paving shall be designed in accordance with a minimum
130 mm of bituminous (DBM100) or cementitious (CBM3) roadbase construction.
• Unless specifically agreed with the authority only rectangular blocks manufactured with
nominal dimensions of 200 mm length, 100 mm width and 65 mm thickness for clay and
80 mm thickness for concrete pavers shall be used.
9.7.8 All concrete block or clay pavers shall be laid in accordance with the procedures and
recommendations set out in BS 7533 Part 3 (8). Unless otherwise agreed in writing by Surrey CC,
Materials Group a standard laying pattern of 450 Herringbone with a proprietary starter block
system used in conjunction with either a single or double stretcher course should be adopted.
9.7.9 The laying course sand and jointing sand shall comply with BS 7533. The use of a sealant to
deter jointing sand wash out is encouraged for areas that may be scoured or have large surface
water movement. Drainage channels and details for around ironwork shall be set in wet
concrete in order to isolate the units from the sand laying course.
9.7.10 All pavements constructed with small element concrete flags, natural stone slabs should be in
accordance with BS 7533 Part 4 (9)and unless otherwise agreed to a design in accordance with
the recommendations of BS 7533 Part 8 (10).
9.7.11 Overall the design of any footway shall consider the implications of future maintenance set
out as the recommendations in TRL Application Guide 26 (11) and the positioning of utilities,
mains and plant in accordance with the recommendations of NJUG (1986) Publication
Number 7 (12).
January 2002
Highway Specification
References
(1) British Standards Institution BS6717, Part 1: “Precast concrete paving blocks”.
(2) British Standards Institution BS 6677, Part 1: “Clay or calcium silicate pavers
for flexible pavements”.
(3) British Standards Institution BS 7263 Part 1: “Precast concrete flags, kerbs,
channels, edgings and quadrants”.
(4) SCOTS. Society of Chief Officers of Transportation in Scotland - “Natural Stone
Surfacing – Good Practice Guide”.
(5) British Standards Institution BS 7533, Part 7 - “Code of Practice for the
construction of Pavements of natural stone setts”
(6) British Standards Institution BS 7533, Part 1 “Guide for the structural design
of heavy duty pavements constructed of clay pavers or pre-cast concrete
paving blocks”
(7) British Standards Institution BS 7533, Part 2 “Guide for the structural design
of lightly trafficked pavements constructed of clay pavers or pre-cast concrete
paving blocks”
(8) British Standards Institution BS 7533, Part 3, “Code of practice for laying
pre-cast concrete paving blocks and clay pavers for flexible pavements”.
(9) British Standards Institution BS 7533, Part 4: Code of Practice for the
construction of Pavements of Precast concrete flags or natural stone slabs
(10) British Standards Institution BS 7533, Part 8 “Guide for the design of lightly
trafficked pavements of natural stone setts”.
(11) Transport Research Laboratory TRL Guide 26 – Footway Design and
Maintenance Guide
(12) NJUG (1986) Publication No. 7 “ Recommended positioning of Utilities,
Mains and Plant for New Works”.
January 2002
Highway Specification
January 2002
Highway Specification
References
(1) Design Manual for Roads and Bridges (DMRB), Volume 7: Pavement Design
and Maintenance HD 26/94 Pavement Design
(2) Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works (SHW) and Volume 2 : Notes for Guidance on the SHW.
Clause 1000 series
(3) British Standards Institution BS 5328 Concrete Parts 1, 2, 3 and 4.
(4) Manual of Contract Documents for Highway Works, Volume 3 – Highway
Construction Details, Section C
January 2002
Highway Specification
Cycle Lanes
9.9.11 The use of a Green surface treatment shall be associated with cycle ways and cycle way
reservoirs at stop lines.
The colour green shall be restricted to a muted shade in the following range:
BS381C, (6) “Deep Chrome Green, Grass Green, Bold Green” are currently included in SCC
term tender specifications.
January 2002
Highway Specification
Colour Contrasts
9.9.14 Exceptionally, the use of Buff aggregate, Chinese bauxite, may be used to produce a lighter
colour contrast. This can be used satisfactorily to produce a contrast with “Grey Guyanan
bauxite” in conservation areas in lieu of “red or green”
9.9.15 The use of naturally coloured aggregates such as Harden Red, Criggion Green, Cromhall
Quartzite etc may be considered to colour conventional or proprietary surfaces or surface
treatments. The overall requirement to maintain the minimum PSV for the appropriate
traffic category and location shall be achieved and hence the use of gravel may not achieve
this requirement.
9.9.16 The use of coloured surface treatments and colour contrasts may be restricted in conservation
areas or where a local plan exists.
Surface Texture
9.9.17 The surface texture provided by the surfacing material and surfacing layer is a function of
both the material and process. Surrey CC, Materials Group, will provide advice if required on
what level of surface texture is required at any site plus how it can be best achieved.
9.9.18 The following extract from Appendix 7/1 summarises the overall requirements:
Surface Texture shall be measured by the Sand Patch method described in clause 921 of SHW.
For roads subject to a speed limit of 40 mph or less a minimum average texture depth of 1.2
mm shall be achieved with individual values greater than 0.9 mm.
For high speed roads where the speed limit exceeds 40 mph a minimum average texture depth
of 1.5 mm shall be achieved with individual values greater than 1.2 mm.
Existing Carriageway.
9.9.19 Re-texturing may be specified where the existing carriageway surfacing has deteriorated by loss
of micro-texture and / or macro-texture. Where the development related works on the highway
change the risk rating of the carriageway by virtue of physical alignment or traffic movements,
and as described in DMRB HD 28/94, retexturing may be used as a temporary expedient.
There may be a need to review the carriageway skid resistance adjacent to the works and / or
approaching the works where a temporary increase in skid resistance is required because of the
increase in risk rating due to traffic movements. In this instance the use of re-texturing to raise
the skid resistance is a viable alternative.
9.9.20 Acceptable re-texturing techniques, their suitability and effectiveness are described in DMRB
HD 37/99.
9.9.21 It must be recognised however that for adoption purposes the structural integrity of the
development related carriageway works and design life will have more weighting than surface
texture in the short term. Hence a need to resurface because of structural need will have a
higher weighting than re-texturing a possibly structurally deficient pavement structure.
January 2002
Highway Specification
References
(1) Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works
(2) Design Manual for Roads and Bridges, Volume 7, Pavement Design and
Maintenance, HD 28/94 - Skidding Resistance
(3) Design Manual for Roads and Bridges, Volume 7, Pavement Design and
Maintenance HD 36/99 – Surfacing Materials for New and Maintenance
Construction
(4) Design Manual for Roads and Bridges, Volume 7, Pavement Design and
Maintenance HD 37/99 – Bituminous Surfacing Materials and Techniques
(5) British Board of Agrément / Highway Authorities Product Approval Scheme
(6) British Standards Institution, BS381C – Specification for Colours for
Identification, Coding and Special Purposes
January 2002
Highway Specification
Soakaway systems
9.10.9 All soakaway systems offered for adoption must be located entirely within the limits of the
highway, but not within the carriageway. As far as practicable, the cover of the soakaway
should be located in the paved area to facilitate access and minimise disturbance when
maintenance is carried out. The diameter of a soakaway should not be less than 1.8m, nor
exceed 2.5m diameter and an interceptor / silt trap capable of being cleaned by a conventional
gully pot gulper / emptier must be installed immediately upstream of it. An oil trap shall
always be installed within the system where geological conditions indicate and / or the
soakaway penetrates Chalk.
9.10.10 If there is no reasonable alternative means of drainage from conventional drainage systems
or a “Sustainable Urban Drainage System” (SUDS) (1), a “conventional soakaway” drainage
system will be considered acceptable if designed and constructed in accordance with the SCC
“Design Procedure for Soakaways for Highway Drainage” (2) and provided that the location
and geology are acceptable. The developer must always submit calculations for the design of
any soakaway / infiltration / source control system
January 2002
Highway Specification
Drainage Works
9.10.11 All drainage operations within the development related works must be carried out in accordance
with SHW clause 500 series (3). All pipes for drainage, ducts for services, chambers, gullies and
pipe junctions must comply with clause 500 series, scheduled in Tables 5/1, 5/2, 5/6, and with
the relevant British Standard. Drainage aggregates required for bedding, laying, surrounding
pipes and granular material used for the reinstatement of drainage trench operations shall
comply with clause 500 series and the relevant British Standard.
9.10.12 Where trench excavation and reinstatement operations are required in the adoptable carriageway
all trench arisings / encountered insitu material shall be discarded (used elsewhere in the site)
and the reinstatement back fill shall be an acceptable Class A graded granular material or
granular sub-base, GSB1, both supplied, placed and compacted in accordance with NRSWA
specification. (4). All bound material used in the reinstatement shall comply with the relevant
British Standard (see also this document Appendix D) and to the construction requirements
set out in NRSWA Specification Appendices A1 to A11.
9.10.13 The developer is reminded that before entering or breaking into an existing sewer or drain
the contractor shall give notice to the authority responsible for the pipeline to which the
connection is to be made.
All drains shall be inspected, cleaned where required and water-tight joints tested in accordance
with clause 509 of SHW.
9.10.14 All manhole covers and frames, gully gratings and frames, stop valve covers etc. located within
the adoptable carriageway must comply with SHW and with BS EN 124 (5). All products must
be kitemarked to ensure product certification, to be fine cast with no coating and preferably
manufactured of ductile cast iron. The class of all units shall be D400 except where trafficking
by commercial vehicles will be minimal and / or where the adoptable roads do not form a bus
route. In these exceptional and low traffic loading locations class C250 may be used.
References
(1) Construction Industry Research and Information Association (CIRIA)
Report C522 Sustainable Urban Drainage Systems – design manual for
England and Wales
(2) Surrey CC Manual of Policies Standards Volume 1, Appendix E - “Design
Procedure for Soakaways for Highway Drainage”
(3) Manual of Contract Documents for Highway Works, Volume 1: Specification
for Highway Works
(4) New Roads and Street works Act 1991, Specification for the reinstatement of
openings in Highways.
(5) British Standards Institution BS EN 124: Gully tops and manhole tops for
vehicular and pedestrian areas. – Design requirements, type testing, marking,
quality control.
(6) British Standards Institution BS 8005 – Sewage.
(7) Water Industry Act 1991.
(8) Environment Agency’s ‘Policy and Practice for the Protection of Groundwater’.
(9) DTLR Advice Note HA/02/00 – Spacing of Road Gullies.
(10) The Wallingford Procedure.
(11) British Standards Institution BS 6367 – Code of Practice for Drainage of Roofs
and Paved Areas.
(12) Sewers for Adoption
(13) DTLR Highway Construction Details
(14) DTLR Advice Note HA40
(15) SCC Standard Detail Drawings
January 2002
Highway Specification
Structural Adequacy
9.11.3 Highway structures, whether they support or protect the highway, shall be capable of safely
supporting the load effects derived from current highway loading standards and, with
appropriate inspection and maintenance, have a design life of 120 years. The primary design
standards to be used shall be BS 5400 ‘Steel, concrete and composite bridges’ and the
appropriate Technical Memoranda contained in the Highways Agency’s ‘Design Manual for
Roads and Bridges’ (DMRB), together with those standards listed in the Technical Approval
Schedule. Compliance with these standards will normally ensure that the design, whether for
new or alterations to existing highway structures, is acceptable to the County Council as
Technical Approval Authority.
9.11.4 To reduce future maintenance costs to a minimum all new design proposals will be assessed
for compliance with the principles of ‘design for durability’, as detailed in the Highways
Agency’s DMRB. Essentially this means that designs for bridges that have a span of less than
60 metres, with the exception of footbridges, shall be based on integral bridge concepts.
Materials
9.11.5 The choice of materials for highway structures shall be appropriate for the use and function of
the structure, whilst being sympathetic to the location and environment as far as possible. The
specification to be used shall be the Highways Agency’s ‘Manual of Contract Documents for
Highway Works, Volume 1, Specification for Highway Works’.
9.11.6 It should be noted that for timber structures that are being offered for adoption, both the type
of wood and its source shall comply with County Council policy, and this stipulation may be
a condition of the Planning Consent.
9.11.7 Materials should be chosen for low maintenance throughout the required 120-year design life.
When the actual life of a structure may be less than this, e.g. timber footbridges, the
replacement costs to achieve the 120-year design life will increase the commuted sum required
for adoption. The designer should therefore give consideration to these factors when
developing a design and specifying materials.
January 2002
Highway Specification
Aesthetics
9.11.8 The form and appearance of a structure should, as far as possible, both complement the
environment in which it is located whilst at the same time provide a solution that complies
with the following criteria.
9.11.9 Subways, whether for pedestrians only or for combined use with cyclists, should always be
designed to appear light, airy and spacious. The geometry should be such that a view through
the subway is available before it is entered, the entrances are splayed, and there are no places
of concealment. Security can be further increased if the subway and its approaches are
overlooked by adjacent properties and a well designed overhead lighting scheme is provided
for night time use.
9.11.10 For walls, very often the only aesthetic consideration is the material finish. If the location or
background to the wall permit it, then an applied facing such as brick, stone or flint may be
appropriate. A formed concrete finish may be acceptable in some circumstances, but the
following basic rules must be observed,
• an F3 finish (as described in SHW, series 1700) shall not be used for large areas
• course textured surfaces are acceptable only when they will be viewed from a distance
• fine textured surfaces shall be used when the wall can be viewed from close proximity, but
sharp edges should be avoided.
9.11.11 When specifying the finishes to a structure they should be considered in terms of durability,
low maintenance, ease of cleaning and appropriate texture to deter the application of graffiti.
9.11.12 For structures that are adjacent to or cross natural watercourses the designer should consult
with both the Environment Agency and Surrey Wildlife Trust to ensure adequate provision is
made for wildlife and their needs. This is in addition to the requirements contained within
the DMRB.
Technical Approval
The submission of design proposals for acceptance by the Technical Approval Authority and
the subsequent provision and acceptance of appropriate Certificates, confirming that the design
complies with the standards listed in the agreed Technical Approval Schedule.
Technical Approval Authority (TAA)
The County Council is the Technical Approval Authority for all highway structures within
Surrey, with the exception of those owned by either Railtrack or the Highways Agency (i.e.
those associated with motorways and trunk roads).
Technical Approval Schedule (TAS)
A schedule of documents that are relevant to the design of the highway structure. It is included
within the Approval in Principle as an appendix.
Approval in Principle (AIP)
A proforma that records the standards to be used for the design, together with other pertinent
details. Blank versions of an AIP are supplied by the TAA for completion by the designer, who
shall return the completed form to the TAA for acceptance.
9.11.14 The County requires the procedures described below to be applied to the design of all new,
or alterations to existing, highway structures as defined in the Introduction of this section,
all alternative designs and to temporary structures that support or protect the public highway.
9.11.15 Technical Approval is a continuing process and the period required for consideration will vary
according to the size and complexity of the structure, and if any aspects of the design are a
departure from current design standards. Designers should therefore liase as early as possible
with the TAA prior to making a formal submission on the appropriate AIP and TAS, blank
versions of which are available from the TAA.
January 2002
Highway Specification
9.11.16 A formal AIP submission shall include a location plan, two copies of a General Arrangement
drawing, relevant parts of the soil investigation factual and interpretation reports, and one
completed copy of the TAS and AIP with original signature. The submission is to be sent to:
Principal Engineer (Structures),
Surrey County Council,
Highway House,
21 Chessington Road,
West Ewell
Surrey KT17 1TT
9.11.17 On acceptance, the AIP will be signed by the Principal Engineer (Structures), and a copy of the
endorsed AIP returned to the designer to confirm its acceptance.
9.11.18 On completion of the design and independent check the appropriate Design and Check
Certificates or Design/Check Certificate shall be completed, signed by the designer and/or
checker and forwarded to the TAA for acceptance. This certificate confirms that the design
complies with the agreed standards recorded in the AIP.
9.11.19 On completion of the works the designer shall sign a Construction Certificate to confirm that
the works have been completed in accordance with the approved design and drawings. If any
aspect of the works deviates from the approved design this shall be stated on the certificate
and recorded on a set of As-Built drawings to accompany the certificate.
9.11.20 Notes
1. The signatories of the AIP form, Design, Check and Construction certificates shall be
Chartered Civil or Structural Engineers.
2. Should a licence or consent be required for the works it will not be issued until both
the AIP and Design Certificate have been accepted by the TAA.
3. The TAA will retain the originals of all AIP’s, TAS’s and certificates. Photocopies of the signed AIP
or certificate will be returned to the designer to confirm the TAA’s acceptance of the document.
Adoption of Highway Structures (refer also to Chapter 10, ‘Adoption and Procedures’)
9.11.21 When roads and their associated structures are offered to the County for adoption as public
highway, the County will require to take a freehold transfer of at least the minimum plan area
of land containing such structures, together with easements over adjoining land to permit
access for inspection and maintenance. In addition to compliance with the AIP procedure, the
County will also require
• submission of two sets of detailed drawings for comment and subsequent approval by the
County. This is in addition to the General Arrangement drawings required for AIP approval
• payment of the County’s reasonable costs incurred in inspecting, commenting on and
approving drawings
• payment of the County’s reasonable costs incurred in inspecting the works in progress
• payment to the County of a commuted sum to cover the cost of inspection and
maintenance of the structure during its life, and its eventual renewal
• provision of a bond to insure completion of the structure in the event of default by the developer
• submission of the appropriate documents as required by the Construction (Design and
Management) Regulations 1994, or such other legislation that may from time to time
become relevant
• originals of all approvals required for construction of the highway structure, e.g. Conservation
Area Consent, Listed Building Consent, Ancient Monument Consent, Drainage Consent etc.
Licences
9.11.22 Where the proposed works are subject to the provisions of either section 167, 169, or 176 to
181 inclusive of the Highways Act 1980, or section 13 of the Surrey Act 1985, a licence or
consent as appropriate will be required prior to works starting. The developer will be advised
of the need for a licence or consent during the AIP approval process.
January 2002
Highway Specification
January 2002
Highway Specification
6. Surface Texture
The method to check compliance of surface texture shall be by the Sand Patch Clause 921.
7. Traffic Category
For the purposes of the scheme as a whole all reinstatements / excavations in the carriageway for utility cables, ducts,
pipes or other Utility company plant shall be classified as Road Category Type x in accordance with NRSW Act 1991
When required material complying with Clause 912 / 914 shall be category A of Clause 1.2.5 in BS 4987.
13. Rolled asphalt wearing course shall not be laid on a surface with a temperature of less than 5 degrees centigrade or when
the air temperature falls below 8 degrees
14. Coloured Surfacing and surface Treatments.
Where required red or green coloured surfacings or surface treatments shall be colour compatible and in the muted
Red or Green colour range of BS 381C:1996 incorporating aggregate from the Red or Green colour family approved
by the Engineer.
January 2002
Highway Specification
17. Regulating
No provision shall be made for regulating between 0mm and 15mm. To eliminate regulating in this range additional
planing shall be carried out
It is anticipated that SCC will update the above schedule on a regular basis.
It will be re-issued to successful term tender contractors, suppliers and developers.
Prior to any works commencing Surrey CC, Materials Laboratory, must approve aggregate from any other source.
Details of the proposed material, the source, shipping and storage details, together with a sample, must be supplied to the
Surrey CC, Materials Laboratory, at least 28 days before work commences.
Certificates from ten (10 no) individual PSV tests carried out during the previous year (12 months) undertaken by at least 3
different UKAS accredited test laboratories must be submitted to Surrey CC, Infrastructure Group, Materials, Merrow.
It is possible that trials of new aggregates sources will be carried out for monitoring purposes, albeit with the aggregate
used and placed in a lower risk category than that required by design standards.
January 2002
Highway Specification
Appendix 7/1
Surfacing
Wearing Course 943 Rolled Asphalt 50 pen 45 OR 50 Generally from
Design Mix 30/14 A Polymer BS 594: Part 1: 1993 Table 3 Column 3/2
(45mm layer) Modified Bitumen but to meet the requirements of
OR may be required clause 943, classification of the
35/14 to meet the “special site is class 1or 2.
(50 mm layer) requirements listed The wheel tracking requirements
for the Job Mixture Trials are:
Test Temperature 45 or 600C
Maximum rutting rate 2.0 or 5.0 mm/h
Maximum rut depth 4.0 or 7.0 mm
Binder to be a bitumen to BS 3690 –
Polymer Modified
Coarse aggregate to be crushed rock or
slag only.
PSV 55 min AAV 12 max.
Fine aggregate to clause 2.3.1 a), b) or c).
Weather conditions applicable to laying
shall be submitted with the details of
the binder under cl 943 paragraph 5
and shall include information on early
trafficking. Unless otherwise stated the
wearing course shall not be trafficked
until the as laid material has reached
ambient temperature.
Pre-coated 915 20mm nom size – – PSV 65 min
Chippings AAV 10 max
High Skid 924 Bauxite Epoxy Resin – PSV 72 minimum
Resistance AAV 5 maximum
Surfacing Process shall be HAPAS / BBA certificated
and shall be machine applied as soon
as practicable following the asphalt
wearing course.
Surface Texture 921 – – 1.5 mm texture as per BS 598:
Part 105 for high speed sections
and 1.2 mm elsewhere.
Coloured Surface 924 Bauxite “Clear” binder Aggregate to have
Red ** PSV 72 minimum
Coloured AAV 5 maximum
Green ** Binder shall be a light coloured
bitumen, acrylic, polyurethane,
resin or thermoplastic.
Process shall be machine applied
as soon as practicable following
the asphalt wearing course.
**Selection of colour shall be from the Red / Green colour family of BS381C:1996 and be compatible with the Red / Green colour required elsewhere
for “Red / Green coloured surfacings”
January 2002
Highway Specification
Surfacing
Wearing Course 911 Rolled Asphalt 40 minimum BS 594: Part 1: 1992 Table 3 Column 3/2
Design Mix Marshall Stability of the mix
to be in the range:
SCC Mix A 100 pen Stability 2 to 4kN Flow 2.0mm
30/14 minimum99
Quotient 0.6 to 1.1 Kn/mm minimum
SCC Mix “B” 50 pen Stability 4.0 to 6.5kN
Flow 2.5mm Min
Quotient 1.1 kN/mm min
Binder to be a bitumen to BS 3690
excepting 35 pen or 40 pen.
Minimum target binder content to be
as BS 594 Table 3 plus 0.5%.
Coarse aggregate to be
crushed rock or slag only.
PSV 55 min AAV 12 max.
Fine aggregate to clause 2.3.1 a), b) or c).
Material shall not be laid when the
air temperature falls below that
specified in Clause708 Table7/1.
(Wind speed measured at 2m height)
Surfacing
Wearing Course 911 Rolled Asphalt 40 minimum BS 594: Part 1: 1992
Design Mix Table 3 Column 3/5
Marshall Stability of the mix
to be in the range:
SCC Mix E 50 pen Coarse aggregate to be
55/14 crushed rock to clause 2.2.1(a) or
blast furnace slag to clause 2.2.1(c)
PSV 60 min AAV 10 max.
Fine aggregate to clause 2.3.
SCC Mix “F” Blend of Lake asphalt Stability 4.0 to 6.5kN
30/14 and bitumen Flow 2.5mm Min
Quotient 1.1 kN/mm min
As SCC Mix B with binder substitution
911 SCC Mix “R” A polymer modified 50 Generally from BS 594 Part 1 Table 3
and 943 and Clause 943 bitumen may be column 3/3
needed to meet the Classification of all sites as Class 2.
special requirements The wheel track rutting requirements
for the job mixture approval trials are
Rolled Asphalt Test Temperature 60 0C
35% / 14mm Max. Rutting Rate 5.0 mm / hr
Performance related Max Rut depth 7.0 mm
design mix Coarse aggregate to be crushed rock
or slag
PSV 55 minimum
AAV 10 maximum
Fine aggregate to Clause 2.3.1 a),b) or c)
911 SCC Mix “S” A polymer modified 40 minimum Generally from BS 594 Part 1
and 943 and Clause 943 bitumen may be Table 3 column 3/2
needed to meet the Classification of all sites as Class 2.
special requirements The wheel track rutting requirements
for the job mixture approval trials are
Rolled Asphalt Test Temperature 45 0C
30% / 14mm Max. Rutting Rate 2.0 mm / hr
Performance related Max Rut depth 4.0 mm
design mix Coarse aggregate to be
crushed rock or slag
PSV 55 minimum
AAV 10 maximum
Fine aggregate to Clause 2.3.1 a),b) or c)
Pre-coated 915 Coated Chippings 50 pen (Table 1 No 3) BS 594 Part :1992 Section 4
Chipping for Bitumen 20 mm nominal size
wearing course PSV of the aggregate to be in the range
60 to 64 or 65 minimum as specified
Maximum AAV 12
January 2002
Highway Specification
January 2002
Highway Specification
January 2002
Highway Specification
January 2002
Highway Specification
Appendix 7/4
January 2002
Highway Specification
Appendix 6/7
January 2002
Highway Specification
January 2002
CHAPTER 10
January 2002
Adoption and Procedures
January 2002
Adoption and Procedures
10.1.15 Footpaths & cyclepaths will be eligible for adoption if laid out and constructed to the
requirements of this Guide. The Highway Authority normally adopts only the paved surfaces
of footpaths and their edge restraint. If there is a 2.5m maintenance corridor which is not
vested in the District or Parish council then the Highway Authority will adopt the land falling
within the corridor. If the land forms part of a larger area remaining in private control the
adopted 2.5m corridor must be clearly defined throughout on both sides. A boundary fence or
wall may be suitable for that purpose and one edge of the paved footpath (including the edge
restraint) could serve to identify the limit of adoption.
Margins
10.1.16 Generally margins should be 2m wide. Exceptions should be discussed with the Highway
Authority. Margins contained by paved highway surfaces (except footpaths) will normally be
eligible for adoption. Pedestrian routes which diverge by more than 5m from another paved
highway area may be treated as a footpath and not a footway for purposes of adoption.
10.1.17 A constant adoption width of 2m is generally required for verges adjacent to the carriageway.
This is to facilitate repair or maintenance work and to accommodate statutory undertakers
mains and plant. The back edge of this verge shall be marked where it crosses paved surfaces.
For example the adoption boundary may be identified by a row of granite setts or brick
paviors across private drives and paths. Where a building or wall projects into the normal
adoption width, the limit of adoption at that point will then be the face of such a structure.
In the case of shared surfaces enclosed by buildings or walls the paved surface will be
adoptable between the faces of the enclosing structures.
10.1.18 There may be problems relating to adopted verges contiguous with private gardens. The
rights of the Highway Authority and the statutory undertakers must be fully understood by
the purchaser of the adjacent dwelling. Normally, the owner of the adjacent dwelling would
be encouraged to maintain to the kerb edge of the shared-surface. In some circumstances,
this may be achieved through licence or legal agreements. Whatever is done, the purchaser
must be made aware by the developer in the title and other documents of the prohibition
of buildings, walls or fences and planting of hedges or trees on the verge and that statutory
undertakers may excavate their services at any time and reinstate the area only as a grass verge.
10.1.19 Verges will be adopted as part of the highway whether adjacent to private gardens or between
the footway and carriageway. Highway verges should not be more extensive than is justified
by the overall design. Verges that are a design feature of a layout and can be considered to
have a highway function may also be adopted. In such exceptional cases, suitable landscaping
will be necessary to avoid costly maintenance.
January 2002
Adoption and Procedures
10.1.23 Highway drainage should lie within the area for adoption as far as practicable. In exceptional
cases where the drainage is not within the highway all necessary rights to enter upon other
land for the purposes of inspecting or maintaining the drain must be expected and reserved
out of the transfers of such land.
10.1.24 Where drainage of highway surface water is permitted into soakaways, these must be sited
entirely within the area offered for adoption. A minimum of 1m. beyond the chamber is
needed for adoption and is to be defined on site.
January 2002
Adoption and Procedures
10.2.3 Failure to enter into an agreement before the works are commenced may mean that the Highway
Authority rejects a subsequent application or will result in a need for an independent report
being provided to establish to the Highway Authority’s satisfaction whether or not the works
comply with this guide. The Highway Authority would not be responsible for any part of the
costs involved in obtaining such a report nor for any necessary remedial works and would make
the current charge for the engineering administration fees.
10.2.4 Off-site, infrastructure works or transportation contributions to be provided or funded
by the developer will be secured by agreement under s.278 of the Highways Act, 1980.
Application
10.2.5 Before making a formal application the developer wishing to enter into an agreement with the
Highway Authority should initially apply in writing enclosing two sets of the proposed layout
drawings (the plan geometry at least having been agreed in anticipation of planning permission).
The area which the developer wishes to be adopted is to be shown by red edging on one of the
layouts. Where logical this must extend to the site boundary to avoid the creation of narrow
ransom strips & the frustration of sound planning. The submission will also include any
engineering detail not previously needed for the purposes of obtaining planning permission,
including longitudinal and cross-sections. One set of the drawings will be returned to the
developer with the engineer’s observations. These will include confirmation of the potential area
for adoption. When details of the Section 38 works have been agreed between the engineer and
the developer the latter shall provide at least 6 copies of the approved drawings with the area
which is to be the subject of adoption edged in red on the plan. The drawings will be coloured
as indicated in the Developer’s Guidance Notes. The developer must maintain on the site
throughout the period of the works at least one complete set of the coloured drawings, for any
caller, including prospective purchasers, to see. The developer will also maintain on the site the
Safety File required under the Construction (Design & Management) Regulations 1994.
10.2.6 The whole of the works comprising the development must be shown on the drawings whether
or not they lie within the area to be adopted. This will include land already forming part of
the existing highway where alteration to its fabric is required to accommodate the new road
(e.g. the forming of a bellmouth across the footway, relocation of existing street lighting, etc.).
Works on private land which will not ultimately form part of the public highway (e.g. alterations
to existing garage drives, steps, gardens etc) will be shown on the drawings but not coloured,
nor included in the area edged red. Details of standards for drawings follow.
10.2.7 The developer must enquire of the local authority & statutory undertakers regarding the
position of existing drains, sewers, pipes, mains, cables, services, etc. and must consult with
the engineer as well as the relevant authority concerning siting of surface boxes, cable markers,
telephone and electricity poles etc. The developer is responsible for the service of any notices
or obtaining authority from any statutory body before, during or after the completion of the
works. Private T.V. relay lines and any private apparatus in the area edged in red on the Section
38 drawings shall be the subject of a special licence and must be clearly and accurately shown
on the drawings submitted on completion.
10.2.8 Where the proposal involves culverts, soakaways, other SUDS features, retaining walls, bridges,
landscaping & innovative speed control, etc., the developer will pay a commuted sum to the
Highway Authority for their maintenance & eventual replacement.
Bond
10.2.9 In every case where an agreement under Section 38 of the Highways Act 1980 is to be entered
into the developer must provide a Bond or a deposit in lieu of a Bond in the sum estimated by
the engineer to be the full cost of providing all materials and constructing all works which are
the subject of the agreement. In assessing the value of the Bond regard will be had to the likely
increase in costs during the period of the agreement. The value of the Bond or the money
deposited may be reduced periodically at the discretion of the engineer.
January 2002
Adoption and Procedures
Administrative Charge
10.2.10 The Highway Authority will require a developer to pay a fee in respect of administration and
site inspection equal to 10% of the engineer’s estimate of the total cost of the works to which
the Section 38 Agreement relates. The Highway Authority reserves the right to vary the rate, or
method of applying the fee for administration and site inspection. The developer must include
with the application all of the information sought in the Developer’s Guidance Notes.
Commuted Sums
10.2.11 The County Council is pleased to consider new and innovative forms of construction and
features, as well as those such as structures which may be an integral part of engineering
design on some schemes. Commuted sums are paid by the developer for the increased cost
of maintenance and replacement of the following:-
• Soakaways and other forms of Sustainable Urban Drainage Systems;
• Structures and culverts;
• Non-standard, but acceptable, road lighting;
• Landscaping;
• Innovative vehicle speed control and traffic management measures with potentially higher
maintenance costs;
• Infiltration pavement system.
Start of Works
10.2.12 At least 7 days written notice must be given to the engineer before any work is begun on site. At
least three days written notice shall be given before any of the following operations are started:-
a) laying pipes for highway drains or gully connections;
b) construction of manholes or soakaways;
c) placing concrete surround to pipework, manholes or soakaways:
d) backfilling trenches or other excavations whether or not the pipework or mains are
to be adopted by the Highway Authority;
e) laying kerbing (or other edge restraint),
f) laying sub-base;
g) laying or placing the road base,
h) laying base course or wearing course surfacing in a carriageway, footway,
footpath or cyclepath;
i) works involving existing public highways or highway drains;
j) clearing away from site.
10.2.13 The developer is responsible for all setting out and supervision & must allow access to the site
at all reasonable times for the engineer to inspect the works and be satisfied that the Highway
Authority’s requirements in respect of materials and workmanship are complied with. Every
agreement with the Highway Authority under Section 38 will include for all materials and
workmanship to conform at least to the requirements of the full standard specification
contained in chapters 6 to 9 of this Guide.
Site Inspections
10.2.14 Any inspections made of the works on behalf of the Highway Authority are made solely for
the purposes of that Authority who will not accept any liability for defects in the construction
works due to the standard of workmanship or materials used, howsoever arising. No supervision
of the works is offered by the Highway Authority.
January 2002
Adoption and Procedures
Phasing of Agreements
10.2.16 There is no objection in principle to works under a section 38 Agreement being organised for
completion and adoption by stages. Before agreeing to such a course or before recommending
that any particular stage of the works should be adopted, the engineer will require to be satisfied
that construction traffic engaged on completing other phases of the development will not pass
over that to be adopted.
Completion
10.2.18 When the works have reached practical completion (subject to any arrangements about phasing)
the developer may apply to the inspecting engineer for a Provisional Certificate (of Completion).
The maintenance period shall run from the date of the Provisional Certificate of Completion. A
developer may apply at the same time for a reduction in the Bond to not less than 10% of the
engineer’s valuation of the total works at the time of completion. The retention will not be
released until the engineer is satisfied that any defects have been properly remedied and all
works and apparatus are ready to be taken over in a sound condition.
Maintenance
10.2.19 The s.38 Agreement will require that the works be maintained by the developer for a period of
12 months from the date of practical completion. The developer shall remain responsible
during the maintenance period for all structural defects and damage whatsoever and howsoever
arising, but from the date of practical completion of the works the Highway Authority may be
willing to undertake grass cutting and gully emptying [see also chapter 7 – Lighting]. The
Highway Authority’s undertaking of these functions shall be without prejudice to the developer
performing any of them if they require that they be carried out more frequently than the
Highway Authority will.
Reduction in Bond
10.2.20 In addition to the reduction in the value of the Bond at the commencement of the maintenance
period, the developer may apply to the engineer for the value of the Bond (or the money
deposited in lieu thereof) to be reduced periodically during the course of the works. Such
reductions would be for at least 25% of the value of the original Bond. The value of the remainder
of the Bond (or money deposited in lieu) must be sufficient to cover all outstanding works and
materials irrespective of the unit rates for works or materials on which the original estimate
was based. Developers should note particularly that a reduction will not necessarily be agreed
in respect of works already carried out or materials delivered prior to the developer entering
into an agreement. A reduction will not normally be entertained within the first third of the
agreed period for completion.
January 2002
Adoption and Procedures
Adoption
10.2.21 Eleven months from the date of practical completion & when the As-Built drawings have been
received, the inspecting engineer will visit the site to ensure that they are accurate (& include
any approved alterations covered in a Deed of Variation). The developer will pass the contractor’s
Safety File to the inspecting engineer in accord with the Construction (Design & Management)
Regulations 1994. Provided the works remain satisfactory, the inspecting engineer will issue a
letter to the developer – referred to in the Agreement as the Final Certificate. This explains that
the road was suitable for adoption from that date (generally 12 months from the date of the
Provisional Certificate), that adoption formalities will be concluded shortly & that they may
present the Final Certificate to the Surety to secure release of the remaining 10% of the Bond.
The road is formally adopted from the date stated in the Final Certificate.
10.2.22 If the works are not satisfactory at the end of the maintenance period, the inspecting engineer
will write to the developer itemising the works needed to conclude. When this work is done,
the inspecting engineer issues the Final Certificate with the date of adoption.
10.2.23 If remedials at the end of the maintenance are extensive, they may be subject to a further
maintenance period. The developer will be told in advance by the inspecting engineer if
this is to apply.
Drawings
10.2.25 Location drawings will be based on the Ordnance Survey 1/2500 or 1/1250 series. Layouts will
be based on an accurate survey drawn to 1/500 or 1/200 scale. Enlarged details may be drawn
to any convenient scale compatible with the metric system. Drawings will be coloured and
annotated in accordance with the schedule.
10.2.26 A complete set of drawings will include:
a) a location plan clearly indicating the whole area of the development, at least one existing
road junction and the names of the roads which form it;
b) a site survey showing all relevant details of the site including levels, trees, buildings or
positions of recently demolished structures, drainage etc.,
c) a layout plan;
d) a setting out drawing, sufficiently detailed to allow the works to be accurately set out on
the site.
January 2002
Adoption and Procedures
Schedules
10.2.29 Detailed schedules will be provided for:
a) street lighting, including details of lamps and lanterns, whether they are post top or
side entry mounted, the type of column or wall mounting, mounting heights etc.;
b) highway drainage including depths and sizes of manholes and soakaways, cover types,
pipe runs, pipe sizes and gradients.
c) a copy of the Environment Agency’s approval where soakaways or other, more innovative,
forms of Sustainable Urban Drainage Systems for the prospective highway (or which affect
it), are proposed;
d) landscaping, giving details of plants and their spacing, trees etc;
e) public and private sewers and drains within the area to be adopted;
f) any features for which a commuted sum is payable.
Additional Information
10.2.30 To facilitate preparation and execution of an agreement the developer will provide the
information sought in the following Developer’s Guidance Notes. They must also acquaint
themselves with, & act on, the whole of Chapter 10.
10.2.31 The Highway Authority will enter into an agreement under section 38 of the Highways Act
1980 only if the developer secures an assurance from the Water Authority that they intend to
enter into an agreement under section 104 of the Water Industry Act 1991 securing the adoption
by them of any non-highway sewers (foul or surface water) lying within the area to be adopted
by the Highway Authority.
10.2.32 The inspecting engineer will require a programme for all the works included in the s.38
Agreement at least 21 days before any highway works are commenced on the site.
January 2002
Adoption and Procedures
January 2002
Adoption and Procedures
20. The Developer will be responsible for funding any additional works which may be reasonably required by the Engineer
resulting from any inadequacies in the Agreement drawings or arising from unforeseen circumstances up to an agreed
maximum of 5% of the total cost of the works or £10,000, whichever is the greater.
21. The Developer will be responsible for the full cost of alteration to, or provision of new, Traffic Regulation Orders as
may be required (to include advertising, processing orders, staff admin costs, signs, road markings etc).
22. The Developer will obtain a licence, where necessary, from the Engineer for landscaping proposals which affect the
public highway.
23. The developer will indemnify the County Council against third party claims on all areas of work which are on the
existing highway.
24. Highway lighting design can be undertaken by the County Council subject to instruction and prior payment by the
developer. Approved schemes involving non-standard, but acceptable columns and lanterns will attract a commuted
sum in the agreement, to cover the increased cost of maintenance and replacement.
25. Commuted sums are paid by the developer for the increased cost of maintenance and replacement of the following:-
• Soakaways and other forms of Sustainable Urban Drainage Systems;
• Structures and culverts;
• Non-standard, but acceptable, road lighting;
• Landscaping;
• Innovative vehicle speed control and traffic management;
• Infiltration pavement system.
January 2002
Adoption and Procedures
January 2002
Adoption and Procedures
January 2002
Adoption and Procedures
18. The Developer will state at the outset if any retaining structures are involved and initially indicate them on the layout
drawing stating their maximum height. If their use is considered necessary and acceptable, approval of the detailed design
must be obtained from the County Council for which a separate fee is paid by the Developer. A commuted sum will also
be paid through a clause in the Agreement.
19. Highway lighting design may be undertaken by the County Council, subject to instruction and prior payment by
the developer.
20. The use of soakaways to drain adoptable highway may be acceptable, subject to satisfactory soakage tests, SUDS and other
strict criteria. Where permitted, a commuted sum of £4000 per soakaway (at 2002 prices) will be paid by the developer.
21. If, after conclusion of the Agreement, it is found necessary to extend or delete an area of originally private land, this will
be covered by a Deed of Variation. The engineering and legal costs incurred by SCC will be paid in full by the developer.
22. The developer will write at the outset to confirm that they understand and will comply with the terms of these Guidance
Notes and Chapter 10 of this Appendix.
23. Commuted sums are paid by the developer for the increased cost of maintenance and replacement of the following:-
• Soakaways and other forms of Sustainable Urban Drainage Systems;
• Structures and culverts
• Non-standard, but acceptable, road lighting;
• Landscaping;
• Innovative vehicle speed control and traffic management.
January 2002
Adoption and Procedures
Highway Materials
Site Name :
b. Capping Layer
1 How much of the material required for highway construction can come from the job itself?
a. Capping Layer %
1 How much material arising from the earthworks is removed from site/
2 What method is being used to make existing sub-grade material suitable as a capping layer?
3 Will planings be created as part of the works? If yes; what will you do with them?
January 2002
Adoption and Procedures
Programming of Works
10.4.2 All work within the area of the existing highway will be completed before new road construction
is commenced, including drainage and sewerage works, installation of statutory undertakers
mains and any service connections, ducts and manholes for future cabling and street-lighting
connections. Highway construction will then proceed with formation, preparation, kerbing,
sub-base, roadbase, and base-course together with gullies. All pipe, duct and cable connections are
to be marked by paint on the adjacent kerb, then when the majority of the houses are complete
any settlement or faults shall be made good. Then, street-lighting will be installed, footways and
paths constructed. Finally, wearing courses will be applied to ensure a good appearance.
Existing Services
10.4.3 It is the developer’s responsibility to be satisfied as to the accuracy of any information which
may be made available to them.
10.4.4 Drawings purporting to show the position of existing water, gas, electricity, and
telecommunications mains, ICT cabling & service connections, must be checked. No
mains and services shall be altered or interfered with unless with the approval of the relevant
statutory authority. The developer shall take all precautions necessary to prevent damage or
distortion to such services. No scaffolding, props, staging, ropes, supports other than required
for temporary support of mains shall be fixed or attached to them.
10.4.5 The developer shall take all risks and be responsible for all claims arising from any failure to
comply with these requirements. Any damage to services equipment caused by the developer
or sub-contractors, in the course of or in consequence of the operations will be made good at
the developer’s expense.
10.4.6 Wherever considered necessary by the inspecting engineer the developer will, at their expense,
excavate by hand any trial holes, etc. required to locate the position of important mains or
services prior to the commencement of work in the vicinity of such mains or services. Failure
or omission of the engineer to require exploratory work to be carried out will not absolve the
developer from their liabilities.
10.4.7 The developer will be responsible for arranging for any alterations of the existing mains and
services of the statutory authorities and make allowance for the effect on the phasing of works
of alterations to existing mains and services. The developer will need to ensure that existing
mains and services are not interrupted without the written consent of the authority concerned.
Control of Noise
10.4.9 The best practicable means to prevent or reduce noise during the execution of work shall
be taken including the use of effective silencers and enclosures on power-operated plant
and equipment and the use of a purpose-made muffler on any pneumatic breaker or drill.
January 2002
Adoption and Procedures
Protection of Trees
10.4.10 The developer will take measures to ensure that trees which are to be preserved shall not
be damaged by the Works. In particular the following will be observed:
a) great care will be taken when excavating in the vicinity of trees not to cause damage
with the jibs or tracks of excavating plant, and not to sever roots. Where the inspecting
engineer so directs, excavations will be carried out by hand;
b) no oil, tar, bitumen, cement or other materials likely to be injurious to a tree will be
stacked within 6m of the bole;
c) no fires will be lit beneath or in close proximity to the canopy of a tree;
d) where so directed by the inspecting engineer the developer will erect temporary fencing
for the protection of trees or shrubs,
e) trees to be preserved will not be used as anchorages for removing stumps, roots or
other trees.
Temporary Works
10.4.11 The developer will provide, maintain and remove on completion all temporary works required
in the execution of the development. Temporary works will be constructed to the satisfaction
of the inspecting engineer, but the developer will still be responsible for damage done to, or
caused by, these works, including the reinstatement of any lands or property disturbed or
damaged by them.
Existing Highways
10.4.12 The developer will at all times take precautions and adopt measures considered necessary by
the inspecting engineer to ensure the safety and convenience of the public and the owners
and occupiers of affected properties. The developer will also reduce to a minimum interference
with the use of the highway and private property. The passage of vehicles and pedestrians will
be maintained at all times throughout the construction period unless the highway is closed by
the order of the Highway Authority.
January 2002
Adoption and Procedures
Developer’s Quality Assurance Checklist for both Section 38 and Section 278 Works
When submitting proposals to Surrey County Council for technical approval or adoption purposes the Developer
must submit sufficient information to allow the details to be checked and approved. Use of this form will ensure
that proposals are dealt with most efficiently and designs can be easily checked.
Checklist
Development Details
ITEM DETAILS
Developers Name
Address
Contact Name
Date of Submission
Scheme Name
Scheme Location
Design Details
Any departures from standards must be stated and the reason given before Surrey County Council will consider
approval. All Section 38 and Section 278 works shall comply with current Department for Transport, Local
Government and Regions standards.
January 2002
Adoption and Procedures
(c) Drawings
A complete set of drawings to enable the horizontal and
vertical design to be checked, (including visibility zones
where applicable).
Plans to be provided at a scale of 1/500 or larger and
include the following:
1. Existing levels
2. Proposed levels
3. Contour plots of junctions at 25mm intervals
4. Cross sections at 10 or 20 m intervals to a natural scale
5. Longitudinal sections of channel and crownlines
Widths carriageway
footway
verge
January 2002
Adoption and Procedures
Pipes
Manholes
Gullies
Ironware
Calculations
Speed restraint
Crossfall/cambers
Summits/valleys
Calculations
Column Type/Height
Lantern Type
1. Road Signs
2. Drainage
3. Lighting
4. Landscaping
Statutory Undertakers
Emergency Services
SCC
Materials Lab date / / reply / /
January 2002
Contact Details
January 2002
January 2002
01/02/500/icdesign/scc003069