0% found this document useful (0 votes)
72 views5 pages

1Z0 902 Demo

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views5 pages

1Z0 902 Demo

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Oracle

1Z0-902 Exam
Oracle Exadata

Questions & Answers


(Demo Version - Limited Content)

Thank you for Downloading 1Z0-902 exam PDF Demo

Get Full File:


https://www.certsland.com/1z0-902-dumps/

www.certsland.com
Questions & Answers PDF Page 12

Version: 4.0

Question: 1
What is the maximum DRAM capacity you can expand an X9M-2 DB Server?

A. 1536GB
B. 512GB
C. 2048GB
D. 768GB
E. 1024GB
F. 384GB

Answer: C
Explanation:

The Exadata X9M-2 Database Machine uses powerful database servers, each with two 32-core x86
processors and 512 GB of memory (expandable up to 2 TB).

Question: 2
Examine this list of software components:
1. Oracle KVM Guest
2. Oracle Enterprise Manager Agent (OMA)
3. ASM instance
4. RDBMS instance
5. Automatic Diagnostic Repository Command Interpreter (ADRCI)
6. CELLCLI
7. Cell Server(CELLSRV)
8. diskmon
9. Restart Server (RS)
10. Management Server (MS)
What is the correct location where these software components can run in the standard Exadata
Database Machine deployment?

A. 2, 3, 4, 8, and 10 run on the database servers; 1, 5, 6, 7and 9 run on the Exadata storage servers.
B. 1, 2, 3, 4, 9 and 10 run on the database servers; 5, 6, 7, 8, 9, and 10 run on the Exadata storage
servers.
C. 1, 2, 3, 4, 5, 8, 9 and 10 run on the database servers; 5, 6,7, 9 and 10 run on the Exadata storage
servers.
D. 3, 4, 8, and 10 run on the database servers; 1, 2, 5, 6, 7 and 9 run on the Exadata storage servers.
E. 1, 2, 3, 4, 8 and 9 run on the database servers; 5, 6, 7, 9 and 10 run on the Exadata storage servers.

www.certsland.com
Questions & Answers PDF Page 3

Answer: C
Explanation:

Question: 3
Your customer needs to ensure that their data is available on the Exadata machine during updates.
The customer wants to be able to update one server at a time but still be protected against single-
node server failure.
What ASM redundancy level should they use?

A. Normal
B. Sparse
C. High
D. External
E. Extended

Answer: C
Explanation:

https://www.oracle.com/technetwork/database/exadata/maa-exadata-asm-cloud-3656632.pdf

Question: 4
Which three statements are true about the CELLCLI command?

A. It can execute commands on multiple storage servers in parallel.


B. It has command-line history.
C. It requires root privileges to create CELLDISKS and GRIDDISKS.
D. It can be executed on storage servers.
E. It can be executed using the DCLI utility.

Answer: B,D,E
Explanation:

The CellCLI utility supports command-line history.

Each Exadata Storage cell can be monitored, configured, and maintained using the cellcli command
line interface.

The dcli utility facilitates centralized management across an Oracle Exadata Storage Server Software
realm by automating the execution of CellCLI commands on a set of cells and returning the output to
the centralized management location where the dcli utility was run.

References: http://docs.oracle.com/cd/E80920_01/SAGUG/exadata-storage-server-cellcli.htm

www.certsland.com
Questions & Answers PDF Page 4

Question: 5
An Exadata X9M-2 Elastic Rack with 4 Database Servers and 8 HC Storage Servers and 3-phase 24kVA
PDUs is being installed in a Data Center. However, the Data Center is only providing enough power
for a single cable from each PDU. Which statement is correct?

A. A splitter cable can be used to provide power to all PDU cables.


B. The power cables from the servers to the PDUs can be rearranged inside the rack following OECA
guidance to utilize a single PDU power cable.
C. The installation cannot proceed until two power feeds are available per PDU.
D. The installation can go ahead, no change is required.

Answer: B
Explanation:

www.certsland.com
Thank You for trying 1Z0-902 PDF Demo

https://www.certsland.com/1z0-902-dumps/

Start Your 1Z0-902 Preparation

[Limited Time Offer] Use Coupon " SAVE20 " for extra 20%
discount on the purchase of PDF file. Test your
1Z0-902 preparation with actual exam questions

www.certsland.com

You might also like