Power Safety Code 2024 (Final)
Power Safety Code 2024 (Final)
Third Edition
June, 2024
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 1 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Table of Contents
1. Purpose ............................................................................................................................................... 4
2. Definitions .......................................................................................................................................... 5
3. General Instructions ......................................................................................................................... 18
4. Resources ......................................................................................................................................... 19
5. Non-Compliance to Power Safety Code ........................................................................................... 20
6. HSE Policy ......................................................................................................................................... 21
7. HSE Management System Requirements ......................................................................................... 22
7.1. Compliance to the Legal and other Requirements ................................................................ 23
7.2. HSE Management Team ......................................................................................................... 24
7.3. Communication Protocol ....................................................................................................... 26
7.4. Risk and Impact Management ............................................................................................... 26
7.5. HSE Meetings ......................................................................................................................... 28
7.6. HSE Orientations .................................................................................................................... 29
7.7. Job Specific Trainings ............................................................................................................. 29
7.8. HSE Awareness Trainings ....................................................................................................... 32
7.9. Control of Visitors and Animal Access.................................................................................... 37
7.10. Contractors, Sub-contractors & Suppliers.............................................................................. 38
7.11. Safety Instructions for Bulk Power / Single Point Supply Consumer ..................................... 38
7.12. Top Management HSE Walk-through/ Site Tours .................................................................. 40
7.13. Standard Operating Procedure (SOP)/ Work Instructions ..................................................... 40
7.14. Documents and Record Management ................................................................................... 41
7.15. Site Supervision ...................................................................................................................... 42
7.16. Accountability......................................................................................................................... 44
7.17. Engineering and Construction Management ......................................................................... 45
7.18. Operation and Maintenance .................................................................................................. 54
7.19. Asset Integrity Management .................................................................................................. 61
7.20. Management of Change ......................................................................................................... 67
7.21. Traffic Management ............................................................................................................... 67
7.22. Task Risk Assessment/ Job Safety Analysis ............................................................................ 70
7.23. Personal Protective Equipment.............................................................................................. 71
7.24. De-Energized Circuits and Apparatus ..................................................................................... 77
7.25. Temporary Grounding and Bonding for De-energized Circuit/Lines ..................................... 87
7.26. Working on Energized Conductors and Apparatus ................................................................ 89
7.27. Safe Practices for Transformer and Capacitor Installations ................................................... 92
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 2 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.28. Electrical and Mechanical Energy Isolation ............................................................................ 97
7.29. Permit to Work ..................................................................................................................... 101
7.30. Tools, Portable Power Tools and Heavy Equipment ............................................................ 104
7.31. Working at Height ................................................................................................................ 108
7.32. Ladders ................................................................................................................................. 110
7.33. Excavations ........................................................................................................................... 110
7.34. Welding and Cutting............................................................................................................. 111
7.35. Hydro-jetting ........................................................................................................................ 112
7.36. Ionizing Radiation ................................................................................................................. 113
7.37. Hazard Communication Program ......................................................................................... 113
7.38. Polychlorinated Biphenyls (PCBs)......................................................................................... 113
7.39. Asbestos and asbestos-containing materials, equipment and items .................................. 114
7.40. Work Over or Adjacent to Water ......................................................................................... 115
7.41. Adverse Weather ................................................................................................................. 115
7.42. Environmental Management ............................................................................................... 118
7.43. HSE Signs .............................................................................................................................. 120
7.44. Housekeeping ....................................................................................................................... 121
7.45. Health & Hygienic Facilities .................................................................................................. 123
7.46. Fire Prevention ..................................................................................................................... 126
7.47. First-aid Facilities.................................................................................................................. 127
7.48. Emergency Management ..................................................................................................... 127
7.49. Incident Management .......................................................................................................... 131
7.50. Monthly HSE Performance Reporting .................................................................................. 140
7.51. Internal HSE Audits............................................................................................................... 141
7.52. HSE Performance Evaluation................................................................................................ 141
8. Annexures ....................................................................................................................................... 143
Annexure-1: HSE Team Contact Details Form ............................................................................... 144
Annexure-2: Incident Reporting Form ........................................................................................... 145
Annexure-3: Monthly HSE Performance Report Form ................................................................... 148
Annexure-4: HSE Performance Evaluation Form ........................................................................... 150
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 3 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
1. Purpose
1.1. In exercise of the powers, conferred by Section 7(2)(i), and 35(a) read with 14B(4), 14D(2),
18(1), 18B(2)(c), 19d, 21(2)f of the Regulation of Generation, Transmission and Distribution of
Electric Power Act, 1997 (XL of 1997) (hereinafter referred to as the “Act”) and provisions as
prescribed in NEPRA Performance Standards Rules, Grid Code, Distribution Code and
Consumer Service Manual, the National Electric Power Regulatory Authority devised this
Power Safety Code (the “Code”).
1.2. To ensure that the licensee, NEPRA's concurrence holder, generation company, registered
person or a network owner with a connection agreement, power purchase agreement,
relevant contract or among others, during the conduct of their operations including but not
limited to construction, operation, maintenance, turnaround, rehabilitation, standby,
decommissioning, mothballing, and demolition are planned and conducted by Generation,
Transmission and Distribution companies in an efficient and safe way without compromising
on occupational Health, Safety and Environment aspects.
1.3. The Licensee, NEPRA's concurrence holder, generation company, registered person, or a
network owner with a connection agreement, power purchase agreement, relevant contract
or among others, at the site of construction, operation, maintenance, turnaround,
rehabilitation, standby, decommissioning, mothballing, and demolition shall take
precautionary measures to;
Protect the lives and well-being of employees, contract workers and general public
including visitors, and animals,
Eliminate and/or minimize damage to the equipment, property and associated facilities as
well as that of neighboring areas near to operations,
Eliminate and/or minimize economic losses and disruption to business for safe and smooth
operations.
1.4. For the purpose of maintaining highest standards of HSE at workplace, follow NEPRA Act, Rules
and Regulations made thereunder, this Power Safety Code and other applicable documents to
be issued in future.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 4 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2. Definitions
The terms and expressions used but not defined in this code shall have the meaning assigned to
them in the Act.
2.1. Act
The term “Act” means the Regulation of Generation, Transmission and Distribution of Electric
Power Act, 1997 (XL of 1997).
2.2. Annual
The period of one fiscal year, starting from July 01 and ending on June 30.
An electrical arc flash is a sudden, intense release of energy due to a fault or short circuit in an
electrical system, generates intense heat, light, and pressure waves, posing a significant
hazard to personnel and equipment within the vicinity. The arc flash may occur during
electrical isolation, operating breakers, switches or starters, racking breakers in or out, testing
electrical circuits, and applying temporary earthing, etc.
2.4. Authority
The term "Authority" means the National Electric Power Regulatory Authority (NEPRA)
established under Section 3 of the NEPRA Act.
2.5. Building
2.6. Calibration
Calibration is the process of configuring an instrument to provide a result for a sample within
an acceptable range.
Consumer premises refers to the physical location where a consumer or end-user directly
receives and uses electrical services.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 5 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2.8. Contractor
A medically and physically fit person who is assigned, designated and authorized in writing to
perform a specific type of duty or to be at a specific location, having necessary training,
experience, technical skills, as well as relevant qualifications, certifications or licenses to
perform assigned roles and responsibilities safely.
DCS is used in Power Plants, a computerized process control system for operation usually with
many control loops, used for system management and data collection.
An Electrical Worker received general electrical training, performing routine tasks like basic
maintenance, repairs, and installations. They understands basic electrical principles, hazards,
and safety practices, and typically possess standard certifications or licenses for general
electrical work. They handles common electrical systems in residential, commercial, and light
industrial settings. These workers often works under the supervision of experienced or
specialized electrical personnel for more complex tasks.
- Regular Employee.
- Contract Employee.
2.15. Environment
Surroundings in which organization operates, including air, water, land, natural resources,
flora, fauna, humans and their interrelation.
An element of company activities, products and services that can and/or does interact with
the environment. Examples of environmental aspects categories are:
Air Emissions,
Energy,
Soil contamination,
Water contamination,
Biodiversity,
Effluent discharges,
Sludge Generation,
Freshwater/Seawater consumption,
Noise.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 7 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2.18. Environmental Impact
Any change to the environment, whether adverse or beneficial, resulting from organization’s
activities, product and services.
2.19. Exposure
2.20. Excavation
Any man-made cavity or depression in the earth's surface, including its sides, walls, or faces,
formed by earth removal. This could be carried out manually, by power tools or mechanical
excavator.
2.21. Facilities
2.22. Fire
Fire is a chemical reaction that occurs when a combustible substance/fuel combines with
oxygen in the presence of heat, typically producing smoke, flame, heat, and light. It is a rapid
oxidation process that releases energy in the form of heat and light.
The first party is the primary entity or department involved in an internal audit or inspection
of its own system or site. The second party is the entity or other department(s) that interact
directly with the first party within an organization to conduct an internal audit or inspection.
The third party is an external entity or organization that is not directly involved in the primary
interaction between the first and second parties but may conduct audits or inspections.
2.24. Goal
2.25. Guarded
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 8 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2.26. Hazard
A hazard is any source or situation that has the potential to cause harm, injury, damage, or
adverse health effects on people, animals, property, the environment, or any combination
thereof. Source or situation could be physical, chemical, biological, ergonomic, psychosocial,
and environmental hazards.
Any type of heavy equipment or construction machinery used for digging, lifting, moving, and
shaping materials such as forklift, excavator, bulldozer, wheel loader, backhoe, grader, crane,
dump truck, bucket mounted vehicles and more.
2.28. HSE
The HSE (Health, Safety, and Environment) Management System is a structured framework
and documented approach implemented by organizations to manage the health, safety, and
environmental risks associated with their activities, providing detailed and clear action steps.
It defines the scope, roles, responsibilities, policies, procedures, processes, and practices
aimed to promote a safe working environment, prevent incidents and ensure compliance with
Power Safety Code requirements. An HSE management system typically covers a range of
documents including organization Plans, Policies, Manuals, Guidelines, Procedures, SOPs,
General Instructions, Work Instructions, Forms, Checklists, Log Sheets, Data Sheets,
Specifications, Reports, Training Material, Handbook, Poster, Alerts, Flyer, Leaflet, and
Brochure, among others. It outlines job steps for all end users to perform tasks safely,
efficiently, and effectively, describing “who, what, when, where, why, and how” the task
should be initiated, conducted, executed, and completed to achieve the desired outcome.
An immediate cause (also known as a "Causal Factor" or “Direct Cause”) is a human error/
mistake, equipment failure, material failure or natural phenomena that directly leads to the
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 9 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
incident, a specific outcome or consequence. For example, in a workplace accident where an
employee slips and falls, the immediate cause may be the wet floor (e.g., due to a spill).
However, to prevent future accidents, other root causes should be addressed such as
inadequate training, lack of proper signage, or a failure in maintenance processes.
The root cause, often referred to as the "basic cause" or "initial factor" that started the chain
of events leading to a problem, issue, incident, or undesired outcome. When root cause is
properly fixed, will prevent recurrence or significantly reduce the likelihood of the similar
problem or incident in future.
2.32. In-charge
The person in-charge who holds a position for control and management of specific equipment,
devices, activities, operations and performing, directing or authorizing tasks.
2.33. Incident
An incident is an unexpected event that disrupts regular operations and may or may not lead
to an accident involving injury, damage, or harm.
Accident
Incident Direct Cost refers to cost of direct damage, repairs or replacement, clean-up, material
disposal and environmental remediation resulting from the incident.
Direct Cost does not include indirect costs such as operational loss, business opportunity loss,
business interruption and feedstock/electricity losses, loss of profits due to equipment
outages, cost of obtaining/operating temporary facilities.
2.35. Inspection
2.36. Insulated
Separated from other conducting surfaces by a dielectric (including air space) offering a high
resistance to the passage of current.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 10 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2.37. Key Performance Indicator
A Key Performance Indicator (KPI) is a measurable value that demonstrates how effectively an
organization is achieving goals and objectives. Key Performance Indicators (KPIs) are in
numbers for the goals and objectives to review and monitor its status for effective
implementation.
National and provincial laws including the NEPRA Act, rules, regulations, standards, codes,
consumer service manual, SOP’s, directives, license terms & conditions, agreements, and
other applicable documents.
2.39. Licensee
2.40. Likelihood
2.42. Machinery
2.43. Material
Near miss is an incident which does not result in injury, illness or loss, but which has the
potential for injury, or illness or loss. For example, if a worker nearly slips on a wet floor but
prevents a fall, it's an incident, near miss or close call, having potential to result in a real
accident/injury.
2.46. Objective
Objectives define strategies or implementation steps to attain the identified goals. They are
more specific and outline the “who, what, when, where, and how” of reaching the goals.
A complete list of all treatments considered as First Aid is provided below (Any minor
medical treatment which is not in the list should be considered as a Medical
Treatment injury or illness)
- Using wound coverings such as bandages, Band-Aids, gauze pads, etc.; or using
butterfly bandages or Steri-Strips,
- Using any non-rigid means of support, such as elastic bandages, wraps non-rigid
back belts, etc.,
- Removing foreign bodies from the eye using irrigation or a cotton swab method
only,
- Removing splinters or foreign material from areas {other than the eyes} by
irrigation, tweezers, cotton swabs or other simple means,
An on-job injury or illness that is more serious than First Aid injury or illness (Examples:
Treatment requiring sutures, use of tweezers to remove splinters from eye; rigid
means to immobilize part of body). Medical Treatment Case (MTC’s) include all cases
involving but not limited to:
- Using devices with rigid stays or other systems designed to immobilize parts of
the body (does not include any non-rigid means of support),
- Removing splinters from the eye with tweezers and other complex means
An on-job injury or illness that results in restricted work or job transfer. The
employee/contractor cannot perform an activity he regularly performs (Example: A
sprained ankle resulting in a re-assignment from field to a desk job). Time period does
not include restricted work activity on the day of the injury or illness. Examples of how
to determine a restricted work case are:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 13 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
- A medical physician recommends that the employee/contractor cannot perform
one or more of the routine functions of his/her job, or not work the full workday
that he would otherwise have been scheduled to work.
An on-job injury or illness that involves one or more days away from work beyond the
day the injury occurred.
2.49. Overcurrent
An overcurrent refers to an electrical current that exceeds the normal rated operating level of
an equipment or a conductor, leading to potential damage or hazards. Overcurrent may occur
due to overload, short circuit, or ground fault and lightning strikes.
Residual risk refers to the level of risk that remains after implementing and maintaining
existing control measures for risk mitigation.
PEL is the occupational exposure standard that refer to the maximum permissible exposure to
air-borne substances to which nearly all healthy persons can be exposed to an average 8 hour
period per day (Time Weighted Average: TWA) without adverse health effects. Detail
information about PEL is primarily found in the Material Safety Data Sheet (MSDS).
A periodic plan or schedule that is structured to occur at regular intervals over a defined period
of time, such as yearly, bi-annually, quarterly, monthly, or weekly. These plans are designed
to help individuals or organizations systematically manage and achieve their goals over time.
The NEPRA Power Safety Code is a set of unified and standard HSE guidelines, specifying
requirements for an Occupational Health, Safety, and Environment (HSE) management system
that licensee, NEPRA's concurrence holder, generation company, registered person, or a
network owner with a connection agreement, power purchase agreement, or relevant
contract to comply with these requirements.
2.55. Process
2.56. Product
2.58. Risk
Overall process of Hazard identification, analysis, evaluation of risk level and application of
controls.
Safety critical protection devices, limit or stop the abnormal condition in system or flow of
current in the event of a ground fault, overload, or short circuit in the circuit/ wiring system,
whose failure can result in serious injuries, significant property damage or environmental
impacts.
The maximum concentration to which workers may be exposed for a period of time up to 15
minutes continuously without suffering irritation, chronic tissue damage, or narcosis which
may lead to accidental injury. In addition, exposure to STEL shall not be repeated more than 4
times per day. Information about STEL is found in Material Safety Data Sheet (MSDS).
2.62. Severity
2.63. Shall
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 15 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2.64. Should
2.65. System
2.66. Task
Time-weighted average concentration for a normal 8-hour working day, and a 40-hour
working week, to which nearly all workers may be repeatedly exposed day after day, without
adverse effects. Information about TWA is found in Material Safety Data Sheet (MSDS).
2.69. Tools
A device, one held in the hand, used to carry out a particular task.
An equipment to regulate the electric energy to step up (increase) or step down (decrease)
voltage levels.
2.71. Turnaround
2.72. Utilities
Essential facilities that support the operation and maintenance such as fuel, water, steam,
electricity, compressed air and telecommunication, etc.
2.73. Vehicle
A mode of transportation that carry passengers, goods, or equipment from one location to
another, powered by an engine, motor, or human effort, and is used across various domains,
including land, water, air, and rail.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 16 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
2.74. Visitor
Visitor means a person, other than a regular employee, contract employee or daily wages
worker, permitted to enter a work area under permission by the authorized person.
2.75. Waste
2.76. Worker
A worker is any individual who performs work or work-related activities assigned by the
company under various arrangements, whether paid or unpaid. This includes regular,
contractual, daily wages, temporary, intermittent, seasonal, casual, or part-time work that is
falls under the control of the company. Workers include all levels of staff, including top
management, line management, and support staff.
2.77. Worksites
2.78. Workplace
Place under the control of the company where a person needs to be or to go for work or work-
related activities.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 17 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
3. General Instructions
3.1. The company shall ensure compliance with Power Safety Code, together with NEPRA
Performance Standards Rules, Grid Code, Distribution Code and Consumer Service Manual and
other applicable national and provincial legal requirements, as applicable. The Safety Code
enables the company to operate in a manner that protects and promotes the well-being and
safety of its employees, contractors, the general public, visitors, animals while also protect the
environment and assets.
3.2. When any portion or section of this Code is considered unsuitable or impractical for
implementation, or when compliance with other industry standards or codes is preferred, or
when conflicts or deviations arise between this Code and other industry standards or codes, a
clarification should be sought regarding these conflicts or deviations, along with appropriate
justification and reasoning. The decision made by NEPRA shall be final and binding.
3.3. The company shall establish, implement, monitor and maintain a system to identify Health,
Safety and Environment (HSE) hazards and to reduce risks to “As Low as Reasonably
Practicable” (ALARP).
3.4. The company shall promote a HSE culture, provide safe and healthy workplace. The company
shall ensure that safe working is integrated into every aspect and area of business. Safety
culture shall be based on personal leadership, commitment, collaboration and active
involvement.
3.5. The company shall foster openness and dialogue, and be open to the HSE concerns of
employees, contractors and other interested parties. It shall also be ensured that HSE
requirements are known, understood, implemented and applied at all levels.
3.6. The company shall treat all injuries, occupational illnesses and HSE incidents as preventable
and establish specific targets and goals of achieving zero occurrences for each type of incident.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 18 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
4. Resources
4.1. The company shall be responsible to utilize its own resources for the planning, establishing,
implementing, maintaining, monitoring, and communicating (both internally and externally) of
the HSE system to avoid injuries to employee, contractor, visitor, member of general public,
animals, loss of equipment/ property or adverse impact to the environment.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 19 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
5. Non-Compliance to Power Safety Code
5.1. Non-compliance with the requirements of the Power Safety Code and other applicable
documents, the Authority may initiate legal proceedings under the relevant provisions of
NEPRA laws.
5.2. The Authority may order investigations under section 27A of the NEPRA Act against any
licensee, NEPRA's concurrence holder, generation company, or a registered person, if found in
violating the NEPRA Act, its rules, regulations and codes made thereunder or the conditions of
a license issued or registration granted under the NEPRA Act, as the case may be.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 20 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
6. HSE Policy
6.1. Top management shall establish, implement and maintain a HSE Policy, by including a
commitment to provide safe and healthy working conditions, eliminate hazards and reduce
HSE risks for the prevention of work-related injury, ill health and to protect the environment
within the national and provincial legal requirements.
6.2. The HSE Policy shall address continual improvement of the HSE system, ensure workers
involvement, and be communicated to all relevant stakeholders and interested parties.
6.3. The company shall ensure that the policy statement is reviewed within specified time and
amended to reflect changes in the company or statuary requirements.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 21 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7. HSE Management System Requirements
c. HSE Management System/ Manual shall clearly define the necessary actions and measures to
be taken by Licensee to prevent harm to company employees, contractor personnel, visitors,
general public, animals, natural environment and damages to property.
d. Roles and responsibilities shall be clearly identified and documented in HSE Management
System/ Manual for all positions/ functions that are responsible for the control of system of
construction, installation, operation, maintenance, testing, turnaround, and HSE critical
activities. Roles and responsibilities shall be communicated to responsible and interested
parties. It shall also cover operational interface or joint responsibilities of each job step by
agreement, where required.
e. HSE Management System/ Manual shall cover all definitions, glossary, abbreviations of all
important terms and words being used.
h. The written HSE Management System/ Manual shall address the following sections/sub-
sections as applicable as per work activities and job scope.
7.1.2. The company shall prepare and maintain a legal compliance register for national,
provincial and other legal requirements as applicable regarding Health, Safety and
Environment (HSE), including this Code as applicable, such as but not limited to:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 23 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
- Boilers & Pressure Vessel Ordinance 2002,
7.2.3. Responsibilities and duties of the HSE management team shall be clearly defined.
7.2.4. The minimum number of HSE personnel for generation, transmission, distribution
activities and enabling functions, shall be evaluated on a case-to-case basis,
depending upon the level of risk, the criticality of activities, service territory &
jurisdiction and the need for the supervision. Moreover, HSE positions shall not be
filled by irrelevant officials without relevant qualification and certification. The
appointed/deputed HSE personnel shall be experienced and competent with
technical background for the defined roles and responsibilities and possess at least
one of the approved safety qualifications, such as ISO-45001, CSP, ASP, NEBOSH,
NVQ, NFPA 70E, or any other approved HSE qualifications, certificates, diplomas, or
degrees including knowledge of international standards and codes such as ISO-
14001, ANSI, ASTM, IEEE, IEC, NFPA and other applicable legal requirements.
7.2.5. Appropriate job specific training should be planned and arranged to the HSE
personnel within the HSE Directorate/Department, as deemed necessary.
7.2.6. The table below provides the minimum number of contractor HSE staff, required at
construction project site or turnaround:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 24 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.2.7. The company shall upload HSE staff contact details at NEPRA’s Data Exchange Portal
as mentioned in Annexure-1 “HSE Team Contact Details” within seven (07) working
days. Upload the revised and updated contact list, in case of new recruitment,
transfer, resigned or in case of HSE organization change.
7.2.8. Corporate-level and/or site-level organogram shall be maintained for company and
Long Form Contract (LFC) contracts, including but not limited to contractors for
project/construction, operation, and maintenance. Contractors working on company
premises such as restaurants, shops, banks, and mail/courier services are excluded.
7.2.9. Long Form Contract (LFC): A form of contract where either the value of the contract
exceeds $250,000 or the duration of work is more than six months.
7.2.10. Short From Contract (SFC): A form of contract where the value of the contract is less
than or equal to $250,000 and the duration of work is less than or equal
to six months.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 25 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.3. Communication Protocol
7.3.1. The company shall establish, implement and maintain Internal and External
Communication Protocol with authorization and availability of nominated/ focal
person for proper coordination and system control to avoid an incorrect, incomplete,
inadequate or misleading communication, to communicate clear information
message, to the right people at the right time, to control and monitor construction,
installation, operation, maintenance, testing, turnaround and HSE critical activities.
7.3.2. Critical information/ message should be to the point, brief, clear and simple manner.
However, it should be ensured that information is received and completely
understood by internal, external affected group, next shift personnel, contractors
and end-user. All such critical communication shall be recorded in soft or hard form
for a period of minimum one fiscal year.
7.3.3. The line management shall identify communication deficiencies during job activities
to avoid potential injuries. The line management shall correct poor communication,
which can cause confusion, misinformation/misleading, and worker failure to
implement SOP’s including workers’ inability to communicate critical information.
c. Materials.
d. Equipment.
7.4.2. Only one independent potential failure, deviation or accident with the worst-case
scenario shall be assessed at a time.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 26 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.4.3. Consideration shall be given to the following potential hazards, as applicable:
b. Potential ignition sources such as personal smoking materials, hot work in the
area, open flames, mechanical friction and sparks, impact sparks, hot surfaces &
equipment, thermal decomposition, electric sparks and electrostatic discharge.
h. Potential Hazards above ground level such as fall of a person from height, fall of
objects from height, overhead power lines, loose sag, less clearance from the
houses/ buildings/ trees, poles, fuel, chemical, hazardous dust/ fumes, pressure
vessels/ boilers and so forth.
j. Potential underground hazards such as buried utilities, high water table, building
foundations, underground wastewater, unstable soil, chemical/ trash dump area,
ash storage, voids in the earth (caves) and underground fuel/ chemical storage
and hazardous dust/ fumes.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 27 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
legal requirements.
m. Identify existing preventive controls for each identified hazard and provide
recommendation(s) for additional control(s) for high risks to reduce risk levels to
As Low as Reasonably Practicable (ALARP).
Depending on the nature and scale of the hazard under assessment when
determining controls, or considering changes to existing controls, consideration shall
be given to reducing the risks according to the following hierarchy:
a. Elimination,
b. Substitution,
c. Engineering Controls,
d. Administrative Controls,
- Review Annual HSE Goals, Objectives and KPI’s for effective implementation.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 28 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
- Discuss safety issues related to operations, contractors, tools, equipment, work
environment and work practices with proper resolution for mitigation.
7.5.2. Attendance record shall be maintained for the period of one fiscal year.
7.5.3. Meeting minutes shall be recorded, distributed and posted at notice board within
three (03) working days.
7.7.2. The company shall conduct training need assessment and develop periodic plan to
provide technical training / job skills competency training/ activity specific training/
vocational training (in-house or external), primarily for new employees or new
contractor, or refresher training for those who have not been appointed as skilled,
competent and authorized technician, electrician, wireman, or those who currently
perform work beyond their obligatory scope of competence.
7.7.3. Skilled based training courses of short duration should be designed for the field staff
to focus on the essential skills required to perform their job safely and effectively.
Past accidents case studies should be made part of these training courses to increase
awareness among the relevant field workers.
7.7.4. Trainer on any specific training topics should be nominated on the basis of training
courses, knowledge and experience. Arrange specialized trainings for in-house
trainers to enhance their Knowledge and skills. A good trainer will produce more
skilled, safe and efficient worker and will be beneficial for the company. The company
shall not assign risky people as in-house trainers for training of staff. People do what
they are taught, so a bad trainer creates a risk taking worker, and the cycle continues
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 29 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
until they are broken.
7.7.5. The Job Skills Competency Training/ Activity Specific Training shall also comprise but
not be limited to the following aspects as per job trade of a person:
a. HSE Principles.
- Improper Guarding,
- Hazardous arrangements,
- Hazardous weather,
- Insufficient lighting,
- Improper ventilation,
- Unsafe Loading,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 30 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
- Non-vigilant and inattentive behavior,
- Shift Duties,
- Fire Precautions,
- Working on road,
- Working at height,
- Weather information,
- Interference of animals,
- Visitors,
7.7.6. Provide refresher technical training/ job skills competency training/ activity specific
training/ vocational training in case of a major incident or change in equipment,
process or chemical or new critical risk identified, and/or internal/ external audit
recommendation or change/amendment in the applicable law or technology.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 31 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.8. HSE Awareness Trainings
7.8.1. The company shall provide information, instruction, training and supervision to all
their employees and contractors as far as necessary, to understand processes and
risks, as governed by the national and provincial legal requirements, to ensure the
safety of all personnel at the work place, and for protection of equipment & the
environment.
7.8.2. HSE awareness training plan/schedule shall cover following HSE related topics but
not be limited to; hazard identification, risk assessment, isolation (logout/tagout),
work permit training, electrical safety, PPE, fire watch, standby man, fire prevention,
first aid, working at height, confined space and emergency & rescue, waste
management and environmental protection, etc.
7.8.3. HSE awareness refresher training should also be planned once in every two (2) to five
(5) years according to the validity of the training and nature of competency/ skill/
work area or in case of a major incident or change in equipment, process or chemical
or new critical risk identified, and/or internal/ external audit recommendation or
change/amendment in the applicable law or technology.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 32 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
circuits. This will minimize the potential for electric shocks, fires, or
equipment damage resulting from faults or short-circuit currents.
Additionally, install a permanent earthing system to prevent electrical
accidents. It ensures that any fault current when developed will directly
flow to the ground, reducing the risk of electric shock, fire or equipment
damage. The earthing system offer protection during overcurrent
protective devices, fuses, or circuit breakers failure. Both systems should
be designed to work together to protect human lives, equipment, and
property. Upon installation of these protective mechanisms, consumers
shall arrange annual tests and maintenance by a qualified electrician for
these protective mechanisms including faulty wires, fittings, holders,
switches, sockets, plugs, lamps, fans, heaters, geysers and others
appliances.
7.8.4.2. Use three-pin plug instead of a two-pin plug for appliances and equipment’s
within residential units, offices, educational institutions, healthcare
facilities, commercial, agricultural, construction, and industrial sites. Three-
pin plug is primarily for safety reasons. Each of the three pins in the plug
serves a distinct purpose:
Live (or Hot) Pin: This pin provides the current to the appliance.
Neutral Pin: This pin acts as the return path for the current.
Earth (or Ground) Pin: This is a safety feature that provides a path for
fault currents to flow to the ground, reducing the risk of fire or electric
shock to the person while touches the live conductor or faulty
appliances.
7.8.4.3. Keep a distance of 3 meters (10 feet) from the electric pole during rain.
7.8.4.4. Keep children away from electric poles and wires, especially in rainy
weather.
7.8.4.5. Install electrical switches, sockets, plugs, holders, wires and extension cords
at a suitable height, out of the reach of small children, fire and water.
7.8.4.7. Never touch electrical appliances with wet hands or bare feet, it can be
fatal.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 33 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.8.4.8. Turn off the power and unplug the cord before making any adjustments to
domestic or commercial appliances.
7.8.4.9. If the electrical switch board or appliances are wet or submerged in water,
do not use them. Call a qualified electrician to check the appliance before
use.
7.8.4.10. When connecting two electrical cables, first wrap electrical tape around the
exposed wires then apply waterproof tape, heat shrink tubing, or
connectors to seal the connection and prevent moisture ingress during rain.
7.8.4.12. Use protective conduits for all indoor and outdoor electrical wiring.
7.8.4.13. Overhead consumer service cables shall not be routed over or near the
rooftops of consumer premises buildings or structures unless absolutely
necessary, and in such cases, proper clearance and protective conduits
must be used. Additionally, these consumer service cables shall not be
routed above or on the rooftops or structures of other consumer buildings
or properties.
7.8.4.14. Replace broken and defective electrical wiring, switches, sockets, plugs,
holders and wires immediately otherwise they may cause accidents.
7.8.4.15. Don't insert bare wires directly into an electrical socket. Use a plug to be
safe.
7.8.4.16. Don’t overload electrical switch, socket, plug and extension cords as it may
lead to overheating and fire.
7.8.4.17. If there is no electricity or electrical appliances are not in use, turn them off
and unplug them.
7.8.4.18. Don’t install direct hooking (kunda connection), there is a risk of electric
shock and fire.
7.8.4.19. Don't construct or extend the building under or near power lines. Maintain
minimum safe clearances for overhead bare conductors from the vertical
clearance above rooftops or horizontal clearance from the house, building
or structure side, shall be,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 34 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.8.4.20. If the minimum safe vertical clearances above rooftops or the horizontal
clearance from the side of a house, building, or structure are not met for
overhead bare conductors, immediately contact the relevant Power
Distribution Company to relocate the conductors or install insulated
conductors in accordance with the Consumer Service Manual.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 35 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
c. Use non-metallic ladders, scaffolding material, and tools near live
conductors.
7.8.4.22. Don't fly kites near power lines as the kite metallic or wet strings can cause
an electric shock.
7.8.4.25. Don't excavate near power lines or dig boreholes for water. Contact the
power company for guidance.
7.8.4.26. Don’t drive or park overloaded vehicles beneath power lines.
7.8.4.27. Don't approach or cross power lines or poles if they fall, notify the power
company immediately.
7.8.4.28. If power lines are broken and fell into the water, don’t touch conductor or
step into the water, assume that there is current in it.
7.8.4.29. Don't touch or remove anything that comes in contact with a power line,
notify the power company immediately.
7.8.4.30. Repair your dedicated transformer only at the manufacturer's facility, the
Distribution Company's own workshop, or an authorized private workshop,
equipped with appropriate testing facilities to ensure reliability and
integrity.
b. Do not touch the electrocuted victim directly. Make sure you are
standing on a dry, non-conductive surface to avoid getting electrocuted
yourself. Disconnect the power or remove the electrical wires with non-
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 36 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
conductive materials like a dry broom, plastic, rope or wooden stick.
c. After the victim is free from the electrical source, only provide first aid,
such as CPR if needed.
d. If the victim's clothing has caught fire, extinguish it with a cloth or towel
or fire blanket.
e. If a wound is bleeding, apply a clean bandage to stop the bleeding. The
patient often dies from excessive bleeding.
g. Don’t try to feed the victim. The patient's condition may deteriorate if
the airway is obstructed.
h. If the victim stops breathing or has no pulse, take him to the hospital
with continuous CPR and artificial respiration.
7.8.5. NEPRA may issue safety flyers or alerts as necessary to promote safety awareness
and reinforce key practices outlined in the safety code.
7.9.2. The panels and covers of energized equipment and circuits shall remain closed at all
times until the system is declared dead, both for preventive and corrective
maintenance purposes.
7.9.4. Visitor shall not be permitted access to the construction, operation, or maintenance
areas unless accompanied by a company employee.
7.9.5. The host shall provide temporary PPE to visitors while they are visiting construction,
operation, or maintenance areas. Upon completion of the visit, the temporary PPE
must be returned to the designated storage location.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 37 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.10. Contractors, Sub-contractors & Suppliers
7.10.1. The Company shall enforce safety requirements to foster a strong safety culture
across its sites, service territories, and jurisdictions by ensuring full compliance by
contractors, sub-contractors, suppliers, bulk power consumers, and other system
users, as outlined in this Code and any project-specific HSE requirements.
7.10.2. Contractors, sub-contractors, suppliers, bulk power consumers, and other system
users shall prepare a safety plan as per the job scope, approved by the company and
assign necessary HSE personnel accordingly to oversee safety during critical tasks.
7.10.3. Line Superintendent/Supervisor shall ensure that the Contractors, Sub-contractors &
Suppliers and other system users brings their own PPE as stipulated in the agreement
and shall not be allowed for any task unless equipped with required PPE.
7.10.4. Any accident occurring within the company site, service territory and jurisdiction,
however, shall be the responsibility of the company therefore all activities carried
out by contractors, sub-contractors & suppliers and other system users shall be
controlled and supervised by company officials. Company shall take reasonable and
necessary measures to prevent accidents involving employees, contractors, sub-
contractors, suppliers and other system users during construction, operation,
maintenance, turnaround, rehabilitation, standby, decommissioning, mothballing,
and demolition works or tests under the contract.
7.11. Safety Instructions for Bulk Power / Single Point Supply Consumer.
7.11.1. Distribution companies shall include Bulk Power Consumer (BPC)/ Single Point
Supply Consumer (SPSC) safety instructions in the connection agreement/contract
and communicate safety instructions to BPC/SPSC through written letters, training
sessions, workshops, or online resources.
7.11.2. BPC/SPSC shall follow all applicable rules and regulations already issued or to be
issued in the future by the Distribution Company, NEPRA, or the relevant
authorities.
7.11.3. Any BPC/SPSC committing a breach of the procedures/rules outlined above shall
render itself liable for disconnection of its electric power and legal action.
7.11.4. Distribution Company shall develop a communication protocol with the BPC/SPSC.
This protocol should have a designated and authorized focal person from each side
to ensure effective coordination.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 38 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.11.5. BPC’s electrical installation shall confirm the design criteria of DISCO/NTDC and
approved by the Distribution Company, as per the terms and conditions of the
Consumer Eligibility Criteria, Performance Standards (Distribution) Rules,
Distribution Code, Safety Code and Grid Code.
7.11.6. BPC/SPSC shall employ qualified and trained personnel to handle operations and
maintenance.
7.11.7. All operation and maintenance activities shall be performed safely and in
compliance with the BPC Procedure or SOP. Job supervisor shall conduct a job
briefing before beginning tasks.
7.11.8. The job supervisor must confirm that his/her staff do not start work on the de-
energized lines until isolation, lockout, and tagout procedures have been
completed, and a work permit has been issued. Next, his/her staff use a contact or
non-contact voltage tester, detector or beeper to confirm that the line is dead.
Alternatively, line staff shall carry a personal or proximity voltage detector (with
voltage ranges from 120VAC to 500kV) all the time while working to detect induced
voltage from adjacent conductors or circuit, particularly if the earthing clamp is
loose or not electrically connected.
7.11.9. The job supervisor must confirm that his/her staff provide temporary earthing on
both sides of the line, whether it is high tension (HT) line or low tension (LT) line, to
safeguard against potential energization of the line or monopole/tower/structure
or back-feeding from consumer double supply lines, generators, UPS systems,
stored charges from capacitors, lightning strikes, or induced voltage from
conductors/ cables/ transformers. The job supervisor must ensure that his/her staff
use electrical rubber gloves, rubber sleeves, and a full-body safety harness along
with double lanyard with a positioning belt for work at heights, when necessary.
When working in electrically conductive environments, use a Full Body Harness with
PVC coated hardware or made from non-conductive materials like synthetic fibers
or specialized fabrics with anti-static properties to minimize the risk of static
discharge.
7.11.10. BPC shall arrange annual inspection and testing of electrical equipment,
transformers, switchgear, distribution panels, and protective devices, including
circuit breakers and protection relays. Ensure there are no defects, verify trip
settings and configurations, and confirm that they are not bypassed, isolated, or
deactivated.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 39 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.11.11. BPC/SPSC shall ensure that all electrical equipment and systems are adequately
grounded to prevent electrical faults and minimize the risk of electric shock and
fire.
7.11.12. BPC/SPSC shall manage their electrical load efficiently and avoid overloading
circuits, which can lead to overheating and potential fire/explosion.
7.11.13. BPC/SPSC shall repair its in-service equipment and transformers only at the
manufacturer's facility, the Distribution Company's own workshop, or an
authorized private workshop, equipped with appropriate testing facilities to ensure
reliability and integrity.
7.11.14. BPC/SPSC shall have clear emergency procedures in place for dealing with electrical
incidents, including power outages, fires, and electrical faults.
7.11.15. BPC/SPSC shall promptly report any electrical incidents, faults, or hazardous
conditions to the Distribution Company and relevant authorities.
7.11.16. BPC/SPSC shall maintain records of safety training, incidents, and safety compliance
at BPC/SPSC facilities at least for three (03) years, if not defined.
7.12.2. During HSE walk-throughs and site tours, top management should engage with staff
in the field, identify potential unsafe conditions, unsafe acts, near misses,
housekeeping deficiencies, and other observations that may impact employee safety,
facility protection, and environmental impact.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 40 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
promoting a secure and healthy workplace for employees and contractors.
7.13.2. SOP/ Work Instructions should provide a clear understanding of the detailed
operating parameters and limits for safe operation, according to equipment
manufacturer’s manual, including an explanation of HSE consequences of operation
outside the parameters and limits, and a description of steps to be taken to correct
and/or to avoid deviations/ failure/ trip.
7.13.3. SOP/ Work Instructions should include following contents, as required depending
upon company operations such as SOP Purpose, Scope, Definitions/ Abbreviations,
Responsibilities, Operation Description, Potential Hazards, Safety, Health and
Environmental Controls/ Precautions, Specific Engineering Controls, Specific
Administrative Controls, Specific Personal Protective Equipment (PPE), Operation
Modes (Temporary, Normal, Start-up, turnaround, Emergency), Operational Limits/
Parameters, Maintenance, Maintenance Override Switch (MOS), Records and Check
Lists/ Log Sheets.
7.13.4. Work procedures, SOP's, practices, and training material shall be reviewed at least
every three (03) years or, in case of a major incident or change in equipment, process
or chemical or new critical risk identified, and/or internal/ external audit
recommendation or change/amendment in the applicable law.
7.13.5. The company shall form a technical committee, composed of technical staff with
knowledge of field to review work procedures, SOP's, practices, and training material
for correct safe practices in the field.
7.13.6. The company shall provide adequate training and supervision to ensure all
employees and contractors understand the required steps as defined in the SOP/
work instructions and perform their work accordingly.
7.14.2. The control of all types of documents created, used and maintained by company
should include document creation, identification, numbering, revision, concurrence,
approval, issuance, distribution, accessibility/ access control, change control,
cancellation and periodic review.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 41 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.14.3. This will ensure accessibility of the right information to the right personnel at the
right time to prevent unintentional use of obsolete HSE documents/ information. HSE
documents/ information should have identification, protection, storage, retrieval,
retention, and authorized disposal of various Data and Records.
7.14.4. Critical records shall be retained and preserved by company as per equipment
manufacturer recommendation, legal & other requirements or at least for three (03)
years, if not defined.
7.14.5. Fiscal Year from July 1 to June 30, will be followed for HSE data and record.
7.15.2. Workers will take risks if no one is watching. Poor attitudes and behavior can be
mitigated by close and proper supervision. An effective site supervision of workers'
tasks reduces the likelihood of mistakes and accidents.
7.15.4. The Line Management, Resident Engineer and Sub-Divisional Officer are responsible
to ensure the work outcomes and safety, regardless of whether they supervise the
activities directly or indirectly. Holding Line Management, Resident Engineer, and
Sub-Divisional Officer accountable for their actions will prevent accidents caused by
poor management oversight.
7.15.5. The Line Management, Resident Engineer, Executive Engineer, and Sub-Divisional
Officer shall conduct regular field visits within their service territory and jurisdiction
at intervals specified in the HSE/Safety Manual, or at least once in a week to
proactively prevent serious accidents and ensure strict compliance with rules and
SOP’s. They shall record all HSE observations, including unsafe conditions, unsafe
acts, near misses, housekeeping deficiencies, and any other issues that could impact
the safety of the facility/network system, employees, contract workers, the general
public, and animals. These observations should be recorded in their register/logbook
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 42 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
for prompt action and immediate correction.
7.15.7. The Line Management, Resident Engineer, and Sub-Divisional Officer must frequently
remind Line Superintendents/Supervisors to conduct job briefings/toolbox talk at the
start of each job and follow Safety rules and SOP’s.
7.15.8. The Line Management, Resident Engineer, and Sub-Divisional Officer must confirm
that his/her staff do not start work on the de-energized lines until isolation, lockout,
and tagout procedures have been completed, and a work permit has been issued.
Next, his/her staff use a contact or non-contact voltage tester, detector or beeper to
confirm that the line is dead. Alternatively, line staff shall carry a personal or
proximity voltage detector (with voltage ranges from 120VAC to 500kV) all the time
while working to detect induced voltage from adjacent conductors or circuit,
particularly if the earthing clamp is loose or not electrically connected. The Line
Management, Resident Engineer, and Sub-Divisional Officer must confirm that
his/her staff provide temporary earthing on both sides of the line, whether it is high
tension (HT) line or low tension (LT) line, to safeguard against potential energization
of the line or monopole/tower/structure or back-feeding from consumer double
supply lines, generators, UPS systems, stored charges from capacitors, lightning
strikes, or induced voltage from conductors/ cables/ transformers. The Line
Management, Resident Engineer, and Sub-Divisional Officer must ensure that his/her
staff use electrical rubber gloves, rubber sleeves, and a full-body safety harness with
a positioning belt along with double lanyard for work at heights, when necessary.
When working in electrically conductive environments, use a Full Body Harness with
PVC coated hardware or made from non-conductive materials like synthetic fibers or
specialized fabrics with anti-static properties to minimize the risk of static discharge.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 43 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.15.10. Line Superintendent/Supervisor must remain vigilant and keep an eye on worker to
prevent unsafe acts/violations. In case of non-compliance or if the worker is taking
short cuts, not following SOP’s, remove worker from the team to save his/her live
and arrange necessary training and coaching for him.
7.16. Accountability
7.16.1. Work-related accidents can be prevented when the leadership takes timely and
proper safety measures to protect employees, contractors, and the general public.
Similarly, employees and contractors have a duty to ensure their own safety and the
safety of others.
7.16.2. The top management, whether in the role of Chairman, Chairperson, Board
Members, Chief Executive Officer, Managing Director, Deputy Managing Director,
Director General, Chief Financial Officer, Chief Operating Officer, Chief Technical
Officer, Chief Administrative Officer, Company Secretary or equivalent position,
holds strategic leadership roles with significant decision-making authority and are
responsible for the overall success and growth of the company. They shall be
responsible and accountable for planning, establishing, implementing, maintaining,
monitoring, and communicating (both internally and externally) for providing a safe,
decent, and healthy workplace for employees and contractors. Additionally, they are
responsible and accountable for the occupational health and safety of employees,
contractors, and the general public, as well as for minimizing damage to property and
mitigating adverse impacts on the environment, directly associated with network
owner's operations or infrastructure.
7.16.3. Top management shall motivate the staff to implement robust controls, provide
resources and insist on strict compliance with rules and SOPs. There shall be zero
tolerance for careless risk-taking or negligence to ensure accident prevention.
7.16.4. The top management shall promote a 'safety-first' culture, where poor attitudes and
behavior are unacceptable. Set the initial safety expectation that nothing is more
important than getting the job done safely and that poor behavior and attitudes are
intolerable and can result to termination/dismissal from the service. Provide
retraining, if individuals fail to meet safety expectations. If safety expectations are
still not met, then remove personnel from the team if they cannot or are not willing
to be align with the company’s safety culture. Disciplinary action must be taken for
the HSE noncompliance. Sometimes, harsh disciplinary action or even
termination/dismissal, may be in the best interest of the individual to save his/her
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 44 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
life and the lives of others as well as to set an example for others. If necessary, apply
termination/dismissal policy in line with the Industrial and Commercial Employment
(Standing Orders) Ordinance, 1968 or any relevant legislation, so that he/she can find
another safer job opportunity to support his/her family as a bread earner.
7.16.5. The line management includes roles such as Plant Manager, General Managers,
Deputy General Managers, Managers, Deputy Managers, Assistant Managers,
Directors, Deputy Directors, Assistant Directors, Chief Engineers, Superintending
Engineers, Executive Engineers, Resident Engineers, Assistant Resident Engineers,
Senior Engineer, Junior Engineer, Sub-Divisional Officers, Grid In charge, Sub Station
Officer, Line Superintendents, Supervisors and Foremen or equivalent position, are
directly involved in the operational roles at the site in managing the day-to-day field
operations and shall be responsible and accountable for ensuring compliance with
Health, Safety, and Environmental (HSE) requirements.
7.16.6. The line management shall set initial safety expectations for their team. If the safety
expectations are not met, provide retraining to them. If expectations are still not met,
then remove them from leading or working in the team, especially if they are not
willing to be align with the company’s safety culture.
7.16.7. The line management shall discipline staff who intentionally ignore and disregard
safety rules and SOPs. If an individual consistently fails to comply, then the only
option is to remove him/her from the risky tasks to save his/her life and the lives of
others. Staff who are taking shortcuts have a higher tendency to disregard safety in
the belief that nothing will happen since they have performed similar jobs or the
same work before without following safety rules and SOP’s. The safety rules are
mandatory, therefore removal is beneficial to save a violator from making mistakes
and possibly injuring himself or others at work.
7.17.3. A single line diagram shall be displayed or made available in all electrical rooms
within any facility.
7.17.4. Transformer, poles, structures, towers, conductors, and other electrical apparatus
shall be installed in safe locations to avoid hazards to humans and animals. These
installations can be at ground level, underground, or overhead, and shall be away
from hazardous locations such as flood channel, etc. Existing transformer, poles,
structures, towers, conductors, and other electrical apparatus in hazardous
locations must be relocated or replaced with new ones in safe locations. Install
guy/stay wires to stabilize poles and structures, marking them with high-visibility
sleeves to prevent tripping hazards at public places. Install barriers or fences around
high-voltage equipment to prevent unauthorized access. Clearly mark the location
of underground electrical facilities to alert future excavation efforts. Install clear
and visible signage indicating the presence of high-voltage equipment and potential
hazards.
7.17.6. All electrical installations and circuits shall be identify, designed, constructed and
maintained to provide protection against the abnormal conditions (overload, short-
circuits (whether phase-to-phase or phase-to-ground), and electric shock (due to
direct or indirect contact with electricity), lines fall on rocks or any surface, which
may cause injury to people, animal or damage to property, etc.) such as distance
relay, overcurrent relay, over voltage relay, earth fault relay, and automatic self-
closing relay including fixed earthing/grounding of circuits, apparatus and
infrastructures.
7.17.7. ELCB (earth leakage circuit breaker), RCD (residual current device), RCCB (residual
current circuit breaker) and molded case circuit breaker (MCCB) shall be used for
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 46 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
protection and control purposes as per design in circuits in order to prevent fires
and shocks in electrical installations.
7.17.8. Protective relays and protection schemes set points/ sizes should be sufficient for
the current rating to immediately ‘blow’ the fuse or trip the circuit breaker within
the specified time, in case of fault or overcurrent.
7.17.9. Generation Company shall address dust zones wherever applicable, following the
guidelines provided in NFPA 499, NFPA 654, and IEC 60079-10-2 to verify all
inherent controls are in place and functional.
7.17.10. Generation Company shall maintain and operate in a manner that minimizes the
escape of dust in Zone-20, 21 and 22 from process equipment or ventilation
systems, wherever applicable. Continuous local exhaust ventilation should be
provided for processes where combustible dust is liberated in normal operation so
as to minimize the escape of dust. The dust should be conveyed to dust collectors.
7.17.11. Generation Company shall take appropriate measures to avoid dust suppression
such as sprinkler water, etc. to increase air moisture levels, which can help reduce
dust dispersion. This method is particularly useful in dry environments where dust
is more likely to become airborne.
7.17.12. Ensure isolation or shielding of hot surfaces. Any hot surface at 65 degree Celsius
and above, within the areas at site shall be insulated to reduce the possibility of
auto ignition of dust, wherever applicable. Surface temperatures shall not exceed
260 degree Celsius. The minimum ignition temperature (MIT) for a dust cloud varies
depending on the type of dust, but generally, it ranges from 400°C to 600°C.
7.17.13. All mechanical equipment installed in hazardous dust zone should be manufactured
to ensure that rotating parts are non-sparking and adequately protected against
the generation of a static charge.
7.17.14. Impulse noise exceeding 140 dB shall not be permitted in any plant area.
7.17.15. All design aspects/ design criteria shall be provided to NEPRA as and when required
and complete record shall be maintained by the company.
7.17.17. The network owner shall install safety guards, nets or screens beneath the span of
existing and new conductors crossing roads, canals, or railways for 400 Volts and
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 47 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
below, 11 kV and 33 kV lines to ensure that the conductors do not make contact
with the ground or other structures in case of breakage, which can pose significant
risks to public and animals safety. Metallic safety guards, nets or screens shall be
connected with fixed earthing at each point. In the event of a conductor breaking,
the guard will catch the conductor, triggering the blowing of the fuse or tripping of
the circuit breaker. The guard wire should be made of appropriate type, with an
actual breaking load of at least 1,500 lbs and sufficient current carrying capacity to
prevent fusing if the live line comes into contact with it.
7.17.18. Conductors of 400 Volts and below, 11 kV and 33 kV lines and its safety measures
such as guards, nets, or screens spanning across roads, canals, or railways shall be
free of joints.
7.17.19. Installing safety guards, nets, or screens beneath the spans of lines such as 66 kV,
132 kV, 220 kV, and 500 kV lines that cross roads, canals, or railways, may not be
feasible due to the longer span lengths, the height of the towers, and the weight of
the conductor. In such situations, an alternative safety measures should be
considered as per design like vibration dampers for single conductor to reduce
aeolian vibration and spacer dampers for bundled conductors to maintain the sub
span oscillation and spacing, thereby mitigating the risk of potential conductor
breakages. High voltage lines shall be protected by fast acting relay operated circuit
breakers with a tripping time of even less than the order of 0.25 seconds from
occurrence of fault to its clearance.
7.17.20. Each tower for these crossing spans, whether on roads, canals, or railways, must
have fixed earthing system by two distinct earthing connections. Each of these
connections should have its own dedicated earth electrode. If a tower's earth
resistance exceeds 5 ohms, counterpoise earthing must be implemented.
7.17.21. In-service overhead lines crossing roads, canals, or railways shall be subjected to
scheduled inspections to ensure their structural integrity and the safety of the
crossing point.
7.17.22. The platform/grating structure shall be designed to withstand the imposed loads
from equipment, materials, refractories, and other factors. It is crucial that all loads
are evenly distributed to prevent any failure or deformation.
7.17.23. A safety corridor should be considered during design phase to protect the network
systems from the flood, windfall, trees and branches and other potential hazards
that may result in damage to the system, power failures or forest fires.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 48 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.17.24. The headroom in the plant area or grid station, which provides vertical clearance
for vehicles to pass safely beneath overhead structures such as bridges, tunnels, or
pipes/structure, shall be a minimum of 18 feet (5.5 meters) across the full width of
roads to allow the safe passage of emergency vehicles, cranes, and other tall
vehicles.
7.17.25. The network owner shall install insulated conductors (aerial bundled
cables/conductors/ABC) for new LT lines or while replacement of spoiled/worn-out
bare conductors, especially in narrow, congested or overcrowded areas where
there's limited clearance from trees, houses, buildings, or other structures.
However for new HT Lines XLPE covered conductor (Tiger) shall be installed.
Consideration should be given to the potential for physical damage to insulation.
Insulation that comes into contact can suffer abrasion damage. To prevent such
damage, tree branches should be trimmed, allowing for wind-induced movement
of either the branches or the conductor without them touching the conductor
insulation. These insulated conductors (aerial bundled cables/conductors/ABC)
should be suitable for self-suspension, incorporating outer sheaths resistant to
ultra-violet (UV) radiation, abrasion and the effects of external temperature
variations and moisture. Utilizing insulated conductors will prevent accidental
contact and can be positioned close to trees, houses, buildings, or other structures
and will not generate sparks if touched.
7.17.26. The minimum safe clearances from the ground surface for overhead bare
conductors at maximum conductor sag to prevent induced voltage or flashover in
areas exclusive to pedestrians having no access to vehicles, as well as on roads and
streets with heavy vehicles such as trucks, trailers, buses, or cranes, shall be,
Note: The network owner shall increase clearance in accordance with the Consumer Service
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 49 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Manual if it is reduced due to road or street construction.
7.17.27. The minimum safe clearances for overhead bare conductors at maximum
conductor sag from the rivers and canals from highest flood level (HFL), shall be 30
feet (9.1 meters) for all voltages.
7.17.28. The minimum safe clearances from the ground surface for overhead bare
conductors at maximum conductor sag to prevent induced voltage or flashover in
areas crossing railway tracks, shall be,
7.17.29. Whenever feasible, consider underground cabling when crossing roads, highways,
and railway tracks with power lines up to 66 kV.
7.17.30. The minimum safe clearances for overhead bare conductors at maximum
conductor sag from the vertical clearance above rooftops or horizontal clearance
from the house, building or structure side, shall be,
Note-1: Roofs, especially those accessible for use as terraces or recreational areas, might
require higher vertical clearances than sloped roofs. Roofs with installations such as solar
panels, water tanks, or air-conditioning units might require more clearance for safety.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 50 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note-2: Extra horizontal clearance is needed near windows, terraces, balconies or any
extensions to prevent easy access to conductors.
Note-3: When a person comes into contact with a Low Tension (LT) or Low Voltage, the
electrical current might not be strong enough to cause that immediate muscular contraction
that throws the victim away. Instead, the person may be "locked/caught” onto the current.
Note-4: When a person comes into contact with a High Tension (HT) or High Voltage circuit,
the immediate and strong muscular contraction caused by the electrical current often
"throws" the individual away from the source. The electrical arcing can also physically push
a person away from the source.
7.17.31. If the minimum safe vertical clearance above rooftop or the horizontal clearance
from the side of a house, building, or structure are not met for overhead bare
conductors, or in case of illegal construction or extension of the building under or
near distribution or transmission lines that violate these minimum safe clearances,
the network owner shall immediately issue a notice to stop unsafe construction
until the conductors are relocated or insulated conductors are installed in
accordance with the Consumer Service Manual. This notice shall be issued to the
consumer or building owner, with copies sent to the local building department, the
relevant civic authorities and the concerned police station. If the notice is not
complied with within 24 hours, the network owner shall file an application with the
concerned police station against the consumer or building owner to halt the illegal
construction or extension of the building. Additionally, the network owner shall
submit applications to the local building department and the relevant civic
authority for the demolition of any illegally constructed or extended structures near
or under the transmission or distribution lines.
7.17.32. The minimum safe clearances between the overhead bare conductors phase to
phase shall be; to ensures that there is no risk of electrical arcing or flashover
between the conductors, even under adverse weather conditions,
400 Volts
No. Description and below
11 kV 33 kV 66 kV 132 kV 220 kV 500 kV
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 51 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.17.33. The minimum safe clearances for high voltages AC or DC shall meet approved
design criteria. The minimum safe clearances shall adhere to the most recent
versions of ANSI, ASTM, IEEE, IEC, NFPA, or an equivalent engineering standard or
specification, they shall be considered acceptable.
7.17.34. The Distribution Company shall verify the wiring test report, duly issued by the
Electric Inspector or an authorized wiring contractor during the site survey/visit for
new or re-connection.
7.17.35. The distribution company is responsible for maintaining the integrity and safety of
its network up to the electricity meter. Beyond the meter, the consumer is
responsible for the service cables, premises wiring, and internal installations.
7.17.37. For new or re-connection, the Distribution Company shall ensure during the site
survey/visit that, where feasible, underground consumer service cables for the
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 52 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
energy meter should be routed by the consumer through protective conduits,
ducts, or trenches to prevent physical damage. These conduits, ducts, or trenches
should be buried by the consumer at a depth of at least 18 inches (45 cm) to avoid
accidental damage during ground works. Appropriate signage or markers should be
installed by the consumer to indicate the presence of underground cables.
7.17.38. For new or re-connection, the Distribution Company shall ensure during the site
survey/visit that the overhead consumer service cables for the energy meter should
be installed by the consumer at a sufficient height to avoid interference with
pedestrian and vehicular traffic. The minimum safe clearances from the ground
surface shall be 15 feet (4.6 meters) in pedestrian areas, 19 feet (5.8 meters) over
streets, and 26 feet (7.9 meters) near roads. These consumer service cables should
be installed in a straight, secure manner without excessive sagging. If the length of
consumer service cables exceeds 130 feet (40 meters) then the Distribution
Company shall provide support by poles or structures in accordance with the
Consumer Service Manual.
7.17.39. For new or re-connection, the Distribution Company shall ensure during the site
survey/visit that the overhead consumer service cables shall not be routed over or
near the rooftops of consumer premises buildings or structures unless absolutely
necessary, and in such cases, proper clearance and protective conduits must be
used. Additionally, these consumer service cables shall not be routed above or on
the rooftops or structures of “other” consumer buildings or properties.
7.17.40. Power cable splicing, joining, and connecting shall be environmentally sealed,
weatherproof, and capable of preventing the ingress of external moisture and
contaminants, even under severe environmental condition or rain. When
connecting two electrical cables, first wrap electrical tape around the exposed
wires, then apply waterproof tape for additional protection. For a more durable
connection, consider using heat shrink tubing or connectors.
7.17.41. The Distribution Company has the right to access a consumer's premises after
providing written notice in accordance with the Consumer Service Manual. This
access is for the purpose of internal inspection, examination, or testing of the
consumer's electric system, service cable condition (secured with a shackle
insulator, support or clamp), internal wiring, fittings, breakers, earthing, or any
other internal apparatus. If any unsafe conditions or hazards are identified during
the inspection, the Line Management/Sub-Divisional Officer or their representative
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 53 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
is responsible for issuing a notice with an appropriate solution and a reasonable
completion target date. The notice remains open until the Line Management/Sub-
Divisional Officer or their representative physically verifies that the consumer has
implemented corrective actions. In cases of severe hazards, electricity may be
temporarily disconnected until the consumer has addressed the issue.
7.18.2. In order to prevent accidents, line management shall ensure robust job planning
and job briefing before beginning tasks to fully communicate the roles and
responsibilities as well as task-level scope, hazards, and controls, to all of the
assigned workers. Job briefing should cover, what is to be done, how is to be done,
and who is authorize to do it.
7.18.3. The company shall implement all necessary precautions to avoid any leakage of
electrical current or hazardous energy from its system/ infrastructure to harm
human life.
7.18.4. The network owner of street poles shall monitors and maintains system integrity to
ensure the safety of the public and animals.
7.18.6. A minimum clearance of 1 meter (3.2 feet) shall be maintained in front of electrical
panels.
7.18.7. Bonding and grounding conductors shall be provided where needed to dissipate
static charge accumulations.
7.18.8. Operation and maintenance activities shall be carried out by experienced, trained
and authorized employees/ contractors. Alternatively, trainee or apprentice can
work under the direct supervision of experienced, trained and authorized
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 54 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
employees/ contractors, to gain the necessary training and experience.
7.18.9. Normal operation of electrical equipment shall be permitted only when the
equipment is properly installed, maintained, all doors are and covers are closed,
grounded and there are no indications of impending failure or hazards.
7.18.10. Line staff must follow safety rules and SOPs at the work site, apply precautions
based on the hierarchy of controls, and use necessary PPE. No work is important
than their lives.
7.18.11. For all corrective and preventive maintenance activities, the line staff must not start
work until they receive a permit to work and the Line Superintendent/Supervisor is
present on the job site.
7.18.12. The Line Superintendent/Supervisor is responsible for enforcing safety rules, SOP's
and PPE on the work site to prevent accidents.
7.18.13. Voltage testing including Hi-pot tests (AC/DC), power frequency, impulse voltage
withstand tests and high current tests shall be performed safely in compliance to
Operation/ Maintenance Procedure, SOP, or Manufacturer’s manual.
7.18.14. Protections/ controls/ interlocks shall be intact and shall not be by-passed or
modified without approved Management of Change (MOC).
7.18.16. Switching operations for isolation of the transmission network shall be well
coordinated with relevant control center.
7.18.18. Combustible and flammable materials shall be removed from the area.
7.18.19. Gas/combustible dust testing shall be conducted as per Task Risk Assessment/ JSA/
Permit to Work at same elevation and above/ below elevation to test oxygen
deficiency and/or for flammable or toxic gases, vapors and dust.
7.18.20. Electrical equipment and lighting, including flashlights, must be explosion proof and
ATEX or IEC-EX rated for hazardous locations and confined space such as Class 1,
Division 1 or 2.
7.18.21. Consider the non-sparking tools in the dust zone and flammable substances area to
reduce this risk. Use techniques to prevent dropping tools, e.g. “drop tool kit, wrist
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 55 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
straps or tool ties.
7.18.22. Ensure absence of combustible dust before issuing a hot work permit.
7.18.23. Appropriate fire extinguishers shall be made available when hot work is being
performed.
7.18.24. Gas cylinders shall be secured in an upright position with proper labels and a safety
cap shall be installed when not in use.
7.18.25. Use cylinder trolleys, material baskets, cylinder racks, and other proper types of
equipment to transport cylinders.
7.18.26. Cylinder must also be secured against falling by chains, web sling belts, or supports.
7.18.27. Use approved pressure-reducing regulators with a check valve connected to the
cylinder valve on all cylinders.
7.18.28. Always close the cylinder valve before attempting to stop leaks.
7.18.29. Inspect cylinders for safe condition before use. Conduct soap test, inspect all
gauges, valves, regulators, hoses, welding/cutting torches and cylinders for damage
and valid hydro test date.
7.18.30. Compressed gas cylinders shall be hydrostatic pressure tested. The valid test date
shall be indelibly marked on the cylinder.
7.18.31. Protect cylinders from direct flame, sunlight, and other heat sources.
7.18.32. Place flashback arrestors at oxygen, acetylene/other fuel type cylinder regulators.
7.18.34. Compressed gas cylinders shall be kept outside while working inside confined
space.
7.18.35. All power-driven tools, equipment and heavy equipment shall be inspected before
use.
7.18.36. Use portable earth leakage circuit breaker (ELCB) for portable equipment’s and
tools to prevent electric shock.
7.18.37. Every part of electric generators, turbines, motor or rotary converter, fly wheels or
transmission machinery shall be securely guarded and fenced unless they are safe
by position or construction.
7.18.38. Car seals are simple plastic devices used to 'seal' a valve in the open or closed
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 56 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
position to prevent unauthorized operation of the valve. Valve operation can only
take place by cutting the seal, thereby giving evidence of either tampering, or
activity by an authorized worker. A car seal is used to seal the valve during plant
operation. Control of valves refers to those valves that are normally opened or
closed as defined in the “As Built/Controlled" drawing from the safety point of view.
It does not apply to valves that normally open and close during normal plant
operation. Car sealed valve hand wheels are typically painted in orange color for
easy identification in the field. There are two types of car seals:
a. Valves on the inlet and outlet of operational pressure relief valve and rupture
disc.
e. Individual fire water monitors, valves, post indicator valves and deluge system
isolation valves.
7.18.41. Crane lifts shall not be allowed at wind speeds above 32 km/h (20 mph-17.4/ knots-
9 meters/second).
7.18.42. Crane Lift Plan should be prepared by experienced, trained and authorized Crane
Rigger.
7.18.43. When heavy equipment, including cranes, aerial devices, mobile elevated aerial
platforms, man-baskets, man-lifts, or bucket-mounted vehicles, is operating near
live electrical circuits/energized power lines, shall maintain minimum clearance
distances from these live electrical circuits/energized power lines, as mentioned in
the table below. Only qualified and trained personnel shall be allowed to operate
and work on equipment in close proximity to live electrical circuits/energized
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 57 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
power-lines while wearing the necessary personal protective equipment (PPE).
Insulated or uninsulated heavy equipment or construction machinery such as a
forklift, excavator, bulldozer, wheel loader, backhoe, grader, crane, dump truck,
man-baskets, man lifts, bucket mounted vehicles, etc. must be protected by
providing grounding and bonding connections to dissipate any potential electrical
charges when working in an electrically conductive, near live line or when
protection is required against potential energization of the line or
monopole/tower/structure or back-feeding from consumer double supply lines,
generators, UPS systems, stored charges from capacitors, lightning strikes, or
induced voltage from conductors/ cables/ transformers. Insulated heavy
equipment, including those with rubber tires and wooden supports, is not
foolproof. Over time, insulation may deteriorate or get damaged due to
environmental exposure, wear, or physical damage. Even with insulation, there's
still a risk of electrical charge to pass through, or heavy equipment large metal
objects can accumulate induced voltages, especially under high voltage conditions.
A person touching heavy equipment (touch potential) or standing near heavy
equipment while touching the ground (step potential) could be electrocuted.
Grounding and bonding provide an additional layer of protection to safely dissipate
any electrical charge that might be transferred to the heavy equipment protecting
both the equipment and nearby personnel from various electrical risks.
7.18.44. A designated supervisor and signal-man shall ensure the following minimum safe
distances shall be maintained all the time to prevent electrocution, equipment
damage, and fires.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 58 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note-1: Distances listed are for standard conditions, extra care must be taken, if standard
conditions do not exist.
Note-2: When operating insulated heavy equipment near live electrical circuits/energized
power lines, avoid using uninsulated lifting accessories, such as slings, hooks, or rigging
equipment’s. Choose non-conductive lifting accessories made of materials that do not
conduct electricity.
7.18.46. All lifting equipment shall have a certified safe working load (SWL) and be inspected
prior to the lift. The SWL shall not be exceeded during the lifting operations and
equipment that is damaged shall not be used.
7.18.47. The crane operator shall hold a valid government license/Heavy Transport Vehicle
(HTV) license, appropriate for the type and size of the heavy equipment and shall
be certified and trained for the equipment he/she operate.
7.18.48. Crane Rigger shall ensure that no one shall be under a suspended load.
7.18.49. All electrical equipment and portable lighting including flashlights shall be
inspected.
7.18.50. A weatherproof Ground Fault Circuit Interrupter (GFCI) receptacle outlet shall be
installed in wet and damp areas to prevent electrical shocks such as outdoors,
kitchens, bathrooms, laundries, and sink areas where receptacles are placed or
installed within 1.8 meters (6 feet). A weatherproof GFCI receptacle outlet shall be
used at construction sites or while using portable electrical tools unless the voltage
is 12 volts or less.
7.18.51. The confined space shall be provided with illumination of not less than 50 lux. The
contractor can increase numbers of lights to get enough lux level. Where flammable
or potentially explosive atmospheres are likely, extra low voltage lighting (typically
less than 25 Volt) shall be used.
7.18.53. Day and Night shifts representatives shall ensure proper hand over, information of
all on-going critical activities/ issues in writing and verbally to avoid any confusion.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 59 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.18.56. Fire protection system shall be provided, inspected and maintained.
7.18.57. Full body safety harness with front work positioning belt along with double lanyard
for 100% tie shall be used at height more than 6 feet/1.8 meter above the ground
when climbing poles, towers and structures including working through mobile
elevated aerial platform, man-baskets, man-lift or bucket mounted vehicles. Full
body safety harness with front work positioning belt along with double lanyard is
to allow an employee to be supported on an elevated vertical surface such as a wall
or pole and to work with both hands free. The use of a lineman body belt
(positioning belt) for fall arrest or a full body safety harness with a single lanyard is
strictly prohibited. When working in explosive or electrically conductive
environments, use a Full Body Harness with PVC coated hardware or made from
non-conductive materials like synthetic fibers or specialized fabrics with anti-static
properties to minimize the risk of static discharge. Anchor the safety harness
lanyard on rigged anchorage point at height, having fall clearance safety factor
three (03) feet from impact level or ground level.
7.18.58. Use self-retractable lifelines (SRL) when working in elevated areas such as roof top.
7.18.59. PPE shall be in good condition. PPE should be inspected before use. Remove and
dispose defective PPE from the job site.
7.18.60. Employee/ contractor should be familiar with the nearest manual call point (MCP),
safety shower, fire extinguisher, nearest safe escape route and assembly point.
7.18.63. HSE observations, unsafe conditions/ acts and violations shall be recorded and
corrected immediately and necessary action shall be implemented for preventive
action to avoid reoccurrence.
7.18.65. The network owner must ensure that their staff members, private electricians, and
cable operators do not perform any unauthorized or illegal work on the distribution
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 60 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
network.
7.19.3. The company shall develop and maintain preventive maintenance SOP in line with
the manufacturer's manual/recommendations for rehabilitation of its
network/system to cover all operational equipment’s, in-service inspections,
effective maintenance, and the replacement of obsolete equipment, transformers,
relays, structures, poles, and conductors to prevent injuries and fatalities among
workers, the public and animals, and to minimize service disruptions.
7.19.4. The network owner shall conduct scheduled annual patrolling, inspections, testing,
rehabilitation, repairs, replacement and upgradation work of the infrastructure
within the sub-division including overhead lines that crossing roads, canals, or
railways. These patrolling, inspections, and testing are essential to verify the
integrity, assess overall condition, detect potential signs of structural failure,
identify any issues such as cracks, deformation, deterioration, deflection, damage,
defects, corrosion or rust, and confirm compliance with minimum clearance
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 61 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
requirements, among other factors. Check shackle insulators, jumpers insulated
leads, parallel groove clamps (PG clamps) and pin insulators, conduct sag
tightening, correction of tilted pole/structure, stay tightening, tree trimming on
HT/LT lines. Check transformer insulated leads and its appropriate spacing, bush
tightening, load balancing, air break (AB) switch, and that cutouts/dropouts fuses
are of correct standard size and rating.
7.19.6. The company shall ensure that all purchasing requirements are met and a quality
assurance program is in place in order to prevent issues caused by poor quality
material. The Line Management, Resident Engineer, Executive Engineer, Sub-
Divisional Officer, Line Superintendents, or Linemen must inform procurement or
purchasing personnel when poor quality material is discovered at the workplace.
Proper feedback is critical to ensure that inferior quality materials do not cause
accidents.
7.19.7. Operational equipment’s/ devices in-service inspection and quality control shall
address scope, minimum requirements, types and intervals, essential for
equipment, instruments, devices, and systems whose deterioration and failure may
adversely affect overall efficiency, and to assure safety, reliability and integrity of
the system with reliable and efficient safe operation.
7.19.11. A document shall be developed that specifies the suitable procedures, testing of
equipment, frequency of testing, acceptable limits and passing criteria of the tests
of safety critical protection devices, instrumentation, interlocks, protection relays,
breakers, controls, software and components. Ensure there are no defects, verify
trip settings and configurations, and confirm that they are not bypassed, isolated,
or deactivated.
7.19.12. The company shall develop, implement, and maintain Standard Operating
Procedure (SOP) to ensure proper authorization and clear precautions before
interrupting, bypassing, isolating, or taking out of service any critical device. This
includes safety-critical protection devices, safety instrumented systems (SIS),
interlocks, protection relays, breakers, controls, Emergency Shutdown Systems
(ESD), Fire and Gas Detection Systems, Vibration Monitoring Systems (VMS),
Compressor Protection Systems (CCS), software, and components. The
authorization shall only be undertaken for specified reasons such as maintenance
work, planned tests/inspections, or plant start-up activities, and must have formal
documented approval for the minimum possible time, and the work on these
components must continue uninterrupted until the system is back as normal online.
In the absence of specific SOP, the Management of Change (MOC) shall be applied
for temporary changes and interruptions.
7.19.13. Critical devices and Safety Instrumented Systems (SIS) interlocks shall not be
bypassed, isolated, or taken out of service if the plant is not in a stable or normal
operating condition, or if sufficient safeguards are not in place.
7.19.14. The Operator Override Switch (OOS) is designed to bypass any trip initiators within
the plant's emergency shutdown logic during start-up. The OOS can be applied
when the unit is off or as a required step in the SOP while the unit is in operation.
The OOS is configured with a set timer and is designed to automatically remove the
bypass condition after the set time expires or a specific condition is met.
7.19.15. The Maintenance Override Switch (MOS) is designed to bypass any trip initiators
within the plant's emergency shutdown logic while the plant is in normal operating
conditions. Therefore, the MOS shall not be applied for operational purposes,
including but not limited to:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 63 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
a. Plant start-up
b. Plant load reduction due to raw material shortage or any other reason
7.19.16. The MOS for Safety Instrumented Systems (SIS) is intended to be used for
maintenance tasks without affecting plant performance and parameters under the
following circumstances:
d. Replacing spares in the SIS, configured with a "1oo2" (The system can continue
to operate safely if one of the two components is out of service) or "2oo3" (The
system can continue to operate safely if one of the three components is out of
service) voting logic.
7.19.17. Vibration Monitoring Systems (VMS) and Compressor Protection Systems (CCS) are
designed to trip critical plant equipment to protect pumps or compressors from
operating outside their designed limits. If it becomes necessary to bypass any of the
transmitters for maintenance or upgrade purposes, the same criteria as those for
the Maintenance Override Switch (MOS) shall be applied.
7.19.18. Firefighting and gas detection systems shall not be bypassed, isolated, or taken out
of service unless there are alternative protection or countermeasures in place to
address any potential fire or gas leaks in the affected area.
7.19.19. For the maintenance of Fire & Gas Detection systems, some online repairs are
possible, such as replacing or calibrating toxic detectors or performing minor
repairs without bypassing or isolating the main system. In cases where physical
isolation is mandatory, such as repairing firefighting fluid leaks, users must ensure
full coverage for the area by using other firefighting systems, such as standby fire
water trucks in the event of fire water leaks. Typical circumstances requiring such
work authorization include:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 64 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
c. Replacing defective firefighting elements due to aging
d. Performing routine preventive maintenance on any part of the Fire & Gas
Detection system
7.19.20. The company shall perform structural integrity and stability inspections for civil and
steel structures of plant platforms, warehouses, regular office buildings, blast-
resistant buildings, as well as porta cabins, at intervals of 3 to 5 years by qualified
internal or external structural engineers, architects, or government authorities
responsible for enforcing building regulations or inspection agencies registered
with Pakistan Standards and Quality Control Authority or Pakistan Engineering
Council to ensure that the building remains structurally sound so as not to pose a
safety hazard to occupants and/or the public.
7.19.21. The civil and steel structure integrity and stability inspection shall address the
foundation, beams, columns, walls, roof, bolted connection, welded joints,
gratings/clips, handrails, ladders, ladder cages, bracings, toe boards, roof
deflection, beam deformation, truss twisting, column buckling, welding, or any
structural defects including suspended fire water system, pipe support and hanger
to find out potential signs of structure failure if present such as cracks, water
infiltration, deformation, deterioration or deflection and corrosion/rust, etc. If
necessary, assess the load-bearing capacity and conduct non-destructive testing to
detect any hidden defects. The company shall address all inspection findings
accordingly.
7.19.22. The company shall conduct electrical inspections of plant, warehouses, normal
office buildings and blast resistant buildings every 3 to 5 years by licensed and
qualified internal electrical inspectors, or government authorities responsible for
enforcing electrical inspections or inspection agencies registered with Pakistan
Standards and Quality Control Authority to prevent electrical hazards and protect
lives and property. The inspector will assess the wiring, electrical panels, grounding
systems, appliances, and overall electrical setup. They will look for any standard
violations, improper wiring, overloaded circuits, outdated equipment, or potential
safety risks.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 65 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
a. When an equipment or vessel is opened for corrective or preventive
maintenance, thoroughly check and inspect equipment/vessel before boxing-up
for the quality of maintenance work, misalignment, loose objects/parts, or
potential rubbing parts in order to ensure the equipment/vessel is ready and
safe for box-up.
b. Make sure all necessary repairs/modifications are completed as per the job
card/scope.
c. Make sure that the correct type of gaskets are being used as per gasket
specification.
e. Make sure that bolted joints are tight and torque requirements are met.
f. Make sure that the non-return valve is installed in the correct direction.
h. Make sure that platform gratings, handrails, toe boards, stairways, and ladders
around the equipment/vessel are in good condition and safe to use.
i. Make sure that the equipment/vessel is clear and acceptable for operation.
k. Make sure the possibility of the presence of a human being inside the
equipment/vessel by verifying confined space entry log sheet and loudly
shouting or blowing an air horn.
l. Sign-off the box-up checklist and begin boxing up equipment/vessel with strict
site supervision.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 66 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
m. In case of failure or encountering unusual findings during normal start-up, it is
more prudent to perform an in-depth investigation to find the underlying causes
through appropriate fault diagnosis and troubleshooting rather than rushing
towards an immediate start-up.
7.20.2. MOC Committee/ team/ competent authority shall review and approve any change,
modification, addition or deletion.
7.20.3. MOC program shall ensure that any change “Not In Kind” shall have safeguards in
place to eliminate the possibility of hazards introduction as a result of changes to
design, technology, operations, personnel, utilities, parameters, trips, set points,
chemicals and plant equipment.
7.20.4. Lists of MOCs shall be maintained till plant life cycle for awareness of changes and
their implications.
7.21.2. The company shall establish, implement and maintain Traffic Management Plan for
vehicles operating within premises and outside, address authorized driver
requirements, their defensive driving training, usage of company vehicles, safe
routes including rest times and locations and implement a monitoring system that
includes an incentive program for safe driving and a penalty and disciplinary actions
for unsafe driving.
7.21.3. The company should employ only experienced, trained and authorized employees/
contractors as drivers of motor vehicles. Company drivers shall have government
driving license for the type of vehicles they are driving. All drivers are expected to
drive in a defensive manner and maintain control of their vehicles at all times. All
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 67 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
drivers must follow the posted speed limits and traffic signs. The driver shall wear
seat belts at all times. Vehicles must be in good condition.
7.21.4. The driver is responsible for transporting materials properly and ensuring that the
load does not exceed the manufacturer's design load capacity. All loads shall be
properly secured and tied down. Materials should not extend beyond the vehicle's
sides, front, or rear. Loads extending beyond the front or rear shall be marked with
a red flag.
7.21.5. Driver shall perform a 360 degree walk-around before getting into the vehicle or
before reversing to check any obstruction, kids or manhole etc. at front or rear side.
7.21.6. Driver shall inspect the vehicle’s safety equipment (e.g., spare tires, toolkit, safety
cone and fire extinguisher) before using the vehicle.
7.21.7. Driver shall maintain vehicle in a safe condition and maintain tire pressure as per
the manufacturer’s specifications.
7.21.8. All vehicles shall be parked correctly and/or in designated parking areas. Parked
vehicles shall not obstruct other vehicles, roadways, access-ways or fire equipment.
7.21.10. Driver shall report unsafe condition or motor vehicle accident, no matter how
slight, immediately to his/her supervisor/ in-charge.
7.21.11. The company “Traffic Management Plan” should also address following:
a. Pedestrian Routes,
b. Traffic Routes,
c. Traffic Movement,
f. Parking requirements,
j. Loading/ Unloading,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 68 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
k. Traffic existing control and the type of additional controls required,
7.21.12. In case of transporting bulky, oversized, overweight or special large loads, objects
or materials, consider the following safety precautions:
a. Plan the transportation route in advance with local authorities and traffic police,
considering the size, weight, and dimensions of the objects/materials.
b. Verify that the chosen route can accommodate the load without obstructions or
structural limitations.
c. Coordinate with local authorities and traffic police for traffic management,
including road closures, detours, or lane restrictions as needed.
d. Ensure that all necessary permits and approvals for oversized or overweight
loads are obtained from relevant authorities including the traffic police.
e. Ensure that all personnel involved in the transportation process are trained in
safety procedures and emergency protocols.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 69 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
j. Monitor weather conditions and postpone transportation if adverse weather,
such as high winds, fog, smog or heavy rain, poses a safety risk.
k. Establish clear communication between the driver and any escort vehicles or
personnel involved in the transport. Use two-way radios or other
communication devices as necessary.
o. Ensure that the load is evenly distributed to prevent overloading one side of the
vehicle, which can lead to vehicle instability. Center the load on the trailer to
maintain balance.
p. Display oversized load signs, flags, and warning lights to alert other drivers on
the road.
q. Continuously monitor the load and the transport vehicle during transit to
identify and address any safety concerns promptly.
7.22.2. The company shall apply Task Risk Assessment (TRA)/ Job Safety Analysis (JSA) or
Job Hazard Analysis (JHA) as per job plan or method statement to all activities that
are not covered by a standard operating procedure such as projects, modifications,
repairs & maintenance, testing, inspection and turnaround in the existing
operational facilities. The TRA/JSA is a systematic approach to identify and analyze
potential hazards in performing a specific maintenance job/ work activity to
eliminate or reduce these hazards and the risk of a workplace injury or illness.
- Cutting or Welding
- High risk activities involving crane lifts such as use of crane suspended man
baskets, tandem lifts, night-time lifts, limited access situations, near overhead
power lines, etc.
- Activities where a person is required to use any fall arrest system, safety
harness/ safety net.
- Tasks where the hazards and control measures need to be formally assessed.
- Non-Routine Tasks or tasks that are being carried out in unusual or new
circumstances.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 71 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
and/or PPE need assessment study to provide protection from hazardous unsafe
conditions.
7.23.2. Personal Protective Equipment (PPE) and Tools & Plants (T&P) shall meet the
relevant local standards/specifications requirements. If local standards or
specifications are not available, PPE shall comply with the most recent version of
ANSI, ASTM, IEEE, IEC, NFPA or an equivalent engineering standard or specification.
If any part of the local standards or specifications conflicts with ANSI, ASTM, IEEE,
IEC, NFPA standards, or only partially defines the criteria or specification, company
should follow the International Industry standard with a proper justification.
7.23.3. Maintain list of approved stock and non-stock safety items including PPE with
material description and model number.
7.23.5. Identify task specific PPE in Task Risk Assessment/ JSA/ Permit to Work.
7.23.7. Each staff member is responsible for inspecting his/her PPE before each use. They
should promptly notify their Line Superintendent/Supervisor if the PPE is lost,
defective, damaged, or in need of replacement due to normal wear and tear. Any
PPE requiring replacement should be presented to the Line
Superintendent/Supervisor. Any expired, defective, or damaged PPE shall be
promptly removed from service and disposed of correctly.
7.23.8. PPE shall be stored and maintained in a safe working condition after completion of
work.
7.23.9. Individual PPE, is issued to individuals and their care is the responsibility of the
individual.
7.23.10. Individual PPE should be issued only to technical staff working in the field and
should not be issued to individuals working in an office-based setup, irrespective of
his/her service cadre. If an office-based individual needs to visit a construction,
operation, or maintenance site, they may use PPE from the common pool.
7.23.11. In the first month of fiscal year, the following individual PPE shall be issued in
accordance with the issuance frequency.
7.23.11.3. A minimum of one non-conductive safety helmet with chin strap shall
be issued every five (5) years. Material should be fully dielectric, no
metal parts, non-vented, helmet material polyethylene/ polycarbonate,
other plastic materials stabilized against degradation from ultraviolet
radiation, 6 or 4 point suspension, adjustable type, helmet intended to
reduce the danger of exposure to high voltage electrical conductors.
Head Protection shall be used with strap when working at height above
1.8 meter/confined space.
7.23.12. Common Pool PPE shall be managed by each sub-division/section. Common Pool
PPE shall be issued on a temporary basis and shall be returned to the store or
designated location upon job completion. PPE cleaning is the user's responsibility.
7.23.13. Common Pool PPE/ safety items should include one or more of the following:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 73 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
g. Dielectric hand gloves and sleeves made of natural latex rubber, with a
thickness ranging from 0.5 to 2.9 mm, offer protection against voltages up to
36,000 volts.
h. The date of the dielectric electrical test made at the end of production is placed
on every hand gloves and sleeves bag, as well as a lot number to ensure
product traceability. Gloves and sleeves should be inspected for any visible
damage or after any action that may have caused damage. Hand gloves that
are used frequently should be tested at intervals not exceeding 6 month and
sleeves should be tested at intervals not exceeding 12 months. Hand gloves
that are used only occasionally should be tested after each use and, in any
case, at intervals of not more than 12 months. Hand gloves and sleeves held in
stock should be re-tested at intervals not exceeding 12 months.
j. Conductive PPE for live line/circuit such as conductive shoes, conductive socks,
conductive gloves, conductive trousers, and conductive shirts for involved
working voltage. It is not recommended to use foot powder with protective
conductive footwear since foot powder provides insulation and reduces their
conductivity.
l. Use drop toolkits to prevent tools from falling to the ground from a height.
m. Arc Flash Kit for Arc Flash Protection such as Category-4 Arc Flash Resistant
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 74 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Suite, Arc Flash Hood Arc-rated Gloves and Arc-rated Fall Protection while
working on high voltages (more than 420 V). The Arc Flash Kit Category-4
provides maximum protection for workers performing tasks such as:
r. Full body safety harness with front work positioning belt (positioning lanyard)
along with double lanyard for 100% tie shall be used at height more than 6
feet/1.8 meter above the ground when climbing poles, towers and structures
including working through mobile elevated aerial platform, man-baskets, man-
lift or bucket mounted vehicles. Full body safety harness with front work
positioning belt along with double lanyard is to allow an employee to be
supported on an elevated vertical surface such as a wall or pole and to work
with both hands free. The use of a lineman body belt (positioning belt) for fall
arrest or a full body safety harness with a single lanyard is strictly prohibited.
When working in explosive or electrically conductive environments, use a Full
Body Harness with PVC coated hardware or made from non-conductive
materials like synthetic fibers or specialized fabrics with anti-static properties
to minimize the risk of static discharge. Anchor the safety harness lanyard on
a rigged anchorage point at height, having fall clearance safety factor two (02)
feet from impact level or ground level. The replacement frequency for full body
safety harness, positioning ropes, lanyards, and fall arresters shall be every five
(5) years.
s. Suspension Trauma Strap especially for work at height for long hours, in case
of emergency the worker can stand on his/her feet on it to prevent trauma till
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 75 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
he/she is rescued.
t. Use self-retractable lifelines (SRL) when working in elevated areas such as roof
top.
x. Other task specific PPE could be, hot stick, portable earthing/ grounding/
bonding and short set, earth resistance tester, megger tester, gum boot, air
supplied helmet for chemical sprays or grit blasting, PVC Shoes, life line,
portable gas detector, particulate masks, half or full face Respirator (cartridge
masks as per MSDS, SCBA, supplied air breathing Apparatus), Bunker Gear, Ear
Plugs/Muffs, Rain Coat, PVC Disposable Coverall, Rubber/PVC Apron, fire
blanket, Face Shield, Safety Goggle, Welder’s Shield, well-fitted gloves (Cut
Resistance, Pinch Resistance, Heat Resistance, Cryogenic, Welder Gloves,
Electrical Gloves, Chemical Gloves as per MSDS, Rubber or Plastic acid-
resistant chemical gloves with elbow-length gauntlet), portable eye wash,
Non-Sparking Tools, flame-proof light, explosion proof low voltage (24v)
lighting, Aluminized suit for pyrophoric chemical handling, Long boots, Snake
catcher Rod, Anti-Snake Repellent Powder, Warning Tapes/ Cones, Warning
Sign, non-conductive measuring tape/ stick and ruler, Reflective Vest for
worker visibility, Lifejacket, etc.
7.23.14. Individuals using PPE, tools, equipment, or insulated cables may receive a fatal
electric shock if the voltage exceeds the dielectric strength of the PPE, tools,
equipment, or insulated cables. Thus, it's crucial to use non-conductive PPE, tools,
plants, and earthing/ grounding/ bonding sets according to the rated voltage.
7.23.15. Don't wear gloves/loose clothes around moving machinery such as drill presses,
mills, lathe, grinder, etc.
7.23.16. Long hair must be securely tied back or restrained to prevent it from getting caught
in machinery or other moving parts. Avoid wearing jewelry, particularly rings, as
they can become caught in moving machinery or equipment.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 76 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.23.17. The company should establish clear instructions or add in relevant SOP that when
and where these PPE should be used and communicate these effectively to all
relevant workers on its facilities.
7.24.2. Install and maintain fixed earthing/grounding system for all equipment’s, exposed
metallic structures/ poles, stay wires/braces and both H-Type and Spun Type
concrete poles that contain a reinforced iron bars, having designated point for the
connection of earthing/grounding. Poles are grounded or earthed for several
important reasons related to electrical safety, system reliability, and protection
against electrical faults. In the event of a fault, such as a short circuit, electrical
current can flow through the pole and into the ground. Earthing of the pole provides
a safe path for the fault current to dissipate into the earth, reducing the risk of
electrical shock hazards to personnel and nearby structures. Poles can also serve as
lightning rods, attracting lightning strikes during thunderstorms. Therefore, proper
earthing of the pole helps dissipate the electrical energy from lightning strikes
safely into the ground, reducing the risk of damage to the pole and associated
equipment, as well as the risk of fire. Earthing of the pole stabilizes the electrical
potential of the pole and the surrounding area. This can help prevent potential
differences and voltage gradients that could lead to electrical arcing, equipment
damage, or electrical interference in nearby facilities. In some cases, electrical
systems may produce stray currents that can affect nearby structures, pipelines, or
communication cables. Grounding the poles diverts these stray currents safely into
the ground, preventing corrosion or interference with other systems.
7.24.3. Although Glass Fiber Reinforced Polymer (GFRP) poles are non-conductive, any
conductive components mounted on the pole, such as transformers, metal cross
arms, and lightning arrestors, should be properly grounded. This grounding
provides a path to earth for lightning strikes and surges, protecting both the
equipment and the surrounding area, and reducing the risk of electrical shocks and
fires.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 77 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
HT/LT structures/ poles shall be not more than 5 Ohms and Distribution
transformer shall be not more than 2.5 Ohms to determine the integrity of the
grounding path to ensure protection from shock hazards. The earthing resistance
for Grid Station/ Substation/ switchyard equipment shall be not more than 2 Ohms.
7.24.5. Verify integrity of fixed earthing/ grounding by continuity test and resistance
measurement. In general, this cycle can range from 6 months to 3 years, depending
on conditions and criticality. Wet locations testing should be 12 months and critical
care shall be 6 months. Provide name plate/ tag to all structures/ poles/
equipment’s with numbers for tracking of earthing/ grounding testing record, etc.
Original record of testing with structures/ poles/ equipment’s numbers shall be
retained and preserved by the company for three (03) years.
7.24.6. Before working on circuits and apparatus, identify task specific PPE in Permit to
Work.
7.24.7. Dry insulated stick/ rod, tools and PPE shall be used for applying and removing the
earthing connection to lines or equipment.
7.24.8. Follow safety procedure/SOP with required PPE to ensure safe execution of the job
when it is confirmed that there is no induced voltage exists at the maintenance
worksite or where workers work at an electrically safe distance outside the
boundary of induced voltage.
7.24.9. Workers shall maintain an appropriate minimum working safe distance from
uninsulated live conductors/ energized apparatus at all times with required PPE to
obtain the safest work environment and adequately to protect against electrical
shock or burns.
Specialized Electrical
Electrical Worker with
No. Voltage AC General Public Worker with Required
Required Electrical PPE
Electrical PPE
400 Volts
1. 3 Meters (10 Feet) 1 Meters (3.5 Feet) 0.3 Meter (1 Feet)
and below
2. 11 kV 3 Meters (10 Feet) 1.5 Meters (5 Feet) 0.7 Meter (2.2 Feet)
3. 33 kV 3 Meters (10 Feet) 1.8 Meters (6 Feet) 0.8 Meter (2.9 Feet)
4. 66 kV 3 Meters (10 Feet) 2.5 Meters (8 Feet) 1 Meter (3.5 Feet)
5. 132 kV 3.4 Meters (11 Feet) 3 Meters (10 Feet) 1.2 Meters (3.9 Feet)
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 78 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
6. 220 kV 4 Meters (13 Feet) 4 Meters (13 Feet) 1.7 Meters (5.6 Feet)
7. 500 kV 5.8 Meters (19 Feet) 5.8 Meters (19 Feet) 3.6 Meters (11.8 Feet)
Note-1: Distances listed are for standard conditions, extra care must be taken, if standard
conditions do not exist.
Note-2: An Electrical Worker received general electrical training, performing routine tasks like basic
maintenance, repairs, and installations. They understands basic electrical principles, hazards, and
safety practices, and typically possess standard certifications or licenses for general electrical work.
They handles common electrical systems in residential, commercial, and light industrial settings.
These workers often works under the supervision of experienced or specialized electrical personnel
for more complex tasks.
Note-3: A Specialized Electrical Worker receives advanced or specialized electrical training, enabling
them to handle complex and high-risk electrical tasks. They possess in-depth knowledge of
advanced electrical concepts and high voltage safety protocols. Holding advanced certifications,
specialized licenses or specific training certifications in areas like high voltage systems, hazardous
locations, or specialized industrial machinery. They can work independently on complex
assignments, and handles specialized electrical systems in high-risk environments.
Note-4: A trained and authorized worker may "contact" live conductors/energized apparatus up to
33 kV using insulated electrical PPE. However, the worker must observe and maintain a minimum
safe working distance between any uninsulated part of his/her body and the live
conductors/energized apparatus. In cases where maintaining the minimum safe working distance
is not feasible, the trained and authorized worker shall be insulated or guarded by portable voltage-
rated portable rubber insulated floor mats, insulated working supports or blankets, rubber/plastic
plates, or any other non-conductive objects like plywood barriers that prevent accidental contact.
7.24.11. When it may not be possible to maintain the appropriate minimum distance, then
the adjacent circuit or circuits must be de-energized, OFF isolated, locked, tagged,
and grounded by opening circuit breakers, isolators and closing the earthing switch
at all ends of the connected grids.
7.24.14. All of the below precautions are applicable when a new monopole/tower/structure
is to be erected in hot zone along with an existing transmission line with in same
corridor.
7.24.15. The job steps shall be listed in the Method Statement/SOP/Job Plan, reviewed and
confirmed by all parties with precautions, and means of communication shall be
available at ground level as well as at high elevation.
7.24.16. Conduct a risk assessment or analysis for electric shock and arc flash to evaluate
and identify site-specific safety needs for electrical facilities, establish an arc flash
protection boundary, and provide recommendations for the safe execution of the
job. Arc-flash hazard warning and labeling shall be provided for electrical
equipment’s such as switchboards, panelboards, industrial control panels, and
motor control centers. If no arc flash analysis is available, then the default arc flash
protection boundary along with the appropriate PPE should be set at 1.2 meters (4
feet) for voltages ranging from over 420 V to 11 kV.
7.24.17. The associated risks near energized high voltage lines, and its appropriate
protection must be effectively communicated to all involved parties.
7.24.18. When planning the task, the worker's position in relation to the exposed circuit such
that planned movements of the worker’s body or conductive tools, material or
vegetation should not result in any encroachment upon these limits.
7.24.19. Power lines are made of metal, it expands and contracts when it is hot and cooled.
The conductors may become hot from high ambient air temperatures and/or from
excessive electrical load current passing through the conductors. Whatever the
cause, any expansion will result in gravity causing the power lines to sag. Power
lines can also swing from side to side due to wind. Due to this reason, hot zone limit
must be increased either vertically or horizontally, depending on how much the
conductor sags or swings.
7.24.21. Work shall not be performed in the following conditions at or near energized lines,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 80 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
– At night time,
– In adverse weather, or rain
– A situation in which visibility is obscured.
– When wind speed above 32 km/hr. (20 mph, 17.4/knots, or 9 meters/second).
– Temperature above 45°C.
– Excessive outdoor humidity in direct sunlight (heat index more than 52°C)
Heat index is calculated by using temperature and humidity together. There are
four categories of heat index: Caution (26 to 32°C), Extreme Caution (33 to 39°C),
Danger (40 to 51°C), and Extreme Danger (52°C or higher).
Note: Night time work may be allowed only if the parallel circuit is de-energized
and the above conditions are met, i.e. suitable weather, proper visibility, and
wind speed below 32 km/h.
7.24.22. Only authorized, trained, experienced, and medically & physically fit
employees/contractors shall enter in the hot zone with necessary level of personal
protection (PPE) to perform specific maintenance task against approved “Permit to
Work” under the continuous direction and supervision of the site job in-charge to
monitor compliances with safe work procedures. Authorized
employees/contractors shall have electrical knowledge and training to avoid
electrical hazards associated with work on or near exposed energized live parts or
conductor. Inexperience employee/contractor, trainee or apprentice can work
under the direct supervision of authorized employees/contractors, to gain the
necessary training and experience.
7.24.23. The site job in-charge shall be available at all times to resolve differences in the
work practices and opinions in order to ensure effective coordination at the work
site.
7.24.25. Ensure that all jobs are executed under safe and reliable condition and do not let
any unauthorized worker/contractor/sub-contractor/daily wage employees to
enter in the hot zone.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 81 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.24.26. Identify and verify the exact location/correct circuit to be worked in the field by the
site job in-charge before starting the job to avoid any contact with the energized
line.
7.24.28. Suitable barriers shall be erected around the work area at ground level at minimum
safe distance (safe zone) boundary from the monopole/tower/structure.
7.24.29. A staging area shall be established in the safe zone at upwind or crosswind
direction, outside the barricaded area of hot zone for maintenance planning &
operation, workers, their rest area and heavy equipment’s parking.
7.24.30. In order to identify the safe zone boundary, warning tape and cones must be used
at ground level when working near energized overhead power lines.
7.24.31. Employees shall not reach blindly into areas containing exposed electrical
conductors or circuit parts where an electrical hazard exists.
7.24.32. When entering and working in hot zone, personal protective equipment must be
worn.
7.24.33. A standby man shall be deployed in a safe zone who is trained and competent to
perform his/her task. He must know emergency procedure and to control
unauthorized visitors and vehicles into the restricted hot zone/barricaded area.
7.24.34. The standby man shall control and allow workers as per plan to enter the hot zone
once the grounding system has been applied and all personal protective equipment
has been worn.
7.24.35. A standby man shall have no other duties that could distract him from monitoring
the work continuously.
7.24.36. In case of unsafe conditions, unsafe behavior of entrants, or any other situation
that could endanger entrant’s life, the standby man shall order them to evacuate
the area.
7.24.37. Standby man shall remain at his/her post until relieved by a qualified replacement
who is familiar with the job, or until all entrants have exited the hot zone. If he must
leave the area and no other standby man is provided, all entrants must exit the hot
zone.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 82 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.24.38. Standby man shall request concerned supervisor for additional standby man, if
required.
7.24.39. Wear high voltage insulated electrical rubber hand gloves and sleeves for the rated
voltage for protection against potential energization of the line or
monopole/tower/structure or back-feeding from consumer double supply lines,
generators, UPS systems, stored charges from capacitors, lightning strikes, or
induced voltage from conductors/ cables/ transformers.
7.24.40. Discard electrical rubber hand gloves from service whose shelf life is expired.
Electrical gloves are made of natural rubber, which is derived from the latex of
plants. Natural rubber has a shelf life of three (3) to five (5) years, depending on the
weather and the usage conditions.
7.24.41. Conduct periodic inspection and dielectric testing of in-service insulated electrical
rubber hand gloves. Rubber insulating gloves must be tested before first issue and
every six months thereafter or when showing any signs of defects upon inspection.
Write the date of next re-testing on the gloves pair with permanent marker. The
"first issue" mean when the new gloves are removed from their original,
manufacturer's packaging.
7.24.42. Insulating sleeves shall be worn with insulating gloves in case exposing the
employee elbow and upper arm to contact with other energized parts for
protection against potential energization of the line or monopole/tower/structure
or back-feeding from consumer double supply lines, generators, UPS systems,
stored charges from capacitors, lightning strikes, or induced voltage from
conductors/ cables/ transformers.
7.24.43. Insulated Electrical Rubber Hand Gloves and Sleeves, Class 00 (Maximum AC
500V/DC 750V), 0 (Maximum AC 1000V/DC 1500V), 1 (Maximum AC 7500V/DC
11250V), 2 (Maximum AC 17000V/DC 25500V), 3 (Maximum AC 26500V/DC
39750V), 4 (Maximum AC 36000V/DC 54000V) for involved line or induced voltage.
Leather gloves shall be worn over insulated rubber gloves to provide the required
mechanical protection. The gloves shall not be used when damp.
7.24.44. Use a Full Body Harness along with double lanyard with PVC coated hardware or
made from non-conductive materials like synthetic fibers or specialized fabrics with
anti-static properties to minimize the risk of static discharge, when working in
height in explosive, electrically conductive environments, live line or when
protection is required against potential energization of the line or
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 83 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
monopole/tower/structure or back-feeding from consumer double supply lines,
generators, UPS systems, stored charges from capacitors, lightning strikes, or
induced voltage from conductors/ cables/ transformers.
7.24.45. Wear high voltage insulated electrical (dielectric) safety shoes (non-metallic and
non-magnetic) with titanium or composite toe for the rated voltage instead of
normal safety shoes (steel toe) to avoid step potential hazards when working in an
electrically conductive, live line or when protection is required against potential
energization of the line or monopole/tower/structure or back-feeding from
consumer double supply lines, generators, UPS systems, stored charges from
capacitors, lightning strikes, or induced voltage from conductors/ cables/
transformers.
7.24.46. Do not use muddy shoes when climbing up, there is a risk of slipping.
7.24.47. When protection against arc flash is required as per risk assessment/JSA then use
arc flash kit while working on high voltage at energized/live line more than 420V.
7.24.48. Electrical rubber hand gloves and sleeves shall be stored in approved protective
bags in a cool, and dry location out of the sun. The items shall not be directly placed
on the ground, as they must be kept free of dirt and moisture.
7.24.49. When electrical rubber hand gloves and sleeves have been in service for a long time
(such as overnight), it must not be expected to provide appropriate protection.
Such items must be removed, inspected, and cleaned before being used again. If
suspected, they must be sent for electrical tests.
7.24.50. Rubber gloves must not be worn inside out. They must not be worn without
approved leather gloves. Leather gloves must never be used for any other purpose.
7.24.51. Use insulated tools, platforms and equipment. Insulated tools could be made of
fiberglass-reinforced plastic or appropriate material when working in an electrically
conductive, live line or when protection is required against potential energization
of the line or monopole/tower/structure or back-feeding from consumer double
supply lines, generators, UPS systems, stored charges from capacitors, lightning
strikes, or induced voltage from conductors/ cables/ transformers.
7.24.52. Tools and telescopic hot stick must be approved and tested according to the rated
voltage of the line. Test dates must be clearly marked and never exceeded.
7.24.53. In an electrically conductive/ live line, metal rulers, measuring tapes, or wire
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 84 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
reinforced fabric tapes must not be used.
7.24.55. Under-rated tools or apparatus must not be used in the hot zone.
7.24.56. Use weatherproof Ground Fault Circuit Interrupters (GFCIs) in wet and damp areas
to prevent electrical shocks at construction sites or while using portable electrical
tools unless the voltage is 12 volts or less.
7.24.57. Employees/contractors must not touch tools or any conductive materials with bare
hands in the presence of induced voltage in the area.
7.24.58. Drop toolkits shall be used to prevent tools from falling from a height. The standby
man shall monitor and ensure that no one is underneath the worksite.
7.24.59. Each tool and piece of equipment must be inspected for mechanical and electrical
strength and wiped clean before use.
7.24.60. All parties involved in working must understand the risks of falling/touching tools
on nearby live circuits and shall take appropriate precautions.
7.24.61. Tools shall not be used on energized lines or near energized lines, or on energized
equipment unless workers have been properly trained to use such tools.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 85 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
A person touching heavy equipment (touch potential) or standing near heavy
equipment while touching the ground (step potential) could be electrocuted.
Grounding and bonding provide an additional layer of protection to safely dissipate
any electrical charge that might be transferred to the heavy equipment protecting
both the equipment and nearby personnel from various electrical risks.
7.24.63. All rubber protective equipment, tools, and equipment shall be thoroughly
inspected before each use and whenever damage is suspected. If any tools or
equipment show signs of damage, they must be taken out from service and
disposed of immediately.
7.24.64. In an electrically conductive, live line, grid station, substation, switch yard or in
presence of induced voltage, conductive items such as metallic coins, metal-framed
glasses, jewelry, watches, watchbands, bracelets, rings, key chains, necklaces,
metallic belt buckle, metal headgear, metalized aprons, or cloth stitched with
conductive thread shall not be worn or carried.
7.24.65. Ropes, slings, taglines, hand-lines and other tackle shall be of non-conductive
material/insulated used at or near energized lines and equipment, and must not be
used for any other purpose. It must be kept clean, dry, and free of foreign
substances.
7.24.67. Crane Lift Plan shall be prepared by an experienced, trained and authorized Crane
Rigger and crane operation activity shall be supervised by the Crane Rigger against
an approved Permit to Work. Warning signs shall be posted on cranes and heavy
equipment regarding the minimum clearance.
7.24.68. In the hot zone, only authorized operators shall enter and operate certified
insulated heavy equipment’s, cranes, and aerial devices.
7.24.69. When a boom or load is within 20 feet of an energized circuit, the heavy
equipment’s, cranes, man lift and aerial devices must be grounded.
7.24.70. Ground workers must stay away from cranes, heavy equipment, and aerial devices
that have booms or buckets in the vicinity of lines, or apparatus that could be
energized due to induced voltage.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 86 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.24.71. The ground workers who are required to approach heavy equipment, cranes, or
aerial devices must use insulated electrical (dielectric) overshoes because they
could be subjected to step potential during a fault.
7.24.72. Ground workers must communicate effectively with those in the bucket to ensure
that ground workers are clear when work is performed in the hot zone.
7.24.73. In the hot zone, employees/contractors shall not perform housekeeping near
energized electrical conductors and circuit parts or where induced voltage can
cause injury unless adequate safeguards are provided to prevent electrical shock.
7.24.74. In the hot zone, conductive cleaning products, such as steel wool, metalized cloth,
and silicon carbide, as well as conductive liquid solutions shall not be used unless
adequate safeguards are provided to prevent electrical shock.
7.24.75. The company shall implement and document a system to verify that all established
requirements in this paragraph are met. If it is observed that deviations and/or
violations are present, the company shall determine and implement adequate
actions to prevent and rectify these deviations and/or violations.
7.25.2. The working circuit must be de-energized, OFF isolated, locked, tagged, and
grounded by opening circuit breakers, isolators and closing the earthing switch at
all ends of the connected grids.
7.25.3. When a circuit is isolated, live conductors/apparatus act as capacitors, storing
electrical charge. Even after isolation, this stored energy may discharge when a
worker touches the isolated conductors/apparatus, potentially causing an electric
shock.
7.25.4. The temporary grounding or bonding will be placed at such locations so that each
worker is protected from hazardous voltages. After this confirmation from the
authorized personnel, the work can be performed.
7.25.5. The temporary grounding wires for 400 Volts and below, 11 kV and 33 kV lines, shall
be connected to the temporary grounding rod inserted into the ground to a depth
of at least 1 meter, and should be placed preferably 6 meters away from the point
of work and, inside the barricaded area, where no one is present or able to touch
it. In case of high voltage lines such as 66 kV, 110 kV, 132 kV, 220 kV, and 500 kV
lines, the temporary grounding wires shall be connected to the transmission
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 87 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
structure grounding points.
7.25.6. Portable grounding leads, and clamps must be capable of conducting the maximum
fault current possible at the work location for the duration needed to clear the fault.
7.25.7. De-energized lines and equipment must be treated as live in the absence of proper
grounding.
7.25.8. The protective grounding system, which includes conductor ground and bonding
leads, must be engineered to protect workers from hazardous voltages that can be
created by line reenergizing, lightning strikes, or induced voltage.
7.25.9. If more than one crew is working independently on the same de-energized line or
circuit, each crew must have single-point protective grounds installed to create an
equipotential zone at each work location.
7.25.10. Isolate the line from all possible power sources in the electrical network and install
portable temporary grounding/earthing on both sides of the work area as close as
possible. Ground all conductors, including the neutral and stay wires, that may be
approached and touched during the work.
7.25.11. Single-point grounding shall be applied because it generally yields the lowest
potential difference in the work zone and because it usually requires less grounding
equipment and effort to install. Single-point grounding involves installing one set of
grounds at the work location between the conductors, the system neutral (if one
exists), and the ground (which may be a tower or pole ground) to create a bonded
work zone that will remain at a near identical state of electrical potential, hence the
term "equipotential zone."
7.25.12. When applying single-point temporary grounding, first connect the ground clamp
of grounding lead to monopole/tower/structure/stub, and then connect the
contact clamp to isolated/de-energized line. While for removing temporary
grounding, first remove the contact clamp from isolated/de-energized line and then
remove the ground clamp from the monopole/tower/structure/stub.
7.25.13. Provide training to its employees and contractors on how to correctly install
conductor grounds and bonding for the involved voltage rating to mitigate the
electrical shocks.
7.25.14. Workers shall not start work on the de-energized lines until isolation, lockout, and
tagout procedures have been completed, and a work permit has been issued. Use
a contact or non-contact voltage tester, detector or beeper to confirm that the line
is dead. Alternatively, worker shall carry a personal or proximity voltage detector
(with voltage ranges from 120VAC to 500kV) all the time while working to detect
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 88 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
induced voltage from adjacent conductors or circuit, particularly if the earthing
clamp is loose or not electrically connected.
7.25.15. Provide temporary earthing on both sides of the line, whether it is high tension (HT)
line or low tension (LT) line, to safeguard against potential energization of the line
or monopole/tower/structure or back-feeding from consumer double supply lines,
generators, UPS systems, stored charges from capacitors, lightning strikes, or
induced voltage from conductors/ cables/ transformers. When necessary, use
rubber electrical gloves, rubber sleeves, and a full-body safety harness (PVC coated)
with a positioning belt along with double lanyard for work at heights.
7.25.16. Grounding cables shall meet the requirements of the IEC 61230 Standard.
7.25.17. Hazardous induced voltage is present all the time around the de-energized line,
monopole/tower/structure and at worker worksite even after installation of
conductor grounds and bonding therefore the conductor grounding and bonding
must be effective and intact while work is being performed to provide maximum
protection to workers.
7.25.18. In any case, temporary grounding clamps must be secured and cannot be detached.
7.25.19. The temporary grounding must be short circuit proof and electrically connected to
the work object.
7.25.20. Whenever two lines need to be connected to each other, temporary grounds shall
be installed on each line section to drain inductions.
7.25.21. When equipment and conductors are grounded, currents related to induce voltage
will circulate to ground. Installed grounding sets at different locations can create a
hazardous condition, therefore they shall be barricaded to prevent step or touch
potential.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 89 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.26.3. Work on or handling of any energized electrical conductor, bus bar, etc. up to 36
kV, shall not be permitted without an approved insulated tools, instruments or
handle unless one of the following conditions is met:
a. The employee is insulated or guarded from the energized part. (Insulated gloves
with sleeves rated for the voltage involved shall be considered for insulation of
the employee from the energized part.) Don’t only wear leather (non-insulated)
gloves when working on energized lines. Insulating sleeves shall be worn with
insulating gloves in case exposing the employee elbow and upper arm to contact
with other energized parts.
7.26.4. The hazard of falling/ touching of tools on live circuits/ breakers shall be understood
by all concerned and appropriate precautions shall be taken.
7.26.5. If work is to be done on energized electrical conductor, bus bar, etc., effective
supervision of site senior in-charge shall be ensured.
7.26.6. Identify task specific PPE in Permit to Work especially Category 4 Arc flash resistant
suite, Arc flash hood, Arc-rated gloves and Arc-rated Fall Protection while working
on high voltages (more than 420 V).
7.26.7. Hazards and appropriate protection for work on live circuits shall be effectively
communicated to all concerned involved in the job.
7.26.8. The company shall implement and document a system to verify that all established
requirements in this paragraph are met. If it is observed that deviations and/or
violations are present, the company shall determine and implement adequate
actions to prevent and rectify these deviations and/or violations.
7.26.9. When working on live line/circuit more than 36 kV, live line conductive PPE shall be
used all the time in hot zone to offer protection against electrical shocks such as
conductive shoes, conductive socks, conductive gloves, conductive trousers, and
conductive shirts. It is not recommended to use foot powder with protective
conductive footwear since foot powder provides insulation and reduces their
conductivity.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 90 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.26.10. When working on live line, wear PVC coated full body safety harness for fall
protection along with double lanyard for 100% tie to be attached with strong point
while climbing and working on the height more than 6 feet/1.8 meter above the
ground or impact level.
b. Trained First Aider(s) with first aid kit shall be available at all times in the safe
zone to assist rescue efforts in the safe zone, when required.
c. No one shall respond to any incident unless he is trained and he has appropriate
PPE for the incident.
Make sure everyone is at least 6.1 meters (20 feet) away from the fallen line.
Use flag man to protect motorists, spectators, and other individuals from
fallen or low wires.
7.27.2. The Distribution Company shall arrange sufficient quantity of spare distribution
transformers for immediate replacement of damaged transformer and to get
enough time for proper repair and testing through manufacturer's facility, the
Distribution Company's own workshop, or an authorized private workshop.
7.27.4. A fitness certificate for electrical equipment and transformers shall be issued upon
delivery of the repaired equipment and transformer and the certificate shall be
retained and preserved at the relevant sub-division or office.
7.27.5. The Distribution Company shall establish and maintain at least one transformer
workshop in each district within its jurisdiction, either the Distribution Company's
own workshop or an authorized private transformer workshop, equipped with all
necessary repair and testing facilities in accordance with NTDC or company
specifications.
7.27.6. The Distribution Company shall make sure that no transformer repairs are carried
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 92 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
out in unauthorized transformer workshops.
7.27.7. During repairing of transformer, workers shall empty their pockets of lose articles
such as mobiles phones, knives, keys, and watches. Do not allow tools, bolts, nuts,
or similar objects to drop into the transformers.
7.27.8. The Distribution Company shall adjust the transformer's output voltage using the
transformer tap changer to provide 220 Volts ± 5% to the consumer, in accordance
with PSDR 2005. The voltage must not fall below 209 Volts as stipulated in PSDR
2005. If the transformer tap changer is defective or unavailable, the Distribution
Company shall replace the faulty transformer at no cost to the consumer and adjust
the tap changer accordingly to ensure the consumer receives the appropriate
voltage of 220 Volts ± 5%.
7.27.10. Install the LT breaker on the low voltage side of the distribution transformer, either
close to the transformer, within a distribution panel, or in an outdoor enclosure,
along with appropriately sized and rated HT link fuses. The LT breaker shall provide
immediate protection to the transformer and downstream circuits by quickly
isolating the circuit in the event of an overload, short circuit, or other electrical
faults originating from the consumer's side.
7.27.11. Only fuses with correct standard size and rating shall be used for transformers to
protect human and animal lives. Substandard or "rora" type fuses are strictly
prohibited.
7.27.12. Distribution Company shall regularly assess the loading position of the distribution
transformers and take appropriate measures in form of augmentation of
transformers to prevent overloads, breakdowns, and potential accidents.
d. When replacing fuses on the high voltage side of transformer, all possible
secondary load shall be removed.
e. Insulating tongs, similar to insulated switch sticks shall be used to remove and
install fuses.
- Job Safety Analysis shall be carried out before carrying out the job.
b. Liquid-Immersed Transformer.
- Insulating oil shall be handled and stored where it will not be exposed to
temperatures approaching the ignition point.
- Static charges can be developed when transformer oil flows in pipes, hoses,
and tanks. Oil leaving a filter press may be charged to over 50,000 volts.
Filter press, metal hoses, and tanks shall be grounded during oil flow into
any tank to accelerate dissipation of the charge in the oil.
- After any oil filtration work, the accumulated air on the transformer shall
be released by opening the Buchholz relay vent after the transformer is
cooled down.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 94 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
the unit is filled under vacuum the time period can be shortened to 1 hour,
and when small quantities of oil are added in such a way as to eliminate the
formation of air bubbles.
- Precautions shall be taken to avoid developing static charges from oil flow
in pipes, hoses, and tanks.
a. Inspect the temporary transformer trolley, and associated parts for any visible
damage. Do not proceed with installation if you notice any issues.
b. Get PTW and provide temporary earthing on HT and LT line from both sides.
c. Place temporary transformer trolley at proper level and stable location. It should
be free from water accumulation, flammable materials, and potential
contaminants. Clear the area of any obstacles or debris that could impede
installation or maintenance.
d. Install the transformer trolley at a safe place on the side of the road to avoid
traffic/pedestrian congestion.
f. Earth the neutral of the transformer trolley with current earthing of the faulty
transformer.
g. Earth the body of the trolley of temporary transformer with the current earthing
point of the faulty transformer body.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 95 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
h. Earth the trolley by connecting it to the same earthing of the faulty transformer
and ensure that the earthing is correctly installed.
k. Temporary transformer trolley shall have proper fuses having standard size and
rating.
m. Maintain proper clearances around the transformer to allow for airflow and heat
dissipation.
7.27.16. The network owner is responsible for overseeing the inspection and maintenance
of in-service conductor/utility cable management at every pole/structure within
their service territory and jurisdiction. It's essential to maintain proper clearance
between conductors and surrounding infrastructure. The Line Management,
Resident Engineer, and Sub-Divisional Officer shall ensure that all
conductors/cables are properly managed, in good condition, correctly tensioned,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 96 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
and free of defects. When slack loops of additional cable are present on the
pole/structure, they must be neatly and securely organized to avoid any potential
damage.
7.27.17. The Line Management, Resident Engineer, and Sub-Divisional Officer are
responsible for securing all consumer service cables with shackle insulator,
supports or clamps that are currently wrapped directly around the structure/pole
without shackle insulator, supports or clamps to keep consumer service cables
organized and ensure public and animals safety. Consumer service cables shall not
be directly wrapped around the structure/pole during new or re-connection. Over
time, the service cable insulation can deteriorate and puncture due to weather
conditions and wind exposure, leading to current leakage in the structure/pole and
posing a risk of injury to the public and animals.
7.27.18. All existing and new poles/structures more than 400 Volts and pole/structure
mounted transformers shall have prominently displayed and maintained "Danger"
sign to warn the general public about the risks of electrocution. These signs shall be
clear and easy to understand. Wording on the signs should be in Urdu, English,
and/or any language understood by the local community. The signs shall be placed
at height of 8 feet (2.5 meters), facing towards the direction from which individuals
are most expected to approach, and shall be readable at a minimum distance of 10
feet (3 meters).
7.28.2. Electrical energy isolation shall be conducted in compliance with the company
isolation SOP/Procedure such as locking out and tagging out of electrical switches,
circuit breakers, or other control devices including the opening of all relevant line
isolators, as well as the closure of earth switches.
7.28.4. Mechanical energy isolation shall be conducted in compliance with the isolation
SOP/Procedure by stopping, locking out and tagging out of all moving parts, such
as motors, engines, or rotating equipment by using of mechanical locks to prevent
movement including isolation of valves, clutches, brakes, rotating shafts, belts,
chains, gears, couplings, tensioning systems, pressure relief devices, hydraulic
systems, pneumatic systems, spring-loaded mechanisms, cams and other relevant
components.
7.28.5. All electrical circuit conductors and circuit parts shall be considered energized until
the source(s) of energy is (are) removed, electrical energy discharged and de-
energized through a mechanically secure connection to an effective ground
potential. Electrical conductors and circuit parts that have been disconnected, but
not under isolation, tested and grounded (where appropriate) shall not be
considered to be in an electrically safe work condition, and safe work practices
appropriate for the circuit voltage and energy level shall be used. Isolation
requirements shall apply to fixed, permanently installed equipment, temporarily
installed equipment and portable equipment.
7.28.6. To ensure electrically safe work conditions, the following steps must be taken:
a. Clearly identify the exact work area, including the tag number of the equipment,
pole, or structure.
b. Identify all potential sources of hazardous energy and define the working zone
limits.
c. Completely disconnect the network from all possible sources of hazardous
energy.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 98 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
d. Secure the network against reconnection by applying lock and tag.
e. Test and verify disconnection by using voltage tester, detector, or beeper
appropriate for the rated voltage to confirm that the line is dead.
f. Apply temporary earthing at all sides near to workplace to prevent back-feeding
from consumer double supply lines, generators, UPS systems, stored charges
from capacitors, lightning strikes, or induced voltage from conductors,
apparatus, or transformers.
g. Protect against adjacent live parts by utilizing voltage-rated PPE/T&P along with
portable rubber-insulated floor mats, insulated working supports or blankets,
rubber or plastic plates, or any other non-conductive materials as needed for
partitioning or shielding from potential electrical hazards.
h. Electrician/lineman shall carry a personal or proximity voltage detector (with
voltage ranges from 120VAC to 500kV) all the time while working to detect
induced voltage from adjacent conductors or circuit, particularly if the earthing
clamp is loose or not electrically connected.
7.28.7. In situation where it is not possible to lockout or cable/chain off an isolating device,
isolation may be accomplished by removal of fuses, disconnection of electrical
cables, or physical removal of component of the system supplying energy to the
equipment. The point of physical interruption should be identified with installation
and securely fastening of “Danger Card/ Tag – Do Not Operate or Remove Tag” with
purpose/ reason of installation, date and time of installation, isolating location/
equipment, Card/ Tag installer name, his/her badge number, contact number and
signature. No individual shall attempt to remove Danger Card/ Tag except installer,
after verification when it is safe to do so.
7.28.8. When the job or task is completed, the lock/tag installer must carefully remove
locks/tags from designated locations or points to avoid the inadvertent removal of
incorrect locks/tags, as doing so can lead to the introduction of hazardous
conditions.
7.28.9. Up-to-date drawings shall be considered a primary reference source for isolation
location. When up-to-date drawings are not available, the company shall be
responsible for ensuring that an equally effective means of locating all sources of
energy is employed.
7.28.10. All personnel who are performing isolation and de-isolation shall be experienced,
trained, competent and authorized.
7.28.11. All personnel who are required to actually do the electrical isolation shall wear
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 99 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
proper PPE to ensure safe switching Off & On and applying isolation.
7.28.12. No individual shall attempt to start, energize, use, or operate a piece of equipment
that has been isolated. The company shall implement lockout/ tagout (LOTO)
systems to prevent any accidental energizing of equipment.
7.28.13. Isolation is completed only when no associated control device, such as a push
button, control interlock or automatic start-up control circuit, shall have the
capability of energizing equipment.
7.28.14. Verification test shall be conducted on each isolating device and on each piece of
equipment isolated.
7.28.15. Sometimes de-energized circuits may become energized because of the following
reasons:
- Switching errors,
- Back feeding of current from any generating source i.e. Generator or UPS,
- Lightning strikes (All work on or near apparatus where a lightning strike may
cause personal injury should be suspended immediately),
7.28.16. Mechanical isolation of Vessels & Pipes can be achieved by any of the following:
7.28.17. The blind shall be of the manufacturer recommended thickness and material.
7.28.18. The blind rating must be equal to the pressure setting of the pressure relief valve
protecting the line or equipment.
7.28.19. If there is no pressure relief valve, then the rating must be equal to lowest rated
equipment in the system (most likely pipe flange).
7.28.20. Each blind must have a handle that can be easily identified.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 100 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.28.21. Prior to blind installation, the following documents need to be prepared:
7.28.23. Permit to Work issuer and receiver shall cross check between the Process and
Instrument Drawing (P&ID), blind list and the blind register before installation of
blinds.
7.28.24. The company shall establish and maintain systems to prevent the accidental
removal of safety systems that would lead to unsafe situations. These systems
include the implementation of lock out/ tag out (LOTO) systems.
7.28.25. When the job or task is completed, appropriate tests and visual inspections shall be
conducted before electric circuits or equipment are re-energized to verify that all
tools, mechanical restraints and electrical jumpers, short circuits, and temporary
protective grounding equipment have been removed, so that the circuits and
equipment are in a condition to be safely energized. All workers involved in these
activities shall acknowledge that they have completed their work and understand
that the system will be energized.
7.28.26. Operation staff shall physically verify the removal of blinds in field and update the
blind register accordingly.
a. The hazards associated with the activities can result in immediate danger to life
or health (i.e., lost time injury, disability or death) of personnel involved in work
and/or other personnel in or around the facility.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 101 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
d. Permit to Work shall be applied for all critical activities such as but not limited
to; welding, cutting, grinding, maintenance and repair electrical apparatus, de-
energized/ energized activities, hydro-jetting, lifting, work at elevated areas,
confined space entry, excavation, equipment/line opening and any other activity
as defined by company.
h. PTW Receiver shall specify personal protective equipment (PPE) in the PTW and
PTW Issuer shall verify in accordance with SOP/JSA/MSDS for the
“Equipment/Line Opening Permit,” which may include goggles, face shields,
boots, rubber gloves, coveralls, aprons, hoods, canisters, or SCBA sets. It is
mandatory to wear SCBA whenever toxic gases are likely to be released.
i. Permit to Work shall be issued and received only by trained and authorized
Permit to Work Issuer & Receiver. Company shall establish specific training
requirements for these functions as well as maintain a list of staff who is
authorized to act as a permit to work issuer or receiver.
j. Permit to Work shall cover all hazards, PPE requirements, Exact Work Location,
Apparatus/ equipment number, Job/ Work Order Number, Work Description,
Isolation/ Lockout/ Tagout application, Barricade at job site, job briefing with all
involved person including discussion of any job-related hazards. A Permit to
work is only valid for the time and date as specified on the permit.
k. All internal and external affected parties shall be informed in writing or get
counter signature on permit to work for necessary precautions before issuing
permit to work.
l. Permit to Work Issuer must confirm that the necessary safety precautions are in
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 102 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
place before issuance of PTW and commencement of work. Additionally, he
should conduct periodic visits to the work site to ensure ongoing compliance
with safety protocols.
m. Permit to Work Receiver shall obtained a copy of the Permit to Work and shall
keep it at the work site.
n. Permit to Work Receiver must remain vigilant and keep an eye on worker to
prevent unsafe acts/violations. In case of non-compliance or if the worker is
taking short cuts due to overconfidence and complacency, remove worker from
the team to save his/her live.
o. Permit to Work Receiver shall remain at work site continuously when the job
activities are in progress to adequately supervise the work till completion of the
work, however, if Receiver must leave the job site for any reason, for example
to obtain additional tools or equipment, tea/ lunch/ washroom break, or prayer,
etc., then an another Receiver that is certified and authorized can be delegated
to carry out the responsibilities of the Receiver during the remaining part of the
job or the job shall be stopped till break time and all workers shall be out of
designated job site/barricaded area. The delegated Receiver shall write his/her
badge number and sign the Permit to Work.
p. A receiver may receive more than one permit, if the jobs are under his/her direct
control span based upon the nature, hazards, and job criticality at one location
and on the same level where the receiver can monitor all activities and easily
see them visually to prevent any incident.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 103 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
s. Before energizing and starting operations, all Permit to Works must be
cancelled/closed by all the Issuers and Receivers.
7.30.3. All equipment’s and its accessories including outsourced equipment’s inspection
tags/certification for validity and physical condition shall be checked at main
gate/entrance prior to entering the facility. No equipment shall be permitted for
use without inspection tag within the facility.
7.30.4. Employee/ Contractor who use tools must be properly trained and authorized to
use, adjust, store and maintain tools properly. Electrical hand tools shall be properly
grounded or be of the double insulated type. All tools shall be free from defects and
maintained in good condition.
7.30.5. The number of accidents involving the use of tools can be reduced by following
basic safety principles:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 104 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Safety guards and face shield shall be used while operating power-driven
rotating tools.
7.30.6. Examples of Non-Powered Hand Tools; Hand tool is any tool that is powered by
hand, rather than a motor. Categories of hand tools include wrenches, pliers,
cutters, striking tools, struck or hammered tools, screwdrivers, vises, clamps, snips,
saws, drills and knives. Portable power tools are not hand tools.
7.30.7. Pliers, wrenches, etc., whether insulated or not, shall not be used without rubber
gloves while working near live parts.
7.30.9. Examples of heavy equipment are; heavy lifting, elevating, and mobile equipment,
bulldozers, skid mounted support equipment, excavators, cranes (all types),
tractor-scrapers, riggers, graders, below the hook lifting devices, wheel loaders,
wheel dozer (soil compactor), forklift, backhoes, personnel platforms/ man-
baskets/ man lift/ bucket mounted vehicles, elevating equipment, aerial platforms,
side boom tractors, overhead hoists, etc. including insulated aerial bucket, that
successfully passed dielectric testing of the insulated portion of the boom and
bucked.
7.30.10. Wooden pads shall be provided to all outrigger to evenly distribute weight,
minimizing the risk of surface damage underneath and preventing the crane or
bucket-mounted crane from toppling over.
7.30.11. The heavy equipment drivers/operator shall hold a valid government license/Heavy
Transport Vehicle (HTV) license, appropriate for the type and size of the heavy
equipment and shall be certified and trained for the equipment he/she operate.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 105 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
for heavy equipment operator certification.
7.30.13. The validity period of a heavy equipment operator card ranges from 1 to 5 years for
specific equipment, based on criticality and risk level.
7.30.14. Heavy equipment drivers/operator card shall be issued to a person who has a
satisfactory medical certificate, have a valid relevant government license/Heavy
Transport Vehicle (HTV) license, and successfully pass both theoretical and practical
examination for a specific equipment.
7.30.15. The heavy equipment operator card shall include, but is not limited to the following
details:
7.30.16. Certified operators shall carry their original card with them at all times, along with
a valid driving license.
7.30.18. When heavy equipment, including cranes, aerial devices, mobile elevated aerial
platforms, man-baskets, man-lifts, or bucket-mounted vehicles, is operating near
live electrical circuits/energized power lines, shall maintain minimum clearance
distances from these live electrical circuits/energized power lines, as mentioned in
the table below. Only qualified and trained personnel shall be allowed to operate
and work on equipment in close proximity to live electrical circuits/energized
power-lines while wearing the necessary personal protective equipment (PPE).
Insulated or uninsulated heavy equipment or construction machinery such as a
forklift, excavator, bulldozer, wheel loader, backhoe, grader, crane, dump truck,
man-baskets, man lifts, bucket mounted vehicles, etc. must be protected by
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 106 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
providing grounding and bonding connections to dissipate any potential electrical
charges when working in an electrically conductive, near live line or when
protection is required against potential energization of the line or
monopole/tower/structure or back-feeding from consumer double supply lines,
generators, UPS systems, stored charges from capacitors, lightning strikes, or
induced voltage from conductors/ cables/ transformers. Insulated heavy
equipment, including those with rubber tires and wooden supports, is not
foolproof. Over time, insulation may deteriorate or get damaged due to
environmental exposure, wear, or physical damage. Even with insulation, there's
still a risk of electrical charge to pass through, or heavy equipment large metal
objects can accumulate induced voltages, especially under high voltage conditions.
A person touching heavy equipment (touch potential) or standing near heavy
equipment while touching the ground (step potential) could be electrocuted.
Grounding and bonding provide an additional layer of protection to safely dissipate
any electrical charge that might be transferred to the heavy equipment protecting
both the equipment and nearby personnel from various electrical risks. A
designated supervisor and signal-man shall ensure the following minimum safe
distances shall be maintained all the time to prevent electrocution, equipment
damage, and fires.
Note-1: Distances listed are for standard conditions, extra care must be taken, if standard
conditions do not exist.
Note-2: When operating insulated heavy equipment near live electrical circuits/energized
power lines, avoid using uninsulated lifting accessories, such as slings, hooks, or rigging
equipment’s. Choose non-conductive lifting accessories made of materials that do not
conduct electricity.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 107 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.30.19. Use non-conductive insulated measuring stick to verify clearance distances.
7.31.4. All scaffold materials shall be inspected prior to use. Damaged material shall be
removed from site.
7.31.5. Scaffolds shall be constructed by qualified scaffolders, who are trained in the right
work methods as well as familiar with working at height requirements. Scaffolders
will always be provided with fall protection with double lanyards when working at
levels higher as 6 feet above the ground. They shall follow the 100% tie off rule.
7.31.6. Only a specialized scaffold erector is authorized to design, erect, alter, inspect, and
dismantle special scaffolds and scaffolds exceeding 12.2 meters in height.
7.31.7. The Civil/Structural Engineer is responsible for reviewing Special Scaffold Plans and
calculations to ensure the structural integrity and soundness of the proposed
scaffold design.
7.31.8. A Civil/Structural Engineer with expertise in scaffold design analysis shall approve
Scaffold Plans for the following special scaffolds:
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 108 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
square meters (320 square feet), supported by or hung from an existing
structure or within 3 meters of another scaffold supported by the same
structure.
f. Scaffolds supported by or hung from wind girders or roofs of floating roof tanks.
7.31.9. To shift scaffolding material, planks and tubes safely from ground level to height
and vice versa, precautions shall be taken to prevent falls. Secure the materials,
planks, and tubes using straps, ropes, or bungee cords before lifting them with a
pulley system. Additionally, ensure that scaffolding planks and tubes are securely
fastened using clamps to prevent slipping, falling, or displacement during lifting.
Scaffolding materials, planks and tubes shall not be shifted manually from ground
to height by helpers’ hand to hand. Barricade the area or install safety nets
underneath to mitigate the risk of falling materials.
7.31.10. A gate or drop bar shall be installed to secure the scaffolding platform for safe
access when getting on or off using the ladder.
7.31.11. The company shall provide protection against fall hazards, such as guardrails, safety
nets, full body safety harness, positioning devices or fall restraint systems.
7.31.12. Prior to the use of a scaffold, the scaffold shall be inspected by a qualified scaffold
inspector. The inspection result shall be clearly marked at the entrance of the
scaffold. Only qualified scaffolders are allowed on a scaffold that is not inspected
or where the inspection results show the scaffold is not safe to use.
7.31.13. At least once every two weeks a scaffold will be re-inspected to verify it is still safe.
7.31.14. All scaffolds that are not inspected, show visible damage, are modified or have
other safety concerns shall be closed-off for general workers until hazards have
been rectified by scaffolders and the scaffold has been inspected.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 109 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.31.15. The scaffold shall be protected from electrical hazards. Electrical conductors shall
be de-energized and electrically grounded. Scaffold and platform shall not be less
than 10 feet (Minimum Safe Distance) from energized electrical conductors, even
greater distances are required at very high voltages.
7.31.17. If using power tools on a scaffolding platform, ensure external grounding is in place.
7.32. Ladders
7.32.1. The company shall ensure the inspection of all in-service ladders before use and
remove defective ladders. Ladder shall be properly secured at the top and provide
stable footing while being used. Ensure ladders extend a minimum of 1 m (3 ft.)
above the top landing point. In general, set ladders at a 4:1 slope. When climbing
up or down any ladder, face the ladder and maintain three points of contact with
hands free of materials. Only single person can use it at a time. Metal ladder shall
not be used when working on or near electrical equipment or conductors; use only
non-conductive ladders.
7.32.2. Fall protection must be provided for employees climbing or working on FIXED
ladders above 24 feet. Fall protection is not required for employees while climbing
or working on portable ladders unless it is anchored on a rigged anchorage point at
height, having fall clearance safety factor three (03) feet from impact level or
ground level.
7.32.3. All poles, towers and structure shall be carefully inspected before climbing to assure
that they are in a safe condition for the work to be performed and that they are
capable of sustaining the additional or unbalanced stresses to which they will be
subjected. The types of abnormalities that should be checked are cracks, damages,
and deteriorations in poles, towers and structure and its foundation.
7.32.4. If poles, towers and structure are unsafe for climbing, they shall not be climbed
until made safe by guying, bracing or use mobile elevated aerial platform, man-
baskets, man-lift or bucket mounted vehicle instead of ladder.
7.33. Excavations
7.33.1. Excavation shall be done against approved Permit to Work.
7.33.2. The company shall establish proper excavation techniques including sloping,
shoring, shielding or benching/stepping as per soil type to minimize the risk of the
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 110 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
cave-in and damage to the underground services (Utilities). Piping and cable
detector should be used. When underground piping or electrical installations are
suspected, mechanical excavators shall not be used until all obstructions have been
exposed by manual digging.
7.33.4. If electrical live cable de-energization is not feasible, the suitable protection
measures should be applied such as, providing a wooden box around the cable,
providing protective sleeve for the cable, insulating personnel and equipment from
possible electrical contact. Insulation of hand tools. Adopting test trenches
excavation method by using hand tools to unveil underground pipes and electrical
cables, etc.
7.33.5. Ensure proper communication done with local authorities for road closure. Where
there is a likelihood of public, vehicles or equipment falling into an excavation,
suitable barriers shall be erected including fencing of the excavation area,
supervision, flagmen, traffic control and other measures required to ensure the
safety of public at all times. Blinking warning lights should be used during dark to
mark the limit of the work.
7.33.7. Trenches exceeding 4 feet (1.2 Meters) in depth should be treated as confined
spaces.
7.33.8. Provide suitable entry and exit points for the excavation.
7.34.2. Welding and cutting booth shall be covered with fire blanket to contain sparks
during activity. Sufficient lighting to be provided once working at night.
7.34.3. Welding and cutting sparks shall not fall on gas cylinders, flammable materials or
operating equipment.
7.34.4. Combustibles around the welding and cutting work area shall be removed.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 111 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.34.5. Oxygen and fuel cylinders should not be stored together.
7.34.6. Gas Testing shall be conducted as per Task Risk Assessment/ JSA/ Permit to Work
at same elevation and above/ below elevation to test accumulation of explosive
mixture.
7.34.7. Arrange trained Fire watch with adequate number of fire extinguishers.
7.34.9. Use appropriate PPE for the job such as Welder Face shield, Mask, Leather Gloves
and Welding Shade Number.
7.35. Hydro-jetting
7.35.1. The company shall consider following precautions during hydro-jetting activity for
equipment cleaning:
a. All workers performing hydro-jetting job shall be trained and experienced for
high pressure water jetting job and shall have the required certificate.
b. Provide and use task specific PPE for hydro-jetting activity such as helmet with
strap, face shield over mono-goggles, cut-resistant suit, respiratory protection
(when require for confined space), gloves for hydro-jetting grip, metatarsal
boots and hearing protection (Noise more than 85dBA). Use specialized ultra-
high pressure PPE suit for Ultra High pressure (40K Psi) for hydro-jetting job.
c. There are two levels of high pressure washing, based on the water pressure
used:
f. The anti-withdrawal device must be used on all flex lances, rigid lances and line
moling activities. The anti-withdrawal device must be securely attached to the
equipment being cleaned.
7.36.2. The company shall ensure that the relevant contractor is approved with Pakistan
Nuclear Regulatory Authority.
7.37.2. Install eye wash stations in areas in accordance with the Material Safety Data Sheet
(MSDS), where chemicals are handled and processed.
7.38.2. The company shall establish, implement and maintain a program to ensure safe use,
handling, managing, processing, operation, storage, transport and monitoring of
Polychlorinated biphenyls (PCBs) and its waste in compliance with applicable
national and provincial legal requirements to protect people and the environment
from harmful effects of PCBs.
7.38.3. The company shall ensure all materials, oil and items introduced at site are certified
PCB-free.
7.38.4. The company shall consult Pakistan Environmental Protection Agency or Provincial
Environmental Protection Agency, if any suspected PCB material found.
7.38.5. In case no suitable PCB-free materials, oil or items are commercially available, a
written approval/ waiver shall be obtained from Pakistan Environmental Protection
Agency or Provincial Environmental Protection Agency for purchasing, handling,
replacement and disposal purposes.
7.38.6. Existing stocks of PCBs and equipment containing PCBs shall be identified. These
shall be marked and removed/ replaced as soon as feasible, as per aforementioned
requirements.
7.39.2. The company shall establish, implement and maintain a program to ensure safe use,
handling, managing, processing, operation, storage, transport and monitoring of
asbestos and its waste in compliance with applicable national and provincial legal
requirements to protect people and the environment from harmful effects of
asbestos.
7.39.3. The company shall ensure all materials and items purchased are asbestos free.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 114 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.39.4. Available asbestos materials shall be identified and dispose properly when not
required.
7.39.5. The company shall consult Pakistan Environmental Protection Agency or Provincial
Environmental Protection Agency, if any suspected asbestos material found.
7.39.6. In case no suitable asbestos free materials are commercially available, a written
approval/waiver shall be obtained from Pakistan Environmental Protection Agency
or Provincial Environmental Protection Agency for purchasing, handling,
replacement and disposal.
7.40.2. Life vests (or life jackets) shall be worn by employee/ contractor when working over
water full body safety harness with double lanyard for 100% tie all the times shall
be used to avoid fall hazard.
7.40.3. Keep ready lifebuoy rings (often called life rings or life preservers) to throw to
someone who's fallen in the water to rescue him.
7.40.4. The company shall ensure that people that have fallen in water can be easily and
swiftly be rescued and/or brought to the shore.
a. Strong winds,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 115 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
b. Heavy and continued sandstorm,
g. Floods,
h. Earthquake.
7.41.4.1. Preparation
f. Have an emergency and repair team on standby in day and night shifts
to address any issues immediately.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 116 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
j. Establish clear communication plans for coordination and alerts during
emergencies with staff, local authorities and public.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 117 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
d. Carry out necessary repairs and maintenance to restore full
functionality.
g. Install barricades and warning signs around hazardous areas, and use
blinking warning lights at night until the hazardous condition is
resolved.
7.42.3. The project shall obtain the required No Objection Certificate (NOC)/approval
from the Environmental Protection Agency.
7.42.4. The company shall implement pollution control measures to mitigate/ minimize
the adverse environmental impacts of their operations in accordance with
Environmental Protection Agency requirements. These measures could address
air quality, water quality, noise levels, waste management, and natural resource
conservation.
7.42.5. The company shall meet government emissions reduction targets to reduce its
carbon footprint. This involves implementing measures to reduce greenhouse gas
emissions, particularly from fossil fuel-based power generation. This can include
adopting cleaner technologies, improving fuel efficiency, and implementing
emission control measures.
7.42.6. Waste management system shall address reduce, reuse and recycle approach
with safe handling, storage, transport and disposal of hazardous materials and
waste (gaseous emissions, liquid effluent and solid waste) in accordance with
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 118 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
currently accepted industry practices and applicable national and provincial legal
requirements.
7.42.7. The company shall ensure that the hazardous materials and waste are properly
labeled. Separate areas shall be marked for storage of hazardous material and
hazardous waste stored for disposal.
7.42.9. Waste Disposal System shall address each type of waste (construction, chemical,
sludge, ash, sanitary, medical, scrap and sewage) and shall also identify the steps
to be taken, to treat the wastes or otherwise prevent them from polluting the
ground water, sea or river, canal, or from becoming a public nuisance or hazard.
7.42.10. The company shall identify all waste water streams generated during his activities
and their treatment, monitoring and disposal philosophy. The waste disposal
contractor, disposal method and location shall be approved by local authorities
and Environmental Protection Agency.
7.42.11. Strict control should be exercised over the issue and return of unused explosives.
Precautions should be taken to ensure no jettisoning or concealment of explosives
or detonators underground.
7.42.12. All industrial waste generated within the company not intended for recycling or
reuse shall be treated and/or disposed of at approved waste treatment/disposal
facilities in accordance with local authorities and the Environmental Protection
Agency. In the absence of such requirements, the waste shall be treated and/or
disposed of within one hundred and eighty (180) days of the waste being
generated.
7.42.13. Storage period for dangerous medical waste shall not exceed 24 hours. The
storage period in the storage room shall not exceed 24 hours and 72 hours in the
freezer unit. The storage site shall be equipped with adequate air- conditioning,
lighting, and ventilation and the temperature ranges shall be 15-18 °C.
7.42.14. Waste shall be secured from unauthorized access, and to ensure it remains
inaccessible to animals and birds.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 119 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.43. HSE Signs
7.43.1. The company shall develop, implement, install and maintain HSE Signs at all sites as
required, for specific hazardous conditions, to warn employees, contractors,
visitors and general public.
7.43.2. The fixed “Danger Sign” shall be installed at places where an immediate hazard/
danger exists such as grids, substations, transformers, etc.
7.43.3. The fixed “Caution Sign” shall be installed at places where it is required to warn
against potential hazards or to caution against unsafe practices.
7.43.4. Safety “Instructional Sign” shall be installed at places where permanent Safety
requirement need to be installed such as HSE requirements or Personnel Protective
Equipment required, etc.
7.43.5. Signs shall be placed as close to the area or equipment of coverage as possible and
within buildings to assist personnel to escape. Signs shall be clear, easy to
understand, consistent throughout the facility and placed for optimum visibility.
Pictorial signs with consistent color codes are preferred. These “Signs” shall be
understandable to employees/contractors/visitors and the sign words shall be in
Urdu, English and/or in a language understood by locals and workers. The signs shall
be readable at a minimum distance of 5 feet.
7.43.6. “Caution Tag” shall be used for temporary purpose for an existing hazard to avoid
an incident, such as Do Not Operate Tag, Danger Tag and Caution Tag shall be
developed and made available at each site. The tag shall have a hole on the top to
run a thread that shall be used to tie the tag with the equipment. The tag and the
thread should be made of weather resistant material. The installation and removal
of tags is restricted to authorized employees/ contractors and they shall only install
or remove. All Tags shall be dated and signed in the designated places prior to
installation. Special instructions covering operation of equipment is to be noted on
“Caution Tag”.
b. Signs for minimum horizontal and vertical clearance for overhead Low/High
Tension lines from house/building.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 120 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
d. Signs for the explosion hazard.
7.44. Housekeeping
7.44.1. The company shall maintain a reasonably good housekeeping throughout the site.
Inappropriate housekeeping will increase chances of incidents and fires, etc.
a. Stored materials secured and limited at the height to prevent falling of objects.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 121 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
b. Materials/ files shall not be stored on top of the steel cabinet, which is more
than four (04) feet tall.
c. All cabinets and racks over four feet tall should be secured so that they cannot
fall over.
d. Cabinets and racks over four feet tall should be bolted together or fastened to
the wall or floor.
e. Heavy material should be stored on the lowest shelves in the cabinet or rack
because they will stabilize the cabinet or rack. Store heavy items on shelves
below waist height level. Light or infrequently used items should be stored on
the higher shelves.
g. Drums shall be stacked on pallets or skids with no more than two (2) drums high.
h. Bookcases, filing cabinets, drawers, shelves, racks, storage cabinets and office
materials should be organized properly and closed.
i. Keep all official files in filing cabinet. Remove/ dispose-off, those files, papers,
and materials regularly, which are not required.
o. Exit paths should be clear, unobstructed and properly lit for any emergency.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 122 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.45. Health & Hygienic Facilities
7.45.1. The company shall arrange occupational health assessments for selected
employees and contractors who are usually involved in hazardous tasks related to
their job roles, at least once every three years to ensure that individuals are
medically, physically, and mentally fit for their assigned responsibilities at electrical
network, grids, substations, and other electrical infrastructures. Line management
shall ensure the implementation of occupational health assessment
recommendations for any individual as prescribed by a medical physician and
maintain records of these actions in the employee file. Employees or contractor
staff who are declared medically unfit in an occupational health assessment or by a
medical physician may be reassigned to administrative or light duties if they are
unable to perform hazardous tasks related to their job roles for which they were
specifically hired.
c. Respiratory function tests to evaluate lung function, especially if the job involves
exposure to respiratory hazards.
d. General blood tests for parameters such as blood count, liver function, kidney
function, and cholesterol levels.
7.45.4. The Transmission and Distribution Companies shall maintain the strength of line
and grid cadre staff in accordance with set criteria and yardsticks, ensuring the
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 123 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
transmission and distribution system are reliable and safe for the community. Line
and grid cadre staff shall only be assigned the technical role for which they were
specifically hired, and not to be transferred/posted to unrelated office or
administrative duties.
7.45.5. Line and grid cadre staff shall not be assigned to critical tasks beyond the long
working hours specified in the Factories Act 1934 and labor regulations.
7.45.6. As a line staff requires good balance, strength, stamina, and coordination,
especially when working at heights and electrical infrastructures. Therefore, the
maximum working age limit for a lineman should be 55 years considering natural
aging. After reaching this age threshold, reassigning linemen to administrative or
lighter duties helps utilize their vast experience and knowledge.
7.45.7. The company shall provide hygienic facilities to protect employees/ contractor’s
health and the environment. The company shall also provide an adequate supply of
potable drinking water and well hygienic canteen, mess or cafeteria.
7.45.8. Sufficient individually accessible toilet and handwashing facilities shall be provided
for employees, contractors and visitors, kept clean and maintained in good working
order.
7.45.10. The company should evaluate and ensure suitable natural or artificial lighting at the
site to maintain safe working conditions and clear visibility for tasks. The lighting
should be uniformly spread and of an intensity that prevents discoloration,
shadowing, and strong glare.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 124 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note-1: Illuminance: This is the measure of the amount of light (luminous flux) falling onto a
surface. It's measured in lux (in the metric system) or foot-candles (in the imperial system).
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 125 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note-2: Lighting Power Density (LPD): This refers to the amount of electrical power used for
lighting per square foot of a space or building. It's often measured in watts per square foot
(W/ft2).
7.46.2. The company shall establish, maintain and record monthly visual inspections of in-
service fire protection equipment to check; if it is in correct location, whether access
is unobstructed and clearly visible, to check equipment gauges, signs of leakage,
corrosion or physical damage and check seals are unbroken and up to date
inspection tag is fitted.
7.46.3. The company shall establish and maintain how to notify the concerned parties of
the isolation or outage of Fixed Fire Protection systems, Fire Water Network, and
Fire Detection and Alarm Systems. Company shall ensure the mitigation plan
(control measures) is provided and implemented in case of isolation or outage of
fire protection system.
7.46.4. The company shall take steps to prevent ignition of materials, lubricants, and fuels
used at site.
7.46.7. Welding equipment, heating appliances and other open flames or hot surfaces
should be segregated from combustible materials.
7.46.8. Proper bonding and grounding techniques shall be used for any operation where
static electricity could become an ignition source.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 126 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.47. First-aid Facilities
7.47.1. The company shall provide a qualified paramedic nurse and an ambulance at site of
construction, turnaround, rehabilitation, decommissioning, and demolition to meet
the emergency situation whenever work force exceeds fifty (50) persons.
7.47.2. First aid supplies shall be available nearby all work areas.
7.47.3. The company shall arrange First Aid training for selected employees/ contractors
and arrange inspection and refilling of in-service First Aid Kit on monthly basis
during the first week of each month.
7.48.2. The company shall conduct post-disaster assessment/patrolling after major events
like fire, explosion, floods, earthquake/ tsunami, land sliding, or collapse of
building/structures to verify the integrity of their infrastructures.
7.48.3. The company shall ensure that necessary emergency items are available at site.
7.48.4. The company shall provide, inspect and maintain in good working order adequate
firefighting and rescue equipment. Designated employees/ contractors shall be
properly trained in the use of firefighting and rescue equipment.
7.48.5. The company Incident that is expected to extend beyond the perimeter fence of
the facility and could likely affect the surrounding industries and community OR
external incident such as gas leak, toxic liquid spill and potentially large fire that
occurs outside the boundary of company facility and could endanger the safety and
health of employees/contractors or could cause damage to company property OR
an Incident escalated which cannot be managed by the available onsite resources
and beyond the competency level of company personnel, need immediate
assistance from external Emergency Support Services and from the neighboring
industries.
7.48.6. If external Emergency Support Services are not available to the degree needed by
the site, then the company must develop internal resources and internal response
capability according to the risk, i.e., fire, medical, rescue, and spill response
capabilities.
7.48.7. Only trained employees/ contractors having appropriate PPE should respond to an
incident. Emergency preparedness and response plan shall be followed. Others
employees/ contractors shall follow the evacuation plan.
7.48.8. Employees/ contractors in the affected area shall stop the assigned job in a safe
manner (conduct emergency shutdown/ isolation of operating equipment), if it is
safe to do so as per SOP/ work instruction. They shall evacuate the affected area
and proceed to the designated safe assembly point. All employees/ contractors
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 128 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
after hearing emergency alarm should gather at the assembly point and wait for
further instructions.
7.48.9. Assembly area should be at least 100 feet away from Operational Area, Building,
Warehouse, Substation or Hazardous Area.
7.48.10. Windsocks should be provided at suitable locations in the plant to assist in a safe
escape of personnel in case of an emergency.
7.48.11. The company should incorporate color-coded triage tags or bracelets into their
emergency management system to categorize and prioritize patients during a mass
casualty incident or disaster. These colored tags or bracelets are attached to the
patient's clothing or in a visible location on their body. Patients with higher triage
tags, such as Red tag (Immediate) are given transportation and treatment priority.
Patients should be reassessed regularly to ensure that their condition has not
deteriorated or improved, and tags may be adjusted accordingly. These triage
codes help healthcare providers and hospitals identify patients' conditions
promptly, and allocate resources accordingly based on the severity of injuries or
illnesses.
a. Red Tag (Immediate): Patient with critical condition and require immediate
medical attention.
b. Yellow Tag (Delayed): Patient with significant injuries or illnesses that are not
immediately life-threatening but still require prompt medical care within 6
hours.
c. Green Tag (Minor): Patient with minor injuries or illnesses who can walk and do
not require immediate attention. These individuals can often wait for medical
care, allowing resources to be allocated to more critical cases first.
d. Black Tag (Dead/Expectant): Patient is dead or have injuries or illnesses that are
incompatible with life. These patients are beyond medical help, and resources
should be focused on those with a higher chance of survival.
7.48.12. Employees or contractor’s employee shall stop and turn off their vehicle/ heavy
equipment and park in a safe manner till the “All Clear” is announced. Don’t block
exit routes and routes for emergency responders.
7.48.13. The company shall ensure that a mock drill (announced/ unannounced) of the on-
site Emergency Management System is conducted at least once every three (03)
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 129 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
months.
7.48.15. A tabletop drill should be conducted one day prior to the mock drill to ensure
thorough preparation for a mock drill to identify any potential gaps, test
coordination, communication, decision-making processes, and familiarize with
respective roles and responsibilities during an emergency. During the tabletop drill,
the drill commander and internal responders should gather around a table in the
meeting room. They should exercise/act on their responsibilities related to the
mock drill scenario, starting from the emergency activation till its termination.
7.48.16. The record of each drill shall be retained and preserved by company for period of
one fiscal year.
7.48.17. The results of the drill should be evaluated and when needed used for improvement
of the emergency preparations.
7.48.18. The following potential incident scenarios as applicable, but not limited to, should
be considered in Emergency Management System:
- Incident Reporting,
- Evacuation Plan,
- Medical Incident,
- Elevator Failure
- Earthquake/ Tsunami,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 130 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
- Land sliding,
- Flood,
- Insulated Electrical Rescue Hook to separate the victim from the electrical
source,
- Resources,
7.49.2. The company employees and contractors shall report all incidents, on-the-job
injuries, or occupational illnesses, no matter how slight, immediately to their
supervisor or in-charge. The supervisor or in-charge shall ensure that the injured
employee receives proper first aid or medical treatment.
7.49.3. When an accident is reported to the company, or known through media, occurring
at any of its sites, within its service territory, under its jurisdiction, or electrical
accidents occurring inside consumer premises, the company shall immediately
report the accident to NEPRA Regional Office via email, phone, WhatsApp, or SMS
including email at [email protected].
7.49.4. The company shall upload all work-related and public-related accidents to the
NEPRA Data Exchange Portal within 24 hours when directed by NEPRA when it’s
determined by the Regional Office fact-finding report that it’s employee work-
related or public-related accident.
7.49.7. Any criminal, intentional, or willful act by an employee, contract employee or daily
wages worker shall not be considered safety accident. Instead, it should be treated
as a security incident and addressed in collaboration with the appropriate law
enforcement agencies.
7.49.8. Public-related accidents could involve fatalities or injuries to the general public
directly caused by the network owner’s operations or infrastructure. These
accidents include, but are not limited to, electrocution, arc flashes, hazardous
spills/releases, fires, explosions, falls of conductors, structural collapses such as
building, towers or poles, and any other similar incidents including electrical
accidents at consumer premises involving network owner’s operations or
infrastructure. Theft of network owner assets, illegal connections (such as direct
hooking or kunda connections), unauthorized interference with the network
owner’s operations or infrastructure, or accidents occurring inside consumer
premises that do not involve the network owner’s infrastructure, are not
considered public-related accidents.
7.49.9. Consumer premises electrical accidents NOT involving network owner’s operations
or infrastructure include, but are not limited to:
7.49.9.1. Accidents resulting from faulty wiring within the consumer's premises.
7.49.9.2. Accidents resulting from faulty electrical appliances and equipment at the
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 132 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
consumer's premises.
7.49.9.4. Electrical shocks or electrocution due to the lack of proper earthing for
appliances and equipment at the consumer's premises.
7.49.9.6. Accidents where electrical devices come into contact with water at
consumer's premises, leading to shocks or short circuits.
7.49.10.3. Accidents occurring when HT power lines fall and come into contact with
consumer service cables or consumer premises, leading to electrocution
or fires.
7.49.11. Normal wear and tear, sudden or unforeseen failures, losses, damage or
breakdowns of machinery, equipment or their parts shall not be considered safety
incidents. However, such a technical incident should be handled and investigated
by a technical team consisting of personnel from maintenance, process, asset
integrity, reliability or by the manufacturer.
7.49.12. A power outage or blackout is not categorized as a safety incident unless it leads to
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 133 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
fire, property damage, loss of primary containment, or similar significant
consequences.
7.49.13. The top management of the network owner shall personally visit the residence of
the deceased to offer moral support to the bereaved family in the event of a work-
related or public-related fatality accident directly caused by network owner’s
operations or infrastructure. This provision excludes accidents involving theft of
network owner assets, illegal connections/direct hooking (kunda connections),
unauthorized illegal interference with the network owner’s operations or
infrastructure, or accidents occurring inside consumer premises due to consumer.
7.49.14. All incidents, including significant near misses, of the company, its contractors,
subcontractors, suppliers, bulk power consumers, single point supply consumers
and other system users shall be promptly investigated by the company to identify
the actual root cause. When root cause is properly fixed, will prevent recurrence or
significantly reduce the likelihood of the similar incident in future. The investigation
report of any particular incident shall be submitted to NEPRA, as and when directed.
However, in the case of investigating critical near-miss incidents, the company is
required to conduct the investigation according to their own relevant procedures
or SOP.
7.49.15. The company shall upload soft copy of final investigation report at NEPRA Data
Exchange Portal within thirty (30) working days from the date of the incident. If
more than thirty (30) working days are required, the company shall provide proper
detailed justification with required days for completion of investigation report to
obtain NEPRA approval.
7.49.16. The company shall secure and preserve all relevant evidences/ documents including
victim(s) all PPE for investigation process.
7.49.17. The original complete investigation report shall be retained and preserved at
company safety office file for plant/ equipment life cycle and shall include the
following:
a. Incident Title,
b. Executive Summary,
c. Table of Contents,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 134 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
e. List of investigation team members (For Team Investigations),
m. Root cause analysis or equivalent methodology for main root and primary
contributing causes,
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 135 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
maintenance or contractor procedure, contractor pre-qualifications record,
equipment manual, equipment/pole tag number, specification sheet, heavy
equipment inspection and certification, daily inspection checklist, operator
and rigger certifications, lifting plan, scaffolding plan, scaffold supervisor and
inspector certifications, operation SOP, logbook, field checklist, duty roster,
shift changeover, process and instrument drawing (P&ID)/process flow
diagrams (PFD)/single line diagram, design data, applicable standards,
download fault record from relay, distributed control system (DCS) trend,
computer log, environmental data, fugitive emission data, MOC record, pre
start-up safety review record, layout plan, notification, notice, office orders,
schedule, agreement, contract, communication record, FIR/police report,
compensation proof, fire station report, etc.
7.49.18. Medical Report, Death Certificate or Postmortems Report shall clearly written the
reason of the death.
7.49.19. During an explosion, the resultant blast wave can potentially harm the inner ear of
individuals present within the explosion zone. The explosion pressure is typically 35
to 100 mbarg. Therefore, an audiometric testing and appropriate medical
treatment should be immediately considered for people working in the explosion
zone at the time of the accident.
7.49.21. Recommendation shall be clear with full information and if the action is related to
any equipment, equipment number shall be included in the recommendation
statement.
7.49.24. The company shall communicate critical/ high learning value incident as lesson
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 136 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
learned with the potential for serious consequences to relevant personnel,
interested parties or general public.
7.49.25. NEPRA may reject submitted investigation report, if less than adequate. The
company shall re-investigate the incident and re-submit the investigation report
again to NEPRA within fifteen (15) working days.
7.49.26. Evaluate the physical and mental fitness of an employee before allowing him/her
to resume work after an injury or illness to ensure his/her physical and mental
health and fitness for the job.
7.49.29. If an employee of the company has a work-related accident due to breaches of the
company's Safety Rules, SOPs, Procedures, or Work Instructions, working without
PPE, lacking authorization or PTW, using a mobile phone during work, being under
the influence of drugs, or engaging in an intentional, criminal, or suicidal act, in such
cases, the next of kin/bereaved family should not be eligible for compensation for
fatalities or injuries, but should be entitled to employment benefits. The fatality or
injury of the employee must be a direct result of his/her unsafe actions or violation
of the company's established Safety Rules, SOP, or Work Instruction that are clearly
stated, acknowledged, and consistently enforced by the company. The company
shall maintain a record in the personal files of regular employees, contract
employees or daily wages workers, acknowledging their orientation/training on
Safety Rules, SOPs, Procedures, and Work Instructions.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 137 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.49.30. Whenever the company is held or proven responsible for the fatality or injury
(bodily harm) of a contract employee, daily wages worker or member of the public
due to negligence, violations of safety regulations/protocols, SOPs, supervisory
oversights, unsafe conditions, faulty equipment or infrastructure that the company
is responsible and accountable for planning, establishing, implementing,
maintaining, monitoring, and communicating (internally and externally) in
accordance with the license term and condition for safe, efficient and reliable
operations including but not limited to construction, operation, maintenance,
turnaround, rehabilitation, standby, decommissioning, mothballing, and
demolition jobs, the company shall provide the "Diyat" value. Pakistan's Diyat
(Blood Money) law as a predetermined amount of compensation to be paid to the
legal heirs, announced annually by the Federal Government, in pursuance of sub-
section (2) of Section 323 of the Pakistan Penal Code (Act XLV of 1860). The
company shall also provide employment/job for an adult family member (next-of-
kin) in order to reduce the financial constraints on the bereaved family that has lost
its bread earner, with the condition that the next-of-kin must possess the eligibility
for the post.
7.49.31. Next of kin is defined as a person's closest living relatives/legal heirs through blood,
marriage, or legal relationships. The line of inheritance begins with the victim's
spouse (widow or widower). If the victim's spouse (widow or widower) is not
available, then the victim's legitimate children (son and unmarried daughter). If
both spouse (widow or widower) and legitimate children are not available, then the
victim's legitimate parents. When the victim has no spouse (widow), legitimate
children, or legitimate parents, and he or she is the sole bread earner for his or her
unmarried legitimate sisters and brothers, then his or her sisters and brothers shall
be considered next of kin. If the determination of the next of kin remains unclear,
then a 'Succession Certificate' should be obtained from the court of law to
definitively establish the next of kin and legal heirs.
7.49.32. In the event of an accident involving animal/property loss to the general public for
which company is held responsible, the legal heir/owner of the animal/property
shall be compensated for the loss”. Therefore, company shall determine the
quantum of compensation for loss of property or animal based on the following
general guidelines.
a. The valuation of animal may be based on breed, age, health, productivity (like
milk yield in the case of dairy animals), and market demand. The valuation of
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 138 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
property may involve an assessment by a recognized property valuer. They will
consider the market value of the property, its age, depreciation, potential future
value, and any other relevant factors. Compensation can vary depending on
whether the property or animal is completely lost, partially damaged, or
temporarily unusable. In the case of partial damage, the cost of repairs or
medical treatment can be considered. If the property or animal was a source of
income, such as rental property or a working animal, compensation might
include loss of earnings or potential earnings. This requires a projection of the
earnings that would have been made if the loss hadn't occurred. Accidental
expenses could include costs, such as veterinary fees for injured animals,
transportation costs, or costs to secure alternative accommodation or facilities.
If the property or animal is insured, the insurance company will have its own
process for determining compensation, which might involve adjusters or
valuers. Often, the final amount of compensation is reached through
negotiation between the aggrieved party and the party responsible for the
damage (or their insurance company). Both sides might present their valuations
and justifications, arriving at a mutually acceptable figure. If parties cannot
agree, and the matter is taken to civil court, the court will consider all evidence,
possibly expert testimonies, and determine the appropriate compensation
based on the principles of fairness, equity, and established legal standards.
7.49.33. In the event of a fatality, injury, or loss of property or animals due to the negligence
or fault of a Power Company, bereaved family may seek compensation through
legal means. Here are the guidelines to follow:
b. Report the incident promptly to the nearest police station and Power Company
as quickly as possible. Ensure that it is documented and that you have a
receiving/record of your complaint number.
d. If it is confirmed that the injuries or fatality resulted from the Power Company's
actions or negligence, file a formal complaint with the National Electric Power
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 139 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Regulatory Authority (NEPRA) at its Regional Offices or Main Office in Islamabad.
e. If the aggrieved party, next of kin or bereaved family are dissatisfied with the
compensation offered by the Power Company or have not received
compensation, they retain the right to pursue further claims in the civil court for
the fatality, injury, or loss of property or animals.
f. File a lawsuit against the Power Company to get compensation. Such claims for
fatality or injury can consider factors including the deceased's age, average life
expectancy, medical expenses, current salary, lost wages, potential salary
growth, pension arrangements, loss of educational opportunities for the
deceased's children, and the potential impact on those children's future marital
prospects. In case involving the loss of property or animals, the valuation of
animal may be based on breed, age, health, productivity (like milk yield in the
case of dairy animals), and market demand. The valuation of property may
involve an assessment by a recognized property valuer. They will consider the
market value of the property, its age, depreciation, potential future value, and
any other relevant factors.
g. If a judgment is awarded in bereaved family favor, they may need to take legal
steps to enforce the judgment and ensure that they receive the compensation
as ordered by the court.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 140 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.51. Internal HSE Audits
7.51.1. The company should establish a mechanism for Internal HSE Audit in order to assess
the implementation of HSE Management System, this Code requirements, adhere
to national and provincial legal requirements, to prevent the non-conformities, and
to detect and correct unsafe practices/ conditions and deficiencies.
7.51.2. NEPRA will monitor the company HSE performance and initiatives and will
randomly verify as deem necessary, through site evaluation (planned or
unplanned).
7.51.3. The company shall allow NEPRA nominated representative(s) at their sites to
conduct evaluation for HSE Management System.
7.51.4. The company shall spare and nominate their HSE personnel when requested by
NEPRA for evaluation of another company HSE Management System to identify
gaps and provide site specific recommendations for improvement. The company
shall cover all expense of their HSE personnel while on business travel/ assignment
for evaluation.
7.52.2. The company shall submit all supporting documents, record and evidences of last
fiscal year for the HSE Performance Evaluation at NEPRA HSE Data Exchange Portal
in HSE Performance Evaluation Form or as directed by NEPRA by July 31st of each
year.
7.52.3. The company shall compile the title page, table of contents, and approval page into
a single PDF file for each section of each category. The PDF file title should include
the respective category number and section number. Do not include blank forms in
the PDF file.
7.52.4. Additional documents, record and evidences shall be submitted to NEPRA within
given time, as and when directed.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 141 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
7.52.6. Companies who were responsible for work-related or public fatal accidents during
the evaluation year, they shall receive a zero point in category # 19. For all other
categories, points shall be given to them based on the submitted data to measure
their continual improvement in other categories.
7.52.7. The higher ranking in the report does not guarantee that a company's actual
performance in the field is the same as stipulated in the report. In actual, it could
be either more effective or worse. Despite the higher ranking, this does not mean
that the company is free from individual accidents or lapses.
7.52.8. NEPRA will assign category points from 1 to 5 using the following scale to rate the
HSE performance of company.
Points 1 2 3 4 5
Points x Assessment
Categories
1 x 20 2 x 20 3 x 20 4 x 20 5 x 20
Percentage 20 40 60 80 100
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 142 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
8. Annexures
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 143 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Office Mobile
HSE Team Job Site/Plant WhatsApp Email
No. Contact Contact Remarks
Name(s) Title Address Contact No. Address
No. No.
1.
2.
3.
4.
5.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 144 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
License Category
Generation Transmission Distribution
(Tick mark which is applicable)
Total Victim(s)
Gender Age
Victim Relative
Extent of Injury
Contact No.
Gender Age
Victim Relative
Extent of Injury
Contact No.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 145 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Incident Description. (Write down how incident happened, beginning with the normal job activity that led to
the incident. Put the events with timing, as far as possible, in the order they happened)
Is necessary evidence immediately gathered from the incident site for investigation
process?
What preventive actions are implemented at other sites to avoid reoccurrence of similar Incident?
Prepared by
(Company Representative)
Note-1: When an accident is reported to the company, or known through media, occurring at any of
company sites, within its service territory, under its jurisdiction, or electrical accidents occurring inside
consumer premises, the company shall immediately report the accident to NEPRA Regional Office via
email, phone, WhatsApp, or SMS including email at [email protected].
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 146 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note-2: The company shall upload all work-related and public-related accidents to the NEPRA Data
Exchange Portal within 24 hours when directed by NEPRA when it’s determined by the Regional Office
fact-finding report that it’s work-related or public-related accident.
Note-3: In the case of multiple fatalities or injuries resulting from a single incident, the incident reporting
shall include details of all victims, as well as the names and contact numbers of all witnesses.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 147 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
1. General Public
2. Employee
3. Contractor
Injury/ Injury/
No. Classification / Type Accident Accident
Illness Illness
4. General Public
5. Lost Time Injury or occupational Illness of Employee
6. Lost Time Injury or occupational Illness of Contractor
7. Restricted Duty Injury or occupational Illness of Employee
8. Restricted Duty Injury or occupational Illness of Contractor
9. Medical Treatment Injury or occupational Illness of Employee
10. Medical Treatment Injury or occupational Illness of Contractor
11. First Aid Injury or occupational Illness of Employee.
12. First Aid Injury or occupational Illness of Contractor
No. Classification / Type Total Last Month Total Year To Date
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 148 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note-2: Include investigation, inquiry reports, or preliminary occurrence reports of fatal accidents, in
the monthly HSE performance report and send to NEPRA at the email address '[email protected]' by
the 10th of each month.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 149 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Note: The company shall compile all subcategories into a single PDF file. This PDF file should include a
table of contents and page numbers for each subcategory. The title of the PDF file should contain the
respective category serial number for immediate reference.
Sr.
Category Points
No.
1. HSE Management System
Approved HSE Management System/ Manual is available in compliance to Power
Safety Code?
Subcategory Attached Not Available Not Applicable
1. HSE Management System/ Manual
(Attach title page, table of contents,
and approval page only)
2. Legal Compliance Register
(Attach approved register)
3. Third Party HSE Audit Report
(Attach report)
4. Management System Certification
(Attach certificates)
5. Insurance Risk Engineers Report for
plants and facilities.
(Attach report)
6. HSE initiatives and improvements
made by the company during the
evaluation year.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 155 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 156 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
outcomes/ email.
(Attach report/ outcomes/ email
report)
4. Audit non-compliance open/close
status. (Attach evidence)
15. Health & Hygienic Facilities
Health & Hygienic facilities are provided and regularly maintained. Occupational
health assessments are conducted for selected employees/contractors who are
typically engaged in critical tasks, based on their job roles, to ensure that individuals
are medically, physically, and mentally fit for their assigned responsibilities.
Subcategory Attached Not Available Not Applicable
1. Health & Hygienic procedure/SOP.
(Attach title page, table of contents,
and approval page only)
2. Occupational health assessment
record. (Attach evidence, record or
certificate)
3. Evidences/ photographs of hygienic
facilities such as potable drinking
water at workplace, hygienic
canteen, mess or cafeteria. (Attach
evidence or photographs)
4. In-house or third party assessment
conducted with correction evidences
for workplace ergonomics,
illumination, ventilation,
temperature, heat stress, noise, dust
and fume. (Attach evidences, results
or reports)
5. Annual Inspection Report by Labour
Welfare Office. (Attach evidence)
6. Employees' Social Security
Registration Certificate for private
sector organizations. (Attach
evidence)
7. Employees' Old-Age Benefits
Institution (EOBI) Registration
Certificate for private sector
organizations. (Attach evidence)
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 157 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
Subcategory Attached Not Available Not Applicable
1. Environmental management
procedure/ SOP.
(Attach title page, table of contents,
and approval page only)
2. An Initial Environmental Examination
(IEE) or Environmental Impact
Assessment (EIA) study in
compliance with EPA.
(Attach report)
3. Site Specific Environmental and
Social Management Plan for
Sustainable Development.
(Attach plan)
4. Construction or operational phase
EPA No Objection Certificate
(NOC)/Approval Letter.
(Attach letter)
5. Pollution control measures related
to air quality, water quality, land
quality, irrigation, noise levels,
radiation emission, waste
management, ozone depletion
control and natural resource
conservation.
(Attach results)
6. Initiatives to obtain carbon credit
certificates for the reduction of
carbon dioxide and other
greenhouse gas emissions aim to
achieve emissions reduction targets,
reduce carbon footprints, and
mitigate the impacts of climate
change. (Attach evidence)
7. Environmental monitoring report
submitted to relevant Environmental
Protection Agency. (Attach evidence
or report)
8. Petroleum storage License/
Approval. (Attach evidence)
9. Sulfuric acid or other regulated
chemical utilization License/
Approval. (Attach evidence)
10. Industrial waste reduction
evidence. (Attach evidence)
11. Industrial waste reuse evidence.
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 158 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 159 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 160 of 161
National Electric Power Regulatory Authority
Islamic Republic of Pakistan
NEPRA Tower, Ataturk Avenue (East), G-5/1, Islamabad, Phone: +92512013200, Fax: +92512600050
Website: www.nepra.org.pk , Email: [email protected] Page 161 of 161