◆ At a standard plant where daily production of clinker is 5,000 tons, 9,000 kW can be generated at the
generator terminal worth ¥550,000,000 annually (assuming the unit price of electric energy is ¥7.9/kWh).
◆ Since the first waste heat recovery power plant was delivered to a cement plant (Gifu Plant
of Sumitomo Osaka Cement) in 1980, we have supplied 11 of the 22 plants established in
Japan.