Capacity Planning Numerical
Capacity Planning Numerical
You are managing a group of 10 Electricians. These individuals undertake in-home servicing of
electrical systems and are called by telephone for either emergency or pre-arranged visits. They
charge a minimum call out fee that covers the first 15 minutes of their visit plus travelling time.
Beyond the first fifteen minutes they charge in minimum blocks of 15 minutes plus any materials
that might be necessary to carry out the job. The average call out takes 1 hour.
The workers usually are available for eight hours a day but with 2 coffee breaks of 15 minutes each
and a half hour lunch break, they actually work a 7-hour day. Taking time off and illness into account
reduces the electricians’ available time by 20%. This means the 7 hours per day is reduced to a 5
hour and 36-minute day (5.6 hours)
If actual work is only 200 hours billed in the week then (a) What is the capacity utilisation of the
team? (b) What is their efficiency?
Q2
Q3
An assembly line has a total of 8 hours available time in a shift. The employees working the shifts
have a half hour lunch break and two fifteen-minute tea breaks each shift. The machines also
require ten minutes per shift in basic maintenance. At the start of each working day, the supervisor
spends ten minutes talking to the staff and setting goals for the shift ahead. Calculate the available
time to work for the line and Takt time for 100 units per day.
Solution:
10 minutes for a team briefing and 10 minutes for basic maintenance work;
If output demand was for 100 units a day and you were running one shift, then the line would be
allowed to spend a maximum of four minutes to make a product in order to be able to keep up with
demand of 100 units per shift.
Q4
Q5
A VMX ltd. Company manufactures air coolers, and ceiling and table fans. The information provided
by the company on demand forecast for coming five years, machine capacity and labour
requirement is shown in table below. Calculate capacity utilization, machines required and operator
requirement for each year in future.
Solution
each machine
10000 10000 10000 10000 10000
capacity
Number of
machines 3 3 3 3 3
Air cooler
available
number of
operators on 4 4 4 4 4
each machine
Capacity
0.45 0.54 0.61 0.69 0.77
utilization
% Capacity
45 54 61 69 77
utilization
machines
1.35 1.63 1.83 2.07 2.3
required
operators
5.4 6.52 7.32 8.28 9.2
required
% Capacity utilization 42 48 55 62 70
Table fan
10000 10000 10000 10000 10000
each machine capacity
2 2 2 2 2
number of operators on each machine
% Capacity utilization 28 36 45 52 64
Q6
An Electronics India Ltd., company manufactures two products namely product X and product Y. The
marketing department of the company has provided the following data on sales forecast for the
coming five years, machine capacity and operator requirement.
Determine capacity utilization, number of machines and operators required to make sure that
demand forecast for the coming years are met.
% Capacity utilization 41 49 54 59 64
Q7