CONTRACTS
GENERAL CONDITIONS 28
-36
Content
Plant, Temporary Works, Materials &
G C-2 8
Equipment
Materials & Equipments, Standards &
G C-2 9 Specifications
G C-3 2 Pre-Testing
G C-3 5 Inspection
NOTE:
Any m aterials w hich have been sam pled
can be re-sam pled and tested anytim e.
G C 31- SAM PLING AND TESTING
W hen requested
• The contractor is required to furnish a
com plete w ritten statem ent of the original
com position and m anufacture of any or all
m aterials that are to be incorporated into
the w orks.
Pretesting is applicable to
m aterials m anufactured in
bulk such as cem ent,
asphalt and steelbars.
G C 32- PRE-TESTING
At the point of delivery, ow ner has the discretion to resam ple for check test
C all the m aterials subjected to the pretesting. Otherw ise, its acceptance shall
be based on the pretesting certificate.
No w ork m ust be covered up w ithout the Contractor m ust give notice to the
approvalof the supervising Architect or inspector w henever there are exam inations
Engineer. and inspections to be done.
G C 36- CORRECTING
D EFECTIVE W ORKS
1 POOR
W ORKM ANSH IP
2 D EFECTIVE
M ATERIALS
D EFECTIVE
W ORKS
Rep la ced to conform
w ith p la ns a nd
3 CARELESSNESS
sp ecifica tions.
4 ACCID ENTS
G C 36- CORRECTING
D EFECTIVE W ORKS
TH ANK