Testing (Manual)
1. What is Software Testing?
Ans. Testing involves operation of a system or application under controlled conditions and evaluating the results (eg, 'if the user is in interface A of the application while using hardware B, and does C, then D should happen'). The controlled conditions should include both normal and abnormal conditions. Testing should intentionally attempt to make things go wrong to determine if things happen when they shouldn't or things don't happen when they should. It is oriented to 'detection'. It is the process of executing the software system to determine whether it matches its specification and executes in its intended environment. It is the process of testing functionality and correctness of software by executing it. 2. What is the Purpose of Testing? The purpose of testing is ● To measure the quality of software. ● To detect the faults in the software. ● To improve the quality and reliability by removing the faults from the software. ● To find the defects before the customer do. ● To help making important decision. The purpose of testing is to provide information about the state of the product at a point of time. 3. What is the need for software testing? Ans. Software is everywhere However, it’s written by people- so it’s not perfect. Software controls our lives. Our daily activities include interacting with some type of software on regular basis. Even some time our life depends on Software’s. That’s why it is necessary to Test the software. ● It helps to verify that all of the software requirements are implemented correctly or not. ● It helps identifying defects and ensuring that they are addressed before software deployment. If any defect found after deployment and fixed, then the correction cost will be much higher than the cost of fixing it at earlier stages of development. ● Effective testing demonstrates that software appears to be working according to specification. ● It helps in determining the reliability and Quality of system as a whole. ● Software is likely to have faults. ● To learn more about the reliability of software. 4. What makes a good Software Test engineer? A good test engineer has a 'test to break' attitude, an ability to take the point of view of the customer, a strong desire for quality, and an attention to detail. Tact and diplomacy are useful in maintaining a cooperative relationship with developers, and an ability to communicate with both technical (developers) and non- technical (customers, management) people is useful. Previous software development experience can be helpful as it provides a deeper understanding of the software development process, gives the tester an appreciation for the developers' point of view, and reduce the learning curve in automated test tool programming. Judgment skills are needed to assess high-risk areas of an application on which to focus testing efforts when time is limited. ● Ability to pose useful question. ● Ability to observe what’s going on. ● Ability to describe what you perceive. ● Ability to think carefully about what u knows. ● Ability to recognize and manage bias. ● Ability to form and test conjecture. ● Ability to think despite already knowing. ● Ability to analyze someone else thinking. ● Curious ● Cautious ● Critical thinking ● Knowledge of programming language. ● Intelligence ● Tolerance for Chaos. ● People Skills ● Organized ● Skeptical ● Self starter ● Technology hungry ● Honest 5. What makes a good Software QA engineer? The same qualities a good tester has are useful for a QA engineer. Additionally, they must be able to understand the entire software development process and how it can fit into the business approach and goals of the organization. Communication skills and the ability to understand various sides of issues are important. In organizations in the early stages of implementing QA processes, patience and diplomacy are especially needed. An ability to find problems as well as to see 'what's missing' is important for inspections and reviews. 6. What makes a good QA or Test manager? A good QA, test, or QA/Test (combined) manager should: ● be familiar with the software development process ● be able to maintain enthusiasm of their team and promote a positive atmosphere, despite what is a somewhat 'negative' process (e.g., looking for or preventing problems) ● be able to promote teamwork to increase productivity ● be able to promote cooperation between software, test, and QA engineers ● have the diplomatic skills needed to promote improvements in QA processes ● have the ability to withstand pressures and say 'no' to other managers when quality is insufficient or QA processes are not being adhered to ● have people judgment skills for hiring and keeping skilled personnel ● be able to communicate with technical and non-technical people, engineers, managers, and customers. ● be able to run meetings and keep them focused 7. What's the role of documentation in QA? Critical. (Note that documentation can be electronic, not necessarily paper, may be embedded in code comments, etc.) QA practices should be documented such that they are repeatable. Specifications, designs, business rules, inspection reports, configurations, code changes, test plans, test cases, bug reports, user manuals, etc. should all be documented in some form. There should ideally be a system for easily finding and obtaining information and determining what documentation will have a particular piece of information. Change management for documentation should be used if possible. 8. What's the big deal about 'requirements'? One of the most reliable methods of ensuring problems, or failure, in a large, complex software project is to have poorly documented requirements specifications. Requirements are the details describing an application's externally- perceived functionality and properties. Requirements should be clear, complete, reasonably detailed, cohesive, attainable, and testable. A non-testable requirement would be, for example, 'user-friendly' (too subjective). A testable requirement would be something like 'the user must enter their previously-assigned password to access the application'. Determining and organizing requirements details in a useful and efficient way can be a difficult effort; different methods are available depending on the particular project. Many books are available that describe various approaches to this task. Care should be taken to involve ALL of a project's significant 'customers' in the requirements process. 'Customers' could be in-house personnel or out, and could include end-users, customer acceptance testers, customer contract officers, customer management, future software maintenance engineers, salespeople, etc. Anyone who could later derail the project if their expectations aren't met should be included if possible. Organizations vary considerably in their handling of requirements specifications. Ideally, the requirements are spelled out in a document with statements such as 'The product shall.....'. 'Design' specifications should not be confused with 'requirements'; design specifications should be traceable back to the requirements. In some organizations requirements may end up in high level project plans, functional specification documents, in design documents, or in other documents at various levels of detail. No matter what they are called, some type of documentation with detailed requirements will be needed by testers in order to properly plan and execute tests. Without such documentation, there will be no clear-cut way to determine if a software application is performing correctly. 'Agile' methods such as XP use methods requiring close interaction and cooperation between programmers and customers/end-users to iteratively develop requirements. The programmer uses 'Test first' development to first create automated unit testing code, which essentially embodies the requirements. 9. What steps are needed to develop and run software tests? The following are some of the steps to consider: ● Obtain requirements, functional design, and internal design specifications and other necessary documents ● Obtain budget and schedule requirements ● Determine project-related personnel and their responsibilities, reporting requirements, required standards and processes (such as release processes, change processes, etc.) ● Determine project context, relative to the existing quality culture of the organization and business, and how it might impact testing scope, aproaches, and methods. ● Identify application's higher-risk aspects, set priorities, and determine scope and limitations of tests ● Determine test approaches and methods - unit, integration, functional, system, load, usability tests, etc. ● Determine test environment requirements (hardware, software, communications, etc.) ● Determine test ware requirements (record/playback tools, coverage analyzers, test tracking, problem/bug tracking, etc.) ● Determine test input data requirements ● Identify tasks, those responsible for tasks, and labor requirements ● Set schedule estimates, timelines, milestones ● Determine input equivalence classes, boundary value analyses, error classes ● Prepare test plan document and have needed reviews/approvals ● Write test cases ● Have needed reviews/inspections/approvals of test cases ● Prepare test environment, obtain needed user manuals/reference documents/configuration guides/installation guides, set up test tracking processes, set up logging and archiving processes, set up or obtain test input data ● Obtain and install software releases ● Perform tests ● Evaluate and report results ● Track problems/bugs and fixes ● Retest as needed ● Maintain and update test plans, test cases and test environment through life cycle. 10. What's a test plan? A software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. The process of preparing a test plan is a useful way to think through the efforts needed to validate the acceptability of a software product. The completed document will help people outside the test group understand the 'why' and 'how' of product validation. It should be thorough enough to be useful but not so thorough that no one outside the test group will read it. The following are some of the items that might be included in a test plan, depending on the particular project: ● Title ● Identification of software including version/release numbers ● Revision history of document including authors, dates, approvals ● Table of Contents ● Purpose of document, intended audience ● Objective of testing effort ● Software product overview ● Relevant related document list, such as requirements, design documents, other test plans, etc. ● Relevant standards or legal requirements ● Traceability requirements ● Relevant naming conventions and identifier conventions ● Overall software project organization and personnel/contact-info/responsibilities ● Test organization and personnel/contact- info/responsibilities ● Assumptions and dependencies ● Project risk analysis ● Testing priorities and focus ● Scope and limitations of testing ● Test outline - a decomposition of the test approach by test type, feature, functionality, process, system, module, etc. as applicable ● Outline of data input equivalence classes, boundary value analysis, error classes ● Test environment - hardware, operating systems, other required software, data configurations, interfaces to other systems ● Test environment validity analysis - differences between the test and production systems and their impact on test validity. ● Test environment setup and configuration issues ● Software migration processes ● Software CM processes ● Test data setup requirements ● Database setup requirements ● Outline of system-logging/error- logging/other capabilities, and tools such as screen capture software, that will be used to help describe and report bugs ● Discussion of any specialized software or hardware tools that will be used by testers to help track the cause or source of bugs ● Test automation - justification and overview ● Test tools to be used, including versions, patches, etc. ● Test script/test code maintenance processes and version control ● Problem tracking and resolution - tools and processes ● Project test metrics to be used ● Reporting requirements and testing deliverables ● Software entrance and exit criteria ● Initial sanity testing period and criteria ● Test suspension and restart criteria ● Personnel allocation ● Personnel pre-training needs ● Test site/location ● Outside test organizations to be utilized and their purpose, responsibilities , deliverables, contact persons, and coordination issues ● Relevant proprietary, classified, security and licensing issues. ● Open issues ● Appendix - glossary, acronyms, etc. 11. What's a 'test case'? ● A test case is a document that describes an input, action or event and an expected response, to determine if a feature of an application is working correctly. A test case should contain particulars such as test case identifier, test case name, objective, test conditions/setup, input data requirements, steps, and expected results. ● Note that the process of developing test cases can help find problems in the requirements or design of an application, since it requires completely thinking through the operation of the application. For this reason, it's useful to prepare test cases early in the development cycle if possible. 12. What should be done after a bug is found? The bug needs to be communicated and assigned to developers that can fix it. After the problem is resolved, fixes should be re-tested, and determinations made regarding requirements for regression testing to check that fixes didn't create problems elsewhere. If a problem- tracking system is in place, it should encapsulate these processes. A variety of commercial problem-tracking/management software tools are available. The following are items to consider in the tracking process: ● Complete information such that developers can understand the bug, get an idea of its severity, and reproduce it if necessary. ● Bug identifier (number, ID, etc.) ● Current bug status (e.g., 'Released for Retest', 'New', etc.) ● The application name or identifier and version ● The function, module, feature, object, screen, etc. where the bug occurred ● Environment specifics, system, platform, relevant hardware specifics ● Test case name/number/identifier ● One-line bug description ● Full bug description ● Description of steps needed to reproduce the bug if not covered by a test case or if the developer doesn't have easy access to the test case/test script/test tool ● Names and/or descriptions of file/data/messages/etc. used in test ● File excerpts/error messages/log file excerpts/screen shots/test tool logs that would be helpful in finding the cause of the problem ● Severity estimate (a 5-level range such as 1- 5 or 'critical'-to-'low' is common) ● Was the bug reproducible? ● Tester name ● Test date ● Bug reporting date ● Name of developer/group/organization the problem is assigned to ● Description of problem cause ● Description of fix ● Code section/file/module/class/method that was fixed ● Date of fix ● Application version that contains the fix ● Tester responsible for retest ● Retest date ● Retest results ● Regression testing requirements ● Tester responsible for regression tests ● Regression testing results A reporting or tracking process should enable notification of appropriate personnel at various stages. For instance, testers need to know when retesting is needed, developers need to know when bugs are found and how to get the needed information, and reporting/summary capabilities are needed for managers. 13. What is 'configuration management'? Configuration management covers the processes used to control, coordinate, and track: code, requirements, documentation, problems, change requests, designs, tools/compilers/libraries/patches, changes made to them, and who makes the changes. 14. What if the software is so buggy it can't really be tested at all? The best bet in this situation is for the testers to go through the process of reporting whatever bugs or blocking-type problems initially show up, with the focus being on critical bugs. Since this type of problem can severely affect schedules, and indicates deeper problems in the software development process (such as insufficient unit testing or insufficient integration testing, poor design, improper build or release procedures, etc.) managers should be notified, and provided with some documentation as evidence of the problem. 15. How can it be known when to stop testing? This can be difficult to determine. Many modern software applications are so complex, and run in such an interdependent environment, that complete testing can never be done. Common factors in deciding when to stop are: ● Deadlines (release deadlines, testing deadlines, etc.) ● Test cases completed with certain percentage passed ● Test budget depleted ● Coverage of code/functionality/requirements reaches a specified point ● Bug rate falls below a certain level ● Beta or alpha testing period ends 16. What if there isn't enough time for thorough testing? Use risk analysis to determine where testing should be focused. Since it's rarely possible to test every possible aspect of an application, every possible combination of events, every dependency, or everything that could go wrong, risk analysis is appropriate to most software development projects. This requires judgment skills, common sense, and experience. (If warranted, formal methods are also available.) Considerations can include: ● Which functionality is most important to the project's intended purpose? ● Which functionality is most visible to the user? ● Which functionality has the largest safety impact? ● Which functionality has the largest financial impact on users? ● Which aspects of the application are most important to the customer? ● Which aspects of the application can be tested early in the development cycle? ● Which parts of the code are most complex, and thus most subject to errors? ● Which parts of the application were developed in rush or panic mode? ● Which aspects of similar/related previous projects caused problems? ● Which aspects of similar/related previous projects had large maintenance expenses? ● Which parts of the requirements and design are unclear or poorly thought out? ● What do the developers think are the highest-risk aspects of the application? ● What kinds of problems would cause the worst publicity? ● What kinds of problems would cause the most customer service complaints? ● What kinds of tests could easily cover multiple functionalities? ● Which tests will have the best high-risk- coverage to time-required ratio? 17. What if the project isn't big enough to justify extensive testing? Consider the impact of project errors, not the size of the project. However, if extensive testing is still not justified, risk analysis is again needed and the same considerations as described previously in 'What if there isn't enough time for thorough testing?' apply. The tester might then do ad hoc testing, or write up a limited test plan based on the risk analysis. 18. What can be done if requirements are changing continuously? A common problem and a major headache.
● Work with the project's stakeholders early
on to understand how requirements might change so that alternate test plans and strategies can be worked out in advance, if possible. ● It's helpful if the application's initial design allows for some adaptability so that later changes do not require redoing the application from scratch. ● If the code is well-commented and well- documented this makes changes easier for the developers. ● Use rapid prototyping whenever possible to help customers feel sure of their requirements and minimize changes. ● The project's initial schedule should allow for some extra time commensurate with the possibility of changes. ● Try to move new requirements to a 'Phase 2' version of an application, while using the original requirements for the 'Phase 1' version. ● Negotiate to allow only easily-implemented new requirements into the project, while moving more difficult new requirements into future versions of the application. ● Be sure that customers and management understand the scheduling impacts, inherent risks, and costs of significant requirements changes. Then let management or the customers (not the developers or testers) decide if the changes are warranted - after all, that's their job. ● Balance the effort put into setting up automated testing with the expected effort required to re-do them to deal with changes. ● Try to design some flexibility into automated test scripts. ● Focus initial automated testing on application aspects that are most likely to remain unchanged. ● Devote appropriate effort to risk analysis of changes to minimize regression testing needs. ● Design some flexibility into test cases (this is not easily done; the best bet might be to minimize the detail in the test cases, or set up only higher-level generic-type test plans) Focus less on detailed test plans and test cases and more on ad hoc testing (with an understanding of the added risk that this entails) 19. What if the application has functionality that wasn't in the requirements? It may take serious effort to determine if an application has significant unexpected or hidden functionality, and it would indicate deeper problems in the software development process. If the functionality isn't necessary to the purpose of the application, it should be removed, as it may have unknown impacts or dependencies that were not taken into account by the designer or the customer. If not removed, design information will be needed to determine added testing needs or regression testing needs. Management should be made aware of any significant added risks as a result of the unexpected functionality. If the functionality only effects areas such as minor improvements in the user interface, for example, it may not be a significant risk. 20. How can Software QA processes be implemented without stifling productivity? By implementing QA processes slowly over time, using consensus to reach agreement on processes, and adjusting and experimenting as an organization grows and matures; productivity will be improved instead of stifled. Problem prevention will lessen the need for problem detection, panics and burn-out will decrease, and there will be improved focus and less wasted effort. At the same time, attempts should be made to keep processes simple and efficient, minimize paperwork, promote computer-based processes and automated tracking and reporting, minimize time required in meetings, and promote training as part of the QA process. However, no one - especially talented technical types - likes rules or bureaucracy, and in the short run things may slow down a bit. A typical scenario would be that more days of planning and development will be needed, but less time will be required for late-night bug-fixing and calming of irate customers. 21 .What if an organization is growing so fast that fixed QA processes are impossible?
This is a common problem in the software
industry, especially in new technology areas. There is no easy solution in this situation, other than: ● Hire good people ● Management should 'ruthlessly prioritize' quality issues and maintain focus on the customer ● Everyone in the organization should be clear on what 'quality' means to the customer 22. How does a client/server environment affect testing?
Client/server applications can be quite complex
due to the multiple dependencies among clients, data communications, hardware, and servers. Thus testing requirements can be extensive. When time is limited (as it usually is) the focus should be on integration and system testing. Additionally, load/stress/performance testing may be useful in determining client/server application limitations and capabilities. There are commercial tools to assist with such testing. 23. How can World Wide Web sites be tested?
Web sites are essentially client/server
applications - with web servers and ‘browser’ as a client. Consideration should be given to the interactions between html pages, TCP/IP communications, Internet connections, firewalls, applications that run in web pages (such as applets, JavaScript, plug-in applications), and applications that run on the server side (such as cgi scripts, database interfaces, logging applications, dynamic page generators, asp, etc.). Additionally, there are a wide variety of servers and browsers, various versions of each, small but sometimes significant differences between them, variations in connection speeds, rapidly changing technologies, and multiple standards and protocols. The end result is that testing for web sites can become a major ongoing effort. Other considerations might include: ● What are the expected loads on the server (e.g., number of hits per unit time?), and what kind of performance is required under such loads (such as web server response time, database query response times). What kinds of tools will be needed for performance testing (such as web load testing tools, other tools already in house that can be adapted, web robot downloading tools, etc.)? ● Who is the target audience? What kind of browsers will they be using? What kinds of connection speeds will they by using? Are they intra- organization (thus with likely high connection speeds and similar browsers) or Internet-wide (thus with a wide variety of connection speeds and browser types)? ● What kind of performance is expected on the client side (e.g., how fast should page appear, how fast should animations, applets, etc. load and run)? ● Will down time for server and content maintenance/upgrades be allowed? How much? ● What kinds of security (firewalls, encryptions, passwords, etc.) will be required and what is it expected to do? How can it be tested? ● How reliable are the site's Internet connections required to be? And how does that affect backup system or redundant connection requirements and testing? ● What processes will be required to manage updates to the web site's content, and what are the requirements for maintaining, tracking, and controlling page content, graphics, links, etc.? ● Which HTML specification will be adhered to? How strictly? What variations will be allowed for targeted browsers? ● Will there be any standards or requirements for page appearance and/or graphics throughout a site or parts of a site?? ● How will internal and external links be validated and updated? How often? ● Can testing be done on the production system, or will a separate test system be required? How browser caching, variations in browser are option settings, dial-up connection variability’s, and real-world internet 'traffic congestion' problems to be accounted for in testing? ● How extensive or customized are the server logging and reporting requirements; are they considered an integral part of the system and do they require testing? ● How are cgi programs, applets, JavaScript’s, ActiveX components, etc. to be maintained, tracked, controlled, and tested? Some Guidelines ● Pages should be 3-5 screens max unless content is tightly focused on a single topic. If larger, provide internal links within the page. ● The page layouts and design elements should be consistent throughout a site, so that it's clear to the user that they're still within a site. ● Pages should be as browser-independent as possible, or pages should be provided or generated based on the browser-type. ● All pages should have links external to the page; there should be no dead-end pages. ● The page owner, revision date, and a link to a contact person or organization should be included on each page. Many new web site test tools have appeared in the recent years. 24. How is testing affected by object-oriented designs? Well-engineered object-oriented design can make it easier to trace from code to internal design to functional design to requirements. While there will be little affect on black box testing (where an understanding of the internal design of the application is unnecessary), white- box testing can be oriented to the application's objects. If the application was well-designed this can simplify test design. 25. What is Verification & Validation? Verification is the process of confirming that software meets its specifications. It typically involves reviews and meetings to evaluate documents, plans, code, requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and inspection meetings. Validation is the process of confirming that it meets the user requirements. It typically involves actual testing and takes place after verifications are completed. The term 'IV & V' refers to Independent Verification and Validation. 26. What is Quality? In simple terms Quality is “conformance to Requirement”. Quality software is reasonably bug-free, delivered on time and within budget, reliability, user friendly, easy to use, meets requirements and/or expectations, and is maintainable. However, quality is obviously a subjective term. It will depend on who the 'customer' is and their overall influence in the scheme of things. A wide-angle view of the 'customers' of a software development project might include end-users, customer acceptance testers, customer contract officers, customer management, the development organization's management/accountants/testers/salespeople, future software maintenance engineers, stockholders, magazine columnists, etc. Each type of 'customer' will have their own slant on 'quality' - the accounting department might define quality in terms of profits while an end- user might define quality as user-friendly and bug-free. 27. What is the difference between Quality Assurance and Quality Control? QUALITY ASSURANCE Quality assurance consists of the auditing and reporting functions of management. The aim of quality assurance is to provide management with the data necessary to be informed about product quality is meeting its goals. Software QA involves the entire software development PROCESS - monitoring and improving the process, making sure that any agreed-upon standards and procedures are followed, and ensuring that problems are found and dealt with. It is oriented to 'prevention'. Quality assurance is to examine and measure the current software development process and find ways to improve it with a goal of preventing bugs from ever occurring. Organizations vary considerably in how they assign responsibility for QA and testing. Sometimes they're the combined responsibility of one group or individual. Also common are project teams that include a mix of testers and developers who work closely together, with overall QA processes monitored by project managers. It will depend on what best fits an organization's size and business structure. QUALITY CONTROL Quality control is the process of variation control. Quality control is the series of inspections, reviews and tests generated throughout the development life cycle to guarantee that each work product meets the requirements placed upon it. Quality control activities may be fully automated, manual or combination of automated tools and human interaction
Quality Assurance Quality Control
Quality Assurance Quality Control makes sure you are makes sure the result doing the right of what you have things, the right way. done is what you expected. It focuses on building It focuses on Testing in Quality hence for Quality hence preventing defects. detecting defects. It deals with Process. It Deals with Project. It’s used for entire It’s used in testing life Cycle. part in SDLC. QA is a preventive QC is a corrective Process. Process.
28. What is Severity, Priority and Impact
who will decide what? Impact Impact is the extent to which the presence of bug in software has affected the performance, functionality or usability. Bug impact can be categorized as follows: Low Impact This is for minor problems, such as failure at extreme boundary conditions that are unlikely to occur in normal use or error is layout etc. Medium Impact When a problem is required in the specs but tester can go on with testing. When there is a workaround in available. High Impact For serious Problems with no workarounds affecting the main functionality. Ex. System crash or loss of functionality. Severity Severity indicates how bad the bug is and reflects its impact to the product and to the user. The severity assigned to a defect is dependent on: phase of testing, impact of the defect on the testing effort, and the Risk the defect would present to the business if the defect was rolled- out into production. Using the "Login Screen" example if the current testing phase was Function Test the defect would be assigned a severity of "Medium" but if the defect was detected or still present during System Test then it would be assigned a severity of "High". Severity Levels can be defined as ● Urgent / Show Stopper (System crash, data loss, data corruption etc.) ● Medium / Workaround (Operational error, wrong result, loss of functionality etc.) ● Low ( Minor problems , misspelling ,UI layout issue or rare occurrence etc) Priority Priority indicates how important is to fix the bug and when it should be fixed. It describes the order in which bug should be fixed. Priority level can be defined as ● L1 Fix Immediately ( blocks further testing or highly visible) ● L2 Fix as soon as possible or Must fix before the next milestone ● L3 Must Fix before final ● L4 Should fix if time permits ● L5 Optional ( Would like fix but can be released as is ) 29. What is a Test Driver? Test Driver is a software module or applications used to invoke a test and often provide test data, controls and monitors execution, and reports outcomes. Test drivers are used for the testing of sub-modules in the absence of main control module in Bottom-Up Integration approach. 30. What is a Stub? Stubs are the opposite of drivers in that they don’t provide control or operate the software being tested receive or respond to the data the software sends. Test Stubs are specialized implementation element used for testing purpose, which stimulates a real component. Stubs are programs or components that are used to interface with subsystem. Test stubs are used in case of Top-Down approach, where the main control module is to be tested in absence of sub- modules. 31. What is the test data? Test data is the raw data used for executing the test case. 32. What is a test Log? Test Log is a collection of raw output captured during a unique execution of one or more tests, usually representing the output resulting from the execution of a Test Suite for a single test cycle run. 33. What is a Test Harness? Test Harness is a small program specially written to test a particular subroutine or module. It feeds known data to the module being tested, and displays the results. 34. What is a Walkthrough? A 'walkthrough' is an informal meeting for evaluation or informational purposes. Little or no preparation is usually required. In Walkthrough the programmer who wrote the code formally presents it to a small group of five or so other programmer and testers. The programmer reads the code line by line or function by function explain what the code does and why. The reviewers receive the copy of the software in advance so they can write their comments and questions to be posed in the review session. 35. What is an Inspection? An inspection is more formalized than a 'walkthrough', typically with 3-8 people including a recorder to take notes. Presenter or Reader is not the original programmer. The subject of the inspection is typically a document such as a requirements spec or a test plan, and the purpose is to find problems and see what's missing, not to fix anything. Attendees should prepare for this type of meeting by reading thru the document; most problems will be found during this preparation. The result of the inspection meeting should be a written report. Thorough preparation for inspections is difficult, painstaking work, but is one of the most cost effective methods of ensuring quality. Since bug prevention is far more cost-effective than bug detection. The Objectives of Inspection are: ● To find problems ● To verify that work has been properly done ● Focus on whether the product meets all requirements Benefits of Inspections are ● Provide data on Product and process effectiveness. ● Build technical knowledge among team members ● Increase the effectiveness of software validation testing. 36. What are the different types of testing? Black box testing Black Box Testing is not based on any knowledge of internal design or code. Tests are based on requirements and functionality. It is also known as behavioral testing. Black Box testing attempts to find errors in the following categories. ● Incorrect or missing functions. ● Interface errors ● Errors in data structures or external database access. ● Behavioral or performance errors. ● Initialization and termination errors. Most popular black box testing techniques are ● Equivalence Partioning: Selecting test cases is the single most important task that software testers do and Equivalence portioning is the process of methodically reducing the Huge (Infinite) set of possible test cases into a much smaller, but still equally effective set. It is a software testing technique that involves identifying a small set of representative input value that invoke as many different input conditions as possible. It divides the Input Domain of a program into classes of data from which test cases can be derived. ● Boundary Value Analysis: In Boundary Value Analysis technique we select test cases that exercise boundary values. It is a test data selection method in which value are chosen to lie along data extremes. Boundary Value typically includes maximum, minimum, just inside/outside boundaries and typical values (Default, Empty, Blank, Null and Zero). ● Cause-Effect Graphing: A testing technique in which aids in selecting, in a systematic way, a high yield set of test cases that relates causes to effects to ambiguities in specifications: o Step 1: Identify the causes (input conditions) and effects (output conditions) of the program under test. o Step 2: for each effect, identify the cause that can produces that effect. Draw a cause effect graph. o Step 3: Generate a test case for each combinations of input conditions that make some effects to be true. ● Error Guessing: In this technique, enumerate a list of possible errors or error prone situations from intuitions and experience and then write test cases to expose those errors. White box testing White box testing is based on knowledge of the internal logic of an application's code. It is also known as glass box, structural, clear box or open box testing. White box testing techniques are: Statement Coverage: Test cases are written to execute every statement at least once. Decision Coverage: Test cases are written to test true and false of every decision. Condition Coverage: This technique is used to write test cases such that each condition in a decision takes on all possible outcomes at least once. Decision-Condition Coverage: The technique is used to write test cases such that each condition in a decision takes on all possible outcomes at least once and each decision takes on all possible outcomes at least once. Multiple-Condition Coverage: The technique used to write test cases to exercise all possible combination of True and False of condition within a decision. Basis Path Testing: It is a testing technique which is focus on writing test cases which execute all possible Paths at least once. Loop Testing; It is a technique which is used to checks the validity of the loop constructs of all type of Loops (Simple, Nested, Concatenated and Unstructured Loops). Data Flow Testing: It is a testing technique in which that selects the test paths of a program according to the variable definition and its use in the program. Unit testing The most 'micro' scale of testing; to test particular functions or code modules. Typically done by the programmer and not by testers, as it requires detailed knowledge of the internal program design and code. Not always easily done unless the application has a well-designed architecture with tight code; may require developing test driver modules or test harnesses. Integration testing After all modules are developed and tested then Integration testing of combined parts of an application to determine if they function together correctly. The 'parts' can be code modules, individual applications, client and server applications on a network, etc. This type of testing is especially relevant to client/server and distributed systems. This type of testing is especially useful to expose faults in the interfaces and in the interaction between integrated components. Integration testing in large refers to the whole system being joined. There are two rules that should be followed in Integration testing: Be careful with the Interface especially with ● Number of parameters ● Required Vs Optional ● Order of Parameters ● Type / Data format ● Length ● Definition Use Systematic Incremental Integration Testing Incremental integration testing It is a continuous testing of an application as new functionality is added; requires that various aspects of an application's functionality be independent enough to work separately before all parts of the program are completed, or that test drivers be developed as needed; done by programmers or by testers. There are two ways to perform Integration testing ● Top Down approach ● Bottom Up approach System testing Black-box type testing that is based on overall requirements specifications; covers all combined parts of a system. The only things we should be testing at the System Test stage are things that we couldn’t test before. System Testing: ● Does not Test the system functions ● Compares the system with its objectives ● External specification not used to composed the tests ● System test cases are derived from the user documentation and requirements ● Compares user documents to program objectives. Type of System Testing that are done is: ● Volume Testing ● Load Stress Testing ● Usability Testing ● Security Testing End-to-end testing It is similar to system testing; the 'macro' end of the test scale; involves testing of a complete application environment in a situation that mimics real-world use, such as interacting with a database, using network communications, or interacting with other hardware, applications, or systems if appropriate. Sanity Testing or Smoke testing Typically an initial testing effort to determine if a new software version is performing well enough to accept it for a major testing effort. For example, if the new software is crashing systems every 5 minutes, bogging down systems to a crawl, or corrupting databases, the software may not be in a 'sane' enough condition to warrant further testing in its current state. This testing is also known as Cursory Testing. It normally includes a set of core tests of basic GUI functionality to demonstrate connectivity to the database, application servers, Printers etc. Regression testing The selective Re-testing of a software system that has been modified to ensure that any bugs have been fixed and that no other previously working functions have failed as a result of modifications and that newly added features have not created problems with previous version of software. It can be difficult to determine how much re-testing is needed, especially near the end of the development cycle. Automated testing tools can be especially useful for this type of testing. The idea behind regression test is simple. We know that changes to an existing system often cause other things to break. To detect when this happens, we keep a set tests (regression test or RTS) containing tests of important things that used to work fine. Acceptance testing It is final testing based on specifications of the end-user or customer, or based on use by end- users/customers over some limited period of time. It is a formal Test conducted to determine whether or not a system satisfies its acceptance criteria and to enable customers to determine whether or not accept the system. The goal of acceptance testing is to verify that the software is ready to use and it is performing the functions for which the software was built. Installation Testing Installation Testing is the testing that takes place at a user’s site with the actual hardware and software that will be part of the installed system configuration. The testing is accomplished through actual or simulated use of the software being tested in the environment in which it is supposed to function. This type of testing is performed to ensure that all Install features and options are working properly. Tests are done on different software and hardware configurations. The objective of Installation testing is to verify that the product installs without hanging, crashing, or exhibiting any other installation failures. Features that can be checked during installation test are: ● Installation with minimum space. ● Installation with minimum RAM required. ● Installation with removable drives. ● Drives other than the default Drives. ● Clean System (with no other software installed ) ● Dirty System (Configuration with other programs like firewall, antivirus installed) ● Installation with full, typical and custom install. ● User Navigation Buttons and Input Fields etc ● Licensing Mode ● Testing of full, partial, or upgrade processes. Un-Installation Testing The objective of Un-Installation testing is to verify that uninstalling the product does not cause chronic errors or render the operating system useless. The Un-Installation of the product also needs to be tested to ensure that all data, executables, and DLL files are removed. The Un- Installation of application is tested using Command Line, Add / Remove programs and Manual Un-Installation. Compatibility testing Software Compatibility testing means checking that software interacts with and shares information correctly with other software. The interaction could occur between two programs simultaneously running on the same computer or even on different computers connected through some type of medium (Internet or Intranet). Testing can be done on: ● Different Version of software ( Backward and Forward Compatibility) ● Different Platforms ( Operating Systems) ● Data Sharing compatibility Exploratory testing Often taken to mean a creative, informal software test that is not based on formal test plans or test cases; testers may be learning the software as they test it. Exploratory testing is especially useful in situation when little is known about the project or with no specification is available. Monkey Testing Monkey testing refers broadly to any form of automated testing done randomly and without any typical user bias. Calling such tools monkey derives from variations of popular aphorism. “That if you had a million monkeys typing on a million keyboards for a million years, statistically they might write a Shakespearean play or some other great work” All that random pounding of keys could accidentally hit the right combination. Security testing Testing how well the system protects against unauthorized internal or external access, willful damage, etc; may require sophisticated testing techniques. Ad-hoc testing It is similar to exploratory testing, but often taken to mean that the testers have significant understanding of the software before testing it. Context-driven testing Testing driven by an understanding of the environment, culture, and intended use of software. For example, the testing approach for life-critical medical equipment software would be completely different than that for a low-cost computer game. Alpha testing Testing of an application when development is nearing completion; minor design changes may still be made as a result of such testing. Typically done by end-users or others, not by programmers or testers. Beta testing Testing when development and testing are essentially completed and final bugs and problems need to be found before final release. Typically done by end-users or others, not by programmers or testers. Mutation testing A method for determining if a set of test data or test cases is useful, by deliberately introducing various code changes ('bugs') and retesting with the original test data/cases to determine if the 'bugs' are detected. Proper implementation requires large computational resources. Static Testing Static Testing is testing something that is not running or Examining and reviewing. It is also known as testing the specifications (Black Box Testing). Dynamic Testing Dynamic Testing is the testing that involves Testing, running or using the software. Bebugging The Process of intentionally adding known faults to those already in a computer programs for the purpose of monitoring the rate and removal, and estimating the number of faults remaining in the program is known as Bebugging. Performance testing Performance testing is a class of tests implemented and executed to characterize and evaluate the performance such as Timing profiles, Execution Flow, Response Time, Throughput, Turnaround time and Operation Reliability and limits. Term often used interchangeably with 'stress' and 'load' testing. Ideally 'performance' testing (and any other 'type' of testing) is defined in requirements documentation or QA or Test Plans. Typical Goals of performance testing are to: ● Identify inefficiencies and bottlenecks with regard to application performance. ● Enable the underlying defects to be identified, analyzed, fixed and prevented in the future. ● Provide information to tune the application for maximum performance ● Reduce hardware cost Types of performance testing are Benchmark Testing It is kind of testing that compares the performance of new software with existing products in the market. Comparing software weaknesses and strengths to competing products. Contention Testing This test that a system can handle multiple demands of clients on the same resource. A resource could be a data records, memory or something else which could be accessed by user or application. Load testing It is testing an application under heavy loads, such as testing of a web site under a range of loads to determine at what point the system's response time degrades or fails. Purpose of Load Testing is done to ensure that application has a good response time during peak usage. It is also known as Scalability testing. The typical objectives of Load Testing are: ● Partially Validate the System ● Check Scalability requirements ● Determine if the application will support typical load ● Locate performance bottlenecks ● Identify the point at which load becomes so great that the application fails to meet performance requirements Stress testing Term often used interchangeably with 'load' and 'performance' testing. Also used to describe such tests as system functional testing while under unusually heavy loads, heavy repetition of certain actions or inputs, input of large numerical values, large complex queries to a database system, etc. This type of tests verifies the target-of-tests performance behavior when abnormal or extreme conditions are encountered. The idea is to stress a system to the breaking point in order to find bugs that will male that break potentially harmful. The system is not expected to process the overload without adequate resources, but to behave (fail) in a decent manner. The purpose of stress testing is to reveal issues related to the product’s performance under extreme/ non normal operating environments (low system resources, heavy load) and also to quantify the stress at which a system response time significantly degrades. Volume Testing Volume Testing will seek to verify the physical and logical limits to a system capacity and ascertain whether such limits are acceptable to meet the project capacity. It is the testing where the system is subjected to large volumes of data. Volume testing is performed to find faults at full or high volume. Configuration Testing This tests the software under different hardware and software configurations. Typical objectives of configuration testing are to: ● Determine the effect of adding or modifying hardware resources like ( Memory, Disk Space, Processors, Load Balancers etc) ● Determine an Optimal system Configuration ● Identifying software Unique features that work with special hardware Configuration Recovery testing Testing how well a system recovers from crashes, hardware failures, or other catastrophic problems. It tests system response to presence of errors or loss of data. This testing aimed at verifying the system ability to recover from the varying degrees of failure. In recovery testing we check ● Data recovery from back ups etc. ● Fault Tolerance ● Time to Recover ( MTTR) ● Processing faults must not cause overall system to cease. ● Recovery testing is a system that forces the software to fail in a variety of ways and verifies that recovery is properly performed. It is also known as Failover Testing. Functional testing Black-box type testing geared to functional requirements of an application; this type of testing should be done by testers. It is done to check the software is functioning properly according to user requirements. This doesn't mean that the programmers shouldn't check that their code works before releasing it (which of course applies to any stage of testing.) Usability testing Testing for 'user-friendliness'. Clearly this is subjective, and will depend on the targeted end- user or customer. User interviews, surveys, video recording of user sessions, and other techniques can be used. Programmers and testers are usually not appropriate as usability testers. Usability testing evaluates the system from end user perspective. Usability testing includes the following type of test: ● Human Factor ● Aesthetics ● Consistency ● Online and Contest Sensitive help ● Wizards and Agents ● User Documentation ● Training Materials ● Check for Standards and Guidelines ● Flexible ● Comfortable ● Useful ● Intuitive and Easy to learn/use 37. What is test metrics? Test Metrics and statistics are the means by which the progress and the success of the project, and the testing are tracked. The Test planning process should identify exactly what information will be gathered, what decision will be made with them, and who will be responsible for collecting them. Example of Test metrics that might be useful are ● Total bugs found daily over the course of project ( Bug Found Rate ) ● List of bugs that still need to be fixed ( Pending Bugs ) ● Current bugs ranked and how severe the are ( Severity of Bugs ) ● Total Bugs Found per Tester ( Average Bugs / Tester ) ● Number of Bugs Found per Software Feature ( Bugs / Module ) 38. What is the difference between defect, error, bug, failure and fault? These are different terms used to describe bugs; however there is a subtle difference in them. Formal Definition of a Software Bug is ● The Software doesn’t do something that the product specification says it should do. ● The Software does something that the product specification says it shouldn’t do. ● The Software does something that the product specification doesn’t mention. ● The Software doesn’t do something that the product specification doesn’t mention but should. ● The Software is difficult to understand, hard to use, Slow, or – in the Software Tester’s eyes – will be viewed by the end user as just plain not right. Formal Definition of Error is An Error is a human action that produces the incorrect result. Defect Presence of the error at the time of Software execution is known as Defect. Fault A Fault is a software Defect that cause a Failure. Failure A Failure is the unacceptable departure of a program operation from program requirement. 39. What is a Product Specification? A Product Specification is an agreement among the software development team. It defines the product they are creating, detailing what it will be, how it will act, what it will do, what it won’t do. This agreement can range in form from a simple verbal understanding to a formalized written document. 40. How do you determine, what to be tested? It is not possible to test software completely because ● The Number of possible input is very large. ● The number of possible Output is very large. ● The specification of the software is very subjective. ● The number if Independent path is too much. So the total no of combination is too large to test. It is near to impossible to test software completely. However if every possible scenario is not tested, then there is a risk that customer uses the application and may find the bugs in it. That is the Risk involved in the Testing. Whenever there is too much to do and not enough time to do it, we have to prioritize the tasks. “Prioritize tests so that whenever you stop testing you have done the best testing in the time available”. The approach is called Risk Driven Testing. We need to rate each Module or Unit on two variable IMPACT and LIKELIHOOD. Impact Impact is the extent to which the presence of bug in software has affected the performance, functionality or usability. Impact is what would happen if this piece somehow malfunctioned. Would it destroy the customer database? Or would it just mean that the column heading in a report is not aligned. Likelihood Likelihood is an estimate of how probable it is that this piece would fail. Possibility of failure. Together, Impact and Likelihood determine Risk for the piece. Risk = 3.077 * ((1.5 * Impact) 2 + (Likelihood) 2 ) The Ideal way is to test the software optimally, neither too much, nor too little. Check the part with High Risk value first. 41. What is Software Reliability? Software Reliability is the probability that the software will provide failure- free operation in a fixed environment for a fixed interval of time. 42. What is the BUG Life Cycle? A Bug Life Cycle refers to the stages through which it passes before becoming a Closed Bug. The bug Life cycle is moderately flexible according to the needs of the organization. The simplest Bug Life Cycle is Bug Found (Testers finds and logs bug) Open (Bug assigned to the Programmer, Programmer fixes bug and assigned it back to tester) Resolved (Tester confirms bug is resolved) Closed. The Complex Bug Life Cycle is: Testers open the Bug and Bug is assigned to the programmer, but the programmer doesn’t fix it. He assigned it to project manager to decide whether to fix it or not. The Project manager can review it and then depends upon circumstances; he can defer the bug, close it or assign it back to the programmer to fix it. 43 What is the testing lifecycle and explain each of its phases? Testing Life Cycle begins with estimating the effort at the macro level. It is followed by project initiation and then the system is studied in more details. The Planning starts for the testing and a Test Plan is prepared which is a document that guides about how the testing is to be conducted, what kind of testing to be done, what are the roles and responsibilities of the people involved. After the Plan is signed off from the Client, the testing on the project starts, by designing the test cases, generates the scripts using the tools, and then execution of the test cases. After Testing, the bugs are reported by recording them in an excel sheet or Bug Tracking System. The defects are reported to the development team, modifications are made and after that regression testing is done. Finally analysis and summary reports are done. Phases of Testing Life Cycle are: ● Efforts Estimation ● Project Initiation ● System Study ● Test Plan ● Design Test Cases ● Test Automation ● Execute Test Cases ● Report Defects ● Regression Test ● Analysis ● Summary Reports. 44. Describe Software Development Life Cycle? Software Development Life Cycle (SDLC) is the overall process of developing information system through a multi-step process from investigation of initial requirement through analysis, design, implementation and maintenance. There are many different models and methodologies, but each generally consists of series of defined steps or stages. The Software Development can be categorized into four distinct stages, which are: Status Quo: The Phase which represent the current state of affairs. Problem Definition: During this phase the specific problem to be solved is defined and analyzed. Technical Development: This Phase solves the problem through the application of any technology. Solution Integration: Delivers the result (Document, programs, data, new product) . There are many popular SDLC models. ● Waterfall ● Spiral ● Prototype ● Rapid Application Model (Big Bang) ● V Model
WATERFALL MODEL (Linear
Sequential Model) Waterfall model consists of four steps, System Analysis and Design, Code, Test and Support. Output of one step is used as Input in next step. So unless one step is finished next step can’t be initiated. System Analysis and Design (Analysis and Design): In this phase, the software overall structure is defined. In terms of the Client/Server technology, the number of tier needed for the solution, the database design, the data structure design etc all defined in this phase. Analysis and Design are very crucial in whole development cycle because any glitch in the design phase is very expensive to solve in later stage of the Development. The Logical system of the product is developed in this Phase. Code Generation The design is translated into code by using a suitable programming language and tools. Programming tools like debuggers, compliers and Interpreters are used. Testing Once the code is generated, testing begins. Different Testing methodologies are used. Maintenance and Support Software will definitely undergo changes once it is delivered to customers. Maintenance and Support is Provided in this Stage. SPIRAL MODEL This model demonstrates the use of incremental development and delivery, iteration, evaluation and feedback. ● The project moves continually from planning of the next increment, to risk assessment, through implementation and evaluation. ● The output from evaluation feeds back into next planning stage, informing next round of decision making. ● Focuses on prototyping and formalizes an evolutionary approach to software development. ● Requires an explicit cost-benefit analysis during each cycle. ● User involvement throughout the development process. ● Validation and prioritization of requirements. ● Tends to work best for small projects. RAPID APPLICATION MODEL The RAD is a linear sequential software development process that emphasizes an extremely short development cycle. The RAD model is a high speed adaptation of the Linear Sequential Model in which Rapid development is achieved by using a component based construction approach. RAD has following phases: Business Modeling (Analysis) The information flow among the Business functions is modeled in a way to answer the following questions: ● What information drives the Business process? ● What information is generated? ● Who generate it? ● Where does the information go? ● Who Process it? Data Modeling (Design) The information flow is refined into a set of data objects that are needed to support the business. The attributes of each object is identified and the relationships between these objects are defined. Process Modeling (Design) The Data objects defined in the data modeling phase are transformed to achieve the information flow necessary to implement a business function. Processes are created for adding, modifying, deleting, or retrieving a data object. Application generation (Code) RAD assumes the use of the RAD tools like VB, VC++ etc. The RAD works to reuse existing program components or create reusable components. In all case automated tools are used to facilitate construction of the Software. Testing and Turnover Since the RAD process emphasizes reuse, many of the program components have already been tested. This minimizes the testing and development time. PROTOTYPE MODELING This is a cyclic version of the linear model. In this model once the requirement analysis is done and the design for a prototype is made, the development process gets started. Once a working prototype is made it is delivered to customer. The customer test the package and gives his feed back, Once again whole development process is implemented. After a finite number of iterations, the final software package is given to customer. V MODEL In this model Testing is done side by side on each Phase. Starting from the bottom of the first test level is Unit Testing. It involves checking that each feature specified in the “Component Design” has been implemented in the component. As the modules are built they are tested on the basis of module design. As the components are constructed and tested they are linked together to check if they work with each other Integration Testing is done. Once the Integration testing is done and the entire system is built then it has to be tested against the “System Specification” to check if it delivers the features required, System Testing is done. After system testing is finished, Acceptance Testing checks the system against the “Requirement”. 45. What is the Dimension or measure of Quality? Ans. Quality is defined as “Conformance to Requirements”. FURPS is often used as a conceptually complete system. It is described as: Functionality: Evaluate the feature set and capabilities of the program, the generality of the functions delivered and the security of overall system. Usability: Consider human factors, overall aesthetics, consistency, and documentation. Reliability: Measure the frequency and severity of failures, the accuracy of outputs, the ability to recover from failure, and the predictability. Performance: Measure the processing speed, response time, resource consumption, throughput and efficiency. Supportability: Measure the maintainability, testability, configurability and ease of installation. 46. Describe Rational Unified Process? Rational Unified Process is a Software Engineering Process developed & marketed by Rational Software. Rational Unified Process is software Engineer process that provides a disciplined approach for assigning tasks and responsibilities within a development organization. It enhances the productivity through guidelines, templates tools mentors for all software development lifecycle product activities. Rational implements six best practice for Software development process: ● Develop Iteratively ● Manage Requirements ● Use Component Architectures. ● Model Visually (UML) ● Continuously verify Quality ● Control Change (UCM) Develop Iteratively Iterative development organizes a software project into smaller, more manageable piece of software that is developed in iterations. A full specification is not required to start the development, instead each iteration focused only on those requirement assigned to that iteration. Iteration has a well defined start and end points and incorporates the activities of requirements analysis, software modeling and design, implementation and testing, to deliver an executable release of the software. (Model a Little Code a Little Test a Little) Manage Requirements The requirements are dynamic and change throughout the life cycle of a project and it is difficult to completely state the system’s requirements prior to the start of the development process. Managing the requirement is the systematic approach to Eliciting, Organizing, documenting and managing the changing requirement of the software. Use Component Architectures Architecture is the part of the design, on how the system will be built. It is the most important aspect that can be used to control the iterative and incremental development. Software components are the basis of re-use. They provide common solution to a wide range of common problems, thereby increasing overall productivity and quality of organization. A Software component is a piece of software, a subsystem, a module that performs a well defined function, marked by a boundary and can be integrated in a well defined architecture. In a modular architecture the different components are individually built tested and then integrated as a whole system. Visually Model Software (UML) A model describes the complete system from a particular perspective for better understanding of the system. UML is the standard modeling language used to represent the problem clearly by means of diagrams thereby reducing ambiguities among the different team members working on project. UML is a tool to visualize, specify, constructs and documents the software system being developed. Following diagrams are used normally: Use Case Diagram: This diagram represents the various actors and their interaction with the system. Class Diagram: This diagram depicts various classes and their associations with other classes. Object Diagram: They represent various objects and links with each other. State Diagram: These diagrams illustrate the behavior of the system. Collaboration Diagram: These diagrams represent a set of classes and the messages sent and received by those classes. Sequence Diagram: These diagrams represent the order of messages that are exchanged between the classes. Activity Diagram: These diagrams are used to illustrate the flow of events. Deployment Diagrams: These diagrams show the mapping of software components to the nodes involved in the physical implementation of the system Continuously Verify Quality Testing measures the software quality by finding the faults. Therefore, correcting the defects during the development is less expensive in comparison to the when the product is deployed to the customer. The cost of finding and correcting bugs increased as we move to next stage of development life cycle. Control Change (UCM) Unified Change Management is an activity based management that takes the integration of software configuration management and change management. It provides a pre-defined process that organizes work around activities and artifacts. The process describes how to control, track and monitor the changes to enable successive iterative development. Change Request management is a part of UCM. Changes come from many sources at all times during development. We must capture these changes so that we can assess impact before changes are implemented. All these changes enter into Change Request System and accordingly changes are incorporated into the system. 47. Describe phases of Rational Unified Process. Rational Unified process has the following four phases in the project lifecycle ● Inception Phase ● Elaboration Phase ● Construction phase ● Transition Phase Each phase concludes with a well defined milestone- a point of time which certain critical decision must be made and goals must be achieved. Inception Phase During the inception phase, the business case is established and project scope is defined. This phase demonstrates the architecture, estimates the overall cost & schedule and the potential risks are identified. A business plan is developed to determine whether resources should be committed to the project. The Activities performed in this phase are: ● Formula project scope ● Plan and prepare a business case ● Create a candidate architecture The Outcome of the Inception phases are: ● Vision Document ● Development Case ● Use case model survey ● Initial glossary ● Initial Business case ● Initial risk assessment ● Project Plan MILESTONE: LIFECYCLE OBJECTIVES (LCO) Elaboration Phase The purpose of this phase is to analyze the problem domain, establish a sound architectural foundation, develop the project plan and eliminate the highest risk elements of the projects. During this phase, the vision, the detailed plan & architecture is baseline for the construction phase at a reasonable cost in a reasonable period of time. Activities performed in this phase are: ● Develop the vision and most critical use cases that drive architectural and planning decisions. ● Elaborating the process and the infrastructure of the development environment. ● Elaborate the architecture and select components. The outcome of the Elaboration phase is: ● A use case model (80% complete) ● Supplementary requirements ● An executable architecture ● Revised business case ● Revised risk list ● Development Plan MILESTONE: LIFECYCLE ARCHITECTURE Construction Phase During this phase, all the remaining component and application features are developed and integrated into the product and thoroughly tested. It is a manufacturing process where the emphasis in on resource management, controlling operations to optimize costs, schedules and quality. Activities performed in this phase are: ● Resource management, control and process optimization ● Complete component dev3lopment and testing against the defined evaluation criteria. ● Assessment of product release The outcomes of the construction phase are: ● The Software product, integrated on the adequate platform ● User Manual ● A description of the current release The release is often called as “Beta Release” MILESTONE: INITIAL OPERATIONAL CAPABILITY (IOC) Transition Phase The purpose of this phase is to deploy the software product to the user community. After handing over the product to the customer, maintenance of the product is required to develop new releases. This phase also includes training of the users. The Objective of this phase is: ● Achieving user self supportability ● Achieving final product baseline as rapidly and cost effective as possible. ● Achieving stakeholder concurrence. The activities performed in this phases are: ● Deployment-specific engineering ● Tuning activities ● Assessment of the deployment baselines against the complete vision and project acceptance criteria. The outcomes of this Phase are: ● A completed System 48. What is Cyclomatic complexity? Cyclomatic complexity is a simple notation for representing the logical control flow of the program. The calculated value of Cyclomatic complexity defines the number of independent paths. It provides the answer to the question to how many paths to look for in a program. The Cyclomatic complexity V(G) of the graph can be computed by any of the formulas: V (G) = EDGES –NODGES +2 V (G) = REGIONS IN FLOW GRAPH V (G) = PREDICATE NODES +1 49. How to perform Usability Testing? To carry out usability testing, following things need to be considered: ● Identify representative tasks. ● Preparation of a test schedule ● Book the required room. ● Identify the representative users and invite them to attend. Prerequisite for Usability testing ● Video Taping equipment (if used) ● A formal script so that all participants are treated same way. ● A consent form for video taping ● A pre-evaluation questionnaire to check that your participants match the required profile, and to check whether any effects observed are dependent on demographic attributes. ● A list of tasks, together with criteria for measuring whether they have been successfully completed. ● A post-evaluation questionnaire to measure user satisfaction and understanding. ● Cash or an appropriate thank you gift. The methods to collect usability information are; Participatory Design Workshop: A workshop in which developers, business representatives and user work together to design a solution. Contextual Enquiry: Contextual Enquiry is a technique for examining and understanding users and their workplace, tasks, issues and preference. Site visit materials: To carry out the visit at client site, following material is required A list of representative users. Including both expert and novice users. Logging sheets to make notes. You may consider audio or video recording. Demographic questionnaire for user profiling. User satisfaction questionnaire. 50. What is the cost of Quality? Cost of Quality can be calculated as C (Quality) = C (Conformance) + C (Non Conformance) Conformance cost includes testing and quality assurance. Non Conformance cost include fixing bugs, retesting, dealing with customer, damage to company image, lost business etc. 51. What is a bug tracking system? A Bug tracking system is a database that can be in the form of Excel worksheet or certain tools like Rational Clear Quest, Bugzilla etc in which all bugs are discovered or reported about an application are collected. Bug tracking system helps mange software development projects by tracking software bugs, action items, and change request with problem reports. 52. What is bug Report? A bug report is a formal report describing the details of bugs. Typical fields in the bug reports are: Bug No: Unique identifier given to the bug. Program/Module No: The name of a program or module that being tested. Version & Release No: The version no of the product that you are tested. Problem Summary: Precise to what the problem is. Report Type: Describes the type of problem found. (H65ardware or Software) Severity: Normally, how you view the bug. Various level of severity: Low, Medium, High, Urgent. Environment: Description of the environment. Detailed Description: Detailed description of the bug found. How to reproduce: Steps to reproduce the bug. Reported by: The name of the person who writes the report. Status: Status of the Bug. Open (The status of the bug when it entered) Fixed / feedback (The status of the bug when get fixed) Closed (The status of the bug when verified). Deferred (The status of the bug when it postponed) User error (The status of the bug when it is not a bug) Not a bug ( The status of the when it is not a bug) Priority: Assigned by the project manager who asks the programmer to fix bugs. 53. How to perform Website Testing? Stages of Website Testing There are numerous stages to testing, all of which are very important. Ranging from browser testing, to content testing, none should be excluded. Visual Acceptance Testing Visual Acceptance Testing is the first port-of- call for all Webmasters. This type of testing generally ensures that the site looks as it is intended to. This includes checking the graphic integration, and simply confirming that the site looks good. In this stage you should assess every page carefully to ensure that each looks the same, and that there's no "jumping". "Jumping" defines the situation where the interface moves slightly between pages. This should be avoided at all costs - not only does it look strange, but users are likely to see it as unprofessional, and after all, your aim is to achieve the most professional appearance possible. The site should be tested under different screen resolutions and colour depths. To do this, you can simply change the resolution of the screen you're using. However, the best possible way to do it is to view your site on someone else's screen, which allows you to test what the site will look like in different viewing environments. Functionality Testing Functionality testing is perhaps the most vital area of testing, and one which should never be missed. Functionality testing does tend to be a bit boring, but the benefits certainly outweigh the time and energy it takes to do this properly. Functionality testing involves an assessment of every aspect of the site where scripting or code is involved, from searching for dead links, to testing forms and scripts. In this stage of testing, you should also check all the scripts on your site. When testing scripts and forms, use "real-world" data (data that your users would input), as well as "extreme" data (data that's intended to show errors in the programing. Extreme data should be the kind of data which would not be input by your users, but is intended solely to show any problems with the site). This is extremely important on ecommerce systems in particular. Content Proofing This stage of testing removes any errors in your content, and should ensure that your site has a professional appearance. In this phase, you should reread each page on your site, and check for spelling and grammatical errors. Some Web development programs have built-in spell check software, which means you can check the spelling as you read. It's always a good idea to check the spelling and grammar of a page when you actually write it, as this will save you time when you reach the content proofing phase. At this point you should also make sure that any titles, buttons and product names are correct, and that the usage of common terms is consistent. Finally, you should double-check details such as copyright dates and trademark information. System and Browser Compatibility Testing This test phase is completed in order to ensure that your Website renders correctly on a user's screen. You will already have conducted tests on screen resolutions and colour depths (in Visual Acceptance Testing), so this need not be done again. To begin with, you should test several pages from your site on different browsers. I always test on Internet Explorer 4, 5 and 5.5, Netscape 4 and 6, and Opera. I would also advise you to try to get copies of Lynx and the WebTV software to test your site on those platforms too. This can be extremely important - if your site does not work properly with the Netscape browser, Netscape users will end up annoyed, and they'll go elsewhere. At this point, you would be best to test the site on different computers with different operating systems (including Windows 95, 98, Me, NT4.0 and 2000, Unix and Linux. You could also test on operating systems such as O/S but these aren't very commonly used, and you may have difficulty finding a computer that has them installed). The operating system doesn't affect your site as much as a browser will, but it is still advised that you test your site on different ones, just in case! Delivery Testing Delivery Testing is the point where you test your Website in a realistic environment. You should upload it to the server which you'll use (ensure that actual Web users can't access the site however, or they may be confused or annoyed at the errors they find, as they'll be unaware that the site is only being tested). You should browse through the site and change any remaining errors. This is a good time to check how long your site takes to download on various connections. The download time is very important, and you should keep the following rules of thumb in mind: Download Time = 0.1 Second When a Website (or anything, for that matter) operates as quickly as this, it appears to happen instantly to the user. Such loading times are not likely on the Web due to bandwidth constraints. Download Time = 1 Second If the site operates this quickly, the user won't have a chance to focus their attention somewhere else. The'll generally be engaged with what happens on your site because of the speed. Again, this time is also unlikely, however it's not impossible. Download Time = <15 Seconds This amount of time is accepted to be the threshold for keeping the user's attention focused. Feedback showing that progress is being made should be provided to the user, which is often best achieved by using interlaced images, however the browser progress bar may be sufficient. Download Time - >15 Seconds Over 15 seconds is considered to be too long to keep the user's attention focused, and they're likely to lose interest and do other things (e.g. use other Internet sites, check their email etc.) while waiting for your site to download. Or they may simply leave your site for another. User Acceptance Testing This stage should only take place after you have completed the previous four stages. In this stage, the Website should be presented to a range of test subjects, and you should observe how they react. You should note such things as whether they feel that your site takes too long to download or if they don't like part of the interface. This is an important stage because it allows you to gauge how the public will react to your site, and make changes which will ensure your users have the best possible experience. Scripting Tests Scripting tests, as completed in the "Functionality Testing" stage, are important, and many aspects of the scripts should be tested. Consider the Display Technologies. What you see in your browser is actually composed of many sources: HTML: There are a number of different versions of HTML, which are all similar, but which have different features and tags. The World Wide Web Consortium is the organisation that defines these different versions of HTML, and they allow you to validate your HTML on their Website. This is especially useful to ensure that your site is multi-platform capable. Database Access: In many ecommerce applications, you'll often construct a database of your customers using an online form that's filled in by users. You may also incorporate functionality that retrieves data from a database. So it's important to ensure that all scripting variables are defined properly, and that the database is in a directory which supports Read and Write access as a minimum, with Execute access often required as well. Check that you get the correct results from the database for each request that's entered. CGI-Bin Script: This is a common form of Server Side Scripting, and one that can often go wrong. When you test your CGI script, ensure that the "Path to Perl" is correct, and that the script works as desired. If any server side script is intended to be used by multiple users at once, ensure that it can handle them, and that the users don't "get in each other's way". To test this, simply arrange for a few of your friends to test the scripts at the same time. The different types of CGI scripts (Perl, awk, shell-scripts, etc.) need to be handled, and tests need to check the full operation, from the user input right through to the final result. Java, JavaScript, ActiveX: Java is part of many sites, and while using server side technologies is always preferred, there are some things that only Java can do. Where you have implemented Java, ensure that it looks professional, and does not ruin the look of your site. You should also be sure that the site will still work, and will degrade well on browsers which don't support Java, and in cases where Java has been disabled. Similarly, you should also be sure that you integrate ActiveX controls well. Testing your Search Engine Positions Search engines are an important part of generating traffic for your Website. You need to check your search engine rankings very often to ensure that you consistently achieve the "top spots". There are a number of resources to help you keep track of your search engine placements. Ensuring that you are constantly ranked number one is important, and is something you should check on regularly. For more information on Search Engines, please see SitePoint's PromotionBase, and Search Engine Watch. Testing your Users Testing your users, and the information that this provides, is very important. Many Webmasters design an online form for site users to fill in, but a better way to test your users is to use dedicated statistics software. Whenever you visit a Website, information is taken regarding your browser and operating system, and the pages you view are tracked. This information is extremely important to the site owner as it allows them to analyse their users. For example, if you found that 91% of your users ran Internet Explorer 5.5, you could perhaps tailor your Website to those users. Statistics software can also provide you with information, such as which part of the world your users are in. This is important as you can adapt your Website for specific countries, or produce multi-lingual versions, if you attract many foreign visitors. An example of a good statistics software package is the Enterprise Suite, produced by Webtrends. User testing and examination is an ongoing process, and one which should never stop. Conclusion As you can see, Website testing is a very important part of your role as a Webmaster or site owner. Whether it be an assessment completed during development, or the analysis of your impact on the audience after you've launched the site, testing is vital. It can save many good Websites from failing to satisfy their visitors. 54. Describes various documents used in Testing? I. PRAD The Product Requirement Analysis Document is the document prepared/reviewed by marketing, sales, and technical product managers. This document defines the requirements for the product, the "What". It is used by the developer to build his/her functional specification and used by QA as a reference for the first draft of the Test Strategy. II. Functional Specification The functional specification is the "How" of the product. The functional specification identifies how new features will be implemented. This document includes items such as what database tables a particular search will query. This document is critical to QA because it is used to build the Test Plan. QA is often involved in reviewing the functional specification for clarity and helping to define the business rules.
III. Test Strategy
The Test Strategy is the first document QA should prepare for any project. This is a living document that should be maintained/updated throughout the project. The first draft should be completed upon approval of the PRAD and sent to the developer and technical product manager for review. The Test Strategy is a high-level document that details the approach QA will follow in testing the given product. This document can vary based on the project, but all strategies should include the following criteria: Project Overview - What is the project. Project Scope - What are the core components of the product to be tested Testing - This section defines the test methodology to be used, the types of testing to be executed (GUI, Functional, etc.), how testing will be prioritized, testing that will and will not be done and the associated risks. This section should also outline the system configurations that will be tested and the tester assignments for the project. completion Criteria - These are the objective criteria upon which the team will decide the product is ready for release Schedule - This should define the schedule for the project and include completion dates for the PRAD, Functional Spec, and Test Strategy etc. The schedule section should include build delivery dates, release dates and the dates for the Readiness Review, QA
Process Review, and Release Board Meetings.
Materials Consulted - Identify the documents used to prepare the test strategy Test Setup - This section should identify all hardware/software, personnel pre-requisites for testing. This section should also identify any areas that will not be tested (such as 3rd party application compatibility.)
IV. Test Matrix (Test Plan)
The Test Matrix is the Excel template that identifies the test types (GUI, Functional etc.), the test suites within each type, and the test categories to be tested. This matrix also prioritizes test categories and provides reporting on test coverage. · Test Summary report · Test Suite Risk Coverage report Upon completion of the functional specification and test strategy, QA begins building the master test matrix. This is a living document and can change over the course of the project as testers create new test categories or remove non- relevant areas. Ideally, a master matrix need only be adjusted to include near feature areas or enhancements from release to release on a given product line. V. Test Cases As testers build the Master Matrix, they also build their individual test cases. These are the specific functions testers must verify within each test category to qualify the feature. A test case is identified by ID number and prioritized. Each test case has the following criteria: · Purpose - Reason for the test case · Steps - A logical sequence of steps the tester must follow to execute the test case · Expected Results - The expected result of the test case · Actual Result - What actually happened when the test case was executed · Status - Identifies whether the test case was passed, failed, blocked or skipped. · Pass - Actual result matched expected result · Failed - Bug discovered that represents a failure of the feature · Blocked - Tester could not execute the test case because of bug · Skipped - Test case was not executed this round · Bug ID - If the test case was failed, identify the bug number of the resulting bug. VI. Test Results by Build Once QA begins testing, it is incumbent upon them to provide results on a consistent basis to developers and the technical product manager. This is done in two ways: A completed Test Matrix for each build and a Results Summary document.
For each test cycle, testers should fill in a copy
of the project's Master Matrix. This will create the associated Test Coverage reports automatically (Test Coverage by Type and Test Coverage by Risk/Priority). This should be posted in a place that necessary individuals can access the information. Since the full Matrix is large and not easily read, it is also recommended that you create a short Results Summary that highlights key information. A Results Summary should include the following: · Build Number · Database Version Number · Install Paths (If applicable) · Testers · Scheduled Build Delivery Date · Actual Build Delivery Date · Test Start Date · Scope - What type of testing was planned for this build? For example, was it a partial build? A full-regression build? Scope should identify areas tested and areas not tested. · Issues - This section should identify any problems that hampered testing, represent a trend toward a specific problem area, or are causing the project to slip. For example, in this section you would note if the build was delivered late and why and what its impact was on testing. · Statistics - In this section, you can note things such as number of bugs found during the cycle, number of bugs closed during the cycle etc.
VII. Release Package
The Release Package is the final document QA prepares. This is the compilation of all previous documents and a release recommendation. Each release package will vary by team and project, but they should all include the following information: Project Overview - This is a synopsis of the project, its scope, any problems encountered during the testing cycle and QA's recommendation to release or not release. The overview should be a "response" to the test strategy and note areas where the strategy was successful, areas where the strategy had to be revised etc. The project overview is also the place for QA to call out any suggestions for process improvements in the next project cycle. Known Issues Document - This document is primarily for Technical Support. This document identifies workarounds, issues development is aware of but has chosen not to correct, and potential problem areas for clients. Installation Instruction - If your product must be installed as the client site, it is recommended to include the Installation Guide and any related documentation as part of the release package. Open Defects - The list of defects remaining in the defect tracking system with a status of Open. Technical Support has access to the system, so a report noting the defect ID, the problem area, and title should be sufficient. Deferred Defects - The list of defects remaining in the defect tracking system with a status of deferred. Deferred means the technical product manager has decided not to address the issue with the current release. Pending Defects - The list of defects remaining in the defect tracking system with a status of pending. Pending refers to any defect waiting on a decision from a technical product manager before a developer addresses the problem. Fixed Defects - The list of defects waiting for verification by QA. Closed Defects - The list of defects verified as fixed by QA during the project cycle. The Release Package is compiled in anticipation of the Readiness Review meeting. It is reviewed by the QA Process Manager during the QA Process Review Meeting and is provided to the Release Board and Technical Support. · Readiness Review Meeting: The Readiness Review meeting is a team meeting between the technical product manager, project developers and QA. This is the meeting in which the team assesses the readiness of the product for release. This meeting should occur prior to the delivery of the Gold Candidate build. The exact timing will vary by team and project, but the discussion must be held far enough in advance of the scheduled release date so that there is sufficient time to warn executive management of a potential delay in the release. The technical product manager or lead QA may schedule this meeting.
QA Process Review Meeting:
The QA Process Review Meeting is meeting between the QA Process Manager and the QA staff on the given project. The intent of this meeting is to review how well or not well process was followed during the project cycle.
This is the opportunity for QA to discuss any
problems encountered during the cycle that impacted their ability to test effectively. This is also the opportunity to review the process as whole and discuss areas for improvement.
After this meeting, the QA Process Manager
will give a recommendation as to whether enough of the process was followed to ensure a quality product and thus allow a release.
This meeting should take place after the
Readiness Review meeting. It should be scheduled by the lead QA on the project.
Release Board Meeting:
This meeting is for the technical product manager and senior executives to discuss the status of the product and the teams release recommendations. If the results of the Readiness meeting and QA Process Review meeting are positive, this meeting may be waived. The technical product manager is responsible for scheduling this meeting. This meeting is the final check before a product is released. Due to rapid product development cycles, it is rare that QA receives completed PRADs and Functional Specifications before they begin working on the Test Strategy, Test Matrix, and Test Cases. This work is usually done in parallel. Testers may begin working on the Test Strategy based on partial PRADs or confirmation from the technical product manager as to what is expected to be in the next release. This is usually enough to draft out a high -level strategy outlining immediate resource needs, potential problem areas, and a tentative schedule. The Test Strategy is then updated once the PRAD is approved, and again when the functional specifications are complete enough to provide management with a committed schedule. All drafts of the test strategy should be provided to the technical product manager and it is QA's responsibility to ensure that information provided in the document (such as potential resource problems) is clearly understood.
If the anticipated release does not represent a
new product line, testers can begin the Master Test Matrix and test cases at the same time the project's PRAD is being finalized. Testers can build and/or refine test cases for the new functionality as the functional specification is defined. Testers often contribute to and are expected to be involved in reviewing the functional specification. The results summary document should be prepared at the end of each test cycle and distributed to developers and the technical product manager. It is designed more to inform interested parties on the status of testing and possible impact to the overall project cycle.
The release package is prepared during the last
test cycle for the readiness review meeting.
Testing & The Role of a Test Designer
/ Tester The Role of the Test Designer / Tester is to design and document test cases, execute test cases, record test case results, document and track defects, and perform test coverage analysis. To fulfill this role the designer applies appropriate test analysis, test design, and coverage analysis methods as efficiently as possible while meeting the test organizations testing mandate. The objective is to obtain as much test coverage as possible with a minimum set of test cases. Responsibilities and Deliverables Test Case Design
A test case design is not the same thing as a test
case . the design captures what the Test Designer / Tester is attempting to accomplish with one or more test cases. This can be as informal as a set of notes or a formal deliverable that describes the content of the test cases before the actual tests are implemented. Test Cases
A test case is a sequence of steps designed to
test one or more aspect of the application. At a minimum, each test case step should include: a description of the action, supporting data, and expected results. The test case deliverable can be captured using a "test case template" or by using one of the several commercial / freeware / shareware tools available. Test Case Execution
Test case execution is the actual running or
execution of a test case. This can be done manually or by automated scripts that perform the actions of the test case.
Capturing Test Results
Capturing test results is a simple itemization of
the success or failure of any given step in a test case. Failure of a test case step does not necessarily mean that a defect has been found -- it simply means the application did not behave as expected within the context of the test case. There are several common reasons for a test case step to fail: invalid test design / expectations, invalid test data, or invalid application state. The tester should ensure that the failure was caused by the application not performing to specification and that can the failure can be replicated before raising a defect. Document Defects
The tester documents any defects found during
the execution of the test case. The tester captures: tester name, defect name, defect description, severity, impacted functional area, and any other information that would help in the remediation of the defect. A defect is the primary deliverable of any tester . it is what is used to communicate to the project team. Test Coverage Analysis The tester must determine if the testing mandate and defined testing scope have been satisfied -- then document the current state of the application. How coverage analysis is performed is dependent on the sources available to the tester. If the tester was able to map test cases to well formulated requirements then coverage analysis is a straightforward exercise. If this is not the case the tester must map test cases to functional areas of the application and determine if the coverage is "sufficient" -- this is obviously more of a "gut-check" than a true analysis. Testing Mandate and Scope The Test Designer / Tester must have a clear understanding of the Testing Mandate and Testing Scope before proceeding with their task - for more on Testing Mandates and Testing Scope see the associate article "Testing and The Role of a Test Lead / Test Manager". The temptation of any tester is to test "everything"; the problem is that this cannot be done with any application within a reasonable timeframe. The tester must ensure any test cases to be designed and executed fit into the scope of the current testing effort -- if not then either the scope needs to be redefined or the test cases need to be dropped. Test Phases and Test Case Design The testing phase impacts the style, content, and purpose of any given test case. If the designer can think of the test phases in terms of "levels of abstraction" or "range of view" then the types of tests that need to be implemented for any given phase of testing become apparent. Unit Test The test designer, in this case the developer, creates test cases that test at the level of a line of code. Function Test The test designer creates test cases that test at the level of distinct business events or functional process. System Test The test designer creates test cases that test at the level of the system (Stress, Performance, Security, Recovery, etc.) or complete end-to-end business threads. Acceptance Test The test designers, in this case a system matter expert or end-user, creates test cases that test at the level of business procedures or operational processes. Any given test case should not replicate the testing accomplished in a previous phase of testing. One of the most common mistakes that testers and testing organizations make is to replicate the previous coverage accomplished in Function test when creating test cases for System test. Defect Content A defect is the most important deliverable a test designer creates. The primary purpose of testing is to detect defects in the application before it is released into production; furthermore defects are arguably the only product the testing team produces that is seen by the project team. The tester must document defects in a manner that is useful in the defect remediation process . at a bare minimum each defect should contain: Author, Name, Description, Severity, Impacted Area, and Status. For example, if a defect was discovered during functional testing of a typical Login screen then the information captured by the defect could look like this: Defect Name / Title The name or title should contain the essence of the defect including the functional area and nature of the defect. All defects relating to the login screen would begin with "Login Screen" but the remainder of the name would depend on the defect. Example: "Login Screen -- User not locked out after three failed login attempts" Defect Description The description should clearly state what sequence of events leads to the defect and when possible a screen snapshot or printout of the error. Example: "Attempted to Login using the Login Screen using an invalid User Id. On the first two attempts the application presented the error message "Invalid User Id or Password -- Try Again" as expected. The third attempt resulted in the same error being displayed (ERROR). According to the requirements the User should have been presented with the message "Invalid User Id or Password -- Contact your Administrator" and been locked out of the system." How to replicate The defect description should provide sufficient detail for the triage team and the developer fixing the defect to duplicate the defect. Defect severity The severity assigned to a defect is dependent on: phase of testing, impact of the defect on the testing effort, and the Risk the defect would present to the business if the defect was rolled- out into production. Using the "Login Screen" example if the current testing phase was Function Test the defect would be assigned a severity of "Medium" but if the defect was detected or still present during System Test then it would be assigned a severity of "High". Impacted area The Impacted area can be referenced by functional component or functional area of the system -- often both are used. Using the "Login Screen" example the functional unit would be "Login Screen" and the functional area of the system would be "Security". Relationships with other Team Roles Test Lead / Manager The Test Designer must obviously have a good working relationship with the Test Lead but more importantly the Test Designer must keep the Test Lead aware of any challenges that could prevent the Test Team from being successful. Often the Test Designer (or Designers) have a much clearer understanding of the current state of the application and potential challenges given their close working relationship with the application under test. Test Automation Engineer If the test cases are going to be automated then the Test Designer must ensure the Test Automation Engineer understands precisely what the test case is attempting to accomplish and how to respond if a failure occurs during execution of the test case. The Test Designer should be prepared to make the compromises required in order for the Test Automation Engineer to accomplish the task of automation, as long as these compromises do not add any significant risk to the application.
55. Describe some of the major Software
Failure? ● In July 2004 newspapers reported that a new government welfare management system in Canada costing several hundred million dollars was unable to handle a simple benefits rate increase after being put into live operation. Reportedly the original contract allowed for only 6 weeks of acceptance testing and the system was never tested for its ability to handle a rate increase. ● A bug in site management software utilized by companies with a significant percentage of worldwide web traffic was reported in May of 2004. The bug resulted in performance problems for many of the sites simultaneously and required disabling of the software until the bug was fixed. ● According to news reports in April of 2004, a software bug was determined to be a major contributor to the 2003 Northeast blackout, the worst power system failure in North American history. The failure involved loss of electrical power to 50 million customers, forced shutdown of 100 power plants, and economic losses estimated at $6 billion. The bug was reportedly in one utility company's vendor-supplied power monitoring and management system, which was unable to correctly handle and report on an unusual confluence of initially localized events. The error was found and corrected after examining millions of lines of code. ● In early 2004, news reports revealed the intentional use of a software bug as a counter-espionage tool. According to the report, in the early 1980's one nation surreptitiously allowed a hostile nation's espionage service to steal a version of sophisticated industrial software that had intentionally-added flaws. This eventually resulted in major industrial disruption in the country that used the stolen flawed software. ● A major U.S. retailer was reportedly hit with a large government fine in October of 2003 due to web site errors that enabled customers to view one anothers' online orders. ● News stories in the fall of 2003 stated that a manufacturing company recalled all their transportation products in order to fix a software problem causing instability in certain circumstances. The company found and reported the bug itself and initiated the recall procedure in which a software upgrade fixed the problems. ● In August of 2003 a U.S. court ruled that a lawsuit against a large online brokerage company could proceed; the lawsuit reportedly involved claims that the company was not fixing system problems that sometimes resulted in failed stock trades, based on the experiences of 4 plaintiffs during an 8-month period. A previous lower court's ruling that "...six miscues out of more than 400 trades does not indicate negligence." was invalidated. ● In April of 2003 it was announced that the largest student loan company in the U.S. made a software error in calculating the monthly payments on 800,000 loans. Although borrowers were to be notified of an increase in their required payments, the company will still reportedly lose $8 million in interest. The error was uncovered when borrowers began reporting inconsistencies in their bills. ● News reports in February of 2003 revealed that the U.S. Treasury Department mailed 50,000 Social Security checks without any beneficiary names. A spokesperson indicated that the missing names were due to an error in a software change. Replacement checks were subsequently mailed out with the problem corrected, and recipients were then able to cash their Social Security checks. ● In March of 2002 it was reported that software bugs in Britain's national tax system resulted in more than 100,000 erroneous tax overcharges. The problem was partly attributed to the difficulty of testing the integration of multiple systems. ● A newspaper columnist reported in July 2001 that a serious flaw was found in off- the-shelf software that had long been used in systems for tracking certain U.S. nuclear materials. The same software had been recently donated to another country to be used in tracking their own nuclear materials, and it was not until scientists in that country discovered the problem, and shared the information, that U.S. officials became aware of the problems. ● According to newspaper stories in mid-2001, a major systems development contractor was fired and sued over problems with a large retirement plan management system. According to the reports, the client claimed that system deliveries were late, the software had excessive defects, and it caused other systems to crash. ● In January of 2001 newspapers reported that a major European railroad was hit by the aftereffects of the Y2K bug. The company found that many of their newer trains would not run due to their inability to recognize the date '31/12/2000'; the trains were started by altering the control system's date settings. ● News reports in September of 2000 told of a software vendor settling a lawsuit with a large mortgage lender; the vendor had reportedly delivered an online mortgage processing system that did not meet specifications, was delivered late, and didn't work. ● In early 2000, major problems were reported with a new computer system in a large suburban U.S. public school district with 100,000+ students; problems included 10,000 erroneous report cards and students left stranded by failed class registration systems; the district's CIO was fired. The school district decided to reinstate it's original 25-year old system for at least a year until the bugs were worked out of the new system by the software vendors. ● In October of 1999 the $125 million NASA Mars Climate Orbiter spacecraft was believed to be lost in space due to a simple data conversion error. It was determined that spacecraft software used certain data in English units that should have been in metric units. Among other tasks, the orbiter was to serve as a communications relay for the Mars Polar Lander mission, which failed for unknown reasons in December 1999. Several investigating panels were convened to determine the process failures that allowed the error to go undetected. ● Bugs in software supporting a large commercial high-speed data network affected 70,000 business customers over a period of 8 days in August of 1999. Among those affected was the electronic trading system of the largest U.S. futures exchange, which was shut down for most of a week as a result of the outages. ● In April of 1999 a software bug caused the failure of a $1.2 billion U.S. military satellite launch, the costliest unmanned accident in the history of Cape Canaveral launches. The failure was the latest in a string of launch failures, triggering a complete military and industry review of U.S. space launch programs, including software integration and testing processes. Congressional oversight hearings were requested. ● A small town in Illinois in the U.S. received an unusually large monthly electric bill of $7 million in March of 1999. This was about 700 times larger than its normal bill. It turned out to be due to bugs in new software that had been purchased by the local power company to deal with Y2K software issues. ● In early 1999 a major computer game company recalled all copies of a popular new product due to software problems. The company made a public apology for releasing a product before it was ready. ● The computer system of a major online U.S. stock trading service failed during trading hours several times over a period of days in February of 1999 according to nationwide news reports. The problem was reportedly due to bugs in a software upgrade intended to speed online trade confirmations. ● In April of 1998 a major U.S. data communications network failed for 24 hours, crippling a large part of some U.S. credit card transaction authorization systems as well as other large U.S. bank, retail, and government data systems. The cause was eventually traced to a software bug. ● January 1998 news reports told of software problems at a major U.S. telecommunications company that resulted in no charges for long distance calls for a month for 400,000 customers. The problem went undetected until customers called up with questions about their bills. ● In November of 1997 the stock of a major health industry company dropped 60% due to reports of failures in computer billing systems, problems with a large database conversion, and inadequate software testing. It was reported that more than $100,000,000 in receivables had to be written off and that multi-million dollar fines were levied on the company by government agencies. ● A retail store chain filed suit in August of 1997 against a transaction processing system vendor (not a credit card company) due to the software's inability to handle credit cards with year 2000 expiration dates. ● In August of 1997 one of the leading consumer credit reporting companies reportedly shut down their new public web site after less than two days of operation due to software problems. The new site allowed web site visitors instant access, for a small fee, to their personal credit reports. However, a number of initial users ended up viewing each others' reports instead of their own, resulting in irate customers and nationwide publicity. The problem was attributed to "...unexpectedly high demand from consumers and faulty software that routed the files to the wrong computers." ● In November of 1996, newspapers reported that software bugs caused the 411 telephone information system of one of the U.S. RBOC's to fail for most of a day. Most of the 2000 operators had to search through phone books instead of using their 13,000,000-listing database. The bugs were introduced by new software modifications and the problem software had been installed on both the production and backup systems. A spokesman for the software vendor reportedly stated that 'It had nothing to do with the integrity of the software. It was human error.' ● On June 4 1996 the first flight of the European Space Agency's new Ariane 5 rocket failed shortly after launching, resulting in an estimated uninsured loss of a half billion dollars. It was reportedly due to the lack of exception handling of a floating- point error in a conversion from a 64-bit integer to a 16-bit signed integer. ● Software bugs caused the bank accounts of 823 customers of a major U.S. bank to be credited with $924,844,208.32 each in May of 1996, according to newspaper reports. The American Bankers Association claimed it was the largest such error in banking history. A bank spokesman said the programming errors were corrected and all funds were recovered. ● Software bugs in a Soviet early-warning monitoring system nearly brought on nuclear war in 1983, according to news reports in early 1999. The software was supposed to filter out false missile detections caused by Soviet satellites picking up sunlight reflections off cloud-tops, but failed to do so. Disaster was averted when a Soviet commander, based on what he said was a '...funny feeling in my gut', decided the apparent missile attack was a false alarm. The filtering software code was rewritten. 56. How can new Software QA processes be introduced in an existing organization? A lot depends on the size of the organization and the risks involved. For large organizations with high-risk (in terms of lives or property) projects, serious management buy-in is required and a formalized QA process is necessary. Where the risk is lower, management and organizational buy-in and QA implementation may be a slower, step-at-a-time process. QA processes should be balanced with productivity so as to keep bureaucracy from getting out of hand. For small groups or projects, a more ad-hoc process may be appropriate, depending on the type of customers and projects. A lot will depend on team leads or managers, feedback to developers, and ensuring adequate communications among customers, managers, developers, and testers. The most value for effort will often be in (a) requirements management processes, with a goal of clear, complete, testable requirement specifications embodied in requirements or design documentation, or in 'agile'-type environments extensive continuous coordination with end-users, (b) design inspections and code inspections, and (c) post-mortems.
57. What is 'good code'?
Good code' is code that works, is bug free, and is readable and maintainable. Some organizations have coding 'standards' that all developers are supposed to adhere to, but everyone has different ideas about what's best, or what is too many or too few rules. There are also various theories and metrics, such as McCabe Complexity metrics. It should be kept in mind that excessive use of standards and rules can stifle productivity and creativity. 'Peer reviews', 'buddy checks' code analysis tools, etc. can be used to check for problems and enforce standards. For C and C++ coding, here are some typical ideas to consider in setting rules/standards; these may or may not apply to a particular situation: ● minimize or eliminate use of global variables. ● use descriptive function and method names - use both upper and lower case, avoid abbreviations, use as many characters as necessary to be adequately descriptive (use of more than 20 characters is not out of line); be consistent in naming conventions. ● use descriptive variable names - use both upper and lower case, avoid abbreviations, use as many characters as necessary to be adequately descriptive (use of more than 20 characters is not out of line); be consistent in naming conventions. ● function and method sizes should be minimized; less than 100 lines of code is good, less than 50 lines is preferable. ● function descriptions should be clearly spelled out in comments preceding a function's code. ● organize code for readability. ● use whitespace generously - vertically and horizontally ● each line of code should contain 70 characters max. ● one code statement per line. ● coding style should be consistent throught a program (eg, use of brackets, indentations, naming conventions, etc.) ● in adding comments, err on the side of too many rather than too few comments; a common rule of thumb is that there should be at least as many lines of comments (including header blocks) as lines of code. ● no matter how small, an application should include documentaion of the overall program function and flow (even a few paragraphs is better than nothing); or if possible a separate flow chart and detailed program documentation. ● make extensive use of error handling procedures and status and error logging. ● for C++, to minimize complexity and increase maintainability, avoid too many levels of inheritance in class heirarchies (relative to the size and complexity of the application). Minimize use of multiple inheritance, and minimize use of operator overloading (note that the Java programming language eliminates multiple inheritance and operator overloading.) ● for C++, keep class methods small, less than 50 lines of code per method is preferable. ● for C++, make liberal use of exception handlers 58. What is 'good design'?
Design' could refer to many things, but often
refers to 'functional design' or 'internal design'. Good internal design is indicated by software code whose overall structure is clear, understandable, easily modifiable, and maintainable; is robust with sufficient error- handling and status logging capability; and works correctly when implemented. Good functional design is indicated by an application whose functionality can be traced back to customer and end-user requirements. For programs that have a user interface, it's often a good idea to assume that the end user will have little computer knowledge and may not read a user manual or even the on-line help; some common rules-of-thumb include: ● the program should act in a way that least surprises the user ● it should always be evident to the user what can be done next and how to exit ● the program shouldn't let the users do something stupid without warning them.
59. Will automated testing tools make testing
easier? Possibly. For small projects, the time needed to learn and implement them may not be worth it. For larger projects, or on-going long-term projects they can be valuable. A common type of automated tool is the 'record/playback' type. For example, a tester could click through all combinations of menu choices, dialog box choices, buttons, etc. in an application GUI and have them 'recorded' and the results logged by a tool. The 'recording' is typically in the form of text based on a scripting language that is interpretable by the testing tool. If new buttons are added, or some underlying code in the application is changed, etc. the application might then be retested by just 'playing back' the 'recorded' actions, and comparing the logging results to check effects of the changes. The problem with such tools is that if there are continual changes to the system being tested, the 'recordings' may have to be changed so much that it becomes very time- consuming to continuously update the scripts. Additionally, interpretation and analysis of results (screens, data, logs, etc.) can be a difficult task. Note that there are record/playback tools for text-based interfaces also, and for all types of platforms. Other automated tools can include: Code analyzers - monitor code complexity, adherence to standards, etc. Coverage analyzers - these tools check which parts of the code have been exercised by a test, and may be oriented to code statement coverage, condition coverage, path coverage, etc. Memory analyzers - such as bounds-checkers and leak detectors. Load/performance test tools - for testing client/server and web applications under various load levels. Web test tools - to check that links are valid, HTML code usage is correct, client-side and server-side programs work, a web site's interactions are secure. Other tools - for test case management, documentation management, bug reporting, and configuration management. 60. What are 5 common problems in the software development process? ● Poor requirements - if requirements are unclear, incomplete, too general, and not testable, there will be problems. ● Unrealistic schedule - if too much work is crammed in too little time, problems are inevitable. ● Inadequate testing - no one will know whether or not the program is any good until the customer complains or systems crash. ● Featurisms - requests to pile on new features after development is underway; extremely common. ● Miscommunication - if developers don't know what's needed or customer's have erroneous expectations, problems are guaranteed. 61. What are 5 common solutions to software development problems? ● Solid requirements - clear, complete, detailed, cohesive, attainable, testable requirements that are agreed to by all players. Use prototypes to help nail down requirements. In 'agile'-type environments, continuous coordination with customers/end- users is necessary. ● Realistic schedules - allow adequate time for planning, design, testing, bug fixing, re- testing, changes, and documentation; personnel should be able to complete the project without burning out. ● Adequate testing - start testing early on, re- test after fixes or changes, plan for adequate time for testing and bug-fixing. 'Early' testing ideally includes unit testing by developers and built-in testing and diagnostic capabilities. ● Stick to initial requirements as much as possible - be prepared to defend against excessive changes and additions once development has begun, and be prepared to explain consequences. If changes are necessary, they should be adequately reflected in related schedule changes. If possible, work closely with customers/end- users to manage expectations. This will provide them a higher comfort level with their requirements decisions and minimize excessive changes later on. ● Communication - require walkthroughs and inspections when appropriate; make extensive use of group communication tools - e-mail, groupware, networked bug-tracking tools and change management tools, intranet capabilities, etc.; insure that information/documentation is available and up-to-date - preferably electronic, not paper; promote teamwork and cooperation; use protoypes if possible to clarify customers' expectations. Trick Question for which answers are already provided. ● Why did you ever become involved in QA/testing? ● Should every business test its software the same way? ● What is a Code Coverage? ● Is any graph is used for code coverage analysis? ● How to monitor test progress? ● Describe a few reasons that a bug might not be fixed. ● What are the possible states of software bug's life cycle? Should we test every possible combination/scenario for a program? ● What is the exact difference between Integration & System testing; give me examples with your project. ● Realizing you won't be able to test everything - how do you decide what to test first? ● How do you test if you have minimal or no documentation about the product? ● How do you perform regression testing? ● How do you determine what to test? ● How do you decide when you have 'tested enough?' ● Have you ever created a test plan? ● Have you ever written test cases or did you just execute those written by others? ● What is the purpose of the testing? ● What is the role of QA in a development project? ● What are the properties of a good requirement? ● What is the role of QA in a company that produces software? ● Define quality for me as you understand it ● Describe to me the difference between validation and verification. ● Why do you go for White box testing, when Black box testing is available? ● What are the types of testing you know and you experienced? ● What types of testing do testers perform? ● What is the difference between Re-testing and Regression testing? ● What is the Diff between Code Walkthrough & Code Review? ● What is the relation ship between Quality & Testing? ● What is meant by dynamic testing? ● What is meant by Code Walkthrough? ● What is meant Code Review? ● When do you go for Integration Testing? ● Can the System testing be done at any stage? ● What is the Outcome of Integration Testing? ● When we prefer Regression & what are the stages where we go for Regression Testing? ● What is the Performance testing; those can be done Manually & Automatically? ● What is the Priority in fixing the Bugs? ● Explain the Severity you rate for the bugs found? ● What is risk analysis? ● Describe any bug you remember. ● What are the key challenges of testing? ● How do you prioritize testing tasks within a project? ● How do you know when the product is tested well enough? Software tester (SQA) interview questions These questions are used for software tester or SQA (Software Quality Assurance) positions. Refer to The Real World of Software Testing for more information in the field. 1.The top management was feeling that when there are any changes in the technology being used, development schedules etc, it was a waste of time to update the Test Plan. Instead, they were emphasizing that you should put your time into testing than working on the test plan. Your Project Manager asked for your opinion. You have argued that Test Plan is very important and you need to update your test plan from time to time. It’s not a waste of time and testing activities would be more effective when you have your plan clear. Use some metrics. How you would support your argument to have the test plan consistently updated all the time. 2.The QAI is starting a project to put the CSTE certification online. They will use an automated process for recording candidate information, scheduling candidates for exams, keeping track of results and sending out certificates. Write a brief test plan for this new project. 3.The project had a very high cost of testing. After going in detail, someone found out that the testers are spending their time on software that doesn’t have too many defects. How will you make sure that this is correct? 4.What are the disadvantages of overtesting? 5.What happens to the test plan if the application has a functionality not mentioned in the requirements? 6.You are given two scenarios to test. Scenario 1 has only one terminal for entry and processing whereas scenario 2 has several terminals where the data input can be made. Assuming that the processing work is the same, what would be the specific tests that you would perform in Scenario 2, which you would not carry on Scenario 1? 7.Your customer does not have experience in writing Acceptance Test Plan. How will you do that in coordination with customer? What will be the contents of Acceptance Test Plan? 8.What are the various status reports you will generate to Developers and Senior Management? 9.Define and explain any three aspects of code review? 10. Explain 5 risks in an e-commerce project. Identify the personnel that must be involved in the risk analysis of a project and describe their duties. How will you prioritize the risks? 11. What are the various status reports that you need generate for Developers and Senior Management? 12. You have been asked to design a Defect Tracking system. Think about the fields you would specify in the defect tracking system? 13. Write a sample Test Policy? 14. Explain what test tools you will need for client-server testing and why? 15. Explain what test tools you will need for Web app testing and why? 16. Explain pros and cons of testing done development team and testing by an independent team? 17. Write a test transaction for a scenario where 6.2% of tax deduction for the first $62,000 of income has to be done? 18. What would be the Test Objective for Unit Testing? What are the quality measurements to assure that unit testing is complete? 19. Prepare a checklist for the developers on Unit Testing before the application comes to testing department. 20. Draw a pictorial diagram of a report you would create for developers to determine project status. 21. Draw a pictorial diagram of a report you would create for users and management to determine project status. 22. What 3 tools would you purchase for your company for use in testing? Justify the need? 23. If your company is going to conduct a review meeting, who should be on the review committe and why? 24. You are a tester for testing a large system. The system data model is very large with many attributes and there are a lot of inter-dependencies within the fields. What steps would you use to test the system and also what are the effects of the steps you have taken on the test plan? 25. You are the test manager starting on system testing. The development team says that due to a change in the requirements, they will be able to deliver the system for SQA 5 days past the deadline. 26. You cannot change the resources (work hours, days, or test tools). What steps will you take to be able to finish the testing in time? 27. Your company is about to roll out an e- commerce application. It’s not possible to test the application on all types of browsers on all platforms and operating systems. What steps would you take in the testing environment to reduce the business risks and commercial risks? 28. In your organization, testers are delivering code for system testing without performing unit testing. Give an example of test policy: ● Policy statement ● Methodology ● Measurement 29. Testers in your organization are performing tests on the deliverables even after significant defects have been found. This has resulted in unnecessary testing of little value, because re-testing needs to be done after defects have been rectified. You are going to update the test plan with recommendations on when to halt testing. What recommendations are you going to make? ● How do you measure: ● Test Effectiveness ● Test Efficiency 30. You found out the senior testers are making more mistakes then junior testers; you need to communicate this aspect to the senior tester. Also, you don’t want to lose this tester. How should one go about constructive criticism? 31. You are assigned to be the test lead for a new program that will automate take-offs and landings at an airport. How would you write a test strategy for this new program? 32. In the past, I have been asked to verbally start mapping out a test plan for a common situation, such as an ATM. The interviewer might say, "Just thinking out loud, if you were tasked to test an ATM, what items might you test plan include?" These type questions are not meant to be answered conclusively, but it is a good way for the interviewer to see how you approach the task. 33. How do you promote the concept of phase containment and defect prevention? 34. If you come onboard, give me a general idea of what your first overall tasks will be as far as starting a quality effort. 35. How do you analyze your test results? What metrics do you try to provide? 36. Where do you get your expected results? 37. What do you plan to become after say 2- 5yrs (Ex: QA Manager, Why?) 38. Would you like to work in a team or alone, why? 39. Give me 5 strong & weak points of yours 40. Why do you want to join our company? 41. Is a "A fast database retrieval rate" a testable requirement? 42. Describe a past experience with implementing a test harness in the development of software. 43. Have you ever worked with QA in developing test tools? Explain the participation Development should have with QA in leveraging such test tools for QA use. 44. Who should test your code? 45. How do you survive chaos? 46. What you will do during the first day of job? 47. What is a successful product? 48. What do you like about Windows? 49. Who is Kent Beck, Dr Grace Hopper, Dennis Ritchie? 50. What do you like about computers? 51. Have you ever completely tested any part of a product? How? 52. Discuss the economics of automation and the role of metrics in testing. 53. Describe components of a typical test plan, such as tools for interactive products and for database products, as well as cause- and-effect graphs and data-flow diagrams. 54. When have you had to focus on data integrity? 55. What are some of the typical bugs you encountered in your last assignment? 56. How do you estimate staff requirements? 57. What do you do (with the project tasks) when the schedule fails? 58. How do you handle conflict with programmers? 59. What is the role of metrics in comparing staff performance in human resources management? 60. What is Negative testing? 61. What is the Capability Maturity Model (CMM)? At what CMM level were the last few companies you worked? 62. Could you tell me two things you did in your previous assignment (QA/Testing related hopefully) that you are proud of? 63. In an application currently in production, one module of code is being modified. Is it necessary to re- test the whole application or is it enough to just test functionality associated with that module? 64. Define the following and explain their usefulness: Change Management, Configuration Management, Version Control, and Defect Tracking. 65. What is ISO 9000? Have you ever been in an ISO shop? 66. What is ISO 9003? Why is it important 67. What are ISO standards? Why are they important? 68. What is IEEE 829? (This standard is important for Software Test Documentation- Why?) 69. What is IEEE? Why is it important? 70. Do you support automated testing? Why? 71. We have a testing assignment that is time-driven. Do you think automated tests are the best solution? 72. What is your experience with change control? Our development team has only 10 members. Do you think managing change is such a big deal for us? 73. Can you build a good audit trail using Compuware's QACenter products? Explain why. 74. How important is Change Management in today's computing environments? 75. Do you think tools are required for managing change? Explain and please list some tools/practices which can help you managing change. 76. We believe in ad-hoc software processes for projects. Do you agree with this? Please explain your answer. 77. When is a good time for system testing? 78. Are regression tests required or do you feel there is a better use for resources? 79. Our software designers use UML for modeling applications. Based on their use cases, we would like to plan a test strategy. Do you agree with this approach or would this mean more effort for the testers. 80. Tell me about a difficult time you had at work and how you worked through it. 81. Give me an example of something you tried at work but did not work out so you had to go at things another way. 82. How can one file compare future dated output files from a program which has change, against the baseline run which used current date for input? The client does not want to mask dates on the output files to allow compares. - Answer-Rerun baseline and future date input files same # of days as future dated run of program with change. Now run a file compare against the baseline future dated output and the changed programs' future dated output. 83. What are CMM and CMMI? What is the difference? 84. Discuss what test metrics you feel are important to publish an organization? 85. Who in the company is responsible for Quality? 86. Who defines quality? 87. When should testing start in a project? Why? 88. How did you go about testing a project? 89. If you're given a program that will average student grades, what kinds of inputs would you use? 90. Tell me about the best bug you ever found. 91. What made you pick testing over another career? 92. Tell me about any quality efforts you have overseen or implemented. Describe some of the challenges you faced and how you overcame them. 93. How do you deal with environments that are hostile to quality change efforts? 94. Describe to me when you would consider employing a failure mode and effect analysis. 95. What types of documents would you need for QA, QC, and Testing? 96. What are the entry criteria for Functionality and Performance testing? 97. What are the entry criteria for Automation testing? 98. What is Baseline document, Can you say any two? 99. When to start and Stop Testing? 100. What are the various levels of testing? 101. What exactly is Heuristic checklist approach for unit testing? 102. After completing testing, what would you deliver to the client? 103. What is a Test Bed? 104. What is the Outcome of Testing? 105. What is a Data Guidelines? 106. Why do you go for Test Bed? 107. Can Automation testing replace manual testing? If it so, how? 108. Automation what is the test script? 109. What is the test data? 110. What is an Inconsistent bug? 111. What are the different types of test case techniques? 112. Differentiate Test bed and Test Environment? 113. What is the difference between functional spec. and Business requirement specification? 114. What are the Minimum requirements to start testing? 115. What is cookie testing? 116. What is security testing? 117. What is database testing? 118. What is the Initial Stage of testing? 119. What is the use of Functional Specification? 120. In the Static Testing, what all can be tested? 121. Can test condition, test case & test script help you in performing the static testing? 122. Is the dynamic testing a functional testing? 123. Is the Static testing a functional testing? 124. What kind of Document you need for going for a Functional testing? 125. What is the testing that a tester performs at the end of Unit Testing? 126. What is meant by GUI Testing? 127. What is meant by Back-End Testing? 128. What are the features, you take care in Prototype testing? 129. What all are the requirements needed for UAT? 130. What are the docs required for Performance Testing? 131. How to do risk management? 132. What are test closure documents? 133. What is traceability matrix? 134. What ways you followed for defect management?