Note: As the mockup serves as a demonstration or trial of the main work, all materials, including permanent ones used
in the process, must be thoroughly tested.
Following instructions from the Consultant and RWASA, we have collected samples of the excavated soil to verify its compliance with the design requirements. Previously, soil sample testing was conducted from the trial pit, where the design values differed slightly. This time, with updated design values, the Consultant and RWASA have requested a new soil test to cross-check the material properties. This ensures that both the Contractor and Consultant have verified and completed all necessary requirements for the mockup.