METHOD of STATAMENT - Data Center Sprinkler System
METHOD of STATAMENT - Data Center Sprinkler System
FOR
Contractor name
Gulf Group Co –Al Kulaib Universal
Contractors discription
4128/KNPC
KNPC Contract No. IT/CPC/4128 Document Ref# IT/CPC/2022-02
Page 1 of 7
TABLE OF CONTENT
1 General 3
2 Reference 3
3 Location 4
4 Resource 4
6 Safety 5-7
7 Producer 7
Page 2 of 7
1. GENERAL
1.1 PURPOSE
The purpose of this method statement is to ensure that all information,
materials, tools, equipment, manpower and supervision are available for the
execution of the work.
1.2 ABBREVIATION
MS : Method of Statement.
2. REFRENCE
2.1 Safe work practices work permit system &Critical Task risk assessment
(HSE-TSSA-06-2029.REV.8).
2.2 Best work permit issuer & Executer Scheme guidelines (SHE-TSSA-08-
1126- REV.1).
2.6 Safe work procedure on welding, cutting and heating works (HSE-TSSA-06-
2011).
Page 3 of 7
3. LOCATION
The following personnel shall be involved and responsible for the activities
incorporated in this method statement/procedure and to ensure that safety and
quality aspects are adhere to:
Mechanical Engineer
Mechanical Supervisor
Mechanical Technicians
4.1 The Mechanical Engineer is responsible to ensure that this method statement/
Procedure is understood and is properly implemented by his subordinates. He
shall ensure that subordinates to maintain productivity and quality.
4.3 The Mechanical Technicians shall ensure safe and efficient works
environment.
5.1
Table 1 – Materials
Item Materials Application
To installed at end of pipe line after
1 End cap
dismantling the network
Page 4 of 7
5.2 Equipment
Table 2 – List of Equipment
Item Equipment Application
1 Angle Grinder Preparing end cap welding installation
2 Electric saber saw Cutting pipes
3 Hand tools General Purpose
4 Welding machine End cap installation
5 Paint Painting the end cap after finishing
6. SAFETY
6.1 Reporting
First aid will be done on site by authorized first aider. The first aid box
will be made available by Subcontractor. After providing initial first
aid the injured person will be transported to medical center in
ambulance for further evaluation and treatment if required.
Vehicle shall be kept standby for emergency at site at all times while
work is being performed.
Page 5 of 7
Smoking is prohibited except designated locations. Allowed areas for
smoking shall be well ventilated.
Prior to starting any activity, a detailed Job Safety Task Instruction and
TBT are to be carried out at the work location to discuss the work to be
done and the steps to be taken, the inherent hazards as well as those
specific to the work location and the mitigation methods to be taken
against the identified hazards.
During the task instruction, it must be ensured that all workers
understand their responsibilities.
regulations.
Page 6 of 7
Working at height more than 1.8 m shall have safe work platform with
7. PROCEDURES
Prior to starting the work main contractor shall ensure that zone control
station is isolated and the pipe network is drained from water
After removal of sprinklers from the required area the main pipe shall
followed
Page 7 of 7