0% found this document useful (0 votes)
15 views5 pages

Ship Loading Arm Design Form

https://lygteampower.com

Uploaded by

ufbsingapore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views5 pages

Ship Loading Arm Design Form

https://lygteampower.com

Uploaded by

ufbsingapore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Marine Loading Arm Datasheet

1.1 CONTACT INFORMATION


Contact details
Company
Location
Contact person Email

1.2 PROJECT PLANNING


Project details
Project ☐ Replacement ☐Facility expansion ☐ New termina/plant
Project phase ☐ Budget ☐ FEED Study ☐Tender
Planned date of site delivery

1.3 ENVIRONMENTAL DETAILS


Environmental influences
Location City Country
Terminal / plant name

Temperature Min Max


Seismic load Peak ground acceleration
(g
Max wind speed stored position M/s
Max wind speed maneuvering M/s
Hazardous Area Classification ATEX / NEC

1.4 GENERALREQUIREMENT
MLA Product Product / Medium Flowrate Diameter Operation
m3/h (inch)
Marine Loading Arm 1 ☐Manual ☐Hydraulic
Marine Loading Arm 2 ☐Manual ☐Hydraulic
Marine Loading Arm 3 ☐Manual ☐Hydraulic
Marine loading Arm 4 ☐Manual ☐Hydraulic
Marine Loading Arm 5 ☐Manual ☐Hydraulic
Marine Loading Arm 6 ☐Manual ☐Hydraulic
Marine Loading Arm 7 ☐Manual ☐Hydraulic
Marine Loading Arm 8 ☐Manual ☐Hydraulic

Whatsapp:+65-91275988 Email: [email protected] Web: www.lygteampower.com


Marine Loading Arm Datasheet

1.5 DESIGN DETAILS


MLA Product Design pressure Design temperature Operation
(bar) (min/max °C)
Marine Loading Arm 1 ☐Manual ☐Hydraulic
Marine Loading Arm 2 ☐Manual ☐Hydraulic
Marine Loading Arm 3 ☐Manual ☐Hydraulic
Marine loading Arm 4 ☐Manual ☐Hydraulic
Marine Loading Arm 5 ☐Manual ☐Hydraulic
Marine Loading Arm 6 ☐Manual ☐Hydraulic
Marine Loading Arm 7 ☐Manual ☐Hydraulic
Marine Loading Arm 8 ☐Manual ☐Hydraulic

1.6 ACCESSORIES
MLA Product QCDC ERS Vacuum Tracing and Vapour
breaker insulation return line
Marine Loading Arm 1 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine Loading Arm 2 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine Loading Arm 3 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine loading Arm 4 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine Loading Arm 5 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine Loading Arm 6 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine Loading Arm 7 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no
Marine Loading Arm 8 ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no ☐ yes ☐ no

Whatsapp:+65-91275988 Email: [email protected] Web: www.lygteampower.com


Marine Loading Arm Datasheet

1.8 DIMENSIONS
Jetty Dimensions
A Centerline of Base Riser to dock face
B Dock face to compressed fender
C Dock level to lowest low water Min
D Difference between lowest low water and highest high water Max
The minimum ship size DWT
The maximum ship size DWT
Vessel Data
K Min. Distance from ship railing to ship connection flange mm
L Max. Distance from ship railing to ship connection flange mm
M Minimum difference between Lowest low water and ship mm
flange
N Maximum difference between Highest high water and Ship mm
Flange
O Minimum spacing between ship flanges mm
Maximum spacing between ship flanges mm
P Rail height mm
Is the rail removable? mm
Q Height of center of ship flange to deck mm
Ship Movements
T Heave mm
U Sway mm
V Surge mm
Additional jetty dimensions
E Centerline of inlet flange to dock level mm
G Dock face to flange face mm
H Any dock conditions that limit the arm design mm
I Any dock conditions that limit the arm design mm
J Spacing between different base risers mm

Whatsapp:+65-91275988 Email: [email protected] Web: www.lygteampower.com


Marine Loading Arm Datasheet

Whatsapp:+65-91275988 Email: [email protected] Web: www.lygteampower.com


Marine Loading Arm Datasheet

1.9 CONTROL SYSTEM


Berth information
Berth customer reference
No. of New Marine Loading Arms
No. of existing Marine Loading Arms

Item Scope Configuration Hazardous area Included


classification
1 Hydraulic control One (1) on each loading arm ☐ yes ☐ no
manifold
2 Hydraulic Power Unit Outside on jetty ☐ yes ☐ no
3 Operation Control ☐ Outdoor on jetty ☐ yes ☐ no
Panel at jetty nearby ☐ Indoor in Berth control room ☐ yes ☐ no
MLA
4 Satellite control panel ☐ outdoor on berth ☐ yes ☐ no
5 PLC control cabinet ☐ Integrated in operation ☐ yes ☐ no
control panel ☐ yes ☐ no
☐ Standalone PLC cabinet in
control room
6 Radio remote control ☐ yes ☐ no
7 Pendant remote control ☐ On berth ☐ yes ☐ no
☐ At TSA (shipside)

Whatsapp:+65-91275988 Email: [email protected] Web: www.lygteampower.com

You might also like