0% found this document useful (0 votes)
61 views1 page

Kerb Casting

estimate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Kerb Casting

estimate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Refer

Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 Grade PCC Using
code 8.2.B
1.17 Concrete Batching and Mixing Plant on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped
of Price
towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
Software
Unit= Running metre
Taking output=300 metre length
Cement Concrete
Cement concrete of grade M20=17.48 cum
Cement concrete of grade M10 for base=23.18 cum
Total Concrete=40.66 cum
a) Labour
Mate Day 0.12 617 74.04 L-12
Mason (1st class) Day 1 738 738.00
Mazdoor Day 2 558 1116.00 L-13
b) Machinery 0.00

Kerb Casting Machine hour 6 312 1872.00 MR228


@ 50 metres /hour for laying kerb and channel 0.00

Batching and Mixing Plant (b) 15-20cum capacity hour 2.7 1873 5057.10 MR202

Water Tanker hour 6 250 1500.00 MR259


6 KL capacity 0.00

Tipper - 5 cum hour 6 312 1872.00 MR247


c) Material 0.00
Aggregates 20mm nominal size cum 36.59 1453.77 53193.44
60 per cent 0.00
Coarse sand at Site cum 18.3 1453.77 26603.99
30 per cent 0.00
Cement tonne 9.01 5032.24 45340.48
10 per cent 0.00
water Litre 36 13 468.00
Rate per m 459.45
Applying Cost Index at 35.59% 150.74
Total with cost index 610.19
d) Overheads @ 08% 659.01
e) Contractor's profit @10% 724.91
Say (m) 725.00