Detailed Boq - Ginger & Garlic,Noida_empty (1)
Detailed Boq - Ginger & Garlic,Noida_empty (1)
Detailed Boq - Ginger & Garlic,Noida_empty (1)
15,120,640
Less Discount @ 8.5% over all -1,285,254
Total Cost + (50% GST) 13,835,386
NOTE:
GST AS APPLICABLE
B CIVIL WORKS
1 Cinder Filling + Raised Floor (Brick Coba)
Providing and filling broken Autoclaved Aerated blocks for
sunken areas including compaction, watering and finishing with
PCC 1:3:6 screed concrete. As directed.
FF - Existing Sunken Area (Depth - 400mm) SFT 300.00 75 22,500
FF - Kitchen & Outdoor Area & Washrooms (205mm raised)
SFT 2500.00 50
125,000
FF - Niche Filling Near Fix Sofa Seating SFT 75.00 50 3,750
SF - Stage & Washrooms & outdoor bar + Live Kitchen (205mm
SFT 570.00 50
raised) 28,500
0
2 150mm thk. Wall Construction 0
C FLOORING WORKS
1 Granite Flooring
Providing & fixing Flat Pebble tile Flooring with paper joint.
Quality and shade as specified by designer. Thickness of the
tile should be a minimum of 20-30mm on 15 - 20mm thk
cement mortar of 1:4 including necessary curing, cleaning etc.
Finished price to be inclusive of all materials, wastages, labour,
0
cleaning, scaffolding lead and lift at all floors as directed. The
mode of measurement for certification of payment will be on
actual laid area which includes necessary wastages. Finished
price to be inclusive of all necessary Cutting work, lead and lift
as directed.
Providing and laying Anti skid tile flooring with 3mm spacers.
Quality and shade to designers detail. Thickness of the tile
should be a minimum of 10mm on 40 - 50mm thick cement
mortar of 1:4 including necessary curing, cleaning, etc. All
0
flooring to be protected using vinyl sheet as approved. Spacers
to be filled with epoxy/cement grout of approved shade & make.
Finished price to be inclusive of all necessary Cutting work, lead
and lift as directed.
Providing and laying Anti skid tile flooring with 3mm spacers.
Quality and shade to designers detail. Thickness of the tile
should be a minimum of 10mm on 40 - 50mm thick cement
mortar of 1:4 including necessary curing, cleaning, etc. All
0
flooring to be protected using vinyl sheet as approved. Spacers
to be filled with epoxy/cement grout of approved shade & make.
Finished price to be inclusive of all necessary Cutting work, lead
and lift as directed.
Providing and laying Anti skid tile Cladding with 3mm spacers.
Quality and shade to designers detail. Thickness of the tile
should be a minimum of 10mm on 40 - 50mm thick cement
mortar of 1:4 including necessary curing, cleaning, etc. All
0
flooring to be protected using vinyl sheet as approved. Spacers
to be filled with epoxy/cement grout of approved shade & make.
Finished price to be inclusive of all necessary Cutting work, lead
and lift as directed.
Basic Price: 0
FF- Walls SFT 2500.00 25 62,500
SF - Walls SFT 2750.00 25 68,750
Exterior Facade SFT 2930.00 25 73,250
0
7 Tile Cladding (Dado) 0
Providing and laying Anti skid tile Cladding with 3mm spacers.
Quality and shade to designers detail. Thickness of the tile
should be a minimum of 10mm on 40 - 50mm thick cement
mortar of 1:4 including necessary curing, cleaning, etc. All
0
flooring to be protected using vinyl sheet as approved. Spacers
to be filled with epoxy/cement grout of approved shade & make.
Finished price to be inclusive of all necessary Cutting work, lead
and lift as directed.
Basic Price: 0
FF- Washroom Passage Area SFT 300.00 33 9,900
SF - Washroom Passage Area SFT 350.00 33 11,550
SF - Service Staricase Area SFT 1000.00 33 33,000
FF - Walls SFT 2500.00 33 82,500
SF - Walls SFT 2750.00 33 90,750
0
9 Enamel Paint 0
Basic Price: 0
Whole Metal Structure Frame Work (Exposed Surface) - 8500
RFT 8000.00 40 320,000
Railing RFT 5000.00 40 200,000
SF - Cabana Ornamentation RFT 0
0
10 Exterior Emulsion Paint 0
Basic Price: 0
Exterior Facade SFT 2930.00 40 117,200
0
11 POP Arches 0
Basic Price: 0
FF- Ceiling SFT 2200.00 30 66,000
SF - Ceiling SFT 1900.00 30 57,000
0
2 Gypsum/POP False Ceiling 0
Basic Price: 0
FF- Ceiling SFT 2200.00 80 176,000 Gypsum Ceiling
SF - Ceiling SFT 1900.00 80 152,000
0
3 Calcium Silicate False Ceiling 0
Basic Price: 0
FF- Male & Female Washroom Ceiling SFT 165.00 100 16,500
SF - Male & Female Washroom Ceiling SFT 60.00 100 6,000
FF- Outdoor Area SFT 110.00 100 11,000
0
4 Ply Boxing (Under the False Ceiling) & Pelmets 0
Providing and fixing in place, Ply boxing using 50x25mm
aluminum framework anchored true ceiling as detailed fixed with
12-18mm thick approved ply wood as detailed in drawing. 0
(Height to be considered : 650mm)
Providing and fixing POP false ceiling with required make mesh
on standard India Gypsum perimeter channels, intermediate
channels, hangers and accessories( 80x26x0.5mm of GYPROC
heavy duty suspended from true ceiling spaced at every 450mm
c/c, perimeter channels of Gypsteel Ultra 20x28x30x0.5m,
45x15x15x0.9mm intermediate channels at 1200mm c/c).
12.5mm tapered edge Gypsum board panels to be fixed to
channels using 25mm self tapping fasteners at 250mm centres.
Hangers and suspenders to be fixed using 2nos. anchor
fasteners each at anchorage ends. The rate is inclusive of 0
coves, cornice & steps wherever shown in Drawing, Upstands
upto 600mm to be considered with necessary supports,
necessary Cut-outs for the speakers,lights,smoke detectors,
sprinklers, trap doors, A/C grills and other services to be
considered in final cost. Additionally, 12x 12mm groove to be
provided at periphery as indicated in drawings , to be assumed
in final cost. Finished rate to be inclusive of all necessary
scaffolding at all levels. Mode of measurement will be on actual
laid area.
SF - Open Bar & Live Kitchen Area SFT 400.00 170 68,000
0
8 Royal Emulsion Paint 0
Basic Price: 0
FF- Washroom Passage Area SFT 165.00 33 5,445
SF - Washroom Passage Area SFT 60.00 33 1,980
FF- Kitchen (Only one coat) SFT 900.00 33 29,700
FF - Ceiling SFT 2200.00 33 72,600
SF - Ceiling SFT 1900.00 33 62,700
0
TOTAL OF CEILING WORKS 1,245,925
0
F CARPENTRY WORKS 0
1 Wall shelves Wall Panelling 0
Providing and Cladding as per designer's detail using 18mm
thick approved bwp ply, finished with 1mm thk. brass plate
pasting to be done with all complete in all levels. Finished price 0
to be inclusive of all necessary Cutting work, lead and lift as
directed.
FF- Niches SFT 55.00 450 24,750
0
2 Wood cladding / Lipping Work 0
Providing and Fixing approved size wooden block/lipping
cladded on the metal columns as per designer's detail and 3D
using approved screw or adhesive, All wood surfaces shall be
stained to approved colour and finished with 2 coats of matt 0
clear polish (Exterior Grade) as approved with all complete in all
levels.Finished price to be inclusive of all necessary Cutting
work, lead and lift as directed.
Size : As per 3D 0
FF & SF - Metal Columns (75 x75 1200 - 30No.) Nos 30.00 5500 165,000
0
3 Wood cladding / Lipping Work & High ledge 0
Providing and Fixing approved 6mm thk. wooden block/lipping
cladded on 12mm thk. ply backing as per designer's detail using
approved screw or adhesive, High Ledge counter to be made
with required aluminium box section, cladded with 8mm thk. ply
backing, finished with approved veneer as per given detail.
50mm dia brass rod for the foot rest to be fixed as per detail. All
wood and veneer surfaces shall be stained to approved colour 0
and finished with 2 coats of matt clear polish as approved with
all complete in all levels.Finished price to be inclusive of all
necessary Cutting work, lead and lift as directed.
FF - Above the Lift door (size : 900 x 750) NO. 1.00 8000 8,000
Need a reference image or Drawing for costing 0
6 Bar Front Counter 0
Providing & fixing Main Bar Counter as per drawing using brick
masonry in cement mortar 1:4 using table mould bricks of
standard size with minimum crushing strength of 35 Kg/sq. cm
including of raking of joints, scaffolding, etc. all complete as
directed at all levels. Masonry to be fixed with 20mm thick pre
polished approved marble cladding for the higher and lower
both counter top as detailed in drawing. Vertical Support below
the counter to be cladded with approved granite / tile with paper
joint + storage to be made in 18mm thk. pvc ply with approved 0
laminate of approved shade & make for internal and external
surface. Front of the counter to be made with required ply
backing, cladded with 1mm thk. brass plate as shown in the
detail drawing to be pasted with required adhesive. All
necessary hardware will be hafele make. handles customised
as per Architect's design to be provided.Finished price to be
inclusive of all necessary scaffolding, Cutting work, lead and lift
as directed.
Providing & fixing Bar Counter door as per drawing using 18mm
thk ply backing, internally finished with the approved 1mm thk.
laminate of approved shade and externally finished with 1mm
thk. brass plate cladding or approved brass paint finish in
stepped design as per given drawing. All necessary hardware 0
like hinges, door stoppers, door locks etc will be hafele make.
handles customised as per Architect's design to be
provided.Finished price to be inclusive of all necessary
scaffolding, Cutting work, lead and lift as directed.
FF- Female Washroom (1290 x 3050 x 365) NO. 1.00 51000 51,000
FF- Female Washroom ( 410 x 3050 x 365) NO. 1.00 16000 16,000
0
18 Mirrors 0
Providing & fixing mirror as per drawing using approved ply
framework fixed with 19mm thick approved ply fixed with 6mm
thick approved mirror as detailed in drawing. All exposed edges 0
to be fixed with wooden beading stained & finished in polish as
detailed in drawing.
FF- Male Washroom (1935 x 1200) NO. 1.00 10500 10,500
FF- Female Washroom (1925 x 1200) NO. 1.00 10500 10,500
SF- Male Washroom (1500 x 1200) NO. 1.00 8000 8,000
SF- Female Washroom (620 x 1200) NO. 1.00 3200 3,200
( Rate as actual to be taken from Glass vendor ) 0
19 Community Seating 0
Providing & laying 20mm thk approved marble on block work for
the community table. Vertical support to be made with block
work as per given size and top will be cast in concrete, cladded
with approved marble as per given detail. 75mm dia SS pipe to
be fixed for the foor rest, finished in brass finish as per detail. All
0
exposed edges of the marble to be machine polished. Table to
be protected using 3mm thick vinyl sheet. Required water
proffing etc to be considered for the intigrated planters in the
table.Finished price to be inclusive of all necessary Cutting
work, lead and lift as directed.
Providing & fixing Open Bar Counter as per drawing using brick
masonry in cement mortar 1:4 using table mould bricks of
standard size with minimum crushing strength of 35 Kg/sq. cm
including of raking of joints, scaffolding, etc. all complete as
directed at all levels. Masonry to be fixed with 20mm thick pre
polished approved marble cladding with paper joint for the
higher and lower both counter top and bottom step design as
detailed in drawing. Vertical Support below the counter inner
0
side to be cladded with approved granite / tile with paper joint +
storage to be made in 18mm thk. pvc ply with approved
laminate of approved shade & make for internal and external
surface. Unit to have openable shutters with fingerskip details.
All necessary hardware will be hafele make. handles
customised as per Architect's design to be provided.Finished
price to be inclusive of all necessary scaffolding, Cutting work,
lead and lift as directed.
SF - Open Bar Counter (3080 x 1050 x 1200) NO. 1.00 65000 65,000
SF - Live Kitchen Counter (3080 x 1050 x 1200) NO. 1.00 60000 60,000
0
21 Open Bar & Live Kitchen Back Counter 0
Providing & fixing Bar back Counter as per drawing using 20mm
thick pre polished approved marble cladding for the counter top
as detailed in drawing. Vertical Support below the counter to be
cladded with approved granite / tile with paper joint + storage
and shutters to be made in 18mm thk. pvc ply with approved
shade and make 4mm thk. veneer external surface and 1mm
thk. approved shade and make 1mm thk. laminate for internal 0
surface. Unit to have openable shutters with fingerskip details.
All necessary hardware like hinges/floor spring, door stoppers,
door locks, door closers etc will be hafele make. handles
customised as per Architect's design to be provided.Finished
price to be inclusive of all necessary scaffolding, Cutting work,
lead and lift as directed.
FF - Open Bar Back Counter (4380 x 900 x 900) NO. 1.00 63000 63,000
FF - Live Kitchen Back Counter (4380 x 900 x 900) NO. 1.00 63000 63,000
0
22 Open Bar & Live Kitchen Wall Shelves 0
SF - Open Bar Wall Shelves (4380 x 450 x 50) NO. 2.00 45000 90,000
SF - Live Kitchen Wall Shelves (4380 x 450 x 50) NO. 2.00 45000 90,000
0
23 Mosaic Artwork Frame 0
Providing & Fixing 18mm thk. ply boxing to cover the metal
beam with required aluminium box section framing to give
0
support, to finished with pop. Finished price to be inclusive of all
necessary Cutting work, lead and lift as directed.
Providing & Fixing 6" thk. boxing to be done above the stepped
ceiling using required aluminium box section framing, cladded
0
with 12mm thk. ply as required. Finished price to be inclusive of
all necessary Cutting work, lead and lift as directed.
SF - Open Bar & Live Kitchen Counter SFT 150.00 400 60,000
0
TOTAL OF CARPENTRY WORKS 1,917,540
0
G DOORS & GLAZING & SKYLIGHTS 0
1 Fixed Glazing 0
Providing and fixing in place Glazed Partitions in Approved
brand Aluminium Frame as per designer's detail. 10mm thk
toughened glass is to be fitted in standard Matt Black aluminium
frame using clips. All aluminium sections to be powder coated to
0
approved shade. Rate to include providing & fixing approved
film as directed.Finished price to be inclusive of all necessary
Harware, Cutting work, lead and lift as directed. (consider thin
section)
Basic Price: 0
FF- Open Courtyard SFT 275.00 650 178,750
FF- Sofa Seating Area SFT 120.00 650 78,000
FF- Private Dining SFT 190.00 650 123,500
FF - Outdoor Seating Area SFT 60.00 650 39,000
FF - Balcony(Smoking Area) SFT 68.00 650 44,200
0
SF - Outdoor Seating & Smoking Area SFT 320.00 650 208,000
SF - Cabana SFT 860.00 650 559,000
SF - Multifunction Area SFT 300.00 650 195,000
SF - Front Façade (Above the Entrance) SFT 270.00 650 175,500
1600950
2 Top Hung Openable Glazing 0
Basic Price: 0
SF - Cabana (Size : 750 x 1200) - 16 no SFT 160.00 800 128,000
0
3 Skylight 0
Basic Price: 0
FF- Outdoor Area Opening size is 1000 (500x3250) Nos. 2.00 35000 70,000
FF- Internal Staircase Area (775x3250) Nos. 1.00 32000 32,000
FF- Washroom Passage (940x3050) Nos. 2.00 28000 56,000
SF- Cabana (1300 x 3660) Nos. 2.00 38000 76,000
0
5 Glass Doors (Sliding) 0
Basic Price: 0
FF- Outdoor Seating Area (synchronised sliding) (1425 x 3090)
Nos. 2.00 145000 290,000
These are Sensor door
SF- Outdoor Seating Area (1200 x 3660) Nos. 1.00 135000 135,000
SF- Outdoor Smoking Area (1200 x 3660) Nos. 1.00 135000 135,000
0
6 Main Door (Openable) 0
Providing, fabricating & fixing using Approved floor spring
double leaf door using bloack board with 4mm the approved
veneer + wooden beading/lipping as per given sizes and detail
on both sides. The exposed edges of shutter shall be fitted with
12mm the TW Lipping. All wood and veneer surfaces shall be
stained to approved colour and finished with 2 coats of matt
clear polish as approved. All necessary hardware like
hinges/floor spring, door stoppers, door locks, door closers etc 0
will be hafele make. Door will be on approved make floor spring.
handles customised as per Architect's design to be
provided.Finished price to be inclusive of all necessary
scaffolding, Cutting work, lead and lift as directed.
Providing & fixing Sliding door using 32-35mm thk. block board,
clad with 12mm thk. mdf on both side with approved paint finish
same as the wall on both side with approved handle detail as
per drawing.The edges to be fixed with wooden beading as 0
approved. All wooden surface to be stained & finished polished
as approved. Necessary Sliding hardware, Concealed locks &
handles, signage etc will be hafele make.
NOTE
MATERIAL MAKE LIST
CONSIDER ALL COMM PLYWOOD ISI BRANDED MR GRADE , TOILET & PANTRY AREA USE WP
1
PLYWOOD.
CONSIDER INTERNAL SURFACE 0.8MM LAMINET & OUTSIDE 1MM LAMINETES. MERRINO, GREEN ,
2
CENTURY, IDEAL.
3 CONSIDER ALL HARDWARE MAKE HATTICH, EBCO, ENOX OR EQUALANCE. (SOFT CLOSING)
4 CONSIDER ALL PAINT & POLISHING METARIAL MAKE BY ASIAN PAINTS.
CONSIDER GLASS & MIRRORS MAKE SAINT GOBIN
5
BRAND.
CONSIDER GYPSUM & CALCIUM SILICATE BOARD SAINT
6
GOBIN MAKE
CONSIDER ALLUMINIUM SECTION FRAME DOORLINE
7
MAKE
CONSIDER PLUMBING INTERNAL PIPE CPVC ASHIRWAD,
8
SUPRIME MAKE
CONSIDER PVC PIPE FOR DRANAGE AND EXTRANAL
9
SUPERIME MAKE