0% found this document useful (0 votes)
58 views122 pages

Organized

Uploaded by

anwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views122 pages

Organized

Uploaded by

anwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 122

‫شركة القوة الفعالة‬

‫للوحات الكهربائية والمحوالت‬


Contents
1. Company Introduction…………………………………………………………………3

 Vision……………………………………………………………………………………………………………..3
 Our Mission…………………………………………………………………………………………………….3
 The Present…………………………………………………………………………………………………….4
 The Management……………………………………………………………………………………………4
 Marketing & Sales…………………………………………………………………………………………..4
2. AI JAZEA Group…………………………………………………………………………….5
 The factory…………………………………………………………………………………………………………….5
 Al JAZEA GROUP SUBSIDIARIES………………………………………………………………………………6
 Effective power company………………………………………………………………………………………7
 Organizational Structure………………………………………………………………………………………..8
 Fit Criteria………………………………………………………………………………………………………………10
3. Our Designs and Machines……………………………………………………………13
 Designing and Engineering………………………………………………………………………………14
 Powder coating facility……………………………………………………………………………………18
 Bus bar fabrication………………………………………………………………………………………….19
 List of Equipment’s & calibration plan…………………………………………………………….20
 Machines list and Descriptions……………………………………………………………………….21
 Manufacturing Process Flowchart…………………………………………………………………..22
 Production Panel Check list…………………………………………………………………………….23

4. Our Products……………………………………………………………………………….24
5. Suppliers……………………………………………………………………………………..32
6. Legal Documents………………………………………………………………………….35
 Company Registration Certificate……………………………………………………………………36
 Tax Return Certificate……………………………………………………………………………………..43
 VAT Registration Certificate…………………………………………………………………………….45
 National Address…………………………………………………………………………………………….48
 Bank Details…………………………………………………………………………………………………….50

7. Clients………………………………………………………………………………………….51
8. Certificates and Approvels……………………………………………………………53
 SASO Certificate………………………………………………………………………………………………56
 SCHNEIDER Panel Builder Certificate ………………………………………………………………58
 EATON Panel Builder Certificate………………………………………………………………………59
 ISO 9001:2015…………………………………………………………………………………………………60
 IEC 62208 Certificates……………………………………………………………………………………..62

9. Reference Projects……………………………………………………………………….80

Page 2 of 122
Introduction

Effective power is an engineering company for electrical panels and transformers Co. (EPEPTCO)
is a subsidiary of AL JAZEA GROUP, and it is a %100 Saudi owned Company, which was granted
License by the Ministry of Industry and Electricity in the year 2014 to manufacture and assemble
L.V Switchgears, Industrial Automation, including SCADA, BMS, and instrument Control
systems.
Our emphasis is on manufacturing a wide range of quality products such as Lighting and
Distribution Panel Boards, Low Voltage Switchboards and Switchgears, Motor Control Panels,
Synchronizing Panels, Power factor correction, Control systems, Kilowatt-hour Meter Boards and
other engineering products with our Construction, Residential, Industrial, Power and Water
industries …. etc.
Moreover, The Company offers consulting services during the design, procurement, installation,
and operation of the project.

Vision
To fulfill customer basic needs and offer reliable solutions in a sustainable way while improving
the safety & durability and quality.

Our Mission
Our mission is to provide the best engineering solutions in the Saudi market for low voltage
electrical switchboards. The most respected company providing electrical solutions.

Page 3 of 122
The Present
The Growth and diversification in business activities demanded more space and as result by 2001,
the activities were shifted to the present premise in industrial area. Subsequently within the
following few years the factory was also relocated to the new 2nd industrial area – JEDDAH. The
present location covers an area of 15,000sq.m and it includes the Offices, Factory and warehouse.
The factory, with latest state-of-the-art machineries and equipment required for the fabrication of
the switchboards. Effective Power’s policy of continues product development coupled with
perfection ensures its ability to cater the ever changing needs of the market.

The Management
As our business operation covers the entire market segment including Retail, Whole sale, Projects
and export, the organizational structure is composed of various departments that deal with specific
market segments, products and services. A corporate synergy exists between the departments to
ensure the fast and efficient delivery of products and services to our valued clients.

Marketing & Sales


Marketing is the methodology of communicating the value of a product or service to customers. A
team of High qualified, technically strong, well trained and professional Marketing and sales
engineers in the market to find out proper solution to help customers as per their requirement.
Marketing is finding out what people want, why they want it and how much they’ll spend. The
marketing team focuses on creating messaging and related collateral to drive interest in the
company's product or service offering. This may include hosting webinars or attending industry
events. The leads that they generate are handed over to the sales team, who executes a specific
strategy to close the deal.

Page 4 of 122
AI JAZEA Group is one of the leading innovation firms in Saudi Arabia which takes the
burden on the shoulder to facilitate, improve and Provide the market inside and outside with the
latest efficient Products, sufficient enough to be incomparable with the global references, the
pioneering role that the group plays, is not only out From the leverage that is characterized with,
but also for the Undeniable projects executed through the time since the foundation Fields in 1977
till now due to the various industrial and agricultural For its spread factories. As remarkable
projects, we perfectly have Achieved are the Haram meekly extension and the new airport in
Jeddah. The group always looks forward to getting a remarkable place Through the investment in
new fields and capture international Agencies on board.

The factory
Our factory is one among the few low voltage switch gears factories in the kingdom having a built
up area of more than 15,000 sq. m with a production hall of 87,000 sq. m area. The plant has the
capability to design, develop and produce low voltage switch gear panels as required from the
client in line with SASO and IEC Standards. The Engineers and skilled work force are the back
bone of the plant, with a policy of continuous improvement and investment in advanced
technology, EPEPTCO is capable of providing state of art manufacturing facilities. The ultimate
motto of the company is to ensure complete customer satisfaction with high level of quality in its
products and also ensures that all the consignments are delivered to their clients on time. The
company is committed to produce quality products and services all regions in Kingdom Saudi
Arabia.

Page 5 of 122
Al JAZEA GROUP SUBSIDIARIES
1. EFFECTIVE POWER EPEPT CO.
2. AL-TAMER AL-MOATAMDAH FOR CONTRACTING CO.
3. AL JAZEA AGRICULTURAL INVESTMENTS CO.
4. JAZEA CONSTRUCTION CHEMICALS.
5. JAZEA DUCTILE FITTINGS FACTORY.
6. HOUSE OF TOOLS AND INDUSTRIAL EQUIPMENTS.
7. AL JAZEA INDUSTRIAL COMPANY.
8. AL JAZEA POLYTHELENE PIPES.
9. AL JAZEA TRADING & CONTRACTING CO.
10. JAZEA PHARMACY.
11. PETRO JDFF.
12. JMT.
13. JPEPICO.
14. JDFF.
15. HESEN ALMUSAFER

Page 6 of 122
Effective power company, 100% Saudi-owned Company located in Jeddah and covers all regions
of Saudi Arabia. specialized in all types of low-voltage systems and services. An ISO 9001-2015
Certified L.V Switchgear Panel Factory and approved vendor in Saudi Arabia and Yemen. Provide
smart integrated solutions from the study stage to the delivery stage, with complete technical
support and services.

Effective Power Company provides full electrical solutions to the projects, they are partners of
Schneider & ABB to be converted to Siemens S4 Authorized PB.
Effective Power Company was established in 2014, the key principles are to identify value, map
the value stream, create flow, establish pull, and seek perfection who has been leading the
factory’s growth over the years, recently it is part of AL-Jazea Group, the owner & CEO of the
company is Mr. Nayef Alhammdi

Page 7 of 122
Page 8 of 122
Strengths: Weakness:
Your experience in establishing and managing electrical
panel factories provides strong leadership and plan to Projects such as working with the Saudi Electricity Company
improve sales, factory organization, and productivity are long-term and resource-demanding, requiring careful
aligns with the board’s vision to become a leading allocation of time and finances. we facing a lot of
industry player. operational expertise and Potential difficulties with OEM such as delays in shipping, no direct
partnerships with well-known brands will enhance support for project leads, and credit facility.
credibility and market reach. Qualifying the factory with
key entities opens up significant project opportunities,
especially in a growing Saudi economy.

Opportunities: Threats:

Saudi Arabia’s Vision 2030 has fueled increased The electrical panel building market is competitive, with
both local and international players vying for contracts,
demand for electrical panels and infrastructure potentially leading to price wars. Any economic downturns
development, offering numerous business or changes in government spending could negatively
opportunities. By qualifying with more government and impact demand for infrastructure projects. Fluctuations in
private entities, you can diversify your client base, the cost of raw materials may erode profit margins,
especially if contracts are fixed-price. Changes in regulatory
reducing dependency on specific contracts.
standards, especially in the context of testing and
approvals, could create additional barriers and costs.Page 9 of 122
Factory Strength
Loyalty Committed to grow SIEMENS business with dedicated focus
Market Outreach Good reach with Healthcare, Datacenters and MOE, thanks to their expertise
Factory Size About 14,000/sqm with production covered area of 8,910/sqm
Manufacturing Capacity The factory capability to build LV- 2000 Cubicle per year
They have 3 sales engineers in KSA , Managed by Hatem based on his expertise and focused
Sales Talents
client base
The engineering team have knowledge in SE products. We will work to build competent
Technical Capability
knowledge and skills in SIEMENS LV products, systems ,solution sand software solution.
Fit Criteria

Estimation Speed They have 3 EST to support the business as a shared resource, to start with
Financial Status Financial Strength to manage projects up to 8-10M SR/ annually
Payment Flexibility 120 Days L/C
ISO Certifications The factory internal documentation system updated and ISO 9001-2015 certified.
The factory performs HSE audits to ensure that the factory team adhere to Health-safety &
HSE/QMS Compliance
Environmental regulations ,Safety risk assessment is performed for all factory hazards
Professionally set-up Professionally set up a factory with clear processes. Need to improve
Professional Outlook
SIEMENS brand visibility in the factory premises
Business Plan Yearly SIEMENS orders of 5M SR/ 2025 year with 20% growth every year Page 10 of 122
Page 11 of 122
Page 12 of 122
Page 13 of 122
Designing and Engineering
 Full design and engineering team for supporting the sales and production team.
 Continuous evaluation and up-grading.
 Solutions for special spec are from customers.
 Compliance to local and international standards.

Sheet steel fabrication (EUROMAC @ ITALY Punching Machine)


EUROMAC – ITALY (CNC Punching Machine)
HEAVY DUTY HIGH SPEED CNC HYDRAULIC TURRET PUNCHING M/C.
MODEL: MTX FLEX – 12 HYBRID, 1250 / 30T- 2500 ADVANCE SOFTWARE LANTEK-
SPAIN
3 Indexed Stations capable of rotating 360º with 0.01 increments capable to hold:

 MTX innovative 12 station turret with automatic tool change and up to 66 tools (patent
pending).
 More flexibility: each of the D stations can be equipped with single thick turret tools (size
A-B-C-D) or with Multi tool a 4 - 6 - 10 stations. (Patent E 0875310)
 Standard thick turret-tooling forming tools usually have an ”active” die. These dies
protrude a few millimeters over the normal height of a standard punch die, requiring special
attention to set-up and programming. All additional 6 B Stations of the MTX FLEX 12 can
be raised up to 6mm to when the tool is actually employed and lowered when it is passive
eliminating this restriction when punching.

Page 14 of 122
 The innovative EUROMAC Auto index system, allows to MTX to rotate at
360°(bidirectional) No.3 single tool up to “D” station and Multi tool 4, 6 and 10 stations.
Installing three 10 station Multi tools is possible to obtain 30 rotating punches and dies
each at 360° (patent pending).

 EUROMAC MTX punching machines have one of the lowest energy requirements and
reach high performances with only 8,5 kW of working power installed.

 Automatic repositioning for large sheets up to max. 10.000 mm. The minimum width of
the strips automatic repositioning is 40 mm. thanks to the two lower cylinders lifting up
the material from the table.

 FLEX System through which the operator can adjust the punch’s speed and acceleration
and hold the ram at any height of the stroke, hence allowing special functions like
Continuous Forming, Engraving, Bending, Marking, Thread Tapping. Furthermore, allow
the use of the Wilson Wheel technology for shearing and/or offset. (Patent pending).

Page 15 of 122
Sheet steel fabrication (SAFAN DARLEY-NETHERLAND PRESS
BRAKE MACHINE MODEL: E-BRAKE B 100-3100 ES)

 EC10 control on swivel arm.

 Height adjustable Light guard X-Axis, CNC R-axis, CNC Y1/Y2 axis, CNC Adapter

European style, incl. intermediate beams Table OB/S-3.

 Clamping plate with mechanical fast clamping and safety adaptation.

 Electrical cabinet with air co (chiller).

 Numerical product data entry by means of Touch Screen.

 Numerical bending parameter representation.

 Usage of the actual database.

Page 16 of 122
BAYKAL – TURKEY
HYDRUALIC SWING BEAM MACHINES MODEL: HGL 3100 X 6

 Top beam and work table of box type construction.


 Welded all steel frame providing maximum rigidity and cutting accuracy.
 Top beam and work table of box type construction.
 Rapid blade gap adjustment mechanism.
 Swing up back gauge system for shearing longer pieces than back gauge range.
 Back gauge retract function.
 Compact, low-maintenance hydraulic unit located underneath work table.
 Hydraulic cylinders plainly designs and easily serviceable.
 Hydraulic hold down system.
 Hydraulic overload protection.
 Fine adjustment for blades.
 Adjustable stroke length to increase number of strokes on shorter cuts.

CNC Punching, Bending and shearing machines guarantee good steel work which will improve
the quality of the final product.

Page 17 of 122
Powder coating facility
We are making use of our conveyorized, powder coating plant for coating the finished steel parts
to make sure it is protected against the UV rays with our special color for EPEPTCO products, a
test lab with the latest technology devices shall insure the quality of our product and its compliance
with both local and international standards. The heavy duty painting booth covers our entire
painting requirement.

Page 18 of 122
Bus bar fabrication
Electrolytic copper of purity 99.9% is used for the fabrication of the bus bar. Bare copper bars are
used in fabrication and after completion of the process, the bars are tin-plated in our in – house
plating facility, this process ensures that all cut edges and inside of the drilled holes are all covered
completely with tin.

Page 19 of 122
Page 20 of 122
Page 21 of 122
Page 22 of 122
Page 23 of 122
Page 24 of 122
Our Products
 Switchboards up to form 4b and 6300A
 Automatic Transfer Switches-ATS
 Changeover Switches-MTS
 Generator Synchronization Switchgear
 Motor Control Centers –MCC
 Starters Panels-DOL-Y/D
 Variable Speed Drive Panels-VSD
 Soft Starter Panels
 Pump Control panels
 HVAC Motor Controls
 PFC Panels-Capacitor Bank
 Auto & Manual Synchronizing Panels
 Bus way System
 SCADA
 BMS
 Cable Tray & Metal Enclosure

EPEPTCO main distribution boards are used to distribute and control the power supply in large
buildings such as shopping malls, hospitals, universities, and hotels. The main distribution boards
are generally installed after the main power source (eg. transformers or generators) and used to
divide the power feed into subsidiary outgoing feeders.
Low Voltage Switchgears according to IEC 61439-1&2 and other specifications according
standard, TT panels, Partially and universally.

Page 25 of 122
MCC in many commercial and industrial applications, quite a few electric motors are required,
and it is often desirable to control some or all of the motors from a central location. The apparatus
designed for this function is the motor control center (MCC).

Motor Control Centers according to IEC 61439-1&2, and Logic Controlled Industrial Control
Panels.

ATS panel or Automatic Transfer Switch is often installed with a backup generator to allow the
generator to detect if the mains power has failed, start the generator and thereby provide temporary
power
without manual intervention.
(with, motorized ACB and MTS)

Page 26 of 122
Detuned filter reactor

APFC panel is fully automatic in operation and can achieve desired power factor under fluctuating
load conditions

Busway is extremely beneficial in electrical systems that require a lot of flexibility, but that is not
the only advantage when compared to cable bus. Bus duct typically takes up less space and when
used across a multi-floor, multi-tenant building, bus duct only requires a single circuit for all floors.
It is also much simpler to reconfigure busway if you need to expand, alter or move parts of your
busway system.

Page 27 of 122
Pumps type
2. Dynamic 1. Positive Displacement
Centrifugal pumps Diaphragm pumps
Vertical centrifugal pumps Gear pumps
Horizontal centrifugal pumps Peristaltic Pumps
Submersible pumps Lobe pumps
Fire hydrant systems Piston Pumps.

Page 28 of 122
SCADA – (SUPERVISORY CONTROL AND DATA ACQUISITION)

SCADA is a way to control and monitor various industrial processes. SCADA enables monitoring
and controlling of the plant operation remotely. SCADA is not limited to a specific technology.
Instead, SCADA is a type of automation solution that provides additional value to its stakeholders
with the help of technology always. SCADA system gathers information, such as where a leak on
a pipeline has occurred, transfers the information back to a central site, alerting the home station
that the leak has occurred, carrying out necessary analysis and control, such as determining if the
leak is critical, and displaying the information in a logical and organized fashion. SCADA systems
can be relatively simple, such as one that monitors environmental conditions of a small office
building, or incredibly complex, such as a system that monitors all the activity in a nuclear power
plant or the activity of municipal water.

Page 29 of 122
BMS
BMS controls & monitor HVAC directly and integrate other system through network, shuch as:
 Air handling and cooling plant system.
 Lighting.
 Power system.
 Fire systems.
 Security system.

Page 30 of 122
EFECTIVE POWER ENCLOSURE & CABLE TRAY CONTENTS
- APLICATIONS
- SPECIFICATION
- FEATURES

Applications:
Metal Enclosures are designed to accommodate various types of switchgear and control gear
assemblies to suit a variety of electrical installations in commercial and light industrial premises.
They are designed for outdoor applications up to (IP54, IP55).
Specification:
- Made of high quality galvanized Steel sheet.
- Thickness up to 1.5mm for Enclosure Frame, Door thickness 2.0 mm, Rear Panel thickness 1.2
mm, Side Panel thickness 1.2-1.5 mm.
- Polyester powder coated in RAL-7035 color code.
- Standard mounting plate made of hot dip galvanized steel sheet of 2mm thickness with holes can
be supplied separately.
- Degree of protection IP54, IP55.
Features:
- Easily removable hinges, ideal for changing the door opening direction (for certain sizes).
- Extendable on both sides left and right.
- Lock features: - Quarter turn cylindrical lock - Metal keys and locking mechanism for durability.

Page 31 of 122
Page 32 of 122
List Of suppliers

Schneider Electric – ABB – Legrand - LS is – GE - LOVATO

Any other reputable international products are available according to projects requirements
Page 33 of 122
List Of suppliers

LOWARA - EBARA - WILO - GRRUDFOS - Peerless - Armstrong - Fairbanks -


SAMFORD - Cummins - aksa - Perkins - Utech - USSG - STC - TBS - Elsweedy
Any other reputable international products are available according to projects requirements
Page 34 of 122
Page 35 of 122
‫رﻣﺰك اﻟﺘﺠﺎري ‪QR Code‬‬
‫ﻣﻦ ﺧﻼﻟﻪ ﻳﻤﻜﻨﻚ اﻟﺘﺤﻘﻖ اﻟﻤﺒﺎﺷﺮ ﻣﻦ اﻟﻌﻠﻮﻣﺎت‪:‬‬

‫رﺧﺼﺔ اﻟﺒﻠﺪﻳﺔ‬ ‫اﻟﺴﺠﻞ اﻟﺘﺠﺎري‬

‫ﺑﺮﻧﺎﻣﺞ ﻧﻄﺎﻗﺎت‬ ‫ﺷﻬﺎدة اﻟﺴﻌﻮدة‬

‫اﻟﻐﺮﻓﺔ اﻟﺘﺠﺎرﻳﺔ‬ ‫ﺷﻬﺎدة اﻟﺰﻛﺎة‬

‫‪MCgovSA‬‬
‫‪www.mc.gov.sa‬‬
‫‪Page 36 of 122‬‬
̀˹˺˺˹˻˾̂̀˾
˽˹˼˹˻̀̂˺˺˼
˰ϫ˺˽˼˿˹˻˺˹

Δϳ΋ΎΑέϬϛϟ΍ΕΎΣϭϠϟ΍ϭΕϻϭΣϣϠϟΔϟΎόϔϟ΍ΓϭϘϟ΍ϊϧλϣ
ϯΩϭό˰˰˰˰γ ΓΩϭΩΣϣΔϳϟϭ΋γϣΕ΍Ϋ
˰ϫ˺˽˿̂˺˻˻˺ ˰ϫ˺˽˼̂˺˻˻˻ Δϧγ˼˹
ΔϳϧΎΛϟ΍ΔϳϋΎϧλϟ΍ΔϧϳΩϣϟ΍ΓΩΟ
˹˺˺˽˾̀ ˻˺˼́˺ ˿˺̀̀˺˽̂
ϱέΎΟΗϟ΍ίϣέϟ΍΢γϣ˯ΎΟέϟ΍ΔρηϧϷ΍ΕΎϧΎϳΑϰϠϋωϼρϼϟ
ϱΩϭόγ்˺˹က˹˹˹က˹˹˹
ϲΑϳΗόϟ΍ΩϣΣϣΩϬϓϑϳΎϧ

Δϛέηϟ΍ΩϘϋϪϳϠϋιϧΎϣΏγΣ

ΓΩΟ ΓΩΟ
˰ϫ˺˽˽˻˹˼˺˹ ̀˹˹˿̀˺˺ ˰ϫ˺˽˽̀˹˻˺˹

Page 37 of 122
͂௬̗̓ͅ௛̹̺͙̜̾̓͜͵Ͼ̺͙͵͆͜͵̜̻Ͼ̵̺̺̯̺͙͂̓͛͵̸̢̺͙̰̼̻

̨̨̪̣̤̤̣̥̬̪

̧̣̦̣̥̪̬̤̤̦

̨̧̨̤̤̩̣

̧̤̪̪̦̥̥̥̬

̧̨̦̤̣̥̪̫̦̫

͓͙௛̚΀͙̜̘͜

̥̤̣̥̪̥

̚͡͵̀͆

Page 38 of 122
Page 39 of 122
‫ﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﺍﻟﺨﺎﺻﺔ ﺑﺘﻨﻔﻴﺬ ﺍﻟﺘﺮﺧﻴﺺ‬
‫‪ .١‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﻤﻮﺍﺩ ﻗﺎﻧﻮﻥ )ﻧﻈﺎﻡ( ﺍﻟﺘﻨﻈﻴﻢ ﺍﻟﺼﻨﺎﻋﻲ ﺍﻟﻤﻮﺣﺪ ﻟﺪﻭﻝ ﻣﺠﻠﺲ ﺍﻟﺘﻌﺎﻭﻥ ﻟﺪﻭﻝ ﺍﻟﺨﻠﻴﺞ ﺍﻟﻌﺮﺑﻴﺔ‬
‫ﻭﻻﺋﺤﺘﻪ ﺍﻟﺘﻨﻔﺬﻳﺔ‪.‬‬
‫‪ .٢‬ﻋﺪﻡ ﺇﺟﺮﺍﺀ ﺃﻱ ﺗﻮﺳﻌﺔ ﺃﻭ ﺗﻌﺪﻳﻞ ﻓﻰ ﺍﻟﻤﻨﺘﺠﺎﺕ ﻗﺒﻞ ﺍﻟﺤﺼﻮﻝ ﻋﻠﻰ ﻣﻮﺍﻓﻘﺔ ﺍﻟﻮﺯﺍﺭﺓ‪.‬‬
‫‪ .٣‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﺘﺤﺪﻳﺚ ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺼﻨﻊ ﻛﻞ ﺳﺘﺔ ﺍﺷﻬﺮ ﻣﻦ ﺧﻼﻝ ﻣﻮﻗﻊ ﺍﻟﻮﺯﺍﺭﺓ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ‪.‬‬
‫‪ .٤‬ﺍﻟﺘﺰﺍﻡ ﻣﻄﺎﺑﻘﺔ ﺍﻟﻤﻨﺘﺠﺎﺕ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﻭﺍﻟﻤﻘﺎﻳﻴﺲ ﺍﻟﻤﻌﺘﻤﺪﺓ ﺃﻭ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻤﺘﺒﻨﺎﺓ ﻣﻦ ﺍﻟﻬﻴﺌﺔ‬
‫ﺍﻟﺴﻌﻮﺩﻳﺔ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﻭﺍﻟﻤﻘﺎﻳﻴﺲ‪.‬‬
‫‪ .٥‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﻤﻮﺍﺩ ﺍﻟﻨﻈﺎﻡ ﺍﻟﻌﺎﻡ ﻟﻠﺒﻴﺌﺔ ﻭﻻﺋﺤﺘﻪ ﺍﻟﺘﻨﻔﻴﺬﻳﺔ ﻟﻠﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ ﺍﻟﺒﻴﺌﺔ ﻣﻦ ﺍﻟﺘﻠﻮﺙ‪.‬‬
‫‪ .٦‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻷﻧﻈﻤﺔ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﻟﻮﺍﺋﺢ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻷﻣﻦ ﺍﻟﺼﻨﺎﻋﻲ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻌﺎﻣﺔ‪.‬‬
‫‪ .٧‬ﺍﻥ ﺗﻜﻮﻥ ﺣﺴﺎﺑﺎﺕ ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﺼﻨﺎﻋﻲ ﻣﻨﺘﻈﻤﺔ ﻭﻓﻘًﺎ ﻟﻸﺻﻮﻝ ﺍﻟﻤﺤﺎﺳﺒﻴﺔ ﻭ ﺍﻟﻘﻮﺍﻋﺪ ﺍﻟﻘﺎﻧﻮﻧﻴﺔ‬
‫ﺍﻟﻤﺮﻋﻴﺔ ﻭﺃﻥ ﻳﺰﻭﺩ ﺍﻟﻮﺯﺍﺭﺓ ﺑﺎﻟﻤﻴﺰﺍﻧﻴﺔ ﺍﻟﻌﻤﻮﻣﻴﺔ ﻣﺼﺎﺩﻕ ﻋﻠﻴﻬﺎ ﻣﻦ ﻣﺤﺎﺳﺐ ﻗﺎﻧﻮﻧﻲ ﻟﻜﻞ ﺳﻨﺔ ﻣﺎﻟﻴﺔ‪.‬‬
‫‪ .٨‬ﻋﺪﻡ ﺇﺳﺎﺀﺓ ﺍﺳﺘﻌﻤﺎﻝ ﺍﻟﻤﺰﺍﻳﺎ ﺍﻟﻤﻤﻨﻮﺣﺔ ﻟﻠﻤﺸﺮﻭﻉ‪.‬‬
‫‪ .٩‬ﺗﺰﻭﻳﺪ ﺍﻟﻮﺯﺍﺭﺓ ﺑﻤﺎ ﺗﻄﻠﺒﻪ ﻣﻦ ﺑﻴﺎﻧﺎﺕ ﻛﺎﻣﻠﺔ ﻭﺻﺤﻴﺤﺔ ﻋﻦ ﺍﻟﻤﺸﺮﻭﻉ‪.‬‬
‫‪ .١٠‬ﺍﻟﺴﻤﺎﺡ ﻟﻤﻮﻇﻔﻲ ﺍﻟﻮﺯﺍﺭﺓ ﺑﺪﺧﻮﻝ ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﺼﻨﺎﻋﻲ ﻭﺍﻹﻃﻼﻉ ﻋﻠﻰ ﺍﻟﺴﺠﻼﺕ ﻭﺍﻟﻤﺴﺘﻨﺪﺍﺕ‬
‫ﻭﺍﻟﺤﺴﺎﺑﺎﺕ ﻭﻣﺮﺍﻗﺒﺔ ﻋﻤﻠﻴﺔ ﺍﻹﻧﺘﺎﺝ ﻭﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﻧﺸﺎﻃﺎﺕ ﺍﻟﻤﺸﺮﻭﻉ‪.‬‬
‫‪ .١١‬ﻻﻳﺠﻮﺯ ﺇﻗﺎﻣﺔ ﻣﺸﺮﻭﻉ ﺻﻨﺎﻋﻲ ﺃﻭ ﺗﻮﺳﻌﺘﻪ ﺃﻭ ﺗﻄﻮﻳﺮﻩ ﺃﻭ ﺗﻐﻴﻴﺮ ﻣﻨﺘﺠﺎﺗﻪ ﺃﻭ ﺩﻣﺠﻪ ﺑﻤﺸﺮﻭﻉ ﺻﻨﺎﻋﻲ‬

‫‪www.mim.gov.sa‬‬

‫‪Page 40 of 122‬‬
OLC-23-05-04001193 :

2024/05/04 :

2023/05/04 :

: 1436/2/10 : 4030279113 :

0561105419 [email protected]

- Industrial : / 805378 :

0150J00059 :

:
.1
.
" " .2
." "
. 15 .3
. .4
1456/1/5
: .5

Page 41 of 122
Page 42 of 122
1032262728
٣١٠٢٧٨٤٥٣٨
١٠٣٢٢٦٢٧٢٨
‫ ﻫـ‬١٤٤٥/١٠/٢٩

‫ﺷﻬﺎدة‬
Certificate
The Zakat,Tax and Customs ‫ﺗﺸﻬﺪ ﻫﻴﺌﺔ اﻟﺰﻛﺎة واﻟﻀﺮﻳﺒﺔ‬

Authority certifies that the Taxpayer / ‫واﻟﺠﻤﺎرك أن اﻟﻤﻜﻠﻒ‬

‫ﻣﺼﻨﻊ اﻟﻘﻮة اﻟﻔﻌﺎﻟﺔ ﻟﻠﻤﺤﻮﻻت واﻟﻠﻮﺣﺎت اﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬

Entity Unified No./ID No. ٧٠١١٠٢٥٩٧٥ ‫ رﻗﻢ ﻫﻮﻳﺔ‬/ ‫اﻟﺮﻗﻢ اﻟﻤﻮﺣﺪ ﻟﻠﻤﻨﺸﺄة‬

Commercial Registration/License/
٤٠٣٠٢٧٩١١٣ ‫ ﻋﻘﺪ رﻗﻢ‬/ ‫ رﺧﺼﺔ‬/ ‫ﺳﺠﻞ ﺗﺠﺎري‬
Contract No

Has submitted his tax return for the period ending on 31/12/2023 AD, and he ، ‫ ﻫـ‬١٤٤٥/٠٦/١٨ ‫ﻗﺪم إﻗﺮاره ﻋﻦ اﻟﻔﺘﺮة اﻟﻤﻨﺘﻬﻴﺔ ﻓﻲ‬
was granted the certificate to complete all his transactions including the ‫وﻗﺪ ﻣﻨﺢ ﻫﺬه اﻟﺸﻬﺎدة ﻹﻧﻬﺎء ﺟﻤﻴﻊ ﻣﻌﺎﻣﻼﺗﻪ ﺑﻤﺎ ﻓﻲ ذﻟﻚ ﺻﺮف‬
payment of the final amount due on the contract. .‫ﻣﺴﺘﺤﻘﺎﺗﻪ اﻟﻨﻬﺎﺋﻴﺔ ﻋﻦ اﻟﻌﻘﻮد‬
The Certificate is valid until 02/11/1446 AH corresponding to 30/04/2025 ‫ ﻫـ اﻟﻤﻮاﻓﻖ‬١٤٤٦/١١/٠٢ ‫ﻳﺴﺮي ﻣﻔﻌﻮل ﻫﺬه اﻟﺸﻬﺎدة ﺣﺘﻰ ﺗﺎرﻳﺦ‬
AD ‫ م‬٢٠٢٥/٠٤/٣٠

( The second of Dhu al-Qi'dah one thousand four hundred forty-six Hijri ) ( ‫) اﻟﺜﺎﻧﻲ ﻣﻦ ذو اﻟﻘﻌﺪة أﻟﻒ و أرﺑﻌﻤﺎﺋﺔ و ﺳﺘﺔ و أرﺑﻌﻮن ﻫﺠﺮي‬

www.zatca.gov.sa :‫ﻻﻳﻌﺘﺪ ﺑﻬﺬه اﻟﺸﻬﺎدة إﻻ ﺑﻌﺪ اﻟﺘﺤﻘﻖ ﻣﻦ ﻣﻮﻗﻊ اﻟﻬﻴﺌﺔ اﻻﻟﻜﺘﺮوﻧﻲ‬

This certificate is not valid until verified by the Authority's Website: www.zatca.gov.sa

Page 43 of 122
‫‪١٤٤٥/٠٢/١٢‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ‬
‫‪٢٨/٠٨/٢٠٢٣‬‬ ‫ﺍﻟﻤﻮﺍﻓﻖ‬
‫ﺭﻣﺰ ﺍﻟﺸﻬﺎﺩﺓ ‪٥٧٠٧٤٨٩٩‬‬

‫ﺷﻬﺎﺩﺓ‬

‫ﻣﺼﻨﻊ ﺍﻟﻘﻮﺓ ﺍﻟﻔﻌﺎﻟﺔ ﻟﻠﻤﺤﻮﻻﺕ ﻭﺍﻟﻠﻮﺣﺎﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬ ‫ﺇﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ ‪:‬‬

‫ﺟﺪﺓ‬
‫ﺍﻟﺴﻌﻮﺩﻳﺔ‬
‫‪٥٣٤٢١٢٢٢٤‬‬ ‫ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ ‪:‬‬
‫ﻣﺼﺪﺭﻩ ‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‪٤٠٣٠٢٧٩١١٣ :‬‬

‫ﻛﺘﺎﺑﺔ‬ ‫ﺭﻗﻤﺎ‬
‫ﺳﺘﺔ ﻣﺸﺘﺮﻛﻴﻦ‬ ‫‪٦‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﺳﺘﺔ ﻭ ﻋﺸﺮﻭﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٢٦‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﺍﺛﻨﺎﻥ ﻭ ﺛﻼﺛﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٣٢‬‬ ‫ﺍﻟﻤﺠﻤﻮﻉ‬

‫ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ‬
‫ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ‪ ،‬ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ‪ ،‬ﻭﻫﻲ‬
‫ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ )‪ (١٩/٦‬ﻣﻨﻪ‪.‬‬
‫ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ‪ ١٤٤٥/٠٣/١١‬ﻫـ‪.‬‬
‫ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ‬ ‫ﺃﻭ‬ ‫ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ‬
‫ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ ‪:‬‬ ‫ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ‬

‫‪www.gosi.gov.sa/vc‬‬

‫) ﺍﻟﺸﻬﺎﺩﺓ ﻣﻌﺘﻤﺪﺓ ﻣﻦ ﺻﺎﺣﺐ ﺍﻟﺼﻼﺣﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﺇﻟﻰ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ (‬

‫ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ‪ ،‬ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ‬
‫ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ‪ ،‬ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ‪ ،‬ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ‬
‫ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ‪ ،‬ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ‬
‫ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ‪ ،‬ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ‬
‫ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ ‪.‬‬

‫‪Page 44 of 122‬‬
‫‪100191005796513‬‬

‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‪2019/03/13 :‬‬


‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﻤﻴﺰ‪3102784538 :‬‬

‫ﺷﻬﺎﺩﺓ ﺗﺴﺠﻴﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‬


‫‪VAT Registration Certificate‬‬

‫ﺗﺸﻬﺪ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺄﻥ ﺍﻟﻤﻜﻠﻒ ﺃﺩﻧﺎﻩ ﻣﺴﺠﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‬
‫ﺑﺘﺎﺭﻳﺦ ‪2019/03/13‬‬
‫‪Hereby, The General Authority of Zakat & Tax (GAZT) certifies that the taxpayer below is‬‬
‫‪VAT registered on 13/03/2019‬‬

‫‪Taxpayer Name:‬‬ ‫ﻣﺼﻨﻊ ﺍﻟﻘﻮﺓ ﺍﻟﻔﻌﺎﻟﺔ ﻟﻠﻤﺤﻮﻻﺕ ﻭﺍﻟﻠﻮﺣﺎﺕ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻜﻠﻒ‪:‬‬


‫ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬
‫‪VAT Registration Number:‬‬ ‫‪310278453800003‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ‪:‬‬

‫‪Effective Registration Date:‬‬ ‫‪2019/04/01‬‬ ‫ﺗﺎﺭﻳﺦ ﻧﻔﺎﺫ ﺍﻟﺘﺴﺠﻴﻞ‪:‬‬

‫‪Taxpayer Address:‬‬ ‫ﺟﺪﺓ‪،‬ﺟﺪﺓ ﺍﻟﻤﺪﻳﻨﺔ ﺍﻟﺼﻨﺎﻋﻴﺔ ‪21381،‬‬ ‫ﻋﻨﻮﺍﻥ ﺍﻟﻤﻜﻠﻒ‪:‬‬

‫ﻛﻤﻜﻠﻒ ﻣﺴﺠﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‪ ،‬ﻻ ﻳﺠﻮﺯ ﻟﻚ ﺗﺤﺼﻴﻞ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ ﻣﻦ ﻋﻤﻼﺋﻚ ﻗﺒﻞ ﺗﺎﺭﻳﺦ‬
‫ﻧﻔﺎﺫ ﺍﻟﺘﺴﺠﻴﻞ ﺑﺎﻟﻀﺮﻳﺒﺔ‪ .‬ﻓﻲ ﺣﺎﻝ ﺗﺒﻴﻦ ﻏﻴﺮ ﺫﻟﻚ‪ ،‬ﺳﺘﻘﻮﻡ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺘﻨﻔﻴﺬ ﺍﻟﻐﺮﺍﻣﺎﺕ ﺍﻟﻤﺴﺘﺤﻘﺔ‬

‫‪Page 45 of 122‬‬
‫‪100191005796513‬‬

‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‪2019/03/13 :‬‬


‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﻤﻴﺰ‪3102784538 :‬‬

‫‪Taxpayer Name:‬‬ ‫ﻣﺼﻨﻊ ﺍﻟﻘﻮﺓ ﺍﻟﻔﻌﺎﻟﺔ ﻟﻠﻤﺤﻮﻻﺕ ﻭﺍﻟﻠﻮﺣﺎﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻜﻠﻒ‪:‬‬

‫‪CR / License / Contract No.:‬‬ ‫‪4030279113‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‪/‬ﺍﻟﺮﺧﺼﺔ‪/‬ﺍﻟﻌﻘﺪ‪:‬‬

‫‪Tax Period:‬‬ ‫ﺭﺑﻊ ﺳﻨﻮﻱ‪Quarterly-‬‬ ‫ﺍﻟﻔﺘﺮﺓ ﺍﻟﻀﺮﻳﺒﻴﺔ‪:‬‬

‫‪First Filing due date:‬‬ ‫‪2019/07/31‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﺳﺘﺤﻘﺎﻕ ﺃﻭﻝ ﺇﻗﺮﺍﺭ ﺿﺮﻳﺒﻲ‪:‬‬

‫ﻛﻤﻜﻠﻒ ﻣﺴﺠﻞ ﻓﻲ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ‪ ،‬ﻻ ﻳﺠﻮﺯ ﻟﻚ ﺗﺤﺼﻴﻞ ﺿﺮﻳﺒﺔ ﺍﻟﻘﻴﻤﺔ ﺍﻟﻤﻀﺎﻓﺔ ﻣﻦ ﻋﻤﻼﺋﻚ ﻗﺒﻞ ﺗﺎﺭﻳﺦ‬
‫ﻧﻔﺎﺫ ﺍﻟﺘﺴﺠﻴﻞ ﺑﺎﻟﻀﺮﻳﺒﺔ‪ .‬ﻓﻲ ﺣﺎﻝ ﺗﺒﻴﻦ ﻏﻴﺮ ﺫﻟﻚ‪ ،‬ﺳﺘﻘﻮﻡ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺘﻨﻔﻴﺬ ﺍﻟﻐﺮﺍﻣﺎﺕ ﺍﻟﻤﺴﺘﺤﻘﺔ‬

‫‪Page 46 of 122‬‬
Page 47 of 122
‫ ص‬11:15 2024/‫‏‬8/‫‏‬27 ‫طباعة اثبات عنوان وطني‬

‫تحميل‬

Proof Number 1054496191 ‫رقم اإلثبات‬


Original Date 27/8/2024 ‫تاريخ اإلصدار‬
Expiration Date 23/2/2025 ‫تاريخ االنتهاء‬

‫إثبات عنوان‬
Address Proof
Address Holder Details ‫بيانات صاحب العنوان‬

‫مصنع القوة الفعالة للمحوالت‬


Name ‫االسم‬
‫واللوحات الكهربائية‬

Customer Acc. 4 0 0 2 9 2 5 1 2 ‫رقم الحساب‬

Reg. Date 30/3/2014 ‫تاريخ التسجيـــل‬

Address Details ‫تفاصيل العنوان‬


Short Address J N M A 2 5 4 3 ‫العنوان المختصر‬

Building No. Street ‫الشارع‬ ‫رقم المبنى‬

2 5 4 3 Al Marsa 9 9 ‫المرسى‬ 2 5 4 3

Secondary No. District ‫الحي‬ ‫الرقم الفرعي‬

7 1 2 0 Al Mursi Dist. ‫حي المرسي‬ 7 1 2 0

Postal Code ‫الرمزي البريدي‬

2 2 7 5 8 2 2 7 5 8

City ‫المدينة‬

JEDDAH ‫جدة‬

https://proof.address.gov.sa//Default?QAccountNumber=400292512&QServiceNo=177322249&printType=c Page 48 of 122


1/2
‫ ص‬11:15 2024/‫‏‬8/‫‏‬27 ‫طباعة اثبات عنوان وطني‬

Kingdom of Saudi Arabia ‫المملكة العربية السعودية‬

To Verify ‫للتحقق‬
https://proof.address.gov.sa/VerifyProofNA.aspx

‫تم إصدار هذا اإلثبات إلكترونيا وال يتطلب التوقيع عليه‬


‫ ويعد اإلثبات الغيا إذا شابه‬،‫ ويحظر قطعيا تقليده أو إدخال أي تعديالت عليه سواء باإلضافة أو الحذف‬،‫تم إصدار هذا اإلثبات بناء على طلب الموضح أعاله‬
.‫ كما يعرض صاحبه للمساءلة القانونية‬،‫شيء من ذلك‬
This proof has been issued electronically and does not require a signature
This proof has been issued upon the request of the above-named, and it is absolutely prohibited to imitate it or make any modifications to it, whether
by addition or deletion, and the proof is considered void if it is marred by something, and its owner is subject to legal accountability.

19992 https://splonline.com.sa/ar/national-address-1/

https://proof.address.gov.sa//Default?QAccountNumber=400292512&QServiceNo=177322249&printType=c Page 49 of 122


2/2
Page 50 of 122
Page 51 of 122
Some of our Clients 2021

1. BINLADIN GROUP. 11. SAUDI TECHNIC ENERGY. 21. AL-JAZEA FOR CONSTRUCTION
2. AL JABER CONSTRUCTION. 12. JAWHAR AL-RIYADAH GENERAL CHEMICAL

3. AZIZ COMPANY FOR CONTRACTING CONTRACTING EST. 22. ARABIAN FOOD CORPORATION
AND INDUSTRIAL INVESTMENT 13. SAHAB ALOFOQ EST 23. SIMEE CONSTRUCTION.
4. AL QIMMA EQUIPMENT FACTORY 14. DAR CHATTERS CONTRACTING CO. 24. ALEAMMAR AL NADER
CONTRACTING EST.
5. ANDALUS METAL FABRICATION 15. METITO LTD CO.
25. NATIONAL WATER WORKS CO.
6. MADAR BUILDING MATERIALS 16. ENVIRONMENTAL TECHNOLOGY CO. LTD
26. AL FOZAN HOLDING
7. EASTERN LIGHTS CONTRACTING EST. 17. DAR AL BAYAN TRADING CO. LTD.
27. BUILT CONTRACTING CO. LTD.
8. ZAWYA 18. CAP FRANCE BAT - GENERAL CONTRACTING
28. VISION CONSTRUCTION.
9. AL JAZEA TRADING AND 19. DEW POINT CONTRACTING CO.
CONTRACTING COMPANY 29. TASO CO.
20. ALLIED ENGINEERING FORMETAL IND.
10. QASOUR CONTRACTING EST 30. KHALIL HASAN IBRAHIM AL-ZUBEDI
EST.BR

Page 52 of 122
Page 53 of 122
‫‪Ministries and consultant Approvals :-‬‬ ‫االعتمادات لدى (الوزارات – مكاتب استشارية) ‪-:‬‬
‫‪1. MINISTRY OF DEFENSE.‬‬ ‫‪ .1‬وزارة الدفاع‪.‬‬
‫‪2. ROYAL SAUDI NAVAL FORCES.‬‬ ‫‪ .2‬القوات البحرية الملكية السعودية‪.‬‬
‫‪3. MINISTRY OF ENVIRONMENT WATER AND AGRICULTURE‬‬ ‫‪ .3‬وزارة البيئة والمياه والزراعة‪.‬‬
‫‪4. MINISTRY OF HOUSING‬‬ ‫‪ .4‬وزارة اإلسكان‪.‬‬
‫‪5. MINISTRY OF SOCIAL AFFAIRS‬‬ ‫‪ .5‬وزارة الشؤون االجتماعية‪.‬‬
‫‪6. MINISTRY OF WATER & ELECTRICITY‬‬ ‫‪ .6‬وزارة المياه والكهرباء‪.‬‬
‫‪7. NATIONAL WATER COMPANY‬‬ ‫‪ .7‬شركة المياه الوطنية‪.‬‬
‫‪8. SAUD CONSULT‬‬ ‫‪ .8‬شركة الخدمات االستشارية السعودية لالستشارات الهندسية‪.‬‬
‫‪9. SAUDI ARABIAN PARSONS‬‬ ‫‪ .9‬شركة بارسونز العربية السعودية المحدودة‪.‬‬
‫‪10. CONSULTING ENGINEERING GROUP‬‬ ‫‪ .10‬المجموعة االستشارية الهندسية‪.‬‬
‫‪11. BECT‬‬ ‫‪ .11‬المكتب المصري لتقنيات المستشارين‪.‬‬
‫‪12. DAR RIYADH‬‬ ‫‪ .12‬دار الرياض‪.‬‬
‫‪13. KHATIB & ALAMI‬‬ ‫‪ .13‬االتحاد السعودي الهندسي (خطيب وعلمي)‪.‬‬
‫‪14. SAUDI BINLADIN GROUP‬‬ ‫‪ .14‬مجموعة بن الدن السعودية‪.‬‬
‫‪15.Roal Commession‬‬
‫‪Page 54 of 122‬‬
Page 55 of 122
Page 56 of 122
Page 57 of 122
Page 58 of 122
CamScanner
Page 59 of 122
Page 60 of 122
2: ‫رقم االصذار‬ ‫الشركة السعىدية للفحص واالختبار‬
2020/10/01:‫تاريخ االصذار‬ SAUDI INSPECTION & TESTING CO. (SAITCO)
1: ‫رقم المراجعة‬ ‫مالحق متطلبات العملية– نتائج االختبارات مختبر الكهرباء‬:‫ أ‬- 7‫ملحق‬
2020/10/01: ‫تاريخ المراجعة‬ Appendix 7-A: LAB process REQ. TEST RESULTS ELECTRICAL Lab

C-:206 ‫رمز المنتج بالمختبر‬

Laboratory name SAUDI INSPECTION AND TESTING CO.(SAITCO)


Address First Industrial Area, St. No. 4,5,6,7-Riyadh
Country Saudi Arabia

Date or period of tests 11- 13 / 04 / 2023


Date of report issue 15 / 04 / 2023
Laboratory test report number E-230369
Client Reference & date 10 / 04 / 2023
Effective Power Company factory for electrical panels and
transformers
Factory Name & address
Unit No. 45, Street 201 Second Industrial City Building No
6687, 14431 ‫الرياض‬

Product description Control Box


Brand name or trademark EPEPTCO
Model No. / Code EPLC894415S48W
Country of origin Saudi Arabia

Empty enclosures for low-voltage switchgear and controlgear


Product category assemblies –
General requirements
Standard IEC 62208:2014
Conformity to articles tested Yes No

Test case verdicts


Test case does not apply to the test object : N (.A.)
Test item does meet the requirement : P(ass)
Test item does not meet the requirement : F(ail)

Note: The result recorded in this document only related to the item tested
‫ النتائج المدونة في تقرير التحكم في النتائج ال تمثل إال العينة المختبرة‬: ‫مالحظة‬

F 07-08-02 A Page 1 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 61 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230369
IEC 62208
Clause Requirement - Test Result - Remark Verdict

4 Classification
Enclosures are classified according to: - -
a) the type of material:
• insulating;
Metallic P
• metallic;
• combination of insulating and metallic;
b) method of fixing:
• floor standing;
• wall mounting; Wall Mounting P
• flush mounting;
• pole mounting;
c) the intended location:
• outdoor; Indoor P
• indoor;
d) the degree of protection:
• IP code, according to IEC 60529; IP42 P
• IK code, according to IEC 62262;
) the rated insulation voltage (for enclosures made of
- N
insulating materials).
6 Information to be given regarding the enclosure - -
6.1 General - -
The following information shall be given by the
Marked P
manufacturer.
6.2 Marking - -
• either the name, trade mark or identification mark of
EPEPTCO P
the enclosure manufacturer;
• type designation or identification number of the
EPLC894415S48W P
enclosure.
The marking shall be durable and easily legible and
may be inside the enclosure.
durable P
Compliance is checked according to the test of 9.3 and
by inspection.
6.3 Documentation provided P
6.3.1 General provided P
The manufacturer's documentation shall include all
relevant constructional, mechanical
characteristics, the enclosure classification (see
Instructional manual
Clause 4) and any instruction necessary for P
provided
the correct handling, assembling, mounting and
service conditions of the enclosure as well as
reference to this standard:
6.3.2 • dimensions (see 6.3.2); - -
Thedimensionsshallbegiveninmillimeters 890mm x 440mm x
P
150mm
The external dimensions:height, width and depth
arenominalvaluesand shall be indicatedin the - P
catalogue of the enclosure manufacturer.
6.3.3 • mounting arrangements (see 6.3.3); provided P
The means and location of the enclosure mounting
shall be defined in the enclosure manufacturer's provided P
documentation.

F 07-08-02 A Page 2 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 62 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230369
IEC 62208
Clause Requirement - Test Result - Remark Verdict

6.3.4 • permissible loads (see 6.3.4); provided P


The permissible loads that the enclosure and its
doors are able to carry shall be defined in the
provided P
enclosure manufacturer's documentation(see also
8.2).
6.3.5 • lifting devices, if necessary (see 6.3.5); - -
Whererequired, the correct location and
installationoflifting and transportsupportand the
thread size of lifting devices, if applicable, shall
be given in the enclosure manufacturer's Mounting N
documentationorin
theinstructionsonhowtheenclosurehas to be
handled(seealso 8.3).
6.3.6 • provisions for protection against electric shock (see
- -
6.3.6);
The enclosure manufacturer shall indicate in
the technical documentation, if the enclosure
ensureselectricalcontinuitythroughoutbythecond
uctivestructuralpartsoftheenclosureor if and - P
how separate protective conductors to the
protective circuits of the installation shall be
carried out (see also 8.5).
7 • applicable service conditions (see Clause 7); - -
7.2.1.1 Theambientairtemperaturedoesnotexceed+40
°Canditsaverageoveraperiodof24 h does not
Test in humidity
exceed +35 P
chamber
°C.Thelowerlimitoftheambientairtemperatureis-
5°C.
7.2.2 Humidity Condition - -
7.2.2.1 The relative humidity of the air does not exceed
50 % at a maximumtemperature of +40 °C.
Higher relative humidity may be permitted at
lower temperatures, for example 90 % at +20
Applied P
°C.
Moderatecondensationshouldbeborneinmindwh
ichmayoccasionallyoccurdueto variations in
temperature.
8 Design and construction - -
8.1 General - -
The enclosure shall be constructed only of materials
capable of withstanding the mechanical,
electrical and thermal stresses, as specified in Clause Constructed P
9, as well as the effects of humidity
which are likely to be encountered in normal use.
Protection against corrosion shall be ensured by the
use of suitable materials or by the application of
protective coating to the exposed surface, taking into Ensured P
account the intended
conditions of use.
Compliance to this requirement is checked by the test
- P
of 9.1 3.

F 07-08-02 A Page 3 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 63 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230369
IEC 62208
Clause Requirement - Test Result - Remark Verdict

In addition for enclosures or parts of enclosures made


of insulating materials, thermal stability, resistance to
No plastic material N
heat, fire and weathering shall be verified according to
the tests of 9.9 and 9.1 2.
8.4 Access to the Interior of the Enclosure - -
Adequateaccesstotheprotectedspaceshallbeprovid
edbymeansofadoor(s)or
removablecover(s).Accessmayberestrictedbythe
Door P
use ofa key
ortool.Cableglandplatesandcoverswhichareremova
blefromtheoutsideshallrequiretheuseof a tool.
8.5 Protective Circuit - -
Metallic enclosures shall ensure electrical
continuity throughouteither by the
Body is metal, must be
conductivestructuralparts ofthe enclosureor P
earthed
provisionsfor a separateprotectiveconductorto
earth or both.
8.6 Dielectric strength No suitable parts N
The enclosures constructed of an insulating material
- N
shall fulfil the dielectric test of 9.1 0.
8.7 Degree of protection (IK code) - N
The degree of protection against mechanical impact,
as declared by the manufacturer, shall - N
be in accordance with IEC 62262.
Compliance is checked according to the test of 9.7. - N
8.8 Degree of protection (IP code) IP42 P
The degree of protection against access to hazardous
parts, against ingress of solid foreign
objects and/or against ingress of water, as declared by - P
the manufacturer, shall be in
accordance with IEC 60529.
Compliance is checked according to the test of 9.8. - P
9.8 Degree of Protecion (IP CODE) - P
ForIP2X,IP3X,IP4Xenclosures,13.2and13.3ofIE
IP42 P
C60529:1989apply.
ForIP
5Xenclosures,13.4,category2(withoutvacuumpump
)and13.5(withoutvacuum pump) of IEC 60529:1989 - N
apply. Ingress of talcum powder into protected
space is verified as follows:
9.9.2 Resistance to Normal Heat - -
The suitability of the insulating materials to resist
effects of heat shall be verified either by reference
to the insulation temperature index (determined No thermoplastic parts N
e.g. by the methods of IEC 60216 series), or by
compliance to IEC 60085.
9.9.3 Resistance to Abnormal heat and to fire - -

F 07-08-02 A Page 4 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 64 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230369
IEC 62208
Clause Requirement - Test Result - Remark Verdict

Compliance is checked by tests in accordance with


the principles of IEC 60695-2-10 and the
detailsofIEC60695-2-11.Fora
descriptionofthetestsee Clause4 ofIEC 60695-2- - N
11:2000.
TheapparatustobeusedshallbeasdescribedinCla
use5ofIEC60695-2-11:2000.
9.13 Resistance to corrosion - -
Ferrous metallic enclosures and external ferrous
metallic parts of insulating and combined
- P
enclosures shall be tested to verify that they ensure
protection against corrosion.
If it is not possible to carry out the test on the
enclosure, the test shall be carried out onenclosure
elements showing the same constructional detail as
the enclosure itself: material,thickness, layer of
coating, etc. In all cases hinges, locks and fastenings
P
shall be tested. -
The enclosure subjected to the test shall be mounted
as for normal use according to themanufacturer's
instructions.The enclosure or samples shall be new
and in a clean condition.
9.10.2 Preconditioning - -
The enclosures are placed in a humidity cabinet
containing air with relative humidity
maintained at between 91 % and 95 %. The air
temperature, where the enclosures are placed, Applied P
is maintained at (40 ± 2) °C.
The enclosures are kept in the cabinet for two days (48
h).
In most cases, the enclosures may be brought to the
specified temperature by keeping them
at this temperature for at least 4 h before the humidity
treatment. A relative humidity of
between 91 % and 95 % can be obtained by placing in
the cabinet a saturated solution of -
sodium sulphate (Na 2 SO 4 ) or potassium nitrate P
(KNO 3 ) in water having a sufficiently large
contact surface with the air.
In order to achieve the specified conditions within the
cabinet, it is necessary to ensure a
constant circulation of air and, in general, to use a
cabinet which is thermally insulated.
9.11 Continuity of Protective Circuit - -
It shall be verified that the different exposed conductive
parts of the enclosure are effectively connected to the Test on body ( body P
earthing terminal classified as earthed)
or contact of the protective circuit and that the 0.042Ω
P
resistance of the circuit does not exceed 0.1Ω

9.10 TABLE: Electric strength

F 07-08-02 A Page 5 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 65 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230369
IEC 62208
Clause Requirement - Test Result - Remark Verdict

Breakdown
Test voltage applied between: Voltage (V) -
(Yes/No)
between two metal foils and one in contact with
2120 - N
external surface
between two metal foils and one in contact with other
2120 - N
inside the enclosure
between a metal foils and one in contact with
2120 - N
external surface and the bar

Remarks:
a.

Photo no.1 (Marking)

F 07-08-02 A Page 6 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 66 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230369
IEC 62208
Clause Requirement - Test Result - Remark Verdict

Photo no.2 (General View / External package)

Inspected by
Sign
Date
REMARK :
*SOFT COPY OF THE CONTROL TEST RESULT SHEET IS AUDITED BY THE LAB
SUPERVISOR
>>End of control of test result sheet <<

F 07-08-02 A Page 7 of 7 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 67 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
2: ‫رقم االصذار‬ ‫الشركة السعىدية للفحص واالختبار‬
2020/10/01:‫تاريخ االصذار‬ SAUDI INSPECTION & TESTING CO. (SAITCO)
1: ‫رقم المراجعة‬ ‫مالحق متطلبات العملية– نتائج االختبارات مختبر الكهرباء‬:‫ أ‬- 7‫ملحق‬
2020/10/01: ‫تاريخ المراجعة‬ Appendix 7-A: LAB process REQ. TEST RESULTS ELECTRICAL Lab

C-:206 ‫رمز المنتج بالمختبر‬

Laboratory name SAUDI INSPECTION AND TESTING CO.(SAITCO)


Address First Industrial Area, St. No. 4,5,6,7-Riyadh
Country Saudi Arabia

Date or period of tests 11- 13 / 04 / 2023


Date of report issue 13 / 04 / 2023
Laboratory test report number E-230371
Client Reference & date 10 / 04 / 2023
Effective Power Company factory for electrical panels and
transformers
Factory Name & address
Unit No. 45, Street 201 Second Industrial City Building No
6687, 14431 ‫الرياض‬

Product description Control Box


Brand name or trademark EPEPTCO
Model No. / Code EPE2008080FS
Country of origin Saudi Arabia

Empty enclosures for low-voltage switchgear and controlgear


Product category assemblies –
General requirements
Standard IEC 62208:2014
Conformity to articles tested Yes No

Test case verdicts


Test case does not apply to the test object : N (.A.)
Test item does meet the requirement : P(ass)
Test item does not meet the requirement : F(ail)

Note: The result recorded in this document only related to the item tested
‫ النتائج المدونة في تقرير التحكم في النتائج ال تمثل إال العينة المختبرة‬: ‫مالحظة‬

F 07-08-02 A Page 1 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 68 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230271
IEC 62208
Clause Requirement - Test Result - Remark Verdict

4 Classification
Enclosures are classified according to: - -
a) the type of material:
• insulating;
Metallic P
• metallic;
• combination of insulating and metallic;
b) method of fixing:
• floor standing;
• wall mounting; Floor Standing P
• flush mounting;
• pole mounting;
c) the intended location:
• outdoor; - N
• indoor;
d) the degree of protection:
• IP code, according to IEC 60529; IP54 P
• IK code, according to IEC 62262;
) the rated insulation voltage (for enclosures made of
- N
insulating materials).
6 Information to be given regarding the enclosure - -
6.1 General - -
The following information shall be given by the
Marked P
manufacturer.
6.2 Marking - -
• either the name, trade mark or identification mark of
EPEPTCO P
the enclosure manufacturer;
• type designation or identification number of the
EPE2008080FS P
enclosure.
The marking shall be durable and easily legible and
may be inside the enclosure.
durable P
Compliance is checked according to the test of 9.3 and
by inspection.
6.3 Documentation provided P
6.3.1 General provided P
The manufacturer's documentation shall include all
relevant constructional, mechanical
characteristics, the enclosure classification (see
Clause 4) and any instruction necessary for provided P
the correct handling, assembling, mounting and
service conditions of the enclosure as well as
reference to this standard:
6.3.2 • dimensions (see 6.3.2); - -
The dimensions shall be given in millimetres 2000mmX800mmX800
P
mm
The external dimensions: height, width and
depth are nominal values and shall be indicated - P
in the catalogue of the enclosure manufacturer.
6.3.3 • mounting arrangements (see 6.3.3); - -

F 07-08-02 A Page 2 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 69 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230271
IEC 62208
Clause Requirement - Test Result - Remark Verdict

The means and location of the enclosure mounting


shall be defined in the enclosure manufacturer's provided P
documentation.
6.3.4 • permissible loads (see 6.3.4); - -
The permissible loads that the enclosure and its
doors are able to carry shall be defined in the
provided P
enclosure manufacturer's documentation (see also
8.2).
6.3.5 • lifting devices, if necessary (see 6.3.5); - -
Where required, the correct location and
installation of lifting and transport support and
the thread size of lifting devices, if applicable,
- N
shall be given in the enclosure manufacturer's
documentation or in the instructions on how
the enclosure has to be handled (see also 8.3).
6.3.6 • provisions for protection against electric shock (see
- -
6.3.6);
The enclosure manufacturer shall indicate in
the technical documentation, if the enclosure
ensures electrical continuity throughout by the
conductive structural parts of the enclosure - P
or if and how separate protective conductors to
the protective circuits of the installation shall be
carried out (see also 8.5).
7 • applicable service conditions (see Clause 7); - -
7.2.1.1 The ambient air temperature does not
exceed +40 °C and its average over a period Test in humidity
P
of 24 h does not exceed +35 °C. The lower chamber
limit of the ambient air temperature is -5 °C.
7.2.2 Humidity Condition - -
7.2.2.1 The relative humidity of the air does not exceed
50 % at a maximum temperature of +40 °C.
Higher relative humidity may be permitted at
lower temperatures, for example 90 % at +20 - P
°C. Moderate condensation should be borne
in mind which may occasionally occur due to
variations in temperature.
8 Design and construction - -
8.1 General - -
The enclosure shall be constructed only of materials
capable of withstanding the mechanical,
electrical and thermal stresses, as specified in Clause - P
9, as well as the effects of humidity
which are likely to be encountered in normal use.
Protection against corrosion shall be ensured by the
use of suitable materials or by the application of
protective coating to the exposed surface, taking into - P
account the intended
conditions of use.

F 07-08-02 A Page 3 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 70 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230271
IEC 62208
Clause Requirement - Test Result - Remark Verdict

Compliance to this requirement is checked by the test


- P
of 9.1 3.
In addition for enclosures or parts of enclosures made
of insulating materials, thermal stability, resistance to
No plastic material N
heat, fire and weathering shall be verified according to
the tests of 9.9 and 9.1 2.
8.4 Access to the Interior of the Enclosure - -
Adequate access to the protected space shall
be provided by means of a door(s) or removable
cover(s). Access may be restricted by the use of
No access to livepart
a key or tool. P
With key
Cable gland plates and covers which are
removable from the outside shall require the use
of a tool.
8.5 Protective Circuit - -
Metallic enclosures shall ensure electrical
continuity throughout either by the conductive Body is metal, must be
P
structural parts of the enclosure or provisions for earthed
a separate protective conductor to earth or both.
8.6 Dielectric strength No suitable parts N
The enclosures constructed of an insulating material
- N
shall fulfil the dielectric test of 9.1 0.
8.7 Degree of protection (IK code) - N
The degree of protection against mechanical impact,
as declared by the manufacturer, shall - N
be in accordance with IEC 62262.
Compliance is checked according to the test of 9.7. - N
8.8 Degree of protection (IP code) IP54 P
The degree of protection against access to hazardous
parts, against ingress of solid foreign
objects and/or against ingress of water, as declared by - P
the manufacturer, shall be in
accordance with IEC 60529.
Compliance is checked according to the test of 9.8. - P
9.8 Degree of Protecion (IP CODE) - P
For IP 2X, IP 3X, IP 4X enclosures, 13.2 and
IP54 P
13.3 of IEC 60529:1989 apply.
For IP 5X enclosures, 13.4, category 2 (without
vacuum pump) and 13.5 (without vacuum pump)
- N
of IEC 60529:1989 apply. Ingress of talcum
powder into protected space is verified as follows:
9.9.2 Resistance to Normal Heat - -
The suitability of the insulating materials to resist
effects of heat shall be verified either by reference
to the insulation temperature index (determined No thermoplastic parts N
e.g. by the methods of IEC 60216 series), or by
compliance to IEC 60085.
9.9.3 Resistance to Abnormal heat and to fire - -

F 07-08-02 A Page 4 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 71 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230271
IEC 62208
Clause Requirement - Test Result - Remark Verdict

Compliance is checked by tests in accordance with


the principles of IEC 60695-2-10 and the details of
IEC 60695-2-11. For a description of the test see
Clause 4 of IEC 60695-2-11 :2000. - N
The apparatus to be used shall be as
described in Clause 5 of IEC 60695-2-11
:2000.
9.13 Resistance to corrosion - -
Ferrous metallic enclosures and external ferrous
metallic parts of insulating and combined
- P
enclosures shall be tested to verify that they ensure
protection against corrosion.
If it is not possible to carry out the test on the
enclosure, the test shall be carried out on
enclosure elements showing the same constructional
detail as the enclosure itself: material,
thickness, layer of coating, etc. In all cases hinges,
locks and fastenings shall be tested. - P
The enclosure subjected to the test shall be mounted
as for normal use according to the
manufacturer's instructions.
The enclosure or samples shall be new and in a clean
condition.
9.10.2 Preconditioning - -
The enclosures are placed in a humidity cabinet
containing air with relative humidity
maintained at between 91 % and 95 %. The air
temperature, where the enclosures are placed, - P
is maintained at (40 ± 2) °C.
The enclosures are kept in the cabinet for two days (48
h).
In most cases, the enclosures may be brought to the
specified temperature by keeping them
at this temperature for at least 4 h before the humidity
treatment. A relative humidity of
between 91 % and 95 % can be obtained by placing in
the cabinet a saturated solution of -
sodium sulphate (Na 2 SO 4 ) or potassium nitrate P
(KNO 3 ) in water having a sufficiently large
contact surface with the air.
In order to achieve the specified conditions within the
cabinet, it is necessary to ensure a
constant circulation of air and, in general, to use a
cabinet which is thermally insulated.
9.11 Continuity of Protective Circuit - -
It shall be verified that the different exposed conductive
parts of the enclosure are effectively connected to the Test on body ( body P
earthing terminal classified as earthed)
or contact of the protective circuit and that the 0.036Ω
P
resistance of the circuit does not exceed 0.1Ω

F 07-08-02 A Page 5 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 72 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230271
IEC 62208
Clause Requirement - Test Result - Remark Verdict

9.10 TABLE: Electric strength


Breakdown
Test voltage applied between: Voltage (V) -
(Yes/No)
between two metal foils and one in contact with
2120 - N
external surface
between two metal foils and one in contact with other
2120 - N
inside the enclosure
between a metal foils and one in contact with
2120 - N
external surface and the bar

Remarks:

Photo no.1 (Marking)

Photo no.2 (General View )

Inspected by
Sign
Date
REMARK :
*SOFT COPY OF THE CONTROL TEST RESULT SHEET IS AUDITED BY THE LAB SUPERVISOR
>>End of control of test result sheet <<

F 07-08-02 A Page 6 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 73 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
2: ‫رقم االصذار‬ ‫الشركة السعىدية للفحص واالختبار‬
2020/10/01:‫تاريخ االصذار‬ SAUDI INSPECTION & TESTING CO. (SAITCO)
1: ‫رقم المراجعة‬ ‫مالحق متطلبات العملية– نتائج االختبارات مختبر الكهرباء‬:‫ أ‬- 7‫ملحق‬
2020/10/01: ‫تاريخ المراجعة‬ Appendix 7-A: LAB process REQ. TEST RESULTS ELECTRICAL Lab

C-:206 ‫رمز المنتج بالمختبر‬

Laboratory name SAUDI INSPECTION AND TESTING CO.(SAITCO)


Address First Industrial Area, St. No. 4,5,6,7-Riyadh
Country Saudi Arabia

Date or period of tests 11- 13 / 04 / 2023


Date of report issue 15 / 04 / 2023
Laboratory test report number E-230370
Client Reference & date 10 / 04 / 2023
Effective Power Company factory for electrical panels and
transformers
Factory Name & address
Unit No. 45, Street 201 Second Industrial City Building No
6687, 14431 ‫الرياض‬

Product description Control Panel Box


Brand name or trademark EPEPTCO
Model No. / Code EPE1408030WMP
Country of origin Saudi Arabia

Empty enclosures for low-voltage switchgear and control


Product category
gear assemblies –General requirements
Standard IEC 62208:2014
Conformity to articles tested Yes No

Test case verdicts


Test case does not apply to the test object : N (.A.)
Test item does meet the requirement : P(ass)
Test item does not meet the requirement : F(ail)

Note: The result recorded in this document only related to the item tested
‫ النتائج المدونة في تقرير التحكم في النتائج ال تمثل إال العينة المختبرة‬: ‫مالحظة‬

F 07-08-02 A Page 1 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 74 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230370
IEC 62208
Clause Requirement - Test Result - Remark Verdict

4 Classification
Enclosures are classified according to: - -
a) the type of material:
• insulating;
Metallic P
• metallic;
• combination of insulating and metallic;
b) method of fixing:
• floor standing;
• wall mounting; Wall Mounted P
• flush mounting;
• pole mounting;
c) the intended location:
• outdoor; - N
• indoor;
d) the degree of protection:
• IP code, according to IEC 60529; IP66 P
• IK code, according to IEC 62262;
) the rated insulation voltage (for enclosures made of
- N
insulating materials).
6 Information to be given regarding the enclosure - -
6.1 General - -
The following information shall be given by the
Marked P
manufacturer.
6.2 Marking - -
• either the name, trade mark or identification mark of
EPEPTCO P
the enclosure manufacturer;
• type designation or identification number of the
EPE1408030WMP P
enclosure.
The marking shall be durable and easily legible and
may be inside the enclosure.
durable P
Compliance is checked according to the test of 9.3 and
by inspection.
6.3 Documentation provided P
6.3.1 General provided P
The manufacturer's documentation shall include all
relevant constructional, mechanicalcharacteristics, the
enclosure classification (see Clause 4) and any Instructional manual
P
instruction necessary forthe correct handling, provided
assembling, mounting and service conditions of the
enclosure as well asreference to this standard:
6.3.2 • dimensions (see 6.3.2); - -
Thedimensionsshallbegiveninmillimeters 1400mm X 800mm X
P
300mm
The external dimensions:height, width and depth
arenominalvaluesand shall be indicatedin the - P
catalogue of the enclosure manufacturer.
6.3.3 • mounting arrangements (see 6.3.3); provided P
The means and location of the enclosure mounting
shall be defined in the enclosure manufacturer's provided P
documentation.

F 07-08-02 A Page 2 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 75 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230370
IEC 62208
Clause Requirement - Test Result - Remark Verdict

6.3.4 • permissible loads (see 6.3.4); - -


The permissible loads that the enclosure and its
doors are able to carry shall be defined in the
provided P
enclosure manufacturer's documentation(see also
8.2).
6.3.5 • lifting devices, if necessary (see 6.3.5); - -
Whererequired, the correct location and
installationoflifting and transportsupportand the
thread size of lifting devices, if applicable, shall
be given in the enclosure manufacturer's - N
documentationorin
theinstructionsonhowtheenclosurehas to be
handled(seealso 8.3).
6.3.6 • provisions for protection against electric shock (see
- -
6.3.6);
The enclosure manufacturer shall indicate in
the technical documentation, if the enclosure
ensureselectricalcontinuitythroughoutbythecond
uctivestructuralpartsoftheenclosureor if and - P
how separate protective conductors to the
protective circuits of the installation shall be
carried out (see also 8.5).
7 • applicable service conditions (see Clause 7); - -
7.2.1.1 Theambientairtemperaturedoesnotexceed+40
°Canditsaverageoveraperiodof24 h does not
Applied IP66
exceed +35 N
Clause 8.8
°C.Thelowerlimitoftheambientairtemperatureis-
5°C.
7.2.2 Humidity Condition - -
7.2.2.1 The relative humidity of the air does not exceed
50 % at a maximumtemperature of +40 °C.
Higher relative humidity may be permitted at
lower temperatures, for example 90 % at +20
- N
°C.
Moderatecondensationshouldbeborneinmindwh
ichmayoccasionallyoccurdueto variations in
temperature.
8 Design and construction - -
8.1 General - -
The enclosure shall be constructed only of materials
capable of withstanding the mechanical,electrical and
thermal stresses, as specified in Clause 9, as well as - P
the effects of humiditywhich are likely to be
encountered in normal use.
Protection against corrosion shall be ensured by the
use of suitable materials or by theapplication of
- P
protective coating to the exposed surface, taking into
account the intendedconditions of use.
Compliance to this requirement is checked by the test
- P
of 9.1 3.

F 07-08-02 A Page 3 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 76 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230370
IEC 62208
Clause Requirement - Test Result - Remark Verdict

In addition for enclosures or parts of enclosures made


of insulating materials, thermalstability, resistance to
No plastic material N
heat, fire and weathering shall be verified according to
the tests of 9.9and 9.1 2.
8.4 Access to the Interior of the Enclosure - -
Adequateaccesstotheprotectedspaceshallbeprovid
edbymeansofadoor(s)or
removablecover(s).Accessmayberestrictedbythe No access to live part
P
use ofa key ortool. With key
Cableglandplatesandcoverswhichareremovablefro
mtheoutsideshallrequiretheuseof a tool.
8.5 Protective Circuit - -
Metallic enclosures shall ensure electrical
continuity throughouteither by the
Body is metal, must be
conductivestructuralparts ofthe enclosureor P
earthed
provisionsfor a separateprotectiveconductorto
earth or both.
8.6 Dielectric strength No suitable parts N
The enclosures constructed of an insulating material
- N
shall fulfil the dielectric test of 9.1 0.
8.7 Degree of protection (IK code) - N
The degree of protection against mechanical impact,
as declared by the manufacturer, shallbe in - N
accordance with IEC 62262.
Compliance is checked according to the test of 9.7. - N
8.8 Degree of protection (IP code) IP66 P
The degree of protection against access to hazardous
parts, against ingress of solid foreignobjects and/or
P
against ingress of water, as declared by the
manufacturer, shall be inaccordance with IEC 60529.
Compliance is checked according to the test of 9.8. - P
9.8 Degree of Protection (IP CODE) - P
ForIP2X,IP3X,IP4Xenclosures,13.2and13.3ofIE
- N
C60529:1989apply.
ForIP
5Xenclosures,13.4,category2(withoutvacuumpump
)and13.5(withoutvacuum pump) of IEC 60529:1989 - N
apply. Ingress of talcum powder into protected
space is verified as follows:
9.9.2 Resistance to Normal Heat - -
The suitability of the insulating materials to resist
effects of heat shall be verified either by reference
to the insulation temperature index (determined No thermoplastic parts N
e.g. by the methods of IEC 60216 series), or by
compliance to IEC 60085.
9.9.3 Resistance to Abnormal heat and to fire - -

F 07-08-02 A Page 4 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 77 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230370
IEC 62208
Clause Requirement - Test Result - Remark Verdict

Compliance is checked by tests in accordance with


the principles of IEC 60695-2-10 and the
detailsofIEC60695-2-11.Fora
descriptionofthetestsee Clause4 ofIEC 60695-2- - N
11:2000.
TheapparatustobeusedshallbeasdescribedinCla
use5ofIEC60695-2-11:2000.
9.13 Resistance to corrosion - -
Ferrous metallic enclosures and external ferrous
metallic parts of insulating and combinedenclosures
- P
shall be tested to verify that they ensure protection
against corrosion.
If it is not possible to carry out the test on the
enclosure, the test shall be carried out onenclosure
elements showing the same constructional detail as
the enclosure itself: material,thickness, layer of
coating, etc. In all cases hinges, locks and fastenings
shall be tested. - P
The enclosure subjected to the test shall be mounted
as for normal use according to themanufacturer's
instructions.
The enclosure or samples shall be new and in a clean
condition.
9.10.2 Preconditioning - -
The enclosures are placed in a humidity cabinet
containing air with relative humiditymaintained at
between 91 % and 95 %. The air temperature, where
P
the enclosures are placed,is maintained at (40 ± 2) °C. -
The enclosures are kept in the cabinet for two days (48
h).
In most cases, the enclosures may be brought to the
specified temperature by keeping themat this
temperature for at least 4 h before the humidity
treatment. A relative humidity ofbetween 91 % and 95
% can be obtained by placing in the cabinet a
saturated solution ofsodium sulphate (Na 2 SO 4 ) or -
P
potassium nitrate (KNO 3 ) in water having a
sufficiently largecontact surface with the air.
In order to achieve the specified conditions within the
cabinet, it is necessary to ensure aconstant circulation
of air and, in general, to use a cabinet which is
thermally insulated.
9.11 Continuity of Protective Circuit - -
It shall be verified that the different exposed conductive
parts of the enclosure are effectively connected to the Test on body ( body P
earthing terminal classified as earthed)
or contact of the protective circuit and that the 0.041 Ω
P
resistance of the circuit does not exceed 0.1Ω

F 07-08-02 A Page 5 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 78 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Report No : E-230370
IEC 62208
Clause Requirement - Test Result - Remark Verdict

9.10 TABLE: Electric strength


Breakdown
Test voltage applied between: Voltage (V) -
(Yes/No)
between two metal foils and one in contact with
2120 - N
external surface
between two metal foils and one in contact with other
2120 - N
inside the enclosure
between a metal foils and one in contact with
2120 - N
external surface and the bar

Remarks:

Photo no.1 (Marking)

Photo no.2 (General View )

Inspected by
Sign
Date
REMARK :
*SOFT COPY OF THE CONTROL TEST RESULT SHEET IS AUDITED BY THE LAB SUPERVISOR
>>End of control of test result sheet <<

F 07-08-02 A Page 6 of 6 Issued By: QGM - Approved By: GM


SAITCO ,First Industrial City area ,Riyadh Station area beside dry customs St.4,5,6,7 Building No.2433 , Riyadh 11427, PO 27711 ,
Tel : +966 11 2043000,Fax +966 1 2042888, www saitco com.sa
Page 79 of
7,6,5,4‫ منطقة محطة القطار بجوار جمرك الرياض الجاف ش‬، ‫ المدينة الصناعية األولى‬- ‫ الرياض‬-‫الشركة السعودية للفحص واالختبار‬ 122
Page 80 of 122
Material Submittal form
Submittal Ref: SPC-OTCE-MK11-TSL-ELE-19 Rev: 00 Date: 28/1/2024
Program Title: Developmental Housing Project of MOH WAVE #7
Implementation of the housing development project units for the Al-Sadan project, (Contract No22000272)
Project Title: Alkhomra -Jeddah

The Employer: NHC - National Housing Company

Third party: Dar Al Riyadh

Consultant: O T C E Saudi Engineering Consulting Co.

Contractor: Saud Alsaadi & Partners Co. General Contracting & Trading (SPC)

Guidance Notes:
The submission should only include materials which are compliant with the SOPR and CODE requirements and
have been reviewed and coordinated between the Contractor and Designer (and Engineer if applicable) and
should include any authorised variations / changes as instructed.
Review Discipline:
Architectural ☐ Structural / Civil ☐ Mech / Plumb ☐ Elec. ☒ Others ( Specify ) ☐

Material Details
Proposed by:

The Contractor The Consultant ( Designer & The Engineer Specialist / Sub-Contractor
)
Sign/ Sign/ Sign/
Stamp Stamp Stamp

Material Information & Checklist

Location /element Ref: The Title: ELECTRICA PRODUCTS -panel and Plug Checklist of Attachments:

Drawing / ☐
Specified Material: panel and Plug
Specification

Proposed Material: EFFECTIVE POWER – Panel Product Datasheet ☒

Compliance ☐
SOPR/CODE Ref(s): Certificates /
Documents
Manufacturer & Product Supplier : EFFECTIVE POWER - Manufacturer/Brand : Compliance ☐
code ref: EFFECTIVE POWER Statement

SPC-OTCE-MK11-SAT-ELE-7 ☐
Remarks / Notes: Sample (available)

Page 81 of 122
Refer to attached comments and
respond to.

Taha Mehasseb Project Manager 11-05-2024

1 of 2
Page 82 of 122
Page 83 of 122
Page 84 of 122
Page 85 of 122
Page 86 of 122
Page 87 of 122
Daval M Khan 31.10.22 31.10.22

Page 88 of 122
B

Page 89 of 122
NUMBER: Y02-03-00-03/04

DATE OF ISSUE: 01/06/1435

1. All electrical panels shall be factory assembled in accordance with NEMA standard
EE-1 Panel board-1
PB1.
(PB-3) & Panel
board-2, (PB-4)
2. Contractor to comply and provide 200Amp rated bus bar for PB1 & PB3, however
proposed is 100amp.

3. A directory holder with protective cover and a functional name plate shall be
provided.

4. All electrical panels shall be tested according to latest IEC standards and
supported documents to be attached.

Page 90 of 122
PURCHASE ORDER
22 November, 2022 G PO. Ref. No: DYE/MA/MR22/039-01
M/S. Effective Power EPEPTCO. Quot. Ref: QEEP1122-3055-SM-R02
Jeddah Second Industrial City
P.O. Box 11457 Code 21381
Tel.026177149 & Fax. 026177525

Attention: MR. Ahmed Abu Zaid


Sales Manager-Western region
Email: [email protected]
Mobile No. 050 686 8798

Subject: “PURCHASE ORDER”


Load center panel board for Public Housing Project (YANBU)

Gentlemen:
1) SCOPE OF SUPPLY
With reference to your Quotation No. QEEP1122-3055-SM-R02 dated 21 November 2022, we
would like to place our order for the supply & delivery of Load center panel board for Royal
commission Housing Project in Yanbu.
The scope of supply should be as per the Bill of Quantity with complete Specifications in
Supplier's Quotation & agreed Unit Rates in Attachment "A", delivery scheduled as per
customer time slots in Clause No.”4” and as per the Material/Sample Submittal duly approved
by RC, approved Shop Drawings and as follows:
- The scope of materials to be supplied should conform to RC approved Technical Submittal
specifications, Shop Drawings & Sample.

- The vendor to provide (fulfill) any required certificates by RC to confirm product quality.

- The vendor is to provide Test Certificates for each unit along with packing shipment

- The vendor shall provide “Warranty Certificate” for order items.

- Total price includes Transportation Charges.

Page 1 of 4
PO. Ref. No: DYE/MA/MR22/039-01 Page 91 of 122
2) P.O. VALUE
Grand total P.O. Value for the above scope of Supply is SR 660,000.0 (Saudi Riyal Six Hundred
Sixty Thousand) without VAT Tax, based on Bill of Quantity.
Unit Rates shown in the BOQ is firm & fixed (for the complete quantities) up to the completion and
duration of this agreement and it shall be paid to the Vendor according to the payment terms.

3) PAYMENT TERMS & CONDITIONS


3.1) Advance Payment, Thirty Five (35%) Percent of the Total P.O. equivalent SR 231,000.0
(Saudi Riyals Two Hundred Thirty One Thousand) only, to be released to M/s EPEPTCO.
upon confirmation of this P.O. & receiving "Advance Payment Bank Guarantee" issued by
any local bank approved by Dima Yanbu Est valid up to Six (6) months, or against "Open
Dated Cheque" with the same value to be exchange upon collection of Advance Payment.
3.2) Progress Payment, Sixty Five (65%) of the Total P.O. Value – equivalent to SR
429,000.0 (Saudi Riyals Four Hundred Twenty Nine Thousand) only, shall be paid upon
completion of fabrication, accepted, checked & approved by Dima Yanbu Est.
3.3) VAT amount of fifteen (15%) percent, will be paid separately in each invoice which is not
included in the above Total P.O. Value.

4) DELIVEY SCHEDULE
Load Center Panel shall be delivered according to the following schedule:
1) 14 Dec 2022 @ 150 NOS of panel enclosure (steel works), Pan assembly & all available
Qty in the local market L&T Breakers
2) 20 Dec 2022 @ 150 NOS. All needed Qty of remaining L&T Breakers.
3) 11 Jan 2023 @ 211 NOS. A complete set of Panel board
4) 25 Jan 2023 @ 211 NOS. A complete set of Panel board

5) DELIVERY LOCATION
Delivery shall be at site location, Yanbu
Contact Person: Mr. Mahmoud Atalla & Mr. Arif Mohammed
Mobile: 0545301501 & 0567192670

6) DELAY PENALTY
The Vendor/Manufacturer will arrange the delivery of materials accordingly. If the Vendor
/Manufacturer fails to comply with the agreed Delivery Schedule and causes whatsoever
unreasonable delay from any delivery in part or in whole, Dima Yanbu Est has the right to back

Page 2 of 4
PO. Ref. No: DYE/MA/MR22/039-01 Page 92 of 122
charge the Vendor /Manufacturer an amount of (SR 500.00) Saudi Riyal Five Hundred only for
every one (1) day of delay excluding reason due to "Force Majeure".
If in any case there is alteration of quantities or change of delivery schedule, Dima Yanbu Est
should inform its vendor at feast 15 days in advance.

7) PACKAGING & HANDLING


The M/s. EPEPTCO must adhere strictly to the Standard Packaging Procedure, for safe delivery,
handling, storage, and installation convenience. The M/s. EPEPTCO must immediately replace
any damaged delivered materials or not in compliance with the RC's specifications without
additional costs.

8) QA / QC REQUIREMENTS
a) Ensure that the approved manufacturer and material components meet RC requirements.
b) Manufacturer-supplied material shall comply with Saudi Arab Standards Organization (SASO)
requirements. SASO certified or Compliance Certificate shall be supplied if was required by RC.
c) Manufacturer must submit production/fabrication progress report if required until the delivery on
site.
d) The manufacturer shall provide any Test and/or Quality Assurance Certificate in originals, upon
the request of RC.
e) Factory Acceptance Test (FAT): Shall be conducted on material prior to shipment and may
request to arrange a time for the factory witnessing.

9) WARRANTY & CERTIFICATES


EPEPTCO. Shall be responsible and shall warrant their products and workmanship for a period of
eighteen (18) months from the date of delivery.
EPEPTCO. Shall provide a (Written Warranty) and the required Test Certificates stating that all
materials supplied are in accordance with RC-approved specifications and had passed through
the approved testing procedure.

Page 3 of 4
PO. Ref. No: DYE/MA/MR22/039-01 Page 93 of 122
ATTACHMENT “A” (BOQ)

# Description Unit Qty Unit Price Total Price

PB 1(PB3)
Consist of the following:
L&T # DN1 250D*160A-200A 3P– 1 NOS
1 L&T # DN0 100D*80A-100A 3P– 1 NOS SET 286 1,555.00 444,730.00
L&T # 40A/6KA "C CURVE 2P – 1 NOS
L&T # 32A/6KA "C CURVE 2P – 7 NOS
L&T # 20A/6KA "C CURVE 2P -13 NOS

PB2 (PB4)
Consist of the following:
2 SET 286 995.00 284,570.00
L&T # 32A/6KA "C CURVE 2P – 7 NOS
L&T # 20A/6KA "C CURVE 2P -14 NOS

Sup-Total 729,300.00
Special Discount - 69,300.00
Total Amount without VAT 660,000.00
DIMA YANBU EST. VAT. No.: 301244669400003 (15%) 99,000.00
Total Amount 759,000.0
Seven Hundred Fifty-Nine Thousand Saudi Riyals and Zero-Halala

NOTES:
- Kindly issue the invoice to (DIMA YANBU EST. VAT. No. 301244669400003).
- Kindly provide the original invoice and delivery note with material delivery.

Requested BY: Please confirm your receipt and acceptance


Dima Yanbu Est. Vendor Stamp:
Sales Manger
Eng’r. Mahmoud Atalla

Page 4 of 4
PO. Ref. No: DYE/MA/MR22/039-01 Page 94 of 122
Date : 30/01/2023 :‫التاريخ‬

Ref : QEEP0123-2000-R0‫المرجع‬

PURCHASE ORDER

TO Effective Power Co.

Phone

Mobile 0543687838

CITY/ COUNTRY KSA

Eng. Ayman Elmassry

ATTENTION

SAVANNA INTERNATIONAL CONSTRUCTION CO.

FROM Eng. Mostafa Anwar (project Manager)

PROJECT NAME
‫تحديث محطة الكهرباء الفرعية لمبنى اإلدارة العامة لتقنية وأمن المعلوات‬
SUBJECT supply and manufactured of Low voltage panels

Effective Power Co. Ref.

QEEP0123-2000-R0, Dated Sunday, 08 January 2023

Savanna International Company Ref.

‫ تحديث محطة الكهرباء الفرعية لمبنى اإلدارة‬Dated Monday, 30 January 2023


REFERENCE ‫العامة لتقنية وأمن المعلومات‬

With reference to above subject, references and further correspondence we are pleased to
issue this P.O. for the following scope of works, terms and conditions for the supply and
manufactured of Low voltage panels as per the attached technical specifications accordance with the
Effective Power Co. Ref. QEEP0123-2000-R0, Dated Sunday, 08 January 2023

Page 95 of 122
U.Price T. Price
Item Description Qty
(SAR) (SAR)

1 MDB 1 31,389 31,389

MDB (OUTDOOR)
2 1 35,190 35,190

MDB-400A
3 2 5,630 11,259

ATS-1600A,3P
4 1 40,225 40,225

Sub-DB 250A
5 4 3,533 14132

Total 132,195

VAT Price 19,829.25

Grand Total for Scope of Supply in SAR: 152,024.25

Total price for above equipment is (SAR): one hundred thirty-two thousand & one hundred ninety-five
Saudi Riyal ( 132,195)

Total price for above equipment include VAT is (SAR): one hundred fifty-two thousand twenty-four
Saudi Riyal and twenty five hlala ( 152,024.25)

AA. ORDER VALUE:


Total order value of the complete main scope of works as described in clause - AA will
be (SAR): one hundred thirty-two thousand & one hundred ninety-five Saudi
Riyal ( 132,195) without the 15% VAT, and (152,024.25 SAR) Total With VAT .

Page 96 of 122
CB. DELIVERY:
Delivery of all material shall be as per scope of works (clause AA) Ex-works from
Effective Power Co. factory to site within
(10-15 weeks) from the date of receipt of the Advance payment.

CC. Payment Terms:

a. Seventy Percent (70%) of main equipment value as advanced payment after


signing P.O through bank transfer.
b. Fifty percent (30%) before delivery through bank transfer.

DD. WARRANTY:
Warranty shall be 12 months from commissioning or 18 months from delivery whichever
comes first, M/s Effective Power Co. shall submit the warranty certificate starting from
delivery date which guarantees the material / equipment from manufacturing defects and
that the defected material / equipment shall be repaired or replaced at discretion of
Effective Power Co. without any cost to Savanna.

EE. TEST:
 Routine factory testing in accordance with IEC 439-1 as follows;
 Wiring continuity testing
 Clearance and distance
 Mechanical operation test and checking of interlocks
 Dielectric test
 Polarity test
FF. COMPLIANCE TO SPECIFICATION/SEC REQUIREMENTS:
The Specification shall be followed are according to scope of work and SEC standards and
specifications.

Page 97 of 122
GG. INSPECTION I SHIPPING:

 All equipment and material will be subject for inspection by Savanna..


 Shipment shall be affected upon receipt of release of shipment note from
Savanna.
 Shipment release shall not exceed 2 days from successful FAT date and
release of shipment certificate date.
 Shipping label and identification should be as per Effective Power Co.
standards.
 FAT test will be done as per approved ITP.

II. PENALTY:

In the event the Supplier fails to complete and deliver the committed Supplies and / or Services
within the time specified in this Agreement plus 20 business days as a grace period, as a result
of delay directly and solely attributable to the supplier, the Supplier shall be liable to pay
liquidated damages against the delay beyond the time specified for delivery of equipment plus
20 business days as a grace period. The supplier shall pay to Purchaser as liquidated damages
and not as a penalty, a sum equal to 0.5% of the price of the delayed item for each subsequent
full day of delay. The maximum of liquidated damages shall not exceed 10% (ten percent) of
the net price of the delayed item. The Liquated damages shall be the supplier’s sole and
exclusive liability for delay.

JJ. LIMITATION OF LIABILITY, SUSPENSION OF WORKS & TERMINATION and FORCE


MAJEURE:

The Limitation of Liability, Suspension of work & Termination and Force Majeure will be in
accordance to Effective Power Co. offer.

LL. Entire Agreement.


The Terms & Conditions mentioned in Effective Power Co. Ref. QEEP0123-2000-R0,
Dated Sunday, 08 January 2023
Are acceptable to Savanna and part of this P.O except as mentioned otherwise in this
P.O.

KK. ACKNOWLEDGMENT:

Page 98 of 122
M/s Effective Power Co. Co. Ltd to acknowledge the receipt and confirm the
acceptance of this Purchase Order by signing and stamping this copy and send it back
immediately to Savanna by return fax.

Note: The P.O will be affective after the approval of the client and the release of the first
payment from us .

For all technical clarification, contact Engr. Mostafa Anwar. (Tel. +966 543687838)

Best Regards,
Accepted By

SAVANNA INTERNATIONAL Effective Power Co.


CONSTRUCTION CO.

AHMED RASLAN Ayman Elmassry

Projects Manager Sales engineer

Page 99 of 122
lyaall edallzlia
LABINAT AL BINA'A CONTRACTING CO.
Date: 16/08/2022

ORDER REF (Jeddah Montijon -

MASIK / 60 /2022)

(Purchase order)
Dear/Effective Power EPEPT Co. -Sirs
We would like to submit our purchase order regarding the following itemsfor our project IN (Jeddah).
construction of 100 Ready factories -MASIC_Based on Quotation ( QEEP0422-1050-s05-RO6 )
Unit
ltem Rate Amount
Description Unit Qty
SR SR

op sal dgsls Jasi (bolt-on type) üsilaeiy

aaially elaolyal iy :IP65 },ei sogi. :1P432

(LP/Ax-Ox) Production Area Panel PICS 1,755


98 171,990
LP-Mosque PICS 1,837
2 1 1,837
LP-SHOP PICS 1,251
3 3 3,753

A bai clagogsl (NEMA) (wYE) Jd sl


daug u Jai (bot-on type) öyislaedy 4gail

lalaally lholyal js, (IP6S :4ja b . P43:4sn


(LP-ELEC RM) Elecrical Room Panel PICS 832
7 5,824
(LP-STC RM) STCRoom panel PICs 832
832
LP-PUMP RM PICS 832
3,328
Gross Total 187,564
VAT (15%) 28,134.60
DSNeralue 215,698.60,
Only Two Hundred4hd'Fifteen housands And Six Hundred And Ninety Eight
Effective PolRyals 60 Halalas
EPEPT CO.
C.R:4030279113 Page
age 11
,

Page 100 of 122


TL LABINAT AL BINA'A CONTRACTING CO.
Date: 16/08/2022

ORDER REF(Jeddah - Montijon - MASIK / 60 /2022)

(Purchase order)
Dear/Effective Power EPEPT Co. -Sirs
We would like to submit ourpurchase order regardin the following itemsfor our project IN (Jeddah )
construction of 100 Readyfactories -MASIC_Based on Quotation ( QEEP0422-1050-505-RO6)
Unit
tem Rate
Amount
Description Unit Qty
SR

4p lai I s kaine cliole (NEMA) t a i y (WYE) yd


o ala da slSJi (bolt-on type) ùisl ueill

Clalasaly saolyal giy :IP65 },4alal c : 1P431AUn

(LP/Ax-Ox) Production Area Panel PICS


98 1,755171,990
2 LP-Mosque PICs 1,837
1,837
3
LP-SHOP PICS 1,251
3 3,753

qwdag ss Jaai (bolt-on type) üiol illy 4 i

aaialy clolgall à ,(IP6S:2tai s e1P43:


(LP-ELEC RM) Elecrical Room Panel PICS 832
5,824
(LP-STC RM) STC Room panel PICs 832
832
LP-PUMPRM PICs 832
3,328
Gross Total 187,564
VAT (15%) 28,134.60
DgaNer alue 215,698.60
Only Two Hundredand Fifteen housands And SixHundred And Ninety Eight
Eicctive PoRÍyals & 60 Halalas
EPEPT C0.
C.R: 4030279113 age 1

Page 101 of 122


LABINAT AL BINA'A CONTRACTING CO.

**
**Delivery to our site in ( Third industrial City Jeddah)

General Conditions:

- 1Payment Terms:

a- (50% Of the value as an advance payment)


b-(35% Of the value after delivering the materials to the Site )

c-(15% After Consultant Handing & inspection of Materials MIR)

Labenat Al Bena'a Contract has the right to order (Partial order) from the total amount and the
payment terms to be applied based on each order amount accordingly**

2-Supply & installation period: Total ordered amount supply and fabrication and installation period is
the maximum of (90 Days).
3-(Effective Power Co.) is committed to replace any Panel or parts of spare parts that is rejected by
the project consultant due to noncompliance with the approved specifications or for manufacturing
malfunctions free of charge and on time.

4- (Effective Power Co.) is committed to prepare and submitthe required shop drawings within7
Days from signing the order contract.

5- ( Effective Power Co. ) is committed to fabricate and supply the ordered amount according to the
official consultant approval and based on the approved Sample, notes and shop drawings without
any deviations.

Accept our best regards,, Labinat Al Bina'a Contracting Procurement Dep. Cell: 0550698938
[email protected]
and Line :112003600 Fax:112003700

[email protected] [email protected]

Effective Power
Phege 2
EPEPTCO.
C.R: 4030279113

Page 102 of 122


08/02/2023 ‫ﺍﻟﺗﺎﺭﻳﺦ‬ ‫ﻣﺻﻧﻊ ﺍﻟﻘﻭﺓ ﺍﻟﻔﻌﺎﻟﺔ ﻟﻠﻣﺣﻭﻻﺕ ﻭﺍﻟﻠﻭﺣﺎﺕ ﺍﻟﻛﻬﺭﺑﺎﺋﻳﺔ‬
8:39AM ‫ﺍﻟﻭﻗﺕ‬
310278453800003 :‫ﻛﻭﻣﻳﺔ‬

3126 ‫ﺃﻣﺭ ﺍﻟﺷﺭﺍء‬


‫ﺍﻹﺟﻣﺎﻟﻲ‬ ‫ﺍﻟﺳﻌﺭ‬ ‫ﻭﺻﻑ‬ ‫ﺍﻟﺭﻗﻡ‬
mmc-2 Low voltage panel for water pump 200 kw : main breaker 800 A +
43,906.00 SAR 43,906.00 SAR 1
2 motors Branches X 1 pcs
43,906.00 SAR ‫ﺧﺎﺿﻊ ﻟﻠﺿﺭﻳﺑﺔ‬ 08/03/2023 ‫ﺗﺎﺭﻳﺦ ﺍﻟﺗﺳﻠﻳﻡ‬

Mahmoud Mostafa :‫ﻣﻭﻅﻑ ﺍﻟﻣﺑﻳﻌﺎﺕ‬


50% Advance, 40% before :‫ﺷﺭﻭﻁ ﺍﻟﺩﻓﻊ‬
shipping, 10% after testing
RM2 finish area Based On Purchase Request 1650. delivery time : 4
6,585.90 SAR ‫ﺿﺭﻳﺑﺔ‬
weeks
50,491.90 SAR ‫ﺍﻹﺟﻣﺎﻟﻲ‬

SAP Business One ‫ﺗﻣﺕ ﺍﻟﻁﺑﺎﻋﺔ ﺑﻭﺍﺳﻁﺔ‬ 1 / 1 ‫ﺍﻟﺻﻔﺣﺔ‬


Islam :‫ﺗﻡ ﺍﻹﻧﺷﺎء ﺑﻭﺍﺳﻁﺔ‬ ‫ ﺟﺩﺓ‬,‫ﺍﻟﻣﻧﻁﻘﺔ ﺍﻟﺻﻧﺎﻋﻳﺔ ﺍﻟﺛﺎﻟﺛﺔ‬ :‫ﺍﻟﻌﻧﻭﺍﻥ‬
SAUDI ARABIA
+966550033388 :‫ﺍﻟﻬﺎﺗﻑ‬
Page 103 of 122
[email protected] :‫ﺍﻟﺑﺭﻳﺩ ﺍﻹﻟﻛﺗﺭﻭﻧﻲ‬
Integrated Building Solutions
301164964300003 :‫اﻟﺮﻗﻢ اﻟﻀﺮﻳﺒﻲ‬

4030272062 :‫ﺳ ﺠ ﻞ ﺗ ﺠ ﺎ ر ي ر ﻗ ﻢ‬

Shipping address: ‫ﻣ ﺼ ﻨ ﻊ ا ﻟ ﻘ ﻮ ة ا ﻟ ﻔ ﻌ ﺎ ﻟ ﺔ ﻟ ﻠ ﻤ ﺤ ﻮ ﻻ ت وا ﻟ ﻠ ﻮ ﺣ ﺎ ت ا ﻟ ﻜ ﻬ ﺮ ﺑ ﺎ ﺋ ﻴ ﺔ‬
Alsoulai Riyadh Warehouse ‫اﻟ ﻤ ﺪﻳﻨ ﺔ اﻟ ﺼﻨﺎ ﻋﻴ ﺔ‬
Riyadh- Alrail Street- Alrail Plaza 27 11457 ‫ﺟﺪة‬
Jeddah- Building City- D48  +966 12 617 7149
‫اﻟ ﺮﻳﺎ ض‬ VAT Number: 310278453800003
Saudi Arabia
 920012286

Purchase Order #P00714


Purchase Representative: Your Order Reference: Order Date:
Waad QEEP0722-2035-S01-R01 Jan/29/2023
DESCRIPTION TAXES DATE REQ. QTY UNIT PRICE AMOUNT

Control Panel 150X125 FSS4KC 6 37 H, 37 KW ,SOFT ‫ اﻟﻤﺸﺘﺮﻳﺎت اﻟﺨﺎﺿﻌﺔ‬Jan/29/2023 1.00 19,236.0000 19,236.00 SR
STARTOR, 380V, 3PH (2 No's) FOR 2 PUMPS 1 DUTY ‫ﻟﻠﻨﺴﺒﺔ اﻻﺳﺎﺳﻴﺔ‬ Unit
1 STAND BY 15)%)
Control Panel 125X100 FSS4JC 6 11 H 11 KW ,DOL, ‫ اﻟﻤﺸﺘﺮﻳﺎت اﻟﺨﺎﺿﻌﺔ‬Jan/29/2023 2.00 2,387.0000 4,774.00 SR
380V, 3PH (2 No's) FOR 2 PUMPS 1 DUTY 1 STAND ‫ﻟﻠﻨ ﺴﺒ ﺔ ا ﻻ ﺳﺎ ﺳﻴ ﺔ‬ Unit
BY 15)%)
Control Panel 125X100 FSS4JC 6 15 H 15 KW ,SOFT ‫ اﻟﻤﺸﺘﺮﻳﺎت اﻟﺨﺎﺿﻌﺔ‬Jan/29/2023 1.00 12,801.0000 12,801.00 SR
STARTOR, 380V, 3PH (2 No's) FOR 2 PUMPS 1 DUTY ‫ﻟﻠﻨﺴﺒﺔ اﻻﺳﺎﺳﻴﺔ‬ Unit
1 STAND BY 15)%)
Control Panel 80X65 FSS4HC 6 3 H 3 KW ,DOL, 380V, ‫ اﻟﻤﺸﺘﺮﻳﺎت اﻟﺨﺎﺿﻌﺔ‬Jan/29/2023 1.00 2,115.0000 2,115.00 SR
3PH (2 No's) FOR 2 PUMPS 1 DUTY 1 STAND BY ‫ﻟﻠﻨ ﺴﺒ ﺔ ا ﻻ ﺳﺎ ﺳﻴ ﺔ‬ Unit
15)%)

Untaxed Amount 38,926.00 SR

Taxes 5,838.90 SR

Total 44,764.90 SR

payment terms 20% down payment and 70% upon delivery and 10% after testing & commissioning.

‫ﻃ ﺮﻳ ﻖ اﻟ ﺮﻳﺎ ض‬ : ‫ﺧ ﻤﻴ ﺲ ﻣ ﺸﻴ ﻂ‬ ‫ ﺷﺎ ر ع اﻟ ﺮﻳ ﻞ‬- ‫ﻃ ﺮﻳ ﻖ أﺑ ﻮ ﺑ ﻜ ﺮ اﻟ ﺼﺪﻳ ﻖ‬ : ‫اﻟ ﺮﻳﺎ ض‬ ‫ ﺷ ﺎ ر ع ﻓﻠ ﺴ ﻄ ﻴ ﻦ‬- ‫ ﻣ ﺪﻳ ﻨ ﺔ ا ﻟ ﺒ ﻨ ﺎ ء‬- ‫ﺣ ﻲ ا ﻟ ﺴ ﻼ ﻣ ﺔ‬ : ‫ﺟﺪة‬

Free Number: 920012286 https://ibs-shop.com Email: [email protected]

Page: 1 / 1
Page 104 of 122
Page 105 of 122
Page 106 of 122
Page 107 of 122
Page 108 of 122
Page 109 of 122
Page 110 of 122
Page 111 of 122
Page 112 of 122
Page 113 of 122
Page 114 of 122
Page 115 of 122
Page 116 of 122
Page 117 of 122
Page 118 of 122
Page 119 of 122
Page 120 of 122
Page 121 of 122
Page 122 of 122

You might also like