BOQ Document

Uploaded by

Roshan Gandhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Validate Print Help Item Rate BoQ

Tender Inviting Authority: CE Cum Ro MoRTH Vijayawada

Name of Work: Consultancy services for Authority’s Engineer for Supervision of:

Rehabilitation and Up gradation of Newly Declared National Highway Nandyala – Kadapa/Kurnool Border of Nh-167K to 2 lane with paved shoulders from Km 186/0 To Km 250/0 (Design Ch.186+000 To Ch. 248+010 in Kurnool
District in the State of Andhra Pradesh

BOQ Contract No: RW/NH-12014/12/2022-AP/Zone-III/756/AE dated 23.12.2024


Bidder
Name :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder
Name and Values only )

NUMBER TEXT # NUMBER # TEXT # NUMBER # NUMBER # NUMBER # TEXT #


#
Sl. Item Description Quantity Units BASIC RATE In Figures To be TOTAL AMOUNT Without TOTAL AMOUNT TOTAL AMOUNT
No. entered by the Bidder GST (Excluding GST) In Words
(Excluding GST)
Rs.

1 2 4 5 13 53 54 55
1.00
Remuneration for Local Staff
1.01 Team Leader Cum Senior Highway Engineer (1 No) 39 Man Months 0.00 0.00 #VALUE!
(1*24)+(1*15)

1.02 Resident cum Highway Engineer (1*24+1*60) 84 Man Months 0.00 0.00 #VALUE!
1.03 Bridge/Structural Engineer (1 No) 34 Man Months 0.00 0.00 #VALUE!
(1*24+1*10)
1.04 Senior Pavement Specialist (1 Nos) 24 Man Months 0.00 0.00 #VALUE!
(1*24 )
1.05 Senior Quality cum Material Expert (1 Nos) 24 Man Months 0.00 0.00 #VALUE!
(1*24)
1.06 Road Safety Expert (1 No) (1*8)+(1*15) 23 Man Months 0.00 0.00 #VALUE!

1.07 Sub-Professional Staff


1.08 Survey Engineer (01 Nos) (24+10) 34 Man Months 0.00 0.00 #VALUE!
1.09 Assistant Highway Engineer-2 108 Man Months 0.00 0.00 #VALUE!

1.10 CAD Expert (1 No) (4+2) 6 Man Months 0.00 0.00 #VALUE!
1.11 Environmental Engineer 4 Man Months 0.00 0.00 #VALUE!
1.12 Assistant Bridge Engineer 24 Man Months 0.00 0.00 #VALUE!
1.13 Assistant Quality cum Material Engineer 48 Man Months 0.00 0.00 #VALUE!
1.14 Electrical Engineer (1 No) (4+3) 7 Man Months 0.00 0.00 #VALUE!
1.15 HTMS/Toll Expert (1 No) (3+0) 3 Man Months 0.00 0.00 #VALUE!
1.16 Quantity Surveyor (1 No) (24+8) 32 Man Months 0.00 0.00 #VALUE!
1.17 Horticulture cum Landscaping Expert (1 No) (6+18) 24 Man Months 0.00 0.00 #VALUE!
1.18 Lab Technician 48 Man Months 0.00 0.00 #VALUE!
1.19 Document/Data Entry Operator 24 Man Months 0.00 0.00 #VALUE!
1.20 Support Staff (inclusive of per diem
allowance)
1.21 Office Manager (1 Nos) 84 Man Months 0.00 0.00 #VALUE!
(1*24+ 1*60)= 84
1.22 Accountant cum Cashier (1 Nos) (24+60) 84 Man Months 0.00 0.00 #VALUE!
1.23 Steno cum Computer Operator (1 Nos) 84 Man Months 0.00 0.00 #VALUE!
(1*24+ 1*60)= 84
1.24 Office Boy (1 Nos) 84 Man Months 0.00 0.00 #VALUE!
(1*24+ 1*60)= 84
1.25 Transportation (Fixed Costs)
1.26 Scorpio/Bolero or equivalent (not more than 03years old) 39 Months 0.00 0.00 #VALUE!
(01 Nos during construction and 01 number during
maintenance period for 15 month) (24+15) Rate per
month
1.27 Swift desire/ Ford Aspire or equivalent (not more than 03 108 Months 0.00 0.00 #VALUE!
years old) (02 no. during construction & 01 no in
maintenance period) [ (2 x 24)+(1x60)]

1.28 Duty Travel to Site(Fixed Costs): Professional


and Sub-Professional Staff. The employer may
require the key personnel to visit the
Employer's Site Offices/Regional Office. The
quoted amount against remuneration should
include travel fare (including Hotel
Charges,travel costs etc. complete
1.29 For 20 round trip to Employer's Head Office 20 Nos 0.00 0.00 #VALUE!
1.30 For 20 round trip to Employer's regional office. 20 Nos 0.00 0.00 #VALUE!
1.31 Office Rent (Fixed Costs)
The rent cost includes electricity and water
charges, maintenance, cleaning, repairs, etc.
(Rate per Month)

1.32 During Construction period (1 Nos) 24 Months 0.00 0.00 #VALUE!


1*24=24
1.33 During Maintenance /DLP period (1 No) 60 Months 0.00 0.00 #VALUE!
1*60=60
1.34 Office Supplies, Utilities and
Communication (Fixed Costs), Rate per
1.35 Month 24 Months 0.00 0.00 #VALUE!
Office Supplies during construction period
1*24=24
1.36 Office Supplies during Maintenance /DLP period 60 Months 0.00 0.00 #VALUE!
1*60=60
1.37 Drafting Supplies during construction period 24 Months 0.00 0.00 #VALUE!
1*24=24
1.38 Drafting Supplies during Maintenance /DLP period 60 Months 0.00 0.00 #VALUE!
1*60=60

1.39 Computer Running Costs during construction period 24 Months 0.00 0.00 #VALUE!
1*24=24

1.40 60 Months 0.00 0.00 #VALUE!


Computer Running Costs during Maintenance /DLP
period (1*60=60)
1.41 24 Months 0.00 0.00 #VALUE!
Domestic and International Communication during
construction period (1*24=24)
1.42 60 Months 0.00 0.00 #VALUE!
Domestic and International Communication during
Maintenance /DLP period (1*60=60)
1.43 Office Furniture and Equipment (Rental)
Office furniture shall include executive tables, chairs,
visitor chairs, steel almirahs, computer furniture,
conference table etc. Office equipment shall include as
a minimum of telephone (2 external & 10 internal lines),
photocopier (15ppm, 12000 copies per month with A3 &
A4 input) fax machine, PCs(5 No., Intel Core 2 Duo
E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-
250 GB, DVD Writer, Key board, optical scroll mouse,
MS- Windows Vista Business, pre-loaded anti-virus
etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000
pages per month, 600x600 dpi or better etc.,
Engineering Plan printer (1 no.), binding machine (1
no.), plotter A0 size, overhead projector, AC (4 no., 1.5
Ton), Water Coolers (as required)etc.,

1.44 During Construction period Months 0.00 0.00 #VALUE!


24
1*24=24
1.45 During Maintenance /DLP period Months 0.00 0.00 #VALUE!
60
1*60=60
1.46 Reports and Document Printing ( rate as per copy)

1.47 Monthly reports Copy 0.00 0.00 #VALUE!


252
(Design and Construction) ((24+60)*3)
1.48 Half yearly Reports 16 Copy 0.00 0.00 #VALUE!
1.49 Various others reports as provided in the LS 0.00 0.00 #VALUE!
1
Concession Agreement such as Completion Report
1.50 Road Survey Equipment, Rate per Km

1.51 Surface defects detection and roughness Km 0.00 0.00 #VALUE!


measurement using Network Survey Vehicle 496.08

1.52 Pavement strength measurement using FWD 248.04 Km 0.00 0.00 #VALUE!
1.53 Bridge inspection using Mobile Bridge Inspection Km 0.00 0.00 #VALUE!
7.20
Unit
1.54 Road signs inspection using Retro Reflectometer 496.08 Km 0.00 0.00 #VALUE!
1.55 Overhead charges on the remuneration as LS 0.00 0.00 #VALUE!
mentioned in Serial no. I of Appendix C-2 (Summary of cost) 1.00
w.r.t. the professional staff
1.56 Contigencies LS 0.00 0.00 #VALUE!
A fixed amount of Indian Rupees ONE MILLION shall be
included in the Financial Proposal. (Fixed as Rs. 1.000
10,00,000) and to be entered by bidder

Total in Figures 0.00 0.00 #VALUE!

Quoted Rate in Words #VALUE!


Please Enable Macros to View BoQ information
Q information