0% found this document useful (0 votes)
13 views1 page

defect report library

Uploaded by

aniketsomankar75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

defect report library

Uploaded by

aniketsomankar75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Defect Report For Library Management System

Id LB1
Project Library management system
Module Book issue /return module
Detected Build Version V1.2.0
Summary Users are unable to return books when the due date has
passed

Description When a user tries to return a bookAfter the due date, the
system does not allow the return process

Steps To Replicate 1. Login into the library management system


2. navigate to the issue “book select”
3. select book to issue

Actual Result The system allow the user to issue more books
Expected Result The system has displayed and error message when a
user tries to issue more books then allowed limit

Attachments A set of screenshots or videos that provide additional


information on the defect

Remarks
Defect Severity Major
Defect Priority High
Reported By 1. Pradeep Rathod
2. Aniket somankar
3. Sejal Tembhurne
4. Om Shende
Assigned To Development Team
Status Pass
Fixed Build Version 1.0V

You might also like