Pure Steam Quality Protocol With Annexures
Pure Steam Quality Protocol With Annexures
2.0 OVERVIEW: 3
2.1 Objective 3
2.2 Purpose 3
2.3 Scope 3
7.0 ABBREVIATION 15
10.1 Summary 18
10.2 Conclusion 18
PREPARED QUALITY
BY ASSURANCE
QUALITY
ASSURANCE
ENGINEERING
REVIEWED
BY
QUALITY
CONTROL
PRODUCTION
HEAD
OPERATION
APPROVED
BY
QUALITY
ASSURANCE
Company Address as per SMF Company Logo
2.0 OVERVIEW:
2.1 Objective:
The objective of this protocol is to develop a plan for verification of pure steam
quality throgh physical tests (Non codensable gas, Degree of super heat and
dryness fraction test), which is used to facilitate _____________manufacturing
facility.
2.2 Purpose:
2.3 Scope:
This protocol shall be used for the verification study of pure steam quality, which
is generated from pure steam generator (ID___________), installed in
________________ of _________ manufacturing facility, company
address__________as per SMF.
2.4 Responsibility:
➢ Execution of protocol.
Company Address as per SMF Company Logo
Head– Engineering:
➢ Review of protocol, the completed qualification data package, and the final
report Approval.
➢ Assist in the resolving the validation deficiencies.
Head – Quality Control:
➢ Review of protocol, the completed qualification data package, and the final
report approval.
Head – Production:
➢ Review of protocol, the completed qualification data package, and the final
report approval.
➢ Assist in the resolving the validation deficiencies.
Head – Operation/ Quality Assurance:
➢ Review and approval of protocol, the completed qualification data package,
and the final report.
Company Address as per SMF Company Logo
Execution team is responsible for the execution of verification study of pure steam
quality. All executors involved with this protocol shall sign within the prescribed
format given below:
3.1 The installation and operational qualification of the equipment shall be successfully
completed before the verification study of pure steam quality.
3.3 Approved standard operating Procedure for each test (Non codensable gas, Degree
of super heat and dryness fraction test) shall be available.
3.4 All the deficiencies and discrepancies related to the system which affect the product
quality and corrective action taken shall be recorded in the appropriate section of the
protocol.
3.5 The test observation shall be recorded in the respective Annexure of the protocol and
finally verified.
The Pure steam condensate quality of generation and respective Autoclave sampling
point shall be re-verified through physical test, prior to re-validation of concern
autoclave in every six month.
Company Address as per SMF Company Logo
6.1.1.2 Sampling Procedure: At the time of sampling following test kit shall be required.
Test kit:
a. Burette bulb
b. Burette cock
c. Burette
d. Burette guide
e. Condense collection cylinder
Company Address as per SMF Company Logo
Figure -1(Elbow)
initial temperature of water in flask in 0C, final temperature of water and condensate in
flask in 0C, average temperature of steam delivered to sterilizer in 0C, Initial mass of
flask in kg, Initial mass of flask assembly and water in kg, final mass of flask
assembly, condensate and water in kg and latent heat of dry saturated steam at
temperature TA(KJ kg-1) {hfg from steam table} and calculate the dryness fraction
value with the help of this formula:
7.0 ABBREVIATION:
SOP: Standard operating procedure
UTI : Utility
EQI : Equipment
Company Address as per SMF Company Logo
__________________________________________________________________________
__________________________________________________________________________
Checked By Verified By
Sign & Date Sign & Date
Company Address as per SMF Company Logo
Following deficiency was identified and corrective actions taken in consultation with the
validation team.
Description of Deficiency:
Sign/Date Sign/Date
Company Address as per SMF Company Logo
10.1 SUMMARY:
10.2 CONCLUSION:
Prepared By Checked By
(Sign/Date) (Sign/Date)
Company Address as per SMF Company Logo
QUALITY
ASSURANCE
ENGINEERING
REVIEWED
BY
QUALITY
CONTROL
PRODUCTION
HEAD
OPERATION
APPROVED
BY
QUALITY
ASSURANCE
Company Address as per SMF Company Logo
ANNEXURE – I
NON CONDENSABLE GAS TEST
1. Date of testing
2. Sampling ID No
3. Sampling Location
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Checked By Verified By
Sign & Date Sign & Date
Company Address as per SMF Company Logo
ANNEXURE – II
DEGREE OF SUPER HEAT TEST
Sr. No. Testing Parameter Observation
1. Date of testing
2. Sampling ID No
3. Sampling Location
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Checked By Verified By
Sign & Date Sign & Date
Company Address as per SMF Company Logo
ANNEXURE – III
DRYNESS FRACTION TEST
Sr. No. Testing Parameter Observation
9. Date of testing
10. Sampling ID No
( - )
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Checked By Verified By
Sign & Date Sign & Date