1. For supply on 25 kV, 50 Hz single phase, suitable motor for electric traction is
dc shunt motor
dc series motor
Correct Answer : d Explanation : it require high starting
torque
14. A differential relay designed to protect a zone of the distribution system, uses
current transformer (CTs) connected to annually CTs. The auxiliary CTs must match
both the phase shift and the ratio of the differential relays CTs if the values do not
match. Which of the following is the least likely outcome?
The trip could occur only when the CTs are wired in parallel.
Correct Answer : d
15. A Wrist watch mercury cell has a capacity of 200 x 10-3 AH. How many months
can the watch function without replacement if it draws 15 x 10-6 A?
9 months
18 months
24 months
30 months
Correct Answer : b Explanation : Dh = I x t Duration = Capacity / current =
(200/1000) / (15/1000000) = 13333.33Hrs = 555.55days = 18 months
17. During which of the following categories are you more likely to find status
reports many changes and the creation of forecasts?
Concept
Initiation
Planning
Execution
Correct Answer : d Explanation : During Execution of the activity one can find
status reports many changes and the creation of forecasts.
18. The critical path in a project network is the: Shortest path through the network
Longest path through the network Network path with the most difficult activities
Network path using the most resources
Architecture Declaration
Entity Declaration
Waveguide
Array
Hyginus source
Dish Antenna
Correct Answer : d Explanation : A satellite dish is a dish-shaped
type of parabolic antenna designed to receive or transmit information by radio
waves to or from a communication satellite. The term most commonly means a dish
used by consumers to receive direct-broadcast satellite television from a direct
broadcast satellite in geostationary orbit.
0.3 mA
0.3 A
3A
None of above
Correct Answer : b Explanation : Maximum deflection
range of ammeter = 45 / 150 = 0.3 A
23. A low-pass filter:
25. Your boss has just approved the initiation of a project to celebrate Qatar
National Day. Sadia has been assigned the project manager as should be:
Ask the boss as to how many team members would be allowed in the project
Correct Answer : b
Generating capacity that is connected to the grid and ready to take the load