Air System Sizing Summary For SEC1-2
Air System Sizing Summary For SEC1-2
Calculation Months .................................... Jan to Dec Zone CFM Sizing ................ Sum of space airflow rates
Sizing Data ................................................ Calculated Space CFM Sizing ............ Individual peak space loads
Total coil load ....................................................... 16.9 Tons Load occurs at ................................................ Aug 1600
Total coil load ..................................................... 202.8 MBH OA DB / WB ................................................... 99.3 / 68.8 °F
Sensible coil load ................................................ 187.2 MBH Entering DB / WB ........................................... 76.0 / 63.2 °F
Coil CFM at Aug 1600 ......................................... 9026 CFM Leaving DB / WB ........................................... 56.7 / 55.4 °F
Max block CFM ................................................... 9026 CFM Coil ADP .................................................................. 54.5 °F
Sum of peak zone CFM ....................................... 9026 CFM Bypass Factor ........................................................ 0.100
Sensible heat ratio .............................................. 0.923 Resulting RH .............................................................. 49 %
ft²/Ton ................................................................. 219.6 Design supply temp. ................................................ 55.0 °F
BTU/(hr-ft²) ........................................................... 54.7 Zone T-stat Check ................................................. 1 of 1 OK
Water flow @ 10.0 °F rise ..................................... N/A Max zone temperature deviation ................................ 0.0 °F
Max coil load ........................................................ 39.3 MBH Load occurs at ................................................... Des Htg
Coil CFM at Des Htg ............................................ 9026 CFM BTU/(hr-ft²) .............................................................. 10.6
Max coil CFM ...................................................... 9026 CFM Ent. DB / Lvg DB ............................................ 69.7 / 73.8 °F
Water flow @ 20.0 °F drop ................................... N/A
Actual max CFM .................................................. 9026 CFM Fan motor BHP ........................................................ 0.00 BHP
Standard CFM ..................................................... 8947 CFM Fan motor kW .......................................................... 0.00 kW
Actual max CFM/ft² ............................................... 2.43 CFM/ft² Fan static ................................................................. 0.00 in wg
Calculation Months .................................... Jan to Dec Zone CFM Sizing ................ Sum of space airflow rates
Sizing Data ................................................ Calculated Space CFM Sizing ............ Individual peak space loads
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.071 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4705.2 BTU/(hr-CFM)
Site Altitude = 242.0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.071 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4705.2 BTU/(hr-CFM)
Site Altitude = 242.0 ft
0.016
0.012
3 0.010
12
0.008
0.006
0.004
0.002
0.000
30 40 50 60 70 80 90 100
Temperature ( °F )