Predictive Maintenance Check Sheet
Predictive Maintenance Check Sheet
MAINTENANCE DEPARTMENT
MONTH-
APPROVED BY :
JBM AUTO LIMITED (JBM GROUP)
3
Check torch body for any skew , missing or
broken part
5
Check overall apearance for dust spatter or
other residues
7
Check wire feeder cable for any removed
connecting section.
8
Check all Pu & gas pipes for any leakage if
found eliminate them
11
Check allignment mark accordance & damage
at the home position.
CHECKED BY
Verified by
APPROVED BY :
Verified by Engineer
APPROVED BY :
JBM AUTO LIMITED (JBM GROUP)
MONTHLY PREDICTIVE MAINTENANCE CHECKSHEET
M/C NAME : Press No.-
Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22
S.No. Machine check points 1st 2nd 3rd 4th 1st 2nd 3rd 4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 5th
Verified by Engineer
APPROVED BY :
M/C NAME
S.No. Equip NO
1 10089796
2 10089797
3 10089798
4 10089799
5 10089800
6 10089809
7 10089820
8 10089823
9 10089821
10 10089822
Feb-22
Verified by Engineer
APPROVED BY :
Feb-22 Mar-22 Apr-22
1
JBM AUTO LIMITE
HPS P
Apr-22 May-22
2
BM AUTO LIMITED (JBM GROUP)
2
E MAINTENANCE SCHEDULE
Aug-22 Sep-22
1
-22 Oct-22 Nov-22
1
Nov-22 Dec-22
2
M/C NAME
S.No. Equip NO
10089815
1
10089803
2
10089801
3
10089829
4
10089804
5
10089805
6
10089806
7
10089811
8
10089812
9
10089813
10
10089814
11
10089830
12
10089824
13
10089825
14
10089828
15
Feb-22
110T-L1 1
110T-L2 1
160T-L3 1
200T-L4
110T-L5
80T-L6
80T-L7
80T-L8
110T-L9
110T-L10
110T-L11
160T-L12
160T-L13
160T-L14
160T-L15
APPROVED BY :
JBM AUTO LIMITE
L
Mar-22 Apr-22 May-22
1st 2nd 3rd 4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd
1
AUTO LIMITED (JBM GROUP)
LPS PRESSES MONTHLY MAINTENANCE SCHEDULE
May-22 Jun-22 Jul-22 Aug-22
4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd
1
1
1
CE SCHEDULE
Aug-22 Sep-22 Oct-22 Nov-22
3rd 4th 5th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 5th 1st
1
1
Nov-22 Dec-22
2
2