0% found this document useful (0 votes)
52 views5 pages

QSC

Uploaded by

Aishwary Thakur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views5 pages

QSC

Uploaded by

Aishwary Thakur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Chhattisgarh Swami Vivekanand Technical University, Bhilai

Diploma in Civil Engineering Semester -VI


A) Course Code : 2020671(020)
B) Course Title : Quantity Surveying and Costing-II
C) Pre- requisite Course Code and Title :
D) Rationale :
One of the job specifications of a diploma holder is to prepare estimate of civil engineering structures as
for cost and quantity of various construction materials required. This is an essential and basic
requirement for all projects. This is the first step towards efficient management of the project including
proper estimation and utilization of human resources required for the project. This subject is in
continuation of quantity surveying and costing-I. In this, the timber structure, R.C.C. structures and steel
structures bridge and culverts, water supply and sanitary engineering are included. The students will be
able to calculate the quantity of works of the structure of the above mentioned chapters. A provision
has also been made to use various software for accuracy and speedy determination of quantity. A
chapter on valuation and rent fixation is also included so that the students will be familiar with the
method for valuation work and fixing rent

E) Course Outcomes :
CO-1 Prepare estimate of R.C.C. structures i.e. slab, beam, column and column footing, staircase.
CO-2 Prepare estimate of steel structures i.e. beam, column and column footing, and roof
trusses.
CO-3 Prepare estimates of culvert and bridges.
CO-4 Prepare estimates of water supply and sanitary engineering works.
CO-5 a. Do the valuation and rent fixation of different type of buildings.
b. Prepare estimates for repairing works for dismantling, demolishing and repair works in
buildings.

F) Scheme of Studies:
Board of Course Scheme of Studies Credit
Course
Study Code (Hours/Week) L+T+P/2
L T P
Civil 2020671 Quantity Surveying and 3 - 2 4
Engineering (020) Costing-II
L- Lecture, T- Tutorial, P- Practical,
Legend: Lecture (L) CI: Classroom Instruction (Includes different instructional strategies i.e. Lecture and
others).
Practical (P)  LI: Laboratory Instruction (Includes Practical performances in laboratory workshop, field or
other locations using different instructional strategies).
Tutorial (T)  SL: Self Learning

G) Scheme of Assessment:
Scheme of Examinations
Board of Course
Course Title Theory Practical Total
Study Code
ESE CT TA ESE TA Marks
Civil 2020671 Quantity Surveying
Engineering (020) and Costing-II 70 20 30 40 60 220

ESE: End Semester Exam, CT: Class Test, TA: Teachers Assessment
Legend - PRA : Process Assessment, PDA : Product Assessment

CSVTU, Bhilai Page 1


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
Note: i) TA in Theory includes Sessional work (SW) and attendance (ATT) with weightage
of 70% and 30% of total respectively.
ii) TA in practical includes performance of PRA,PDA and Viva-Voce with weightage
of 50%,40% and 10% respectively.
iii) 85% attendance is essential in theory and practical classes to appear in Examination.

H) Course-Curriculum Detailing:
This course curriculum detailing depicts learning outcomes at course level and session level and their attainment
by the students through Classroom Instruction (CI), Laboratory Instruction (LI), Sessional Work (SW) and Self
Learning (SL). Students are expected to demonstrate the attainment of Session Outcomes (SOs) and finally
Course Outcomes (COs) upon the completion of course.
Convert unit of the given physical quantity from one unit system to other.

CO-1 Prepare estimate of R.C.C. structures i.e. slab, beam, column and column footing, staircase.
(Approx. Hrs: CI+LI = 9+10)
Session Outcomes Laboratory Instruction (LI) Class room Instruction (CI) Self Learning (SL)
(SOs)
SO1.1 Identify items of
LI 1.1 Estimate the quantities Unit-1 Estimate of R.C.C. SL1.1 Study
work in RCC structure and prepare abstract of cost structures description of
and prepare schedule for RCC slab from given 1.1 Items of work in RCC PCC and RCC
of bars. working drawing. structures, bar bending work from CG
SO1.2 Prepare LI 1.2 Estimate the quantities schedule. PWD SOR for
estimate of RCC slab and prepare abstract of cost 1.2 Estimate of slab buildings.
and beam. for RCC beam from given 1.3 Estimate of beam
SO1.3 Prepare working drawing. 1.4 Estimate of T-beam
estimate of RCC stair LI 1.3 Estimate the quantities 1.5 Estimate of RCC column
case. and prepare abstract of cost with footing.
SO1.4 Prepare for RCC staircase from given 1.6 Preparation of abstract of
estimate of RCC working drawing. cost above estimates.
column and footing. LI 1.4 Estimate the quantities
and prepare abstract of cost
for RCC column and footing
from given working drawing.
SW-1 Suggested Sessional Work (SW):

a. Assignments:
1. Explain the method of estimation of RCC work.
2. Explain bar bending schedule and calculation of quantity of steel reinforcement.
3. Numerical problems on estimate of RCC structure.
b. Mini Project
1. Prepare the estimate of RCC framed building (one BHK) from given working drawing using suitable
software for estimation.

CSVTU, Bhilai Page 2


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
CO-2 Prepare estimate of steel structures i.e. beam, column and column footing, and roof trusses.
(Approx. Hrs: CI+LI = 9+6)
Session Outcomes (SOs) Laboratory Instruction (LI) Class room Instruction (CI) Self Learning (SL)

SO2.1 Identify items of LI 2.1 Estimate the quantities Unit-2 Estimate of Steel SL2.1 Study
work in steel structure and prepare abstract of cost Structures description of steel
and prepare schedule of for steel beam and column 2.1 Items of work in steel work from CG PWD
bars. with base from given working structure. SOR for building.
SO2.2 Prepare estimate drawing. 2.1Estimate of steel beam and
of steel beam and LI 2.2 Estimate the quantities column (Stanchion) with base.
column. and prepare abstract of cost 2.2 Estimate of steel truss.
SO2.3 Prepare estimate for steel truss from given 2.3 Estimate of roof covering
of steel truss. working drawing. materials
SO2.4 Prepare estimate LI 2.3 Estimate the quantities 2.4 Estimate of GIC roof and
of GIC roof and AC roof. and prepare abstract of cost AC roof.
for GIC roof and AC roof from 2.5 Estimate of steel frames
given working drawing. for doors and windows.
2.6 Preparation of abstract of
cost above estimates
SW-2 Suggested Sessional Work (SW) :

a. Assignments:
1. Explain the method of estimation of steel work.
2. Numerical problems on estimate of steel structure.
b. Mini Project
1. Prepare the estimate of GIC roof of workshop with steel truss from given working drawing using
suitable software for estimation.

CO-3 Prepare estimates of culvert and bridges.


(Approx. Hrs: CI+LI = 10+6)
Session Outcomes (SOs) Laboratory Instruction (LI) Class room Instruction (CI) Self Learning
(SL)
SO 3.1 Identify items of LI 3.1 Estimate the quantities Unit-3 Estimate of Culverts SL3.1Study CG
work in culverts and and prepare abstract of cost of and Bridges PWD SOR for
bridges. hume pipe culvert from given 3.1Items of work in culverts bridges.
SO3.2 Prepare estimate working drawing. and bridges, method of
of hume pipe culvert. LI3.2 Estimate the quantities estimating culverts and
and prepare abstract of cost of bridges.
SO3.3 Prepare estimate slab culvert from given working 3.2 Estimate of hume pipe
of slab culvert. drawing. culvert with splayed type of
SO3.4 Prepare estimate LI3.3 Estimate the quantities wing wall, turn wall, face
of single span R.C.C.T and prepare abstract of cost of wall
beam bridge. single span R.C.C.T beam 3.3Estimate of R.C.C. slab
bridge from given working culvert, straight / return
drawing. type wing walls.
3.4 Estimate of single span
R.C.C.T beam bridge,
splayed wing walls.
3.5 Preparation of abstract
of cost above estimates.

CSVTU, Bhilai Page 3


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
SW-3 Suggested Sessional Work (SW) :

a. Assignments:
1. State the items of work in culverts.
2. Numerical problems on estimate of bridge and culverts.
b. Mini Project
1. Visit a bridge construction site and study the estimate of the project.

CO-4 Prepare estimates of water supply and sanitary engineering works for building.
(Approx. Hrs: CI+LI = 10+10)
Session Outcomes Laboratory Instruction (LI) Class room Instruction (CI) Self Learning (SL)
(SOs)
SO 4.1 Identify items LI 4.1 Estimate the UNIT-4 Estimates of Water SL4.1 Study CG
of water supply work quantities and prepare Supply and Sanitary Engineering PWD SOR for
for a building. abstract of cost for water Works for Buildings Water Supply and
SO4.2 Identify items s u p p ly w o r k s in b u ild in gs 4 .1 Ite m s o f wo rk in W at e r Su p ply Sanitary
of sanitary work for a fr o m giv e n w o rk in g dr aw ing. an d S anit ary E ng in e erin g W o rks E ngineering
building. LI 4.2 Estimate the for Buildings. Works for
quantities and prepare 4.2 Detailed estimate of water Buildings
SO4.3Prepare abstract of cost for sanitary supply for building work.
estimate of water works in buildings from
supply works in 4.3Detailed estimate of sanitary
given working drawing. works for building work.
buildings. LI 4.3 Estimate the
4.4Estimate of S.W., R.C.C. and
SO 4.4 Prepare quantities and prepare
H.D.P.E pipe line.
estimate of sanitary in abstract of cost for septic
buildings. tank with soak pit from 4.5Estimate of septic tank
SO4.5 Prepare given working drawing. 4.6Estimate of manhole.
estimate of septic L I 4 .4 E st im a t e t h e 4.7 Preparation of abstract of cost
tank. quantities and prepare above estimates.
abstract of cost for manhole
SO4.6Prepare
from given working drawing.
estimate of drainage
LI 4.5 Estimate the
pipe.
quantities and prepare
abstract of cost for HDPE
drainage pipe from given
working drawing.

SW-4 Suggested Sessional Work (SW):

a. Assignments:
1. State the items of work in Water Supply and Sanitary Engineering Works for Buildings..
2. Numerical problems on estimate of Water Supply and Sanitary Engineering Works for Buildings..
b. Mini Project
1. Prepare the detailed estimate of sanitary and water supply works of building from given plan.

CSVTU, Bhilai Page 4


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
CO-5 a. Do the valuation and rent fixation of different type of buildings.
b. Prepare estimates for repairing works for dismantling, demolishing and repair
works in buildings.
(Approx. Hrs: CI+LI = 10+8)
Session Outcomes (SOs) Laboratory Class room Instruction (CI) Self Learning (SL)
Instruction (LI)
SO 5.1 Explain different UNIT-5(a) Valuation and Rent Fixation SL5.1 Study rent
terms related to 5.1.1Definition, purpose of valuation fixation of Govt
valuation and rent 5.1.2 Gross income/Net income, Out Buildings.
fixation. goings. SL5.2 Study CG
SO 5.2 Describe method 5.1.3 Scrap value, Salvage value, PWD SOR for
of valuation. Market value, Book value, Rateable dismantling,
value, Obsolescence, Annuity, Capital d emolishing and
SO 5.3 Explain rent repair works in
fixation of a building. Cost, Capitalized value, Year’s
purchase, and Sinking fund. buildings.
SO 5.4 Identify item of
5.1.4 Depreciation, Methods of
works in dismantling,
calculating depreciation.
demolishing and repair
works in buildings. 5.1.5 Methods of valuation
SO 5.5Prepare estimate 5.1.6 Free hold property and Leasehold
of dismantling, Property.
demolishing and repair 5.1.7 Rent fixation of building.
works in buildings.
(b)Dismantling, Demolishing and
Repair Works
5.2.1Dismantling and Demolishing
work and their estimate.
5.2.2Repair works and their estimate.

Legend: CI: Classroom Instruction (Includes different instructional strategies i.e. Lecture (L) and Tutorial (T) and
others), LI : Laboratory Instruction (Includes Practical performances in Laboratory, Workshop, field or
other locations using different instructional strategies) SL: Self Learning

SW-5 Suggested Sessional Work (SW) :

a. Assignments:
1. Define Gross income, Net income, Out goings.
2. Explain obsolescence.
3. Differentiate annuity and sinking fund.
4. What is depreciation? State the methods of calculating depreciation.
5. Describe rent fixation of building.
6. Solve numerical problems on valuation and rent fixation.
7. Solve numerical problems on dismantling, demolishing and repair works in buildings.
b. Project:
1. Visit a old building and prepare estimate for dismantling, demolition and repair for addition,
alternation and maintenance.

c. Mini Project: Visit nearby godowns/plants/factories and observe the types of trusses used and prepare a
report regarding selection of type of truss.

CSVTU, Bhilai Page 5