0% found this document useful (0 votes)
16 views5 pages

CM

Uploaded by

Aishwary Thakur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views5 pages

CM

Uploaded by

Aishwary Thakur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Chhattisgarh Swami Vivekanand Technical University, Bhilai

Diploma in Civil Engineering Semester -VI


A) Course Code : 2020674(020)
B) Course Title : Construction Management
C) Pre- requisite Course Code and Title :
D) Rationale :
A Civil Engineering Diploma pass out is supposed to know different facets of construction management.
The subject on Construction Management develops abilities related to solving day to day problems
arising during constructions maintenance work such as handling live problems in the department,
issuing of tender documents, handling of cash book, muster role, settlement of imprest account, time
scheduling with the help of CPM and PERT, understanding labour laws and successfully dealing with
labour and sub ordinate staff. In brief the subject has been introduced to develop managerial skills in
the students, so that he can successfully handle live situations at work.

E) Course Outcomes :
CO-1 Recognize of execution of Civil Engineering works by Govt. Departments.
CO-2 Describe execution of work by contract.
CO-3 Explain and interpret tender process.
CO-4 Explain construction planning and scheduling.
CO-5 (a) Explain material management methods.
(b) Recognize safety in construction and labour welfare.

F) Scheme of Studies:
Board of Course Scheme of Studies Credit
Course
Study Code (Hours/Week) L+ T+P/2
L T P
Civil 2020674 Construction Management 2 - - 2
Engineering (020)
L- Lecture , T- Tutorial, P- Practical,
Legend: Lecture (L) CI: Classroom Instruction (Includes different instructional strategies i.e. Lecture
and others) .
Practical (P)  LI : Laboratory Instruction (Includes Practical performances in laboratory workshop,
field or other locations using different instructional strategies ).
Tutorial (T)  SL: Self Learning

G) Scheme of Assessment:
Scheme of Examinations
Board of Course
Course Title Theory Practical Total
Study Code
ESE CT TA ESE TA Marks
Civil
Engineeri 2020674 Construction 70 20 30 - - 120
ng (020) Management

ESE: End Semester Exam, CT: Class Test, TA: Teachers Assessment
Legend - PRA : Process Assessment, PDA : Product Assessment
Note: i) TA in Theory includes Sessional work (SW) and attendance (ATT) with weightage of 70% and 30% of
total respectively.

CSVTU, Bhilai Page 21


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
ii) TA in practical includes performance of PRA, PDA and Viva-Voce with weightage of 50%,40% and 10%
respectively.
iii) 85% attendance is essential in theory and practical classes to appear in Examination.

H) Course-Curriculum Detailing:
This course curriculum detailing depicts learning outcomes at course level and session level and their attainment
by the students through Classroom Instruction (CI), Laboratory Instruction (LI), Sessional Work (SW) and Self
Learning (SL). Students are expected to demonstrate the attainment of Session Outcomes (SOs) and finally
Course Outcomes (COs) upon the completion of course.
Convert unit of the given physical quantity from one unit system to other.

CO-1 Recognise of execution of Civil Engineering works by Govt Departments.


(Approx. Hrs: CI+LI= 6)
Session Outcomes Laboratory Class room Instruction (CI) Self Learning (SL)
(SOs) Instruction (LI)
SO1.1Describe the UNIT-1 Execution of work by Govt. SL1.1 Study
organization of Govt Deparments DPR of a
Departments for 1.1Organization-Major departments small Civil
execution of Civil Engg executing civil works, Structure of Engg Work.
Works. departments
SO 1.2 Explain the 1.2 Procedure of initiating the work-
procedure for Detailed Project Report (DPR),
initiating Civil Engg administrative approval, technical
Work. sanction, budget provision, land
SO1.3 Identify acquisition
methods of execution 1.3Methods used in for carrying out
of work by Govt works- contract method and
Departments departmental method
SO1.4 Recognize 1.4 Different types of accounting
different accounting papers -
papers in Govt Measurement Books, Nominal Muster
Departments Roll, Imprest Cash, indent, Invoice, Bills,
Vouchers, Cash Book, Temporary
advance.
SW-1 Suggested Sessional Work (SW):
a. Assignments:
1. State the organization of state PWD.
2. Explain detailed project report.
3. Explain administrative sanction and Technical sanction.
4. Describe departmental method of construction.
5. Explain land acquisition.
6. Write notes on –
(i) Measurement Book. (ii) Nominal Muster Roll
(iii) Cash Book

b. Other Activities (Specify):


1. Visit any Govt agency of Civil Engg Works and prepare a brief report on their working.

CSVTU, Bhilai Page 22


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
CO-2 Describe executive of work by contract.
(Approx. Hrs: CI+LI = 6)
Session Outcomes (SOs) Laboratory Class room Instruction (CI) Self Learning (SL)
Instruction (LI)
SO 2.1 State Unit 2 Contract SL2.1Study PPP
requirements of valid 2.1Definition of contract objects of projects.
contract. contract, requirements of valid contract,
SO 2.2 Explain different Class of contractor, Registration of
types of separated contractor.
contract. 2.2 Classification of civil engineering
SO 2.3Distinguish Design- contract- 2.2.1Separated Contract-Lump
build, Turnkey, BOT and sum contract,
BOOT contract. Measurement contract -item rate
contract, percentage rate contract, cost
SO 2.4 Explain mode of plus percentage contract.
payment tocontractor. 2.2.2 Management Contract-
construction management contract
,Design, Management and construction
Contract
2.2.3 Integrated Contract – Design-
Build, Turnkey, BOT and BOOT contract.
2.3Mode of payment to the contractor -
Interim payment and its necessity,
Advance payment, secured advance, on
account payment, first and final
payment, retention money, reduced rate
payment, petty advance, mobilization
advance.
SW-2 Suggested Sessional Work (SW) :

a. Assignments
1. Explain contract system.
2. Classify Civil Engineering contract.
3. Write notes on –
(i) Lump sum contract (ii) Item rate contract
(iii) Percentage rate contract (iv) Cost plus percentage contract.
4. Describe Design, Management and Construction contract.
5. Differentiate Turnkey, BOT and BOOT contract.
6. Explain the payment procedure to contractor.
b. Other activity
1. Visit a Civil Engg construction site and study system of contract in that project.

CSVTU, Bhilai Page 23


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
CO- 3 Explain and interpret tender process.
(Approx. Hrs: CI+LI = 7)
Session Outcomes (SOs) Laboratory Class room Instruction (CI) Self Learning
Instruction (LI) (SL)
SO 3.1 Classify tenders Unit-3 Tender Process SL3.1 Study
and draft tender notice. 3.1 Definition of Tender, necessity of e-tendering
SO 3.2 Define different Tender, Types of tenders, Tender system of CG
terms related to tender. Notice, points to be included while Govt.
SO 3.3 State tender drafting Tender Notice.
documents. 3.2 Meaning of terms: Earnest
SO 3.4 Explain bidding money, security deposit, validity
process. period, corrigendum to tender notice
and its necessary.
3.3Tender documents – Contract
drawings, specifications, General
Conditions of contract, Special
conditions of contract, bill of
quantities.
3.4Bidding Process-Pre-qualification
process, Notice inviting tender,
Submission of bids, Analysis of
submitted tenders, basis for
evaluation and acceptance, Letter of
Intent, Work Order, agreement, PWD
contract conditions
SW-3 Suggested Sessional Work (SW) :

a. Assignments:
1. State different types of tender.
2. Write a sample tender Notice.
3. Earnest money, security deposit, validity period.
4. Describe documents to be furnished with tender documents.
5. Explain bidding process.
6. State in brief CG PWD contract conditions.
b. Other Activities (Specify):
1. Visit a Govt Departments of Civil Engg Works and study tender documents of an ongoing
project.

CO- 4 Explain construction planning and scheduling.


(Approx. Hrs: CI+LI= 7)
Session Outcomes Laboratory Class room Instruction (CI) Self Learning
(SOs) Instruction (LI) (SL)
SO 4.1Describe bar Unit-4 Planning and Scheduling SL4.1 Study the
chart. 4.1Identifying broad activities in scope of PERT.
SO 4.2Define different construction work & allotting time to it,
terms in CPM Methods of Scheduling,
network. 4.2Development of bar charts, Merits &
limitations of bar chart.
SO 4.3 Distinguish 4.3CPM networks, activity time estimate,

CSVTU, Bhilai Page 24


Chhattisgarh Swami Vivekanand Technical University, Bhilai
Diploma in Civil Engineering Semester -VI
normal time-cost and Event Times by forward & backward pass
crash time- cost. calculation, start and finish time of activity,
SO 4.4 State the project duration. Floats: Types of Floats-
concept of PERT. Free, independent
and total floats, critical activities and
SO 4.5 Explain project
critical path,
monitoring and
Purpose of crashing a network, Normal
control. Time and Cost, Crash Time and Cost, Cost
slope,Optimization of cost and duration.
4.4 PERT-Introduction to PERT
4.5Project Monitoring and Control System-
Updating bar chart and CPM/PERT,
Monthly progress report, stage wise
completion cost.
SW-4 Suggested Sessional Work (SW) :
a. Assignments:
1. Explain development of bar chart and state it’s merits and demerits.
2. Define different terms in CPM network.
3. Explain critical path.
4. Explain float.
5. Explain normal time-cost and crash time- cost and cost optimization.
6. What is PERT? Explain in brief.
7. Describe project monitoring and control.
8. Simple numerical problem on CPM.
b. Other Activities (Specify):
1. Prepare CPM for a small building project and determine project completion time.

CO- 5 (a) Explain material management methods.


(b) Recognize safety in construction and labour welfare.
(Approx. Hrs: CI+LI = 6)
Session Outcomes Laboratory Class room Instruction (CI) Self Learning
(SOs) Instruction (LI) (SL)
SO 5.1 Define Unit-5 (a) Material Management SL5.1 Study
different terms in 5.1.1 Material Management- Ordering cost, construction
material inventory carrying cost, Economic Order quality
management. Quantity management.
SO 5.2 Explain 5.1.2 Store management, various records
inventory control by related to store management, inventory
ABC technique. control by ABC technique, Introduction to
material procurement through portals
SO 5.3 Describe (b) Safety and Labour Welfare
Causes of Accidents, 5.2.1Safety in Construction Industry—
Remedial and Causes of Accidents, Remedial and
Preventive Measures. Preventive Measures.
SO 5.4 Recognize the 5.2.2 Labour welfare and Laws ,Acts
steps for labour pertaining to Civil construction activities-
welfare in Building and other Construction Workers
construction industry. (Regulation of Employment and Conditions
of Services) Act 1996 and Central Rules

CSVTU, Bhilai Page 25