Mark Scheme Pure Mathematics and Statistics
Mark Scheme Pure Mathematics and Statistics
Mathematics B (MEI)
It is also responsible for developing new specifications to meet national requirements and the
needs of students and teachers. OCR is a not-for-profit organisation; any surplus made is
invested back into the establishment to help towards the development of qualifications and
support, which keep pace with the changing needs of today’s society.
This mark scheme is published as an aid to teachers and students, to indicate the requirements
of the examination. It shows the basis on which marks were awarded by examiners. It does not
indicate the details of the discussions which took place at an examiners’ meeting before marking
commenced.
All examiners are instructed that alternative correct answers and unexpected approaches in
candidates’ scripts must be given marks that fairly reflect the relevant knowledge and skills
demonstrated.
Mark schemes should be read in conjunction with the published question papers and the report
on the examination.
© OCR 2021
a Annotations should be used whenever appropriate during your marking. The A, M and B annotations must be used on your standardisation scripts for
responses that are not awarded either 0 or full marks. It is vital that you annotate standardisation scripts fully to show how the marks have been awarded.
For subsequent marking you must make it clear how you have arrived at the mark you have awarded.
b An element of professional judgement is required in the marking of any written paper. Remember that the mark scheme is designed to assist in marking
incorrect solutions. Correct solutions leading to correct answers are awarded full marks but work must not be judged on the answer alone, and answers
that are given in the question, especially, must be validly obtained; key steps in the working must always be looked at and anything unfamiliar must be
investigated thoroughly. Correct but unfamiliar or unexpected methods are often signalled by a correct result following an apparently incorrect method.
Such work must be carefully assessed. When a candidate adopts a method which does not correspond to the mark scheme, escalate the question to your
Team Leader who will decide on a course of action with the Principal Examiner.
If you are in any doubt whatsoever you should contact your Team Leader.
M
A suitable method has been selected and applied in a manner which shows that the method is essentially understood. Method marks are not usually lost
for numerical errors, algebraic slips or errors in units. However, it is not usually sufficient for a candidate just to indicate an intention of using some method
or just to quote a formula; the formula or idea must be applied to the specific problem in hand, e.g. by substituting the relevant quantities into the formula.
In some cases the nature of the errors allowed for the award of an M mark may be specified.
A
Accuracy mark, awarded for a correct answer or intermediate step correctly obtained. Accuracy marks cannot be given unless the associated Method mark
is earned (or implied). Therefore M0 A1 cannot ever be awarded.
B
Mark for a correct result or statement independent of Method marks.
E
A given result is to be established or a result has to be explained. This usually requires more working or explanation than the establishment of an unknown
result.
Unless otherwise indicated, marks once gained cannot subsequently be lost, e.g. wrong working following a correct form of answer is ignored. Sometimes
this is reinforced in the mark scheme by the abbreviation isw. However, this would not apply to a case where a candidate passes through the correct
answer as part of a wrong argument.
H630/02 Mark Scheme November 2021
d When a part of a question has two or more ‘method’ steps, the M marks are in principle independent unless the scheme specifically says otherwise; and
similarly where there are several B marks allocated. (The notation ‘dep*’ is used to indicate that a particular mark is dependent on an earlier, asterisked,
mark in the scheme.) Of course, in practice it may happen that when a candidate has once gone wrong in a part of a question, the work from there on is
worthless so that no more marks can sensibly be given. On the other hand, when two or more steps are successfully run together by the candidate, the
earlier marks are implied and full credit must be given.
e The abbreviation FT implies that the A or B mark indicated is allowed for work correctly following on from previously incorrect results. Otherwise, A and B
marks are given for correct work only – differences in notation are of course permitted. A (accuracy) marks are not given for answers obtained from
incorrect working. When A or B marks are awarded for work at an intermediate stage of a solution, there may be various alternatives that are equally
acceptable. In such cases, what is acceptable will be detailed in the mark scheme. If this is not the case, please escalate the question to your Team Leader
who will decide on a course of action with the Principal Examiner.
Sometimes the answer to one part of a question is used in a later part of the same question. In this case, A marks will often be ‘follow through’. In such
cases you must ensure that you refer back to the answer of the previous part question even if this is not shown within the image zone. You may find it
easier to mark follow through questions candidate-by-candidate rather than question-by-question.
f Unless units are specifically requested, there is no penalty for wrong or missing units as long as the answer is numerically correct and expressed either in
SI or in the units of the question. (e.g. lengths will be assumed to be in metres unless in a particular question all the lengths are in km, when this would be
assumed to be the unspecified unit.) We are usually quite flexible about the accuracy to which the final answer is expressed; over-specification is usually
only penalised where the scheme explicitly says so.
• When a value is given in the paper only accept an answer correct to at least as many significant figures as the given value.
• When a value is not given in the paper accept any answer that agrees with the correct value to 2 s.f.
NB for Specification A the rubric specifies 3 s.f. as standard, so this statement reads “3 s.f”
Follow through should be used so that only one mark is lost for each distinct accuracy error.
g Rules for replaced work: if a candidate attempts a question more than once, and indicates which attempt he/she wishes to be marked, then examiners
should do as the candidate requests; if there are two or more attempts at a question which have not been crossed out, examiners should mark what
appears to be the last (complete) attempt and ignore the others. NB Follow these maths-specific instructions rather than those in the assessor handbook.
h For a genuine misreading (of numbers or symbols) which is such that the object and the difficulty of the question remain unaltered, mark according to the
scheme but following through from the candidate’s data. A penalty is then applied; 1 mark is generally appropriate, though this may differ for some units.
This is achieved by withholding one A mark in the question. Marks designated as cao may be awarded as long as there are no other errors. E marks are
lost unless, by chance, the given results are established by equivalent working. ‘Fresh starts’ will not affect an earlier decision about a misread. Note that a
miscopy of the candidate’s own working is not a misread but an accuracy error.
i If a calculator is used, some answers may be obtained with little or no working visible. Allow full marks for correct answers (provided, of course, that there
is nothing in the wording of the question specifying that analytical methods are required). Where an answer is wrong but there is some evidence of method,
allow appropriate method marks. Wrong answers with no supporting method score zero. If in doubt, consult your Team Leader.
j If in any case the scheme operates with considerable unfairness consult your Team Leader.
H630/02 Mark Scheme November 2021
exp(their
120−31
) Allow slip in rearrangement
16 M1
awrt X = 260 CAO
A1
A = 16.097… leads to 250, A0.
[3]
6 (a) 3p² + 0.5p² + 2p +1.5p + 1.5 p² + 0.5p = 1 Allow if only 3 probs added, or if =
M1
1 omitted.
5p² + 4p ‒ 1 = 0 Allow if one coeff or one sign
A1
wrong
p = 0.2 or ‒1 BC A1
p = 0.2 only A1
[4]
6 (b) Their p must be < 1.
Use of their p to calculate at least two probabilities B1
WWW NB 0.12, 0.42, 0.3, 0.16
Mode is 1 B1
[2]
7 (a) Ignore any comments about advantage
Remove Western Sahara since there is no data B1
removing outliers
available (#N/A)
H630/02 Mark Scheme November 2021
[2]
8 (b) �����⃗ 18 9 FT their 𝐴𝐴𝐴𝐴; allow mark for
𝐴𝐴𝐴𝐴 = � �=2×� �
−24 −12 M1 comparison of their AB and AC
so A, B and C are collinear A1
[2]
9 (a) advantage
The sample is not from the pre-release material
because Arun has data from capital cities. The pre- B1
release material only has data for countries
[1]
H630/02 Mark Scheme November 2021
[3]
10 (b) Stated Detailed reasoning required
PR is a diameter by angle in a semi-circle B1
allow one slip eg sign error
�
−3+9 7−9
, � M1
2 2
(3, ‒1) A1
H630/02 Mark Scheme November 2021
=
54
or 0.5567 correct to 2, 3 or 4 sf. A1
97
[2]
12 (a)
X = 2.1 B1
604−100×2.1²
oe M1
99
[3]
12 (b) n = 10 B1
p = 0.21 B1FT Ft from their 2.1
[2]
12 (c) binomPdf(n, p, 2) used M1 FT their n and their calculated p;
may be implied by 0.301…
H630/02 Mark Scheme November 2021
A1
(x ‒ 1)( x + 3)(x ‒ 2)
M1
Evaluation of f(their 1), f(their 2) and f(their‒3)
seen
35 35 A1
(1,7) (2, ) and (‒3, ‒ )
4 3
[9]
OCR (Oxford Cambridge and RSA Examinations)
The Triangle Building
Shaftesbury Road
Cambridge
CB2 8EA
www.ocr.org.uk
For staff training purposes and as part of our quality assurance programme your call may be
recorded or monitored