0% found this document useful (0 votes)
121 views16 pages

Joint Inspection RE

Inspection

Uploaded by

pawangadewad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views16 pages

Joint Inspection RE

Inspection

Uploaded by

pawangadewad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Annexure-I

Joint Check List of S&T to be submitted before EIG sanction, energization and
AC Loco trial

Sl. Description Compliance


No. (Yes/No)
1. Dynamic Clearance Certificate from DoT has been obtained.
2. All EMC Sockets have been tested, found working and jointly
signed Test Record (at SSE/JE level), is maintained for the same.
3. All relays added during electrification work are tested jointly with
S&T/Division for contact resistance before plugging in and jointly
signed Test Record (at SSE/JE level), is maintained for the same.
4. Data Logger validation for new relays and replaced relays, has
been done and jointly signed validation Record (at SSE/JE/ASTE
level) and is maintained for the same.
5. Joint certificate from Sr.DSTE and Sr.DEE/TRD that bonding
works at stations and other track circuited areas have been
completed.
6. Bifurcation of power supplies in IPS has been done and separate
DC-DC converters provided for Block/BPAC.
7. The following S&T Check Lists have been complied and jointly
signed by executing organization & S&T openline :
a. Broad S&T Railway Electrification Check List for 25 KV
prescribed by CORE (enclosed as Annexure-II).
b. OEM Pre-commissioning Check Lists for newly installed
equipment. e.g. UFSBI/SSBPAC(D) etc.
8. Statement of signalling works having been done in accordance
with Chapter XXII of IRSEM jointly signed by Sr.DSTE & Dy.CSTE.
9. Joint Signal Sighting Report and it’s compliance.
10. Statement for signal implantation w.r.t OHE masts and
dispensation certificate for infringing OHE masts.
11. 6-Quad cable has been attended and parameters have been
checked, recorded and found within the following permissible
limits:
a. Attenuation : < 30 dB
b. Insulation : > 10 M ohms
c. Cross talk : Better than 55 dB
12. Quad cable screen & armor have been made electrically
continuous at the intermediate terminations/joints by soldering and
connecting both ends of cable screens & armors at the joint
locations and terminations.
13. Proper earthing for quad cable at Station/LC and SP/SSP/TS
locations with earth resistance value less than 1 ohm, are provided
and connected properly.
14. Earthing for all Signaling and Telecom equipments at Station
building, Location boxes, Signals, LC Gates and TSS/SP/SSP
locations are provided and connected properly.
15. Separate earthing for each block instrument/block filters have
been provided.
16. Screening arrangements for signals, where necessary are done.
17. Concerned S&T Open Line staff have been counseled regarding
working in RE area and acknowledgement obtained.
18. Insulated tools have been handed over to concerned S&T Open
line staff.

Signature of S&T Head Signature of Sr.DSTE


of Executing/Co-Ordinating Railway Unit of concerned Division
Date : Date :
Annexure-II

CHECK LIST
FOR
25 KV ENERGISATION (RE)
25 KV ENERGISATION
Record 1: Details regarding provision of immunized repeating relays,
double cutting of circuits
(IR SEM Part-II Para 22.5.9 & 22.8.2)
Station: Division: Zone:
Section: Group No: Project:

Confirmation
regarding
Details of AC immunized relay
S.No Name of the Circuit provision of
provided (Make, Style, etc.)
double cutting
(write yes)

A. Work Executing Agency : RVNL/CORE/RITES etc


SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc
Name: Name:
Designation: Designation:

B. Railway Officials:
JE/SE in charge ADSTE/DSTE in charge
Name: Name:
Designation: Designation:
25 KV ENERGISATION
Record 2: Details regarding repeating relays for signal lighting circuits

(IR SEM Part-II Para 22.7.4)

Station: Division: Zone:

Section: Group No: Project:

Distance from the Repeating Relay provided


S.No Signal No.
controlling Relay ( in m) (Yes/NA)

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 3: Details regarding Point Machine Wiring
(IR SEM Part-II 22.8.2)
Station: Division: Zone:

Section: Group No: Project :

Detail of Point Confirmation about


Distance from the
motor AC provision of
S.No Point No. controlling Relay
immunized independent
( in m)
provided. detection

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc


Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 4 : Details of Track Circuits
(IR SEM Part-II 22.10.4.5 to 22.10.4.7)
Station: Division: Zone:
Section: Group No: Project:

Type of AC Provision of Provision of


immunised ‘B’ Type Continuity
Length Type of relay repeater relay Chokes at bonds and
Track
S.No of TC (QTA2/QBAT (QNNA1, Feed end & Cross bonds
Circuit
( in m) etc.) QSPA1 etc.) Relay end of S&T and
Electrical
both.

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 5 : Details of Provision of Earthing
(IR SEM Part-II Para 22.14.2.2 & 22.14.2.3)
Station: Division: Zone:
Section: Group No: Project:

Signalling gears such as Block Insts., Block filters,


Confirmation Earth
Signals, Block Panels, LC Boom, Winch, Lever Frame,
S.No of Earthing resistance
Relay Rack, CT Rack, Armour/Screen of Cables, IPS, A/C,
(write Yes) (in Ohms)
Datalogger, EI, DG Sets & Location boxes to be earthed

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 6 : Details of Provision of Signal Screening

Station: Division: Zone:


Section: Group No: Project:

Distance of Signals/Fittings Protective Iron Screen provided and


S.No Signal No.
from Live Wire in Mtrs connected to Earth (Write Yes/ NA)

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 6A : Details of Signal Implantation

Station: Division: Zone:


Section: Group No: Project:

Signal Front Signal Rear


S.No Signal No. Remarks
Clearance (in m) Clearance (in m)

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 7: Details of Provision of insulator for rodding and wire transmission,
(IR SEM Part-II Para 22.8.3)

Station: Division: Zone:


Section: Group No: Project:

Function operated by the Confirmation about Insulation as


S.No
rodding /wire transmission per SEM provided (Yes/No)

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 8: Miscellaneous Items (Signalling).

Station: Division: Zone:


Section: Group No: Project:

Confirmation of
Sl.
Item compliance
No
(Write complied)
1. Polarised Relay has not been used in any external and internal
circuits.
2. Separate batteries or DC-DC converters have been provided for
external and internal circuits.
3. Separate batteries have been provided for signalling and
Telecommunication circuits.
4. Block filters and Surge arresters have been earthed separately

5. Barring Block Instrument circuit no earth return circuit has been used.

6. Block filters of approved design have been provided

7. Separate batteries or DC-DC converters have been provided for each


Block Instrument.
8. Details of AT Supply
a) Provision of Auto changeover
b) Capacity
c) Load current
9. Any other item as per SEM or as per local procedure of Zonal
Railways.

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 9 : Miscellaneous Items (Telecommunication).

Station: Division: Zone:


Section: Group No: Project:

Confirmation of
Sl.
Item compliance
No
(Write complied)
1. TPC phones have been provided at station and SP/SSPs.

2. All telephone circuits (except cabin to cabin and cabin to ASM circuit,
which may be retained on signalling cable) have been shifted to
underground telecommunication cable.
3. All overhead telecom. alignment have been shifted on cable as per the
approved instructions.
4. REPC clearance has been obtained.

5. Screening of telecommunication cable has been terminated at the


sectionalizing points and repeater station has been earthed in
accordance with approved instructions.
6. Emergency control telephone posts and phones have been provided
at correct regular intervals along the track electrified area as per the
approved instruction.
7. The metallic cabinet cover/frames of telecommunication equipments
have been earthed properly.
8. Details of AT Supply
a) Provision of Auto changeover
b) Capacity
c) Load current
9. PA System modification has been done.

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 10 : Documentation.

Station: Division: Zone:


Section: Group No: Project:

Approval/Sanction
Sl.
Item of the documents
No
(write Yes/NA)
1. S.I.PLAN
2. SWRD.
3. INTERLOCKING TABLE/SELECTION TABLE
4. PANEL DIAGRAM
5. CRS SANCTION/CSTE SANCTION
6. DISPENSATION:-
7. As per GR.Para.3.04(1) Placing of Signal RHS.

8. As per GR.Para.3.04(1) (b) Taking of Home Signal.

9. As per GR.Para.3.07(7) Combining of Signals

10. SIGNAL STRUCTURE INFRINGMENT

11. SAFETY CERTIFICATE

12. SAFETY MESSAGE

13. ASSURANCE CERTIFICATE

14. SIGHTING COMMITTEE REPORT

15. Any other documents (Pl specify)

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation
25 KV ENERGISATION
Record 11 : Details of Infringement of S & T structures erected along the track

Station: Division: Zone:


Section: Group No: Project:

Details of S & T LHS or RHS of Track or Clearance from the nearest


S.No
Structure Between Tracks Track (in m)

A. Work Executing Agency : RVNL/CORE/RITES etc

SE/Sr.Exe/RVNL/CORE/RITES etc Asst. Mgr./Sr.Mgr/RVNL/CORE/RITES etc

Name: Name:
Designation: Designation:

B. Railway Officials:

JE/SE in charge ADSTE/DSTE in charge


Name: Name:
Designation: Designation