CLM Sample
CLM Sample
Prepared by:
LEARNING CONCEPTS
STEM KNOWLEDGE (Disciplinal) Estimated
Learning Assessment
Environmental GMRC GAD 21st Century Learning activities number of
Outcomes Criteria Technology / Communicati
Science Math Issues and other hours
Engineering on
concerns
1. Perform light 1.1 Vehicle Fatigue Parts of Mensur Safety Gender - Mensuratio Read information Perform Task/Job sheet 4 hours
vehicle pre- inspection is management light ation Harness/Devic neutrality n sheet in: in:
starting and performed as per techniques vehicles es & Tools
Critical Perform vehicle
warm-up manufacturer’s
and its Parts of Light Inspection
specification thinking
functions vehicles and its
function Pre-start and warm-up
1.2 Safety
harness/devices light vehicle
LTO/LTFRB
and tools are
Requirements
checked according
to LTO/LTFRB Types of Light
requirements Vehicles
1.3 Warm up of light Safety
vehicle is performed Harness/Devices &
as per Tools
manufacturer’s
manual Fatigue management
techniques
2.5 Driving is
performed
according to the
restriction and
condition stated in
the official receipt
license and within
the occupational
health and safety
standards (OHS).