ST CIE1 Set2
ST CIE1 Set2
Levels of
:
B.T
TIME Software Testing Duration : 1 ½ hours
SLOT :
PART – A Answer All Questions (6 x 2 = 12 Marks)
3. A developer must upgrade the delivered software system as the customer is not satisfied with HOTS 1 3
certain features. Identify the suitable testing type for the given scenario and write in brief.
4. Assume that you are a developer and find there are certain missing requirements in the HOTS 1 6
implementation phase. What are the consequences of this situation? How would you deal with
it?
7. Write a short note on i) Static testing and ii) Dynamic testing LOTS 1 1
8. Describe the risks corresponding to the testing type and list the mitigation to overcome those LOTS 2 2
risks.
9. (a) (i) Sketch the state transition diagram for the following scenario. 7 HOTS 1 6
A book in the library has undergone into a few states such as idle, borrow,
renewal, and return. The transition of a book takes place from one state to
another to capture the entire test condition of the given scenario.
(ii) A wholescale retailer plans to expand his business by purchasing raw 7 HOTS 1 4
materials for generating the product. He sends the list of items details such as
product id, product name, quantity, cost per item. Write optimal number of
test cases by maximizing coverage of the code structure then perform test
execution to identify the bugs.
(OR)
(b) (i) You are about to register in job portal website for seeking a job. The website 7 HOTS 1 4
holds various form elements such as name, age, gender, languages known,
contact number, email etc. Write optimal number of test cases by
maximizing coverage of the code structure then perform test execution to
identify the bugs.
(ii) In a college, the performance of students is assessed based on their obtained 7 HOTS 1 4
10. (a) (i) Discuss the phases of Software Development Life Cycle. Also suggests 7 LOTS 1 1
suitable testing types for each phase to meet the project constraints.
(ii) As a student coordinator, you must acquire the skillsets to organize the event 7 HOTS 2 4
in your college. For that, you are supposed to prepare the effort estimation to
optimally utilization of available resources in terms of manpower, time, and
cost
(OR)
(b) (i) Explain the seven principles of software testing with suitable examples. 7 LOTS 1 1
(ii) The software company plans to introduce a new version of testing tool. As a 7 HOTS 2 2
tester, you suggest the steps involved in execution of the test plan to
configure the new version of software tool.
***************************
Percentag
e
50 50 10