ST CIE1 Set1
ST CIE1 Set1
Levels
B.T
CO
PO
of
TIME SLOT : Software Testing Duration : 1 ½ hours
PART – A Answer All Questions (6 x 2 = 12 Marks)
1. What are software testing tools? LOTS 1 2
2. Write the difference between quality assurance and quality control. LOTS 1 1
3. As a developer, HOTS 3
Case i) You are checking the functionalities and overall flow of the Software Under Test (SUT).
Case2 ii) Checking the fields with valid and invalid inputs and getting corresponding outputs in
a form of SUT.
State whether these two cases belong to validation or verification.
4. Classify the person as child, adult and old based on age factor. Identify valid and invalid classes HOTS 1 3
using equivalence partitioning technique.
5. What is configuration management? LOTS 2 1
6. Why is test plan important? LOTS 2 6