0% found this document useful (0 votes)
18 views3 pages

Project Execution Procedure

Uploaded by

yunusbasha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views3 pages

Project Execution Procedure

Uploaded by

yunusbasha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT EXECUTION PROCEDURE

Plate 8.1: Overall view of the kits

Step 1 : Establishing connection between GSM modem and mobile network.

Plate 8.2: connecting to the wi-fi


Step – 2: Making connection using Mobile Telnet app.

Plate 8.3: screen of telnet app

Step – 3: Register the mobile number over GSM.

Plate 8.4: Mobile number registration


Step – 4: Water level sensor will inspect and gives update of the levels.

Plate 8.5: Level empty

Plate 8.6: Level – 1

Plate 8.7: level full

You might also like