0% found this document useful (0 votes)
101 views4 pages

CRDA Approvel

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views4 pages

CRDA Approvel

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

/

Amaravati Metropolit an Region Developm ent Authority


DEVELOPME NT CONTROL DEPARTMEN T
I BUILDING PERMIT ORDER I
To,
Sri/Smt. Permit No. 1168/0341/B/GNVRM/VPV/2021
NAWULA VENKATESWARA RAO S/0 BHASKARA RAO DATE 09 April, 2021
3-86, MUSTABADA PANCHAYATI, MUSTABADA, KRISHNA
Sir/ Madam,
Sub : Building Permission - Construction of 'Individual Residential Building' - Approval - Granted - Reg"
Ref: Your Application Dated: 25 March, 2021 u/s Andhra Pradesh Metropolitan Region & Urban Development Authorities
Act 2016 and A.P. Building
rules 2017.

Your application submitted In the reference has been examined with reference to the rules and regulations In force
and permission Is hereby sanctioned
conditionally as detailed below:

A APPUCANT AND UCENSED PERSONNEL DETAILS:


1 Applicant NAWULA VENKATESWARA RAO 5/0 BHASKARA RAO
2 Developer / Builder NA Lie.No. NA
3 Licensed Technical Person SHAIK UMAR ( Surveyor 1) Lie.No. 12021(56)13/17
4 Structural Engineer NA Lie.No. NA
5 Others NA
B SITE DETAILS
1 RS/TS No. 426(P)
2 Premises No. 3-86
3 Ward MUSTABADA
4 Block No. NA
5 Mandal GANNAVARAM
6 VIiiage VEDURUPAVULURU
7 Gram Panchayat
C DETAILS OF PERMISSION SANCTIONED
Bulldlng - N (V) (Height (m): 9.6)
1 Floors Ground floor Upper floors Parking floors
2 Use Area (m2) No. Area (m2) Level No. Area (m2)
a Residential 91.15 2 182.30 Cellar 0 0.00
b Commercial 0.00 0 0.00 Stilt
C Others
0 o.oo
0.00 0 0.00 U.Floors 0 0.00
d Total No. of floors Upper floor(s)

3 Set backs (m) Front Rear Side I I Side II


1.50 1.00 1.00
4 Site Area (m2) 1.00
202.23
5 Road affected area (m2) 0
6 Net Site Area(m2) 140.58
7 Tot-lot/ Organized open space (m2) NA
8 Height (m) 9.60
9 No. of RWHPs 1
10 others NA
D DETAILS OF FEES PAID (RS.) TOTAL:
1 Application Fee
3,000.00 2 Building Permit Fees
3 Development Charges (Built Up Area) 836.00
4,110.00 4 Development Charges (Vacant Land)
5 Drainage Charges
9,000.00 6
soo.oo
14% Open Space Charges
7 Labour Cess Component 1 66,106.00
65,746.00 8 Labour Cess Component 2
9 Application User charges 671.00
500.00

TOTAL: 150,489.00
E OTHER DETAILS :
1 Contractor's all Risk Policy No. NA
Date Valld Upto
2 Notarlsed Affidavit No. /
Mortgage Deed No. NA Date
3
Area (m2) o.oo
Enter Sr. No. In prohibitory Property Watch Re
4 ister NA
Floor handed over NA Date
F S.R.O. NA
Construction to be Commenced Before
G 09 October, 2022
Construction to be Completed Before
09 Aprll, 2024
The lulldlng perml■slon Is unctloned subject to following condition•: .
1. The permission accorded does not confer any ownership rights. The permission will be revoked at later stage, If It Is found that the documents or Information are
false and fabricated•
2, If construction Is not commenced within one year, building application shall be submitted afresh du IY pay Ing requ Ire d b uildl ng permIt f ees.
3, sanctioned Plan shall be followed strictly while making the construction & shall be displayed at the site.
4. commencement Notice shall be submitted by the applicant before commencement of the building,
s. completion Notice shall be submitted after completion of the building.
6. Occupancy Certificate Is compulsory before occupying any building, .
7. Public Amenities such as Water Supply, Electricity Connections will be provided only on production of occupancy certificate.
a. Prior Approval should be obtained separately for any modification In the construction. .
9. Tree Plantation shall be done along the periphery and also in front of the premises at l tree/ 8Dsq.mts s,!e area.
10. Tot-lot shell be fenced and shall be malnteined as greenery at owners cost before Issue of occupancy certificate,
11. Space for Transformer shall be provided in the site keeping the safety of the residents In view.
12. Gerbage House shell be mede within the premises.
13. Cellar and stilts approved for parking In the plan should be used exclusively for parking of vehicles without partition walls & ro Ir1ng sh u tters an d th e same should
not be converted or misused for any other purpose. th rl
14. This sanction Is accorded on surrendering of Road affected portion of the site to Amaravatl Metropolitan Region Development Au o ty at f ree Of cos t withou t
claiming any compensation at any time as per the undertaking submitted.
15, Stocking of Building Materials on footpath and road margin causing obstruction to free movement of public & vehicles shall not be done, failing which permission
Is liable to be suspended.
16. This permission Is given based on the Inputs on pages, documents and drawing provided by Applicant, Applicant confirms that the documen ts/ d raw 1ngs
submitted electronically or Inputs by them are correct. The final approvals of proceedings are subjected to verification of reports and documents by concerned
official lnduding site visit report. Any deviation Identified will lead to modification/rejection of the proceedings.
17. The Developer/ Builder/ Owner to provide service road wherever required with specified standards at their own cost.
18, A safe distance from Electrical lines shall be followed as per rules
19. If greenery Is not maintained 10% additional property tax shall be Imposed as penalty every year till the condition Is fulfilled.
20. If condition of providing solar roof top system Is not complied 10% additional property tax shall be Imposed as penalty every year tlll the condition Is fulfilled.
21. If RWHS are not constructed 10% additional property tax shall be Imposed as penalty every year till the condition is fulfilled.
22. All Public and Semi Public buildings shall provide facilities to physically handicapped persons.
23. The mortgaged built up area shall be allowed for registration only after an Occupancy Certificate is produced.
24. The Registration authority shall register only the permitted built up area as per sanctioned plan.
25. The Financial Agencies and Institutions shall extend loans facilities only to the permitted built up area.
26. The Services like Sanitation, Plumbing, Fire Safety requirements, lifts, electrical lnstelletlons etc,, shall be executed under the supervision of Qualified Technical
Personnel.
27. Architect / Structure! Engineer If chenged, the consent of the previous Architect/ Structure! Engineer Is required and to be intlmeted to the Commissioner.
28, Construetion shall be covered under the contractors all risk Insurance till the issue of occupancy certificate (wherever applicable).
29. As per the undertaking executed In terms of A, P, Building Rules-2017,
11. The construction shall be done by the owner/Builder, only In accordance with sanctioned Plan under the strict supervision of the Architect, Structural Engineer
and site engineer felling which the violations are lleble for demolition besides legal action.
b, The owner, builder, Architect, Structural engineer and site engineer are Jointly & severely responsible to carry out and complete the constructton strictly In
accordance with sanctioned plan.
c. The Owner, Builder, Architect, Structural engineer and Site engineer are jointly and severely are held responsible for the structural stability during the building
construction and should strictly adhere to all the conditions.
d. The Owner Builder should not deliver the possession of any part of built up area of the building, by way of Sale / Lease unless and until Occupancy Certlflcate Is
obtained from Amaravatl Metropolitan Region Development Authority a~er providing all the regular service connections to each portion of the building and duly
submitting the following, -
(I) Building Completion Notice Issued by the LTP duly certifying that the building Is completed as per the sanctioned plan.
(II) Structural Stability Certificate Issued by the Structural Engineer duly certifying that the building Is structurally safe and the construction 1s In accordance
with the specified designs,
(Ill) An extract of the site registers containing Inspection reports of Site Engineer, Structural Engineer and Architect.
(iv) Insurance Policy for the completed building for a minimum period of three years.
30, Structural Safety and Fire Safety Requirements shall be the responslblllty of the Owner, Builder, Developer, Architect and st. Engineer to provide all necessary
Fire Fighting Installations as stipulated In National Building Code of India, 2005 like;
a, To provide one entry and one exit to the premises with a minimum width of 4,5 mts. and height clearance of S mt&.
b. Provide Fire resistant swing door for the collapsible lifts In all floors.
c. Provide Generator, as alternate source of electric supply,
d. Emergency Lighting in the Corridor/ Common passages and stair case.
e, Two numbers water type fire extinguishers for every 600 Sq.mts, of floor area with minimum of four numbers fire extinguishers per floor end Sk DCP
extingulsherS minimum 2 Nos. each at Generator and Transformer area shall be provided as per I,5.I, spec1flcat1on N0,2190-1992,
r, Manually operated and alarm system In the entire buildings;
g, Separate Under9round static water storage tank capacity of 25, ODO fits. Capacity,
h. Separete Terrace Tank of 25,000llt! capacity for Rcsldentlal buildings.
I. Hose Reel, Down Comer,
J. Automatic Sprinkler system Is to be provided If the basement area exceed 200 Sq.mts.
k, Electrical Wiring and lnstallatlon shall be certified by the electrical engineers to ensure electrical flre safety, Transformers shall be protected with 4 hours ratl-
nro ra1l1t constructions. ...
I, To create a Joint open spaces with the neighbors building / premises for maneuverability of flre vehlclea, No parking or any conatruct10n1 shall be rnlda In
setbacks area.
31. In case of Group Development Schemes (Other than Industrial) the roads & open spaces shall be handed over at free of cost to ULB through
registered gllt deed before occupancy. .
32, As per the green building provision for sanction of bulldlngs In terms of A,P, Revised Bulldlng Rules-2017,
■, Wator con11rv1tion end m11n1g1m1nt:
(I) Rain Water Harveatlng Structure (percolation pit) shall be provided In case of site area 200 1q, mtr. and above.
(II) Low Wetor Consumption Plumbing Flxturo11h1II bo provided In ca11 of site 1re1 500 sq, mtr. end above.
(Ill) Waste water recycle and reuse (S,T,P.) shall be provided In case of site area 1000 sq. mtr, and above, Treated water to be recyded for gardening end
flushing.
(Iv) Reduction of Hardscape shall be provided In case of site area SOD sq. mtr. and above.
b. Solar Energy Utilisation:
(I) Installation of Solar Photovoltaic Panels shall be provided In case of site area 1000 sq. mtr, and above.
(II) Installation of Solar Assisted water Heating Systems shall be provided In case of site area 1000 sq, mtr. incl above.
c. Energy Efficiency:
(I) LED lights~ solar lights for lighting common areas shall be provided In case of site 1re1 1000 sq, mtr, 1nd above.
[::/)~~lees~ 1 ~ of connecting load to be met by Pl/ Cells (Optton1I) In case of site 1rea 20000 sq, mtr. and above,
) "Cv- acs bricks for construction (OptIon1I) In c11a of 1ltt 1m 20000 1q, mtr, and 1bov1,
(1V '- 8 to b; !ldopt~d
In CHO of alto ll'OI §0000 ■q, mtr. ind 1bovo.
d • WHte M11n11g@ment:
((Ill Segregation of Waste shall be provided In case of site,,... 300 sq, mtr. end above,
11 Organic
Waste Management shall be provided In case of Site area 3000 sq. mtr. and above,
e. Natural Drain system should be maintained
33
· The bdull der/Owner shall provide moblle/temp~rary toilet fadltty for workers (male & female separately) In construction &rte where 25 or more workers are..........,.
per 11 Y In the construction site, -..-.-
By order
Commissioner

This Is system generated report and does not require any signature. For further confirmation anyone can access the department website www.1pdpms,1p.gov,ln
with flle number.
snr- ' 2112.34SQH
11;,-!IIETIIAC I-,_ , l0.2&SQH
'Nl,ADltD3tTUO tARtA:ll.l!ISQM
'ISl!ilJIHllfA i..0.69SQH

~=,=·::::::::
~f!LOORARE A: 91,USQM
TtPlll!J1mNlHAIU:A : Z7J.-65QM
aJOaOIS"'-'"fA : 49.54SQH

~Plan-1

SITEPIA~
5CAl.f .- l : JIXI

You might also like