0% found this document useful (0 votes)
14 views1 page

System Integration Testing Check List

Uploaded by

karmav724
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

System Integration Testing Check List

Uploaded by

karmav724
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Unit

Integration
Functional
System

Acceptance
Types of Testing
Usability

Performance
Non-Functional
Security

Reliability

Risk-Based

Exploratory

Define Scope of Testing Automation


Test Strategies
Regression

Integration

System

Requirements Analysis

Test Design

Execution
Quality Assurance
Validation

Verification

Documentation

Estimate the total time required to complete the


project

Break the project into smaller tasks


Estimate Time
Estimate the time to complete each task

Calculate the total time needed

Identify the resources and personnel needed

Estimate time and resources Estimate Time and Resources Estimate Resources Determine the availability of the resources

Estimate the cost of the resources

Set realistic deadlines

Allocate time for unexpected delays


Suggestions
Track progress and adjust estimates accordingly

Take into account capacity constraints

**Planning phase**
Verifying the functionality of the user interface

User Interface Testing Testing user input validation

Testing the system's response to valid and invalid


input
System Testing

Evaluating the user experience

Usability Testing Checking the user's ability to interact with the


system
Functional Testing
Testing the system's performance

Testing the functionality of individual components

Unit Testing Verifying the correctness of the code

Testing the functionality of each module or class

Identify Test Scenarios


Verifying user authentication

Security Testing Testing data protection

Checking the system's access levels

Testing the system's speed

Non-Functional Testing Performance Testing Verifying the system's scalability

Checking the system's stability

Testing the system with different hardware

Verifying the system's compatibility with different


Compatibility Testing
software

Checking the system's compatibility with different


browsers

Define entry criteria as the conditions that must be


met before a project phase or task can be started.

Define exit criteria as the conditions that must be


Define entry and exit criteria met before a project phase or task can be considered
complete.

Make sure that entry and exit criteria are measurable


and achievable, with clear responsibilities and
timelines.

Create integration test cases using a combination of


unit tests and end-to-end test cases

Leverage automation testing tools such as Selenium


Identify and execute integration tests and Cucumber to create and execute integration
tests

Monitor the integration test environment closely for


any unexpected changes or issues, and take
appropriate action as needed

Functional requirement: clear GUI, secure


authentication, detailed verification process
Verify functional and non-functional requirements
Non-Functional requirement: fast response time,
compatibility with multiple browsers, scalability for
larger user base

Automate test data recording Use test automation tools Implement scripts to capture test data Monitor test results from the automation tool
Record
Manually document tests Take screenshots of test results Document test steps taken Take notes of any relevant observations

Record and Analyze Test Results Check if any test steps did not produce the expected
Analyze Compare test results against expected results Check for any discrepancies in test results Identify any test failures
output

Suggestions Implement automated testing Use data analysis tools Analyze test results to identify trends Make recommendations based on the data analysis

Run unit tests

Run integration tests

Identify performance issues


Suggestions for Identifying Software Defects Make sure to thoroughly test the software
Check for compliance with coding standards

**Testing phase** Inspect software design

Analyze test results

Document the exact steps taken to reproduce the


issue

Note the exact environment in which the issue


occurred
Identify and Document Software Defects Suggestions for Documenting Software Defects Document the issue in detail
Note the exact version of the software the issue
occurred in

Attach screenshots, logs, or any other applicable files


to help explain the issue

Assign the issue to the appropriate development


team

Establish a timeline for resolving the issue

Suggestions for Resolving Software Defects Prioritize the issue based on severity Track the progress of the defect resolution

Test the defect after it is resolved

Document the resolution of the defect

Monitor system performance using a system-level


monitoring tool

Analyze the application logs for any errors or warning


Validate system performance
messages

Run regular stress tests to ensure the system can


handle peak load scenarios

Identify test case and scenario objectives

Requirements Determine test case and scenario coverage

Develop a plan to update test cases and scenarios

Review existing test cases and scenarios

Identify areas that need to be updated


Tactics
Update test cases and scenarios Update Test Cases and Scenarios
Develop a plan for updating test cases and scenarios

Execute the plan

Test case management and automation tools

Issue tracking tools


Tools
Automation frameworks

Version control systems

Loss of confidential data

Identify potential risks System downtime


**Evaluation phase**
Unauthorized access to sensitive information

Define the types of documents that need to be


Clarify the purpose and scope of the system Outline specific procedures and processes Include details on how to use the system
created

Determine who is responsible for document


Ensure Proper System Documentation Suggestions Create a centralized repository for all documents Establish a version-control system Develop a review process for documents
management

Identify the necessary information for each Establish a timeline for document creation and
Use a standard template for all documents Set standards for document quality and format
document updates

Send out surveys to stakeholders to gain feedback


on a specific project

Set up an online portal for stakeholders to leave


Collect feedback from stakeholders
comments and suggestions

Host focus groups and workshops with stakeholders


to gather feedback

Monitor system resources such as CPU utilization,


memory usage, disk I/O, and network bandwidth

Monitor system processes, such as running


Monitor system performance applications, jobs, services, and other system-level
tasks

Monitor application performance, such as response


time, uptime, and availability

Ensure that test environment has the latest software


version installed

Monitor system performance and stability of test


Update and maintain test environment
environment

Create automated scripts to facilitate environment


updates and maintenance

Develop a plan to tackle the root cause of the


unresolved issues

Create a timeline and assign tasks to relevant


Address unresolved issues
stakeholders

Conduct regular follow-up sessions to monitor the


progress of the issues resolution

User interface testing

Manual testing Usability testing


**Maintenance phase**
Functional testing
Test system functionality
Unit testing

Automated testing Integration testing

Regression testing

Monitor system logs


Verify system functionality Verify System Functionality

Monitor system performance Review system metrics

Monitor user feedback

Identify system failures

Troubleshoot system issues Analyze system errors

Resolve system problems

Developing test cases based on the requirements of


the product

Executing regression tests on different versions of


Perform regression testing
the product

Comparing the results of the regression test with the


expected results and reporting any discrepancies

Record the test results in a structured format

Document test results Analyze the test results and create a report
system integration testing check
Create a test log to monitor improvements and
list changes over time

Gather key performance indicators (KPIs)

Collect data with automated tools


Collect data
Monitor virtual machines

Use analytics tools to analyze data

Perform a root-cause analysis

Generate System Performance Reports Suggestions Analyze data Identify performance bottlenecks

Create reports with data visualization

**Reporting phase**
Optimize memory usage

Optimize network performance


Implement solutions
Troubleshoot hardware issues

Configure system settings

Ensure that test plans are up-to-date and accurately


reflect requirements

Identify and document software defects Review source code for potential defects

Monitor software behavior for unexpected or


unintended results

Create a document outlining the scope of the release

Prepare system release documents Identify system dependencies and anticipated risks

Develop a timeline for the release cycle

Regularly evaluate system performance to identify


weaknesses and areas of improvement

Track customer feedback to gain insight into user


Review system performance
experience

Analyze user data to identify trends and patterns in


system usage and performance

Close open defects

Improved system performance

Improved customer service

Easier troubleshooting

Benefits of Proper System Documentation Improved system reliability

Lower maintenance costs

Improved staff productivity

Enhanced security

System architecture

User manuals

Process flow diagrams

Technical manuals
**Closure phase**
Documentation Types
Ensure Proper System Documentation
System configurations

Security policies

Release notes

Network diagrams

Have a clear purpose and scope

Identify the target audience

Use plain language

Include screenshots and diagrams


Tips for Creating System Documentation
Regularly update documentation

Use templates and checklists

Establish a review and approval process

Provide feedback and revisions

Automate archival of test results

Archive test results Use cloud storage to store test results

Develop a system to track and access archived test


results

Hardware Requirements

Cost of Implementation: Software Licensing

Labor Costs

Level of Access

Factors to Consider: User Requirements: System Security

Reporting Features

User Training

Training Requirements: Documentation

Support
Brainstorming Diagram for Assess System
Assess system implementation
Implementation
Compare Offers
Research Potential Vendors:
Consider Reviews

Define Goals

Develop an Implementation Plan: Identify Resources

Establish Timeline
Suggestions:

Identify Issues
Test System During Implementation:
Make Necessary Adjustments

Automated Testing

Utilize Quality Assurance Practices: Error Logging

Performance Benchmarking

Monitor system resource utilization

Monitor system performance Analyze system log files

Set up automated alerting for system performance


metrics
**Post implementation phase**
Creating a survey to collect customer feedback

Track customer feedback Establishing a customer feedback system

Setting up a customer feedback forum

Identify user needs through surveys and interviews

Analyze user feedback and comments


Identifying user needs
Analyze user activity logs

Analyze user behaviour and preferences

Analyze system design and architecture

Evaluate system performance


Evaluating existing systems
Identify potential areas of improvement

Test system scalability and reliability

Design system architecture

Develop system prototypes


Analyze system usage Analyzing system usage Designing solutions
Develop system features and functions

Analyze user feedback and comments

Develop system architecture

Design and develop system components


Implementing solutions
Test system functionality

Deploy system updates

Monitor system performance

Identify and troubleshoot system issues


Maintaining systems
Update system components

Analyze user feedback and comments

Retirement planning

Retire system components Pension plans

Tax planning

User Manuals

Technical Documentation
Types of Documentation
Installation Guides

Troubleshooting Guides

System Overview

Features & Functionality

System Requirements
Content for Documentation
Archive system documentation Archive System Documentation Brainstorm
Setup & Configuration Instructions

Security Policies & Procedures

System Maintenance

User Portal

Online Help
**Retirement phase**
Delivery Methods Printable Manuals

Video Tutorials

Knowledge Base

Document existing system architecture

Perform system decommissioning activities Create a system decommissioning checklist

Archive all existing data and backup systems

Version Control Systems

Configuration Management Tools

Release Tools: Continuous Integration Tools

Build Automation Tools

Static Analysis Tools

Release Management

Change Management

Release associated resources Release Associated Resources Brainstorming Release Processes: Release Planning

Release Scheduling

Release Testing

Release Notes

Release Checklists

Release Documentation: Release Plans

Release Reports

Release Audits