0% found this document useful (0 votes)
43 views1 page

2330859-7 - 415664 - SG - AgC v5 - Process Flow Chart

PRFC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

2330859-7 - 415664 - SG - AgC v5 - Process Flow Chart

PRFC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROCESS FLOW CHART

Product Program AgC Process Issue Date 25.03.20


Supplier Name / Code Steiger Galvanotechnique / 0000415664 Revision Date 10.11.21
Supplier Location Route de Pra de Plan 18CH – 1618 Châtel-St-Denis Part Name Socket Contact DIA. 9.0 BUS BAR VERSION
Project Phase Prototype Pre-Launch Production Part Number 2331058-7_2342907-7_2330859-7
Core Team Maurizio Bosetto, Daniel Lamidieu, Benoit Pinot, Samuel Estoppey, Jean-Claude Puippe Change Level C8
Key Contact / Phone number Maurizio Bosetto / +41 021 948 24 24 Batch Size 150 pcs PFC 13.008
Operation Transportation Inspection Delay Storage SPEC. TEC-112-32041-2

Process Operation or Event


Process Name Process Number Description of Operation or Event Operation Time
Number

Bath Solution Analysis


1000 Preparation / 1000
Inspection N /A
200.1 Receipt of Parts/Inspect for Shipping Damage
200.2 Move to Parts Breakdown/Order Entry Area
200 Incoming 200.3 Verify Customer PO, Generate Production Documents (Work Order, Lot Traveler), Quantity 40 min
200.4 Move Parts to Production Line
200.5 100% Incomming Visual Inspection
400.1 Assembling parts in the rack (n° G130.003.09)
400.2 Electro cleaner (Position n° 01)
400.3 Rinsing (Position n° 02 and n° 03)
400.4 Activation (Position n° 05)
400.5 Rinsing (Position n° 23)
401.1 Pre-copper plaiting (Position n° 08)
401.2 Copper plaiting (Position n° 09)
401.3 Recovery Bath (Position n° 10)
401.4 Rinsing (Position n° 11 and n° 12)
402.1 Pre-silver plaiting (Position n° 15)
402.2 Silver Plating (Position n° 16)
1h 35 min
402.3 Recovery Bath (Position n° 18)
402.4 Rinsing (Position n° 19 and n° 20)
402.5 Dry sample parts
400 Plating
403.1 Bring Sample to Lab
403.2 Layer Thickness control Ag (X-Ray n°0 131)
403.3 Return samples to the production line
404.1 Silver Graphite Plating (Position n° 27)
404.2 Recovery Bath (Position n° 26)
404.3 Rinsing (Position n° 25 and n°24)
404.4 Shower Rinsing (Position n° 23)
404.5 Dry Parts
405.1 Disassembly of parts from the rack
15 min
405.2 100 % Visual Inspection
406.1 Bring Samples to Lab
406.2 Layer Thickness control AgC (X-Ray n° 0131)
406.3 Bending / Scotch Test
406.4 Sample storage 60 min
900.1 Verify Production Documents (Work Order, Measurement Protocol), Quantity, and delivery note.
900.2 Move to Packaging Station
35 min
900 Expedition 900.3 Pack Parts
900.4 Verify and Inspect Packing/Shipping
901.1 Ship Parts 2 days

Document Description
Date
Revision
1 25.03.20 Start of Process Flow Chart
2 05.05.20 Inclusion of the Current Contact cleaning, daily check-list doc n°FO 18.147
3 17.08.21 Change level modified to C7

4 29.09.21 Inclusion of results after corrective and preventive actions according to complaint NCC_21_038 (Scratches on critical zones due to rack fixation) and update of CAPA 6303 results for capability improvement.

5 10.11.21 Drawing updated to version C8, inclusion of technical specification TEC-112-32041-2