PPL224004-CQ-EL-0018_Site Construction Query for SSTAG PLATE

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

COMPLETION OF

KM250 ME&I WORKS

Site Construction Query for USE OF SS TAG FOR EQUIPMENTS

GEN-HAV-PPL-CQ-0018

A 06.01.2025 ISSUED FOR APPROVAL BK TB


REV. DATE REVISION STATUS PREPARED BY CHECKED BY APPROVED BY
SITE CONSTRUCTION QUERY FORM

Document Code: HAV-PPL-DC-FRM-0813 Issue Date:11.11.2024 Rev. No: B Rev. Date: 26.12.2024 Page No: 1/ 2

Construction Query No: GEN-HAV-PPCL-CQ-E-0018

Subject Title: DISCIPLINE: SUBSYSTEM RESPONSE


ELECTRICAL NUMBER: REQUIRED DATE:
SS TAG USE FOR EQUIPMENTS 076-012 07.01.2025

CORRESPONDENCE TO:

CONSTRUCTION QUERY DETAIL


REFERENCE DOCUMENTATION AND REVISION (IF APPLICABLE)

SITE SURVEY ATTACHED:☐ SKETCH/MARKUP ATTACHED:☐ OTHER DOCUMENTATION ATTACHED:☐

QUERY DETAILS:

During the installations in the MSS building, for equipment located on the ceiling or at elevated levels, the
traffolyte label material is currently unavailable. In order to proceed with the installation and ensure
labeling compliance, we propose using stainless steel (SS) tags as a solution starting from MSS and all
other buildings.
Impact on the Project:
• The unavailability of traffolyte labels may delay labeling activities for ceiling-mounted or high-level
equipment.
• Using SS tags will allow us to maintain progress without compromising the labeling requirement.
Below attached also you can see the e-mail about this subject.

We kindly request your approval or further instructions on this matter to proceed efficiently with the
ongoing installations.
SITE CONSTRUCTION QUERY FORM

Document Code: HAV-PPL-DC-FRM-0813 Issue Date:11.11.2024 Rev. No: B Rev. Date: 26.12.2024 Page No: 2/ 2

ORIGINATOR’S RECOMMENDATION:

Approve the use of stainless steel (SS) tags as an alternative to traffolyte labels for ceiling-mounted and
high-level equipment.

OR
SIGNATURE: DATE:
IGINATOR NAME / TITLE:
BEDRETTİN KOLAY/
06.01.2025
E&I QA-QC Superintendent

APPROVER (CONTRACTOR DISCIPLINE CM) SIGNATURE: DATE:


NAME / TITLE:

CONSTRUCTION QUERY RESPONSE


REFERENCE DOCUMENTATION AND REVISION (IF APPLICABLE):

RESPONSE DETAILS:
SITE CONSTRUCTION QUERY FORM

Document Code: HAV-PPL-DC-FRM-0813 Issue Date:11.11.2024 Rev. No: B Rev. Date: 26.12.2024 Page No: 3/ 2

IMPACT ASSESSMENT
DESIGN CHANGE

COST IMPACT

SCHEDULE IMPACT

TAG NUMBER IMPACT

RESPONSE

PROCEED WITH CHANGE PROCEED / RLMU HOLD / TQ


HOLD / DESIGN CHANGE
DRAWING REQUIRED (CR/DR) REQUIRED

RESPONDER (DISCIPLINE FIELD ENG) NAME / TITLE: SIGNATURE: DATE:

REVIEWED BY (FIELD ENG.MANAGER) NAME / TITLE: SIGNATURE: DATE:

APPROVED BY (AREA CONSTRUCTION MANAGER) NAME / TITLE SIGNATURE: DATE: