0% found this document useful (0 votes)
21 views6 pages

Adp Synopsis

i need case study in details
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views6 pages

Adp Synopsis

i need case study in details
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

ARCHITECTURAL DESIGN PROJECT

SINHGAD COLLEGE OF ARCHITECTURE


NAME- SANSKRUTI GARAD
R.NO - 02
TRANSIT HUB / BUS TERMINAL (NASHIK)
-INTRODUCTION-

Bu s t e rm in u s is a p u b lic s p ac e an d it is th e p oin t at th e s tar t /e n d of a b u s rou t e , wh e re t h e ve h ic le


s t op s , re ve rs e an d wait, b e f ore d e p ar tin g on re tu rn jou rn e y. T h e Te rm in u s is t h e d e s ig n at e d p lac e
t h at a t im e t ab le is time d f rom. Te rmin i c an b e loc ate d at b u s s tation s , in t e rc h an g e s , b u s g arag e s or
b u s s t op s . Te rmin i c an b oth s tar t an d e n d at th e s ame p lac e , or may b e in d if f e re n t loc at ion s f or
s t ar t in g an d f in is h in g a rou te . Te rmin i may or may n ot c oin c id e with t h e u s e of b u s s t an d Bu s
t e rm in u s is t h e h u b of ac tiv itie s , p as s e n g e r an d op e rators , an d as s p ac e s wh e re b u s op e rat ors , s t op
an d p as s e n g e r re q u ire me n ts c onve rg e . It is th e s ite f or in te rc h an g e b e t we e n larg e volu m e of b u s an d
p as s e n g e r t raf f ic . T h e main c h arac te ris tic of th e b u s te rmin u s is c onve rg e n c e f u n c t ion b e c au s e t h e y
s e r ve as im p or tan t n od e s of tran s f e r b e twe e n d if f e re n t mod e s . T h e s e n od e s are f oc u s of p as s e n g e r' s
ac t iv it y wh ic h is p ote n tial in g re d ie n t f or a v ib ran t c ity s p ac e .
AIM OF THE PROJECT –

To design a terminal building that could accommodate buses and passengers for the outlying villages as well as the city.
Further to save s pace commercial activities will be incorporate with bus terminal and Socially and environmentally active
complex.

OBJECTIVES -

▪ To Provide an architecture solution for integrating the terminal with commercial complex.

▪ To analyze the existing capacity and future demand estimation

▪ To analyze the operational parameters

▪ To provide fast and understanding flow of traffic

▪ To provide clear segregation of different type of traffic, no congestion at peak hours

▪ To provide optimum connections between all elements and spaces, te Clear connection of functions
METHODOLOGY–

Evolution of design
Selection of the Framing design
concept Building of
project. requirements.
concept and design.

Understanding the
Site selection and Final design and
need of the project
site analysis. solution.
on city level.

Understanding basic site analysis and


need of design, its comparative
scope and limitation. analysis.

Necessary data
collected and Case studies.
analysis.
SCOPE & LIMITATION –

Providing requirements for a maximum no of passengers per day The design would not change
the road pattern, Similarly the direction of cities.

BOOK CASE STUDIES –

❑ Vadodara bus terminus,Gujrat

❑ Geetamandir bus terminus ,ahmedabad,Gujrat

❑ Kempegowda bus terminal, bangaluru

LIVE CASE STUDIES –

❑ BARAMATI BUS STAND

You might also like