NC 04
NC 04
Table of Contents
1. Purpose............................................................................................................................... 4
2. Scope .................................................................................................................................. 4
3. Responsibilities ................................................................................................................... 4
4. Procedure: .......................................................................................................................... 4
4.1 Risk Assessment ......................................................................................................... 4
4.2 Evaluation of Risk ....................................................................................................... 5
4.3 Risk Re-Assessment: .................................................................................................. 5
4.4 Identification of Opportunities ..................................................................................... 5
5. Support Records ................................................................................................................. 6
6. Related Documents ............................................................................................................ 6
CONTROLLED Page 3 of 6
Laboratory of Hammad Engineering Company Pvt. Ltd.
1. Purpose
The purpose of this document is to ensure that the Laboratory of Hammad Engineering is
identified the risks and opportunities regarding the lab activities. Actions will need to be
planned to address these risks and opportunities.
2. Scope
This procedure is applicable to Laboratory of Hammad Engineering Company Pvt Ltd.
3. Responsibilities
As described in below procedure.
4. Procedure:
4.1 Risk Assessment
4.1.1 The Laboratory of Hammad Engineering Company Pvt Ltd considered the risks and
opportunities associated with the laboratory activities in order to
4.1.1.1 give assurance that the management system achieves its intended results.
4.1.1.2 enhance opportunities to achieve the purpose and objectives of the
laboratory.
4.1.1.3 prevent, or reduce, undesired impacts and potential failures in the laboratory
activities.
4.1.1.4 achieve improvement considered as opportunities
4.1.2 Risk Management is a systematic process for the assessment, control, communication
and review of risks may related to
4.1.2.1 Testing quality,
4.1.2.2 Lab environment & Infrastructure,
4.1.2.3 Staff’s health & safety etc.
4.1.3 Two Primary principles of the Quality Risk Management are:
4.1.3.1 The evaluation of the risk should be based on scientific knowledge and
ultimately link to the protection of customer and the level of efforts, formality
and documentation of the Lab Risk Management Process should be
commensurate with the level of risk.
4.1.3.2 The Risk assessment consists in the identification of risk analysis and
evaluation of the risks associated with exposure to those hazards. Risk
Assessment defines with three fundamental questions.
Risk identification address what might go wrong.
Risk Analysis, to analyze the risk involved.
Risk Evaluation, comparing the risk identification and analyze the risk
against the criteria. Any potential risk identified shall be assessed
qualitatively and quantitatively and based on probability. The risk
assessment shall be done in across functional committee to read up to a
common rating.
CONTROLLED Page 4 of 6
Laboratory of Hammad Engineering Company Pvt. Ltd.
CONTROLLED Page 5 of 6
Laboratory of Hammad Engineering Company Pvt. Ltd.
4.4.3 Laboratory of Hammad Engineering Company Pvt Ltd assess the Opportunities by the
following means:
4.4.3.1 To control the identified Risk.
4.4.3.2 In result of annual review
4.4.3.3 As result of output of management review meeting.
4.4.3.4 As results of Internal and external audit outputs
4.4.3.5 By evaluation of current resources and current capacity of lab
management system.
4.4.3.6 By implementation of ISO/IEC 17025:2017 Standard.
5. Support Records
Risk Assessment & Control Plan RIP-FR-001
Opportunities Management Plan RIP-FR-002
Quality Objectives & Monitoring Sheet LMS-OBJ-001
6. Related Documents
Lab System Procedure for Structural Requirements MGT-LSP-STR-02
Procedure for Corrective Actions MGT-LSP-CAR-11
CONTROLLED Page 6 of 6