0% found this document useful (0 votes)
110 views5 pages

Qoutation of Fire Protection

Uploaded by

ron111575
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views5 pages

Qoutation of Fire Protection

Uploaded by

ron111575
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

3-Jan-25

Ref No. FPS-0015


Project: FIRE PROTECTION SYSTEM
Location: LEGAZPI CITY

SCOPE OF WORKS
QUOTATION OF FIRE PROTECTION SYSTEM
MATERIAL COST LABOR COST 50%
ITEM DESCRIPTION QTY UNIT TOTAL AMOUNT
UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ELECTROMACHANICAL WORKS

A BLACK IRON PIPES


1 Seamles BI Pipe SCH.40 4"Ø 13 no. 9,875.00 128,375.00 4,937.50 64,187.50 192,562.50
2 Seamles BI Pipe SCH.40 3"Ø 15 no. 7,285.00 109,275.00 3,642.50 54,637.50 163,912.50
3 Seamles BI Pipe SCH.40 2.5"Ø 6 no. 5,235.00 31,410.00 2,617.50 15,705.00 47,115.00
4 Seamles BI Pipe SCH.40 2"Ø 6 no. 3,285.00 19,710.00 1,642.50 9,855.00 29,565.00
5 Seamles BI Pipe SCH.40 1 1/2"Ø 8 4 2,325.00 18,600.00 1,162.50 9,300.00 27,900.00
6 Seamles BI Pipe SCH.40 1"Ø 44 no. 1,780.00 78,320.00 890.00 39,160.00 117,480.00
7 Seamles BI Pipe SCH.40 3/4"Ø 18 no. 1,085.00 19,530.00 542.50 9,765.00 29,295.00

B BUTTWELDING FITTINGS & FLANGES


Elbow
1 90° Welded BI Elbow 4"Ø SCH 40 6 no. 520.00 3,120.00 260.00 1,560.00 4,680.00
2 90° Welded BI Elbow 3"Ø SCH 40 6 no. 485.00 2,910.00 242.50 1,455.00 4,365.00
3 90° Welded BI Elbow 2.5"Ø SCH 40 8 no. 380.00 3,040.00 190.00 1,520.00 4,560.00
4 90° Welded BI Elbow 2"Ø SCH 40 8 no. 275.00 2,200.00 137.50 1,100.00 3,300.00
Tee
1 Equal BI Tee 4"Ø SCH 40 6 no. 820.00 4,920.00 410.00 2,460.00 7,380.00
2 BI Tee 4" x 3"Ø SCH 40 9 no. 786.00 7,074.00 393.00 3,537.00 10,611.00
3 BI Tee 3" x 1"Ø SCH 40 6 no. 485.00 2,910.00 242.50 1,455.00 4,365.00
4 BI Tee 3" x 2.5"Ø SCH 40 28 no. 370.00 10,360.00 185.00 5,180.00 15,540.00
5 BI Tee 2.5" x 2"Ø SCH 40 17 no. 285.00 4,845.00 142.50 2,422.50 7,267.50
6 BI Tee 2" x 1"Ø SCH 40 18 no. 245.00 4,410.00 122.50 2,205.00 6,615.00
7 BI Threaded Tee 1"Ø 80 no. 98.00 7,840.00 49.00 3,920.00 11,760.00
Threaded Elbow
1 1" x 3/4"Ø BI Threaded Elbow Reducer 130 no. 98.00 12,740.00 49.00 6,370.00 19,110.00
2 3/4"Ø BI Threaded Elbow 32 no. 85.00 2,720.00 42.50 1,360.00 4,080.00
Reducer
1 Bell Reducer 3/4" x 1/2"Ø 128 no. 78.00 9,984.00 39.00 4,992.00 14,976.00
2 Welded Bell Reducer 4" x 3"Ø 8 no. 430.00 3,440.00 215.00 1,720.00 5,160.00
3 Welded Bell Reducer 3" x 2.5"Ø 8 no. 410.00 3,280.00 205.00 1,640.00 4,920.00
4 Welded Bell Reducer 2.5" x 2"Ø 8 no. 345.00 2,760.00 172.50 1,380.00 4,140.00
4 Welded Bell Reducer 2" x 1 1/2"Ø 6 no. 230.00 1,380.00 115.00 690.00 2,070.00
Flanges
Flanged 4" (OD 9") w/8 Bolt size 5/8" x 3" 18 set 780.00 14,040.00 390.00 7,020.00 21,060.00
Flanged 3" (OD 7.5") w/4 Bolt size 5/8" x 2.5" 8 set 715.00 5,720.00 357.50 2,860.00 8,580.00

C VALVES
Zone Valves
1 OS&Y Zone Control Valve 4"Ø Flanged Type 6 no. 21,410.00 128,460.00 10,705.00 64,230.00 192,690.00
2 Butterfly Isolation Valve 4"Ø Flanged Type 2 no. 25,278.00 50,556.00 12,639.00 25,278.00 75,834.00
3 Alarm Check Valve 4"Ø 1 no. 38,500.00 38,500.00 1,200.00 1,200.00 39,700.00
4 OS&Y Test Valve 3"Ø Flanged Type 1 no. 18,564.00 18,564.00 1,200.00 1,200.00 19,764.00
5 Ball Type Foot Valve 4"Ø 1 no. 12,850.00 12,850.00 1,200.00 1,200.00 14,050.00
6 Foot Valve Perforated screen strainer 1 1/2"Ø 1 no. 5,750.00 5,750.00 1,200.00 1,200.00 6,950.00
7 Brass Gate Valve 1/2"Ø 6 no. 760.00 4,560.00 1,200.00 7,200.00 11,760.00
8 Brass Gate Valve 1 1/2"Ø 2 no. 1,093.00 2,186.00 1,200.00 2,400.00 4,586.00
9 Brass Gate Valve 1"Ø 7 no. 975.00 6,825.00 1,200.00 8,400.00 15,225.00
10 Fire Hose Valve 1 1/2" 5 no. 4,700.00 23,500.00 1,200.00 6,000.00 29,500.00
11 Fire Department Connection 100mmx65mmx65mm 1 no. 14,685.00 14,685.00 1,200.00 1,200.00 15,885.00
Sub-Total 834,349.00 383,464.50 1,217,813.50
3-Jan-25
Ref No. FPS-0015
Project: FIRE PROTECTION SYSTEM
Location: LEGAZPI CITY

SCOPE OF WORKS
QUOTATION OF FIRE PROTECTION SYSTEM
MATERIAL COST LABOR COST 50%
ITEM DESCRIPTION QTY UNIT TOTAL AMOUNT
UNIT PRICE AMOUNT UNIT PRICE AMOUNT

D FIRE HOSE CABINET

1 Fire Hose Cabinet Recessed Type w/100ft Double Jacket 5 set 20,900.00 104,500.00 10,450.00 52,250.00 156,750.00

E ASSORTED ACCESSORIES
1 Sprinkler Head
Pendent Sprinkler Head 125 no. 521.50 65,187.50 260.75 32,593.75 97,781.25
Alarm Bell
1 Gong Alarm Bell 1 no. 1,180.00 1,180.00 590.00 590.00 1,770.00
Fire Extinguisher
1 Portable Fire Extinguisher 9.46L 5 no. 8,812.00 44,060.00 4,406.00 22,030.00 66,090.00

F ASSORTED CONSUMABLES MATERIALS


1 Nehon Welding Rod 6011 x 2.5 30 kg. 165.00 4,950.00 82.50 2,475.00 7,425.00
2 Nehon Welding Rod 6013 x 2.5 20 kg. 145.00 2,900.00 72.50 1,450.00 4,350.00
3 Tape Flon 3/4" 150 no. 18.00 2,700.00 9.00 1,350.00 4,050.00
4 Gasket Maker 60 no. 45.00 2,700.00 22.50 1,350.00 4,050.00
5 International Red 9 gal. 680.00 6,120.00 340.00 3,060.00 9,180.00
6 Paint Thinner 4 gal. 415.00 1,660.00 207.50 830.00 2,490.00
7 Paint Brush 2" 6 no. 65.00 390.00 32.50 195.00 585.00
8 Baby Roller 4 no. 45.00 180.00 22.50 90.00 270.00
9 Cutting Disc 4" 50 no. 25.00 1,250.00 12.50 625.00 1,875.00
10 Cutoff Wheel 14" 4 no. 865.00 3,460.00 432.50 1,730.00 5,190.00
11 GI Full Threaded Rod 12mm 60 no. 312.00 18,720.00 156.00 9,360.00 28,080.00
12 Flat Bar 1" x 3/16" 12 no. 365.00 4,380.00 182.50 2,190.00 6,570.00
13 Angle Bar 2" x 3/16" 5 no. 785.00 3,925.00 392.50 1,962.50 5,887.50
14 Nut 1/2" 240 no. 2.00 480.00 1.00 240.00 720.00
15 Flat Washer 1/2" 130 no. 1.50 195.00 0.75 97.50 292.50
16 Dyna Bolt 1/2"x 3" 80 no. 22.00 1,760.00 11.00 880.00 2,640.00
17 Grinding Stone 4" 8 no. 75.00 600.00 37.50 300.00 900.00
18 Pressure guage 100psi 4 no. 235.00 940.00 117.50 470.00 1,410.00
19 Assorted Pipe Fittings 1/4"Ø 1 lot 2,500.00 2,500.00 1,250.00 1,250.00 3,750.00
20 Dark Welding Glass #10 10 no. 15.00 150.00 7.50 75.00 225.00
21 Clear Welding Glass 6 no. 10.00 60.00 5.00 30.00 90.00

G FIRE PUMP
Fire pump set consist of end suction centrifugal pump
driven by electric motor and vertical jockey pump. Pumps
are assembled with discharge line accessories as well as
control panel.
Fire pump:
power electric; 22kw, 30Hp (Q: 250gpm, H:100psi) 3phase,
1 lot 398,000.00 398,000.00 199,000.00 199,000.00 597,000.00
3500rpm, inlet/outlet 65x50mm, voltage 220v60Hz,
Jockey pump
power: 3.0Hp, flow 20gpm, HMT: 160psi, Inlit/outlet
25x25mm, speed 2900rpm
H CONVENTIONAL SYSTEM (FDAS)
1 Manual Pull Station 5 no. 685.00 3,425.00 342.50 1,712.50 5,137.50
2 Conventional Smoke Detector 2 wire 20 no. 325.00 6,500.00 162.50 3,250.00 9,750.00
3 THHN Electrical Wire 2.0 3 box 3,400.00 10,200.00 1,700.00 5,100.00 15,300.00
4 Conventional Heat Detector 6 no. 425.00 2,550.00 212.50 1,275.00 3,825.00
5 Conventional Fire Alarm Control Panel (CFACP) 1 no. 11,365.00 11,365.00 5,682.50 5,682.50 17,047.50

Sub-Total 706,987.50 353,493.75 1,060,481.25


3-Jan-25
Ref No. FPS-0015
Project: FIRE PROTECTION SYSTEM
Location: LEGAZPI CITY

SCOPE OF WORKS
QUOTATION OF FIRE PROTECTION SYSTEM
MATERIAL COST LABOR COST 50%
ITEM DESCRIPTION QTY UNIT TOTAL AMOUNT
UNIT PRICE AMOUNT UNIT PRICE AMOUNT

I FLOOR MOUNTED WATER TANK


Plain Sheet
1 Stainless Steel Plain Sheet (#304) 4''x8''x2.00mm 18 no. 10,875.00 195,750.00 5,437.50 97,875.00 293,625.00
Plat Bar 0.00 0.00 0.00 0.00
1 Stainless Steel Flat Bar 2" x 1/4" 10 no. 2,780.00 27,800.00 1,390.00 13,900.00 41,700.00
Welding Rod 0.00 0.00 0.00 0.00
1 Stainless Steel Welding Rod (Special) 8 kg. 760.00 6,080.00 380.00 3,040.00 9,120.00
Tig Weld Filler Rod 304 6 kg. 685.00 4,110.00 342.50 2,055.00 6,165.00
Angle Bar 0.00 0.00 0.00 0.00
1 Stainless Steel Angle Bar 2" x 1/4" 7 no. 5,960.00 41,720.00 2,980.00 20,860.00 62,580.00
2 Stainless Steel Angle Bar 1 1/2" x 3/16" 7 no. 3,785.00 26,495.00 1,892.50 13,247.50 39,742.50
Channel Bar 0.00 0.00 0.00 0.00
1 C-Channel Bar 2" x 4" x 4.5mm thick 2 no. 4,876.00 9,752.00 2,438.00 4,876.00 14,628.00
Bolts 0.00 0.00 0.00 0.00
Dyna Bolts 1/2" x 3" 20 no. 22.00 440.00 11.00 220.00 660.00
Round Bar 0.00 0.00 0.00 0.00
16mm Rsb 4 no. 365.00 1,460.00 182.50 730.00 2,190.00
0.00 0.00 0.00 0.00
J CONCRETE PLATFORM FOR WATERTANK 0.00 0.00 0.00 0.00
Concrete Platform 0.00 0.00 0.00 0.00
1 Portland Cement 15 bags 260.00 3,900.00 130.00 1,950.00 5,850.00
2 Sand 1.5 cu.m 700.00 1,050.00 350.00 525.00 1,575.00
3 Gravel 1.5 cu.m 1,100.00 1,650.00 550.00 825.00 2,475.00
Steel grills for pump room 0.00 0.00 0.00 0.00
1 Steel Matting 4.5mm thick 10 no. 780.00 7,800.00 390.00 3,900.00 11,700.00
2 Anglr Bar 2" x 1/4" 12 no. 980.00 11,760.00 490.00 5,880.00 17,640.00
3 Welding Rod 5 kg. 165.00 825.00 82.50 412.50 1,237.50
4 G.I. Pipe 2" SCH 40 3 no. 1,100.00 3,300.00 550.00 1,650.00 4,950.00
3 C-purlins 2" x 3" 4 no. 720.00 2,880.00 360.00 1,440.00 4,320.00
4 Corrugated Roofing Sheet 6 no. 720.00 4,320.00 360.00 2,160.00 6,480.00
5 Epoxy Primer Paint 1 gal. 820.00 820.00 410.00 410.00 1,230.00
6 Laqier Thinner 1 gal. 450.00 450.00 225.00 225.00 675.00
7 Paint Brush 2 no. 65.00 130.00 32.50 65.00 195.00
8 Baby Roller Brush 2 no. 65.00 130.00 32.50 65.00 195.00
6 Tek Screw 3" 6 no. 3.00 18.00 1.50 9.00 27.00

Sub-Total 352,640.00 176,320.00 528,960.00

Materials Cost 1,893,976.50


Labor Cost 913,278.25
Grand Total 2,807,254.75
12% VAT 336,870.57

TOTAL CONTRACT AMOUNT 3,144,125.32


CODE NO.: PRJ/FPS -18-12/22/24
Date: 1/3/2025

Att'n: Madam/ Sir

Subject: Quotation for the Fire Protection System

Dear Madam/sir,
As per your request, we are pleased to submit our proposal for the above
mentioned subject as per attached materials list including labor cost.

Engineering services,transportation,labor supply and installations of proposal,fire protection system


and Fire Detection Alarm System (FDAS)

1. Installations of Riser Pipe and Main line


2. Installations of Sub-mainline
3. Installations of Zone Control Valves
4. Installations of Support, Hangers and Sprinklers Heads
5. Installations of Fire Fighting System and Fire pump
6. Installations and Fabricate of SS Floor Mounted Water Tank

TOTAL CONTRACT……… 3,144,125

MODE OF PAYMENT
1 30% down payment upon signed the approved quotation and contract.
2 30% upon completed installations of the riser pipe, mainline, and sub-mainline
3 20% upon completed installation the sprinklers heads and ready to install the fire pump sytem
4 10% upon completed the scope of works.
5 10% upon completed the duration piriod of retension
LEAD TIME OF ACCOMPLISHMENT
1 Mobilization upon received the down payment or go signal from the owner
2 scope of works will be completed with in ninety (90) working days except when the site
are workable and ready .
WARRANTY
1 The fire pump system are guaranteed for twelve (12) months
except damaged was due to force major events or done by any third party.
2 The plumbing/piping system are guaranteed for a period of twelve (12) months
except damaged was due to force major events or done by any third party.
3 The (FDAS) system are guaranteed for a period of twelve(12) months
upon fully operational except damaged was due to force major events or done by any third party.
Note…
a.. Our Quotation / price are valid only within 30 days from the date of submission
b.. The owner should provide temporary electric power & water supply on the site
c. Those not mentioned on the scope of work and contract will be automatically additional cost.

Thank you for giving us an opportunity to quote and hope it will meet your requirements.

Best Regards,
Mr. Ronnie M. Lomerio Prepared By: